Loading...
HomeMy WebLinkAboutRoad ConstructionGENERAL DEVELOPMENT CORPORATION City of Sebastian City Hall P. 0. Box 127 Sebastian, Florida 32958 Att: Mr. A. T. Jordan City Clerk Gentlemen: July 3, 1969 Re: 1969 Road Construction in Sebastian Highlands General Development Corporation plans to start construction of streets and drainage facilities portions of the plats of Sebastian Highlands Units 2, 3, 4, 6, 8 and 14 mmediately. For accounting purposes we have divided the work areas into Work Releases D02, D03, D04, D05 and D06. The following plans are transmitted herewith for your use. If you need additional prints please advise and we would be happy to supply them. 1. Paving and Drainage - DEVELOPMENT PLAN - Sebastian Highlands Units 2, 3 and 4, (being also Work Releases D02, D04 and D05) consisting of seven sheets. 2. DEVELOPMENT PLAN - for a portion of Sebastian Highlands Unit 14, (being also Work Release D03) consisting of seven sheets. The plans for portions of Sebastian Highlands Units 6 and 8 (being also Work Release D06) are in the final design stages and will be sent to you as soon as they are available. All testing will be performed by Pittsburgh Testing Laboratory. Mr. John Harllee, P.E. is the Engineer in charge for Pittsburgh. I am, by copy of this letter, requesting that Mr. Harllee provide your City Engineer, Mr. Lloyd with copies of all tests made on the road construction. Mr. Vaughn Arthur, 1120 S. E. Port Malabar Blvd., Palm Bay, phone 723-5020, will be the G.D.C. Construction Superintendent on this work. Mr. L. N. Clements, 1120 S. E. Port Malabar Blvd., Palm Bay, phone 723-2911, will be the G.D.C. representative in charge of Quality Control. I am, by copy of this letter, requesting that Mr. Clements contact Mr. Jordan to determine necessary notifi- cation procedures for the various phases of construction. It is anticipated that work will progress in the following sequence: 1. Work Release D05 2. D04 3. D02 4. D06 5. D03 EXECUTIVE OFFICES • 1111 SOUTH BAYSHORE DRIVE • MIAMI, FLORIDA 33131 0 TELEPHONE 350-1111 City of Sebastian July 3, 1969 The clearing, rough grading, pipe installation and ditch construction phases of the work will be performed under contract by Roy F. Roberts and Sons, P. 0. Box 1716, Titusville, Florida. This work will begin as soon as the Contractor can mobilize his equipment. G.D.C. forces will do the Soil Cement work. Paving and grassing will be done by contract. If there is any further information you require on this project, please advise. Very truly yours, GENERAL DEVELOPMENT ORPORATION James E. Clark, P.E. Ass't. Manager Engineering JEC:eh Enc. cc: F. Lloyd, City Engr. (w/copy of plans) J. Harllee, Pittsburgh (w/copy of plans) 0. R. McJunkins, U.P., G.D.C. R. A. Bluem C. C. Crump L. N. Landry L. N. Clements GENERAL DEVELOPMENT CORPORATION July 23, 1969 City of Sebastian City Hall Post Office Box 127 Sebastian, Florida 32958 Attn: Mr. A. T. Jordan Re: 1969 Road Construction in Sebastian Highlands Gentlemen: Transmitted herewith please find the DEVELOPMENT PLAN for portions of Sebastian Highlands Units 6 and 8 (being also Work. Release D06), as refered to in my letter of July 3, 1969. Very truly yours, GENERAL DEVELOPMENT CCOORPORATION ames E. Clark, P.E. Assistant Manager - Engineering JEC:jc cc: F. Lloyd, City Engineer w/plans J. Harllee, Pittsburgh w/plans 0. R. McJunkins R. A. Bluem C. C. Crump L. N. Landry L. N. Clements 1111 SOUTH SAYSHORE DRIVE * MIAMI, FLORIDA 31131 • TELEPHONE 350-1111