October 11, 1977
General Development Corporation
2995 Southwest U. S. 1
Aero Beach, Florida 52960
.Attention: Mr. Iden Miller, P. F.
RE: Sebastian Highlands Street Inspection
Units 5, 6, and 8
Gentlemen:
ROBERT F. LLOYD
REGISTERED CIVIL ENGINEER 353B
REGISTERED LAND SURVEYOR 944
TELEPHONE JO Z-4112
1 8 3 5 Z O T H STREET
VERO BEACH, FLORIDA
3296❑
Enclosed please find comments that were made dewing our review of
Units 5, 6, and S.
We initially inspected Units 6 and 8 and it was agreed by all that these
units were not in acceptable condition. Your construction personnel
proposed to come back in to do the necessary construction to bring
these Units up to acceptable condition.
Unit 5 is not in acceptable condition. Until we receive a dedicated easement
to the river and the off fall canal is constructed, I cannot recommend that
these units be accepted.
Yours very, truly,
LLOYD AND ASSOCIATES
a
Robert F. Lloyd, P. F.
Encl.
W
0
SEBASTIAN HIGHLANDS STREET INSPECTION
UNITS 5, 6, and 8
This is an inspection of Sebastian Highlands Units No. 6 and 8. Inspection
was made on Tuesday, October 4, 1977.
Excess asphalt laying on the shoulder along Clearmont needs to be picked
up and disposed of.
Strait Avenue is satisfactory to the Engineer and to the Mayor.
As a general statement, the asphalt that had to be removed should be picked
up along the various streets.
Where new asphalt has been laid at Clearmont, the Engineer requests that
the shoulder be pulled up a little bit to prevent any drop off between the
asphalt and the shoulder.
Clearmont is acceptable through Units 6 and 8, except for the items noted
above. Mr. Flip Lloyd requests that the Report be followed about certifying
to positive drainage.
Shoulders on the east and west of Laconia where it ties into Fellsmere Road
need to be built up and maintained as requested in Flip Lloyds original Report,
on page 32.
No headwalls on either one of the culverts on Lansdowne, south of Vine
Avenue on Lansdowne; back slopes on Noah off Lansdowne need to be mowed.
Fore slopes have been mowed, but back slopes have not. This also holds
true on Lansdowne.
On Lansdowne, just north of Noah, check the distance from the culvert to
the edge of the pavement and see that they comply with the plans as prepared
by Bristol.
At Summer and Lansdowne, on the north side, headwall pipe has to be
extended out approximately three (3) feet to meet the specifications and plans.
On Lansdowne by Topsail, cross culvert the grates need to be lowered and
also need headwalls on the culverts.
Wilson Terrace is acceptable.
General statement for the entire project is that "we should check the plumbness
of the Street Signs. "
Sebastian Highlands Street Inspection October 4, 1977
Units 5, 6, and 8 Page 2
Plans call for riprap on the swale inlets to the cross culverts in the field.
At Persian and Rosebush, the culvert crossing asphalt needs to be sawed
out and replaced.
The culvert between Seamist and Topsail on Rosebush is short.
On Rose Arbor between Tunison and Watercrest, there is a cross culvert
with no headwall on the north end of it, and the swale entrances into the
cross culvert need to riprapped (one side only, the other side has been done. )
Rose Arbor west of Melrose cross culvert - no headwalls on either side.
Crossing at Rose Arbor and Autumn, diagonal culvert crossing cut out and
replace with asphalt paving.
At intersection of Dyke Street and Rose Arbor - short culvert needs to be
checked.
Plans will have to be resolved on Dominican as to the width of the pavement.
There is eighteen feet (181) on the ground. Plans call for twenty feet (201).
Refer to Page 36 of the Report.
At the intersection of Bywood and Melrose, ditch on the east side will need
to be maintained and reworked a little bit.
No headwalls on the cross drain at Melrose between Lansdowne and Rosa
Arbor.
Seagrass east of Melrose needs some fill to bring the shoulder up to the
pavement elevation on the south side.
At Crown and Melrose, we have erosion in the shoulder and into the swale.
Needs some dressing up and some material.
On Barber just north of Lansdowne, a back lot ditch needs some checking
over and rework of headwalls on both sides.
On Lansdowne just west of Barber, check the thickness of the asphalt.
