Loading...
HomeMy WebLinkAbout2001 04 25 LPA's Scope, Budget, Preliminary SketchesTHE LPA GROUP INCORPORATED Transportation Consultants 10008 North Dale Mabry Highway, Suite 202 Tampa, Florida 33618 (813( 960-8366 FAX (813) 960-8774 4/25/01 Mr. Jason Milewski Airport Manager City of Sebastian Sebastian, FL 32958 Re: Access Roads and Waterlines Dear Mr. Milewski: Attached for your review is a revised scope and budget, preliminary sketches showing project location, and a revised cost estimate for the access roads and water lines. Please review and call me with any questions. The cost estimate provided is divided into specific items for a detailed break down of estimated construction costs. If the City elects, and has the manpower availability, City forces could preform certain functions in an effort to save money. Listed below are suggested tasks that may be performed by the City, and associated outside construction costs: Clearing & Grubbing $6,500.00 Regular Excavation $32,175.00 Stabilized Subgrade $21,965.00 Base Course $58,400.00 Concrete Pipe $9,860.00 Sod $35,000.00 Total $163,900.00 Please note; this savings is not absolute. There is a cost associated with equipment and materials. A large savings may be possible if the city under took the task of the water line construction ($265,500). Please call me to discuss further. erel D ug Hambrecht, P.E. Project Manager ATLANTA GA • BATON ROUGE, LA • CHARLESTON, SC • CHARLOTTE. NC • CHICAGO, IL • COWMBIA SC • GREENSBORO, NC • KNOXVILLE. TN MOBILE, AL • MYRTLE BEACH, SC - ORLANDO. FL • RALEIGH, NC • RICHMOND, VA • SARASOTA FL • TALLAHASSEE, FL • TAMPA FL • WEST PALM BEACH, FL