HomeMy WebLinkAbout2002 Final Geotechnical Evaluation Report:ILA NODARSE. P.E.
President
MICHAEL PREIM, P.L
' miarPKePresident
tNIEL DUNHAM, P.E.
FOUAD MASRI, P.E.
SYLVIAJAMMAL
,NIEL STANFILt, P.E.
DAVID TWEDELL
SANDRA WINKLER
— Vice Presidents
so
JR1WODARSE
C ASSOCI N T E S, INC.
Geotechnical, Environmental Geotechnics & Materials Engineering
March 29, 2002
N&A Project No. P0l-r-
r Mark C. Jansen. P.E.
® The LPA Group, Inc.
q 12000 Research Parkway, Suite 152
d Orlando. Florida 33826-3287
RF: Final Geotechnical Evaluation Report
Sebastian Municipal Airport
Runway 09-27 and Parallel Taxiway Improvements
Indian River County, Florida
Dear Mr. Jansen:
Nodarse & Associates, Inc. is pleased to submit this final geotechnical evaluation report for
the referenced project. The work was performed in accordance with our project scope and
fee estimate for geotechnical services dated September 4, 2001 followed by your notice to
proceed dated December 13, 2001.
Project Description
The project consists of evaluating subsurface soil conditions and the asphaltic pavement
structure of the nmway 09-27 and the parallel taxiway for future improvements. The project
site is located at the"Sebastian Municipal Airport, Indian River County, Florida. Figure 1
in the Appendix, illustrates the project site. All figures mentioned in this report are in the
Appendix.
The following services were performed in general accordance with the proposed scope of
work:
• Review of USGS and USDA maps of Indian River County, Florida.
• Site visit and field reconnaissance to observe existing site conditions.
• Layout of test locations in the field as provided by the LPA Group, Inc.
• Mobilize a truck mounted drill rig.
• Perform field testing consistine of:
— 9 Standard Penetration Test (SPT) borings to depths of 10 feetbelow existing
arade.
3 California Bearing Patio (CBR) tests.
— 4 Core samples of the asphaltic concrete pavement.
• Visually classify the recovered soil samples.
• Perform laboratory testing of selective soil samples.
• Prepare this final geotechnical evaluation report in accordance with the FAA
re2uiations.
2442 ME-30CE0tRE BOULEVARD • WESI PALM BEACH, ILORIDA 33401 • (S61) 6160870 • fAX (561) 616-0871 • e-mail: nadarse@nodane.tom
Jun 11 03 10:39a The LPA Group - Orlando
The LPA Group. Inc.
N&A Project No. P01 -G-123
Page 2
Subsoil Conditions
(407)306-0460
Sir
ALWol)ARSE
6 N S 5 0 C I R T F t. t o C.
The USDA/ SCS Soil Survey map of Indian River County, Florida, Figure 2, shows that the project
area consists primarily of Tmmokalee Fine Sand (4) and Myakka Fine Sand (5). Both soils are nearly
level and poorly drained. Immokalee fine sand areas consist of light gray fine sand to a depth of
approximately 3 feet, underlain by light gray or brown tine sand. Myakka Fine Sand areas have
typically a layer of gray to light gray fine sand to about 2 feet in depth, underlain by a dark to reddish
brown fine sand stratum. In both soils. the permeability is rapid and the groundwater depth ranges
from 1 to 3 feet most of the year.
Subsurface Conditious
The soils encountered in the borings are in general t.greement with the USDA soil description. The
soils underlaying the asphalt pavement consisted of yellowish gray fine sand withsilt and traces iof
rock/shell fragments subbase material (stratum #1) approximately 10 inches thick, followed by a till
laver of brown to gray fine sand with traces of roots (stratum # 2), to a depth of approximately 2.5
feet below existing ground surface. Stratum #2 was underlain by a layer of brown to dark brown silty
fine sand with traces of organic and fibrous materials (stratum 43) to an average depth of 8 feet,
followed by a greenish gray slightly clayey to clayey fine sand.layer (stratum # 4 ) to the end of the
bore hole at 10 feet.
Groundwater depths recorded at the time of drilling averaged 3.5 feet below existing ground surface.
Groundwater levels are subjected to fluctuate during the year as they vary from season to season,
year to year and are generally more adverse following periods of prolonged rainfall. Based on our
observations we are of the opinion that the average seasonal high groundwater level will be
approximately 1 foot higher than the observed groundwater level. Boring logs in Figure 3, present
the soil stratigraphy and the groundwater depths.
Laboratory Testing Program
Soil samples recovered from the field were visually classified in general accordance with the Unified
Soil Classification System (USCS). The following laboratory tests were performed on select
samples:
11 Moisture content
• 2 Organic content
• 7 Grain size analysis
- 2 Passing No.200 sieve
Laboratory test results are presented in Table 1 and in Figure 3. Figures 4 and 5 illustrate the
gradation curves for the grain size analyses.
p.5
Jun 11 03 10:41a
The LPA Group - Orlando
The LPA Group Inc.
