Loading...
HomeMy WebLinkAboutPerformance Bond - MaintenancePERFORMANCE BOND KNOW ALL HIEN BY THESE PRESENTS: I GENERAL DEVELOPMENT CORPORATION, a Delaware corporation, authorized to transact business in the State of Florida (hereinafter called GENERAL), is held and firmly bound unto the CITY OF SEBASTIAN, a municipality created under the laws of the State of Florida, in the penal sum of $98;091.04 for the payment of which it binds itself, its successors and assigns, firmly by these presents. THE CONDITION OF THE ABOVE OBLIGATION is such that whereas GENERAL has platted portions of Section 18, Township 31 South, Range 39 East, the CITY OF SEBASTIAN, Indian River County, Florida, into a Subdivision known as SECOND REPLAT IN SEBASTIAN HIGHLANDS - UNIT 9 and FIRST REPLAT IN SEBASTIAN HIGHLANDS - UNIT 16, according to the Plat thereof, as recorded in the Public Records of Indian River County, Florida; and the Plat of said Subdivision shows streets, thoroughfares and drainage rights of way and GENERAL has agreed that it will within ten (10) years from the date hereof, grade and pave the streets and complete the necessary drainage as shown on said Plat of the aforedescribed property in accordance with the details shown on the Development Plan and the Specifications in effect as of the date shown hereon for the CITY OF SEBASTIAN, Florida. NOW, THEREFORE, if GENERAL shall within ten (10) years from the date hereof, grade and pave the streets and complete the drainage as shown on said Plat which abut the aforedescribed property, in accordance with the Specifications in effect as of the date shown hereon for the CITY OF SEBASTIAN, Florida, then this obligation shall be void, otherwise the same shall remain in full force and effect. It is expressly understood the obligation of GENERAL shall diminish in proportion to the amounts expended from time to time toward the completion of the improvements for which it is obligated hereunder; and that by its approval and acceptance of this Bond, the CITY OF SEBASTIAN, Florida, agrees to acknowledge from time to time, in writing, the reduction of the total sum of this obligation according to the extent such work has been completed. IN WITNESS WHEREOF, GENERAL has caused these presents to be executed by its proper officers and its corporate seal to be affixed hereto, all of which has been done at Miami, Dade County, Florida, this 30th day of August, 1973. THE FOREGOING BOND IS HEREBY ACCEPTED AND APPROVED THIS t1'= DAY OF42 ,Z - , 1973. CITY OF SEBASTIAN',, FLORIDA By: GENERAL DEVELOPMENT CORPORATION -BY • Y- President JS11J.rD iI • �^I 44nn-� --^'T Secreta THE FOREGOING BOND IS HEREBY ACCEPTED AND APPROVED THIS t1'= DAY OF42 ,Z - , 1973. CITY OF SEBASTIAN',, FLORIDA By: GENERAL DEVELOPMENT CORPORATION -BY • Y- President r GENERAL DEVELOPMENT ENGINEERING COMPANY ENGINEERING AND LAND SURVEYING August 15, 1973 General Development Corporation 1111 South Bayshore Drive Miami, Florida 33131 PORT MALABAR RE: SECOND REPEAT IN SEBASTIAN HIGHLANDS - UNIT 9 PORT LABELLE FIRST REPLAT IN SEBASTIAN HIGHLANDS - UNIT 16 1111 SOUTH CITY OF SEBASTIAN - INDIAN RIVER COUNTY, FIA. BOND ESTIMATE - (HOUSING) Gentlemen: The estimate for construction of this subdivision is as follows: Roads (0.915 miles) Item antic Unit Price Amount Clearing and Dispose 5.24 AC. $ 139.40 $ 730.46 Grading Incl. Select 9,000 C.Y. 0.27 2,430.00 Pipe 15 Incl. Bands 60 L.F. 3.84 230.40 Pipe 18 Incl. Bands 34 L.F. 4.54 154.36 Pipe 24 Incl. Bands 20 L.F. 6.92 138.40 Pipe 18 x 11 Incl. Bands 224 L.F. 3.98 891.52 Pipe 25 x 17 Incl. Bands 36 L.F. 6.08 218.88 Pipe 29 x 18 Incl. Bands 36 L.F. 6.92 249.12 Road Base 6" S.C. 11,537 S.Y. 2.50 28,842.50 Prime and Sand 11,537 S.Y. 0.043 496.09 Pavement A.C.S.C.II 1" 11,012 S.Y. 1.00 11,012.00 Endwalls 6.32 C.Y. 65.00 410.80 Rip Rap 15 C.Y. 55.00 825.00 Grassing 14,157 S.Y. 0.07 990.99 P.C.P.'s 60 EA. 20.00 )„ 200.00 Street Signs 9 EA. 25.00 225.00 Road Total $49,045.52 PORT MALABAR PORT ST. LUCIE PORT LABELLE PORT CHARLOTTE EXECUTIVE OFFICES • 1111 SOUTH BAYSHORE DRIVE MIAMI, FLORIDA 33131 • TELEPHONE 350-1420 -2 - August 15, 1973 Primary and Secondary Drainage none Roads _ $49,045.52 Drainage none $49,045.52 Plus 100% Contin- gency (10% -Yr. -10 Yr.) $49,045.52 Total $98,091.04 l Very truly yours,,- 6" o 2� Robert Bluem Vice President ot�ngin&ering„ RAB/EOD/pW C. soaca°' • ` C RECEIVED Z4 AUG 301973 GD C 1 IsNGINEERING `� DEPT.