HomeMy WebLinkAboutUnit 17 PreliminaryGENERAL DEVELOPMENT CORPORATION
September 8, 1970
Col. T. Jordan, City Clerk
City of Sebastian
Post Office Box 127
Sebastian, Florida 32958
Re: Preliminary Submission
Sebastian Highlands Unit 17
Dear Colonel Jordan:
Transmitted herewith for preliminary approval are the following:
2 Sets of Record Plat
2 Sets of Development Plan
1 Engineer's Estimate
1 Print of Index Map (locating record plat)
Upon approval of the enclosed documents, the record plat (linens,
mylars and prints), Performance Bond, Opinion of Title and filing
fee will be submitted for final filing, according to Ordinance
No. 179.
Very truly yours,
GENERAL DEVELOPMENT CORPORATION
�i
�lames E. Clark, P.E.
Manager of Engineering
JEC/EOD/jc
Encls.
cc: Mr. Robert F. Lloyd, w/prints
Mr. R. L. Seeley
Mr. P. Koehler
J A M E S E D W A R D C L A R K
C I V 1 L E N G I N E E R
1111 SOUTH SAVSHORE DRIVE • MIAMI. FLORIDA 33131
August 3, 1970
General Development Corporation
1111 South Bayshore Drive
Miami, Florida 33131
RE: Sebastian Highlands, Unit Seventeen
Indian River County, Florida
Gentlemen:
The construction estimate for this subdivision is as follows:
Roadways (20.96 Miles)
Item
Quantity
Unit Price
Amount
Clearing & Grubbing
137.03
Ac
$ 139.40
$ 19,101.98
Grading
284,471
CY
0.26
73,962.46
Subgrade (Arterial
Road)
53,780
SY
0.15
8,067.00
Road Base Soil
Cement 6"
270,573
SY
0.85
229,987.05
Pavement ACSC
II -1"
258,428
SY
0.42
108,539.76
Pipe 15" Incl.
Bands
862
LF
3.50
3,017.00
18" [111
299
LF
4.13
1,234:87
21" "
11
21
LF
4.75
99.75
18" x 11" "
If
2,898
LF
3.64
10,548.72
22" x 13" 11It
728
LF
4.31
3,137.68
25" x 16"
338
LF
5.50
1,859.00
29" x 18" "
102
LF
6.26
638..52
Endwalls
76.74
CY
65.00
4,988.10
Rip Rap
2.71
CY
35.00
94.85
Guard Rail
2,597
LF
4.50
11,686.50
Barricades
3
Ea
100.00
300.00
Grassing
327,921
SY
0.07
22,954.47
Street Signs
125
Ea
17.50
2,187.50
Roadway
Sub -Total -
502,405.21
Drainage
Clearing & Grubbing 28.29 Ac $ 139.40 $ 3,943.63
(CONT. )
General Development Corporation
July 31, 1970
Page 2
Earthwork
Pipe 30" Incl. Bands
36" x 22"
43" x 27"
50" x 31"
50" x 36"
65" x 40"
Pipe Inlet Fabrication
Grassing
Rip Rap
Roadway Sub -Total
Drainage Sub -Total
PRMs 119 @ $20.00 ea.
Total
12 1/2% Engineering
17 % Contingency
Total Bond Amount
Very truly
yours,
0.34
65
ames Edward Clark
Registered
Engineer No. 6085
STATE
OF FLORIDA
JEC; AG; mif
LF
11.16
202
157,200
CY
0.34
65
LF
7.43
142
LF
7.72
348
LF
11.16
202
LF
13.18
195
Lf
15.09
76
LF
17.68
20
Unit
151.10 Av.
49,300
SY
0.07
33.4
CY
35.00
Drainage
Sub -Total
502,405.21
77,445.09
2,380.00
582,230.30
72,778.79
98,979.15
753,988.24
53,448.00
482.95
1 ,096.24
3,883.68
2,662.36
2,942.55
1,343.68
3,022.00
3,451.00
1,169.00
77,445.09