N&A Project No. POI -G-123
Pagc 3
Table 1: Laboratory Test Results
(4071306-0460
six
ODARSE
0 A 5 5 0 C 5 A T E S, t N C.
Stratum
No.
Soil
Description
Boring
No.
Sample
Depth
(ft
Moisture Content
0/0)
Passing No. 200
Sieve
Organic Content
Fill
T-3
0.5
15
3
T-7
0.5
ie
2
T-8
0.5
(8
2
3
SP -SM, SM
R-3
3.0
36
14
R-5
3.5
24
6
R-7
2.5
25
-
6
4
SP -SC
R-5
8.0
i9
19
R-3
8.0
21
12
T-2
4.5
23
14
T-2
9.0
22
ii
T-7
9.0
i8
10
P.6
'Jun 1'1 03 10:42a The LPA Group - Orlando
The LPA Group Inc.
N&A Project No.. PO 1.-G-.123
Page 4
(407)306-0460
rDARSE
a a S S O C L Ares, I n c .
.Existing Pavement
Core samples of the existing runway asphaltic concrete pavement were taken at locations C-1, R-2,
R-4 and R-5. Core locations are shown in Figure I Visual examination of the core samples
indicates that the asphaltic concrete was placed in one lift and the asphalt is a 3/8- inch -sand mix
type design. The base course material under the runway was found to be approximately 11 inches
in thickness and consisted of a yellowish sand with silt and traces of rock/shell fragments.
Table 2 presents the asphalt and base material thicknesses at each core location. Asphalt and base
material thicknesses are also shown on the boring logs in Figure 3.
Table 2: Cores Description
Core No. Core Location asphalt Thickness Base Thickness
(inches) (inches)
1 C-1 1 0 Not Recorded
2 R-2 1.5 10.0
R-4 l.s 11.0
1,0 11.0
4 R-5
Note: No boring was performed at the core No. 1 location (west side of the runway) thus the base material was not
recorded.
California Bearing Ratio (CBR) Values
Three soil samples were obtained for CBR evaluation along the taxiway section. The soil consisted
of gray fine sand with trace of roots. The samples -were tested in accordance with the ASTM D 1883
titled "Standard Test Method for CBR (California Bearing Ratio) of laboratory compacted soils.
Approximate CBR sample locations and corrected CBR values are included in Table 3. Gradation
curves of CBR's samples are presented in Figure 5.
Table 3: CBR Test Results
CBR No.
Approximate
Modified Proctor
Optimum Moisture
Corrected CBR
CBR Sample
Maximum Dry Density
Content
Value
Location
eft
%)
56 blows/lavers
CBR- l
T-7
105
13
21
CBR -2
T -2/T-3
143
9
15
CBR -3
T-8
100
17
13
Note: To convert CBR to LBR, divide CBR by 0.8, FAA Advisory Circular No. 150/5320-6D.
p.7
,Jun I.L u -J 1 u: -+-da i ne t_rH uroup - ur t ancxo t 4u / i :pub-u4bu
The LPA Group Inc.
N&A Project No. POI-G-1?3
Pages 190DARSE
6" R S S O C I R T E S, INC.
Picase note that the CBR values, l 3, 15 and.: 1 are for the gray tine sand material (base material)
sampled from the north side of the taxiway as showrt in Figure 3. The boring advanced trough the
runway pavement {boreholes R-2, R-3, R-4, R-5 and R-7} encountered ayellowish-gray f ne sand
mixed with silt and trace of rock/shell fragments, approximately 10 inches thick, as a base material.
The soils encountered below both the taxiway and the runway pavements are similar to the CBR soil
samples, therefore the same CBR values may be used for the soils under the existing runway
pavement. The CBR value for the proposed runway 09-27 and parallel taxiway improvements will
be a function of the material or blend of materials used for construction of the base. Samples of the
baoo matcrial will have to be tcatcd duiiing cuusuuctiutt to determine the CBR value.
Drainage
Referring to an earlier job at Sebastian airport (N&A project No. POI -G-073) two permeability tests
were performed. Based on these tests you can use a coefficient ofpenneability: "k" of 1.35 ft/day
for your drainage design purposes. We recommend the designer to apply a factor of safety.
Discussion and Recommendations
General Site Preparation
• Clearing and grubbing of the project site should be conducted within the confines of the
proposed paved area and extended a minimum of.15 feet beyond the perimeter. All materials
resulting from clearing should be disposed of or may be used as a non engineered till
material. The existing pavement structure should be removed and the asphalt may be
stockpiled for use as a fill and/or CBR'stabilizer.
