Loading...
HomeMy WebLinkAboutEstimated Construction Costs - Unit 14J A M E S E D W A R D C L A R K C I V I L E N G 1 N E E R 1111 SOUTH SAYSHORE DRIVE • MIAMI. FLORIDA 33131 July 14, 1969 General Development Corporation 1111 South Bayshore Drive Miami, Florida 33131 Re: SEBASTIAN HIGHLANDS UNIT 14 City of Sebastian Gentlemen: The following, estimate has been prepared for bond purposes for this Subdivision Unit: ROAD14AYS Item Quantity Unit Price Amount Clearing & Grubbing 15.89 Acres $ 139.40 $ 2,215.07 Grading, Road Mile 2.14 Miles 1,900.00 4,066.00 Subgrade Stabilization 14,206 Sq.Yds. 0.15 2,130.90 Road Base, Soil Cement (6") 28,813 Sq.Yds. 0.85 24,491.05 Pavement, A.C.S.C. 27,567 Sq.Yds. 0.42 11,578.14 Pipe, 18 x 11 184 Lin.Ft. 3.64 669.76 22 x 13 36 " " 4.31 155.16 25 x 16 112 5.50 616.00 29 x 18 102 6.30 642.60 Inlets 2 Each 77.50 155.00 Endwalls 6.21 Cu.Yds. 65.00 403.65 Grassing 33,645 Sq.Yds. 0.07 2,355.15 Street Signs 8 Each 13.50 108.00 Seep Plates 2 Each 12.50 25.00 Roadway Sub -Total $ 49,611.48 continued - General Development Corporation Item Clearing & Grubbing Earthwork Pipe, 21" 24" 36" Grassing Rip Rap nn T^J R rf July 14, 1969 uantit 4.32 Acres 8,500 Cu.Yds. 4 Lin.Ft. 4 4 4,280 Sq.Yds. 16 Cu.Yds. Unit Price Amount $ 139.40 $ 602.21 0.34 2,890.00 4.69 18.76 5.94 23.76 10.54 42.16 0.07 299.60 33.75 540.00 Drainage Sub -Total $ 4,416.49 Roadway & Drainage Total $ 54,027.97 Lot Fill (65,726 Cu.Yds. @ 0.31) 20,375.06 12-1/2% Engineering 9,300.38 17% Contingency 12,648.52 P.R.M.'s (5 @ 15.00) 75.00 TOTAL BOND AMOUNT $ 96,426.93 Very y trul yours 4V`t+ °!J James Edward j*04�1 Registered E6,g!p6 r No 08�_.�,a t' i State of Fl o rj d JEC:eh