Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
1958 Survey of Lots 1,2,3,4,& 5 Hardee's Addition (Box 22 #16)
1975 Louisiana Ave Municipal Properties (Box 25 #101)
1982 - Sketch of Lot 1 Section 6
1991 Right of Way Survey (Box 22 #12)
1992 Field Survey (Box 24 #97)
1992 Preliminary Engineering Study and Design Recommendations
1997 Right of Way Survey (Box 24 #82)
1997 Sebastian Utilities Connection (Box 23 #46)
2002 Right of Way Acquisition Map (CR 512 to Main) (Box 23 #57)
2003 Aerial Basin Map (Box 23 #72)
2003 Roadway Expansion & Drainage Improvements (Box 23 #73 and Box 24 #83)
2004 - Revision of Parcels
2004 - Right of way Control survey
2004 August Roadway & Drainage Improvements Page 6 (Box 22 #20)
2004 Roadway & Drainage Improvements (Box 23 #37)
2005 Roadway & Drainage Improvements April unsigned (Box 22 #19)
2005 Roadway & Drainage Improvements March (Box 22 #18)
2005 Roadway and Drainage Plans April signed
2005 Roadway and Drainage Plans April signed and sealed (Box 24 #83.5)
S. Wimbrow & Louisiana Ave - Extension 512 Connector Roads (Box 26 #127)