•
Onceclearing and grubbing is completed, the exposed ground surface should be proof -rolled.
.. Proof -rolling .should consist of at least six overlapping passes of a 20 -ton vibratory roller in
both the x and y directions or cquivalcnt bcforc placing LIOW M1. Suft ur weak areas detected
during proof -rolling should be re -compacted or removed and replaced with a suitable fill.
• Soils classified as GW, GP, SW and SP, in general accordance with the Unified Soil
Classification System (USCS) maybe used for engineered fill. Fill materials should be free
- of organic or other dcicterious materials.
Subarade, Subbase and Base Pre aration for a Pavement Structure
• Placement and compaction of fill, which will be below a pavement stricture but is not the
base or subbase should complywith FAA Standard item P-152 specifications forcompactive
effort. According to the FAA Advisory Circular No. 150/5320-6D and for wheel loads less
than 60, 000 pounds (27,400 kg), we recommend the specified relative density for the fill as
a function of depth below subgrade (utilizing ASTM 1557) to be as follow in Table 4:
P.8
Jun 11 03 10:44a The LPA Group - Orlando
The LPA Group Inc.
N&A Project No. P01 -G-123
Page 6
(4071306-0460
Itfo D A R SE
C A SSOCI A T E S, INC.
Table 4: Fill Relative Density vs. Depth Below Subgrade
Depth below finished Subgrade
Percentage of Modifeed Proctor
(inches)(ASTM
D 1557)
12
100
12 to 30
95
> 30
90
FAA Standard Item P-154 specifies a subbase as an integral component of flexible pavement
structures except for those cases where subgradcs with CBR values greater than 20 exist. To
comply with FAA specifications, the subbase course of the runway and the taxiway may
consist of local (in-situ) sand stabilized with limerock or other approved materials and/or
methods to achieve a minimum CBR value of 20 at a compactive effort of 100 percent
modified Proctor maximum dry density.
FAA Standard Item P-211 specifies a base course for flexible pavement structures. To
comply with FAA specifications, the base course for the proposed paved area may consist
of imported limerock with a minimum CBR value of SO at a compactive effort of 100 percent
modified Proctor maximum dry density.
FAA Standard Item P-152 specifies that the compactive effort for base and subbase fills must
be tested in-situ by a qualified engineering technician supervised by a geotechnical engineer
registered in the State of Florida. In addition, samples of material used for base and subbase
shall be tested for CBR value and comply with other FAA quality requirements such as soil
type, gradation and carbonates. The frequency for in-situ density and CBR testing is included
in the referenced specifications.
Pulverized Asphalt / Reclaimed Sand Base
The existing soils will have to be stabilized with limerock or other approved materials to achieve the
minimum CBR. At this site asphaltic concrete pavement that is reclaimed, pulverized and blended
with the existing local sand soil may produce a suitable stabilized material for subbase. The size and
gradation of the pulverized reclaimed asphalt and proportion of the processed material to be blended
with the local sands will have to be determined at the time of construction. Alternatively, reclaimed
pulverized asphalt may be utilized as a non engineered fill for landscaping purposes.
p- 9
Jun 11 03 10:45a The LPA Group - Orlando (4071306-0460
The LPA Group [nc,
N&A Project No. POI -G-123
Page AAT
L A 5 5 0 C 1 0 T F 5, I N C
Closure
Variations in subsurface conditions may occur between borings, and the nature and extent of such
variations are usually not evident until construction is underway. Should there be any differing
subsoil conditions from the ones addressed in this report, Nodarse 3: Associates, Inc. should be
notified immediately so that an authorized representative may assess the actual conditions and
modify the recommendations presented in this report.
We appreciate the opportunity to assist you with this project as your geotechnical consultant. Please
— call us, if you have any questions regarding the contents of this report.
Julcerely Yours.
NODARSE & ASSOCIATES, INC.
Katine Chatt, E.I.
Project Engineer
W:\Geomwhnwal\2001-Nrojects-Geo\p01 gl23tpol g 123 fin.iimpon.wpd
Kumar A. Alla P.E.