Sebastian Highlands Street Inspection October 4, 1977
Units 5, 6, and 8 Page 3
At intersection of Quarry and Seaside, we have a short culvert and some
erosion around the culvert and the side lot ditch.
On Melrose and Jetty Terrace, there are a couple places where motor oil
has been drained out of carson the edge of the road. Engineer requests
we should fix those.
*************
We are now doing the inspection at Unit No. 5.
We are at the culvert between Lots 19 and 20, in Block 164: the headwall
of the culvert on the east side needs some additional fill. We are getting
some site washout. Riprap bottom needs to be repaired.
The cross culvert on Blossom, Lot 172 - the west side needs some reworking.
In Blocks 169, 170, 171 work has been accomplished, but there is some
minor maintenance work to be done on these culverts.
In Block 150 there is water still standing along the entire ditch section.
Dolphin Road just west of Roseland, the first culvert headwall needs to be
repaired on the south side.
Inspection made October 4, 1977
Those in attendance:
Eugene Cragg, City of Sebastian
Robert F. Lloyd, P. E.
William Bevan, GDC
Leonard Plott, GDC
Paul Rosskamp, GDV
General Development Engineering Company
Mr. Robert F. Lloyd, P. E.,
City Engineer
City of Sebastian
1835 -20th Street
Vero Beach, Fla. 32960
September 12, 1977
File: SH RD. SUB. #8
Re: SEBASTIAN HIGHLANDS, UNIT 5
Dear Mr. Lloyd:
This is our formal notification that we have corrected
all deficiencies per your street inspection list dated
August 4, 1977.
We are requesting final inspection and acceptance in
accordance with the Agreement between General Development
Corporation and the City of Sebastian.
Sincerely,
Kenneth F. Miller, P. E.
Assistant Vice President
Regional Engineer
KFM:MRB:ec
cc: C. Crump, R. Bluem, W. Allen, B. Bevan, Mayor Cragg,
F. John
2095 South West U.S. #1, Vero Beach, Florida 32960 Telephone 305-562-6558
A F I Vr"r) AUG 2z Asn
General Development Engineering Company August 18, 1977
IQ
File: 1) CITY OF SEBASTIAN ROAD
SUBM. - 1977 GDC/CITY
ROAD AGREEMENT
2) SH RD. SUB. #9
Mr. Robert F. Lloyd,
City Engineer
City of Sebastian
1835 -20th Street
Vero Beach, Fla. 32960
Re: SEBASTIAN HIGHLANDS, UNIT 6
Dear Mr. Lloyd:
This is our formal notification that the subdivision
improvements in Sebastian Highlands, Unit 6 have been
completed in accordance with the agreement between
General Development Corporation and the City of Sebastian
dated 6/9/76 (see paragraph 4, page 3). We are re-
questing final inspection in accordance with paragraph 4
of the agreement.
Sinc rely,
Kenneth F. Miller, P. E.
Assistant Vice President
Regional Engineer
KFM:LNC:ec
cc: C. C. Crump
Bob Bluem
Wayne Allen
Bill Bevan
Mayor Cragg
Frank John
2095 South West U.S. #1, Vero Beach, Florida 32960 Telephone 305-562-6558
•
General Development Engineering Company
Mr. Robert F. Lloyd,
City Engineer
City of Sebastian
1835 -20th Street
Vero Beach, Fla. 32960
•
RE CE I VF'D AUG 22 1977
August 18, 1977
File: 1) CITY OF SEBASTIAN ROAD
SUBM. - 1977 GDC/CITY
ROAD AGREEMENT
2) SH RD. SUB. #10
Re: SEBASTIAN HIGHLANDS, UNIT 8
Dear Mr. Lloyd:
This is our formal notification that the subdivision
improvements in Sebastian Highlands, Unit 8 have been
completed in accordance with the agreement between
General Development Corporation and the City of Sebastian
dated 6/9/76 (see paragraph 4, page 3). We are re-
questing final inspection in accordance with paragraph 4
of the agreement.
Since ely,le�C.
Kenneth F. Miller, P. E.
Assistant Vice President
Regional Engineer
KFM:LNC:ec
cc: C. C. Crump
Bob Bluem
Wayne Allen
Bill Bevan
Mayor Cragg
Frank John
2095 South West U.S. #1, Vero Beach, Florida 32960 Telephone 305-562-6558