Senior Project Engineer
Florida Registration No.52345
p.10
-Jun TA 03 10:46a The LPR Group - Orlando (4071306-0460
APPENDIX
FIGURE 1: USGS QUADRANGLE MAP
FIGURE ,20: USDA SOIL SURVEY MAP
FIGURE 3: LOCATION PLAN & BORING PROFILES
FIGURE 4: GRADATION CURVES
FIGURE S: GRADATION CURVES (CBR)
P
1
I
ntrtrttivct: U.S-G.S. "FELLSMERE, FLORIDA" QUADRANGLE MAP
REFERENCE: U.S.G.S. "SEBASTIAN, FLORIDA" QUADRANGLE MAP
.SECTIONS FLEMING GRANT ISSUED: 1949
TOWNSHIP: 30 SOUTH PHOTOP,EVISED 1970
RANGE: 38 EAST
VICINITY MAP
SEBASTIAN MUNICIPAL AIRPORT
RUNWAY 09-27 & PARALLEL TAXIWAY
INDIAN RIVER COUNTY; FLORIDA
DRA-M: TA
KC
SCAIE, A WI �� �
iUU
2-9-02 I' POI -G-123 j FIGURE: .i
REFERENCE: U.S.D.A. - S.C.S. INDIAN RIVER COUNTY, FLORIDA SOIL SURVEY
SFC:TION: FI FMING GRANT ISSUED: JANUARY 1987
TOWNSHIP: 30 SOUTH
RANGE: 38 EAST
SOILS LEGEND
C IMMOKALEE FINE SAND
5 MYAKKA FINE SAND
22 URBAN LAND
DRAWN: T.4 Ili
CHKEI� Sir
SCAL.._.KC "'='4000'11 P R. G S 0. s � n arc s.�-
I ilk■
Classification
t1I
_ _ _ _Milo lm►
�iinummm
C
3 T-2@9.0-
3
I ilk■
Classification
t1I
_ _ _ _Milo lm►
�iinummm
SP -SC, SC
3 T-2@9.0-
SP -SM
1.0
SP -SM
Iii■
nln®I[IIli�1l�lf®1
1
111■i��111■®If
lllll��\�iNII�■�illl
I�iI��II
I�11�■�iIII■■
N■�11tt111�1�\�lilll■■�RIIII■�
iln■
llllilnlmf[IllmmulllI■�
IMEN
HAN■■X11111■®IIIIIIiiT1\�f[iII®�n1111■■�
i�i1�■�Illlil■■�IH1n■®illlll■►���f
/III®�IIn11■■�
I I�t1I1■�IIIiN■�®IIII■�IIIIIN��1■11111®�Iin11■■�
II�iif■■�Iil
■■��111■ IIIII■n`�l�lllll®�IIn11■■�
Il�ill■■�Ift
#Ill■■�IIii11■■�I■111■�IIIII■�\�■IIIIi��ilnl
n■��I11■ 11111■�l\1NI1111®�IIN11■■�
■■�.
l�ll�■�iII®1■■�Nn11■�11111■�11�11111®®Ilnl
now
1�®■mill®���111■�IIIII■�1111Dn
IiNII■■�
I_Ifn��lll®�■1■�1111■■■llmm®1�1fiN1®�illNl
INI®■VIII
AMINE
iiill
Hil■■�
lnlf■■■■iIM���111�®nnm■t�ltiim��lmn■1�■■
Ini®�1118i�■�Nlln��llllln�t�►11n®�IIIiii■■�
lnl■n�IIIN/■■�I11111■�Inlll■`,'111
(ln
I■IiI��I11��111111■��Illtl�■■�i1111��®1111■�
IMIIII■�
Hill
GRADATION CURVES
No. I Sample Location
Classification
1 R-3@8-0'
SP -SM
2 T-20,4.5'
SP -SC, SC
3 T-2@9.0-
SP -SM
4 T-79.4'
SP -SM
Project: Sebstian Airport Runway @9-27 & Taxiway
Pakn Beach County
Date: 7/2/2002 N&A Project No. P01 -G-123
LL PL PI Figure No. 4
- - ODARSE
G A S S 0 C L A T E S, Z N C.
Jun 11 03 10:53a The LPA Group - Orlando 14071306-0460
•
■■�
■� ■■■ION■■
�■■■
■
■■
C1---�■�i--
�.®gym■-_
�_�E_E-_
-- ----
----
-
0111111
--
�
�E�-:e■■��i
MEMO.__-■■E�-X089111
r
i
®EE���
NE
��■■■■■■oil�■�
■■
■■■■.
No
C0�
CMIM•CG
_ Q®p-C
-----
-Cp
C
$
MENEM
:�E■_�_�_._--...■ERUME�
Jun I'l 03 10:55a The LPA Group - Orlando (407)306-0460 p.116
Jun 11 03 10:56a
The Ee, Group - Orlando
(4071306-0460
- y
}o/<
z
T§
<s
.
\\\
/
}
C /a
Z2
-
\
/I±e
c
\
�
\
\
)
/
7244
\
»»
\z
(
§
»
N
\
&
-
#2
@
!
/
\
\
/
\
)
\
\
)
\
/
\
j
\
\
\
\
)
/
\
\
§
»
N
\
#2
@
!
/
(
(
\)
\
\
\
(
\
!)
_
f
}
zw
}
}
}
�}\
\
\
2a0
so
d
\
/
}/
j
Mm
k
!
I(!m
Zo
wo
a
;
/
/
d
§E:
0
(