Loading...
HomeMy WebLinkAboutUnit 16 Preliminary1� f� GENERAL DEVELOPMENT CORPORATION 1'T! September 8, 1970 Col. A. T. Jordan, City Clerk City of Sebastian Post Office Box 127 Sebastian, Florida 32958 Re: Preliminary Submission Sebastian Highlands Unit 16 Dear Colonel Jordan: Transmitted herewith for preliminary approval are the following: 2 sets of Record Plat 2 Sets of Development Plan 1 Engineer's Estimate 1 Print of Index flap (locating record plat) Upon approval of the enclosed documents, the record plat (linens, mylars and prints), Performance Bond, Opinion of Title and filing fee will be submitted for final filing, according to Ordinance No. 179. Very truly yours, GENER L DEVELOPMENT CORPORATION James E. Clark, PE. Manager of Engineering JEC/EOD/jc Encls. cc: Mr. Robert F. Lloyd, w/prints i1r. R. L. Seeley Mr. P. Koehler EXECUTIVE OFFICES • 1111 SOUTH BAYSHORE DRIVE • MIAMI, FLORIDA 33131 • TELEPHONE 350-1111 J A M E S E D W A R D C L A R K C I V I L E N G I N E E R 1111 SOUTH SAYSHORE DRIVE • MIAMI. FLORIDA 39181 June 22, 1970 General Development Corporation 1111 South Bayshore Drive Miami, Florida 33131 Re: Sebastian Highlands Unit 16 Gentlemen: The construction estimate for this subdivision is as follows: Roadway Subtotal $316,090.29 DRAINAGE Clearing & Grubbing ROADWAYS (12.90 Miles) 139.40 854.52 Item Quantity CY Unit Price Amount Clearing & Grubbing 85.06 Ac 139.40 $ 11,857.36 Grading 21" 182,675 CY 0.26 47,495.50 Subgrade (Arterial Road) 27,471 SY 0.15 4,120.65 Road Base Soil Cement 6" 167,594 SY 0.85 142,454.90 Pavement ACSC 1" 160,108 SY 0.42 67,245.36 Pipe 15" Incl Bands 1,228 LF 3.50 4,298.00 18" Incl Bands 224 LF 4.13 925.12 21" Incl Bands 142 LF 4.75 .679.25 24" Incl Bands. 41 LF 6.03 247.23 30" Incl Bands 4 LF 7.43 29.72 18 x 11" Incl Bands 1,086 LF 3.64 3,953.04 22 x 13" Incl Bands 357 LF 4.31 1,538.67 25 x 16" Incl Bands 208 LF 5.50 1,144.00 Endwalls 65.29 CY 65.00 4,243.85 Rip Rap 177 CY 35.00 6,195.00 Pipe Armor 26 Ea 36.75 955.50 Guardrail 660 LF 4.50 2,970.00 Grassing 202,101 SY 0.07 14,147.14 Barricades 4 Ea 100.00 400.00 Street Signs 68 Ea 17.50 1,190.00 Roadway Subtotal $316,090.29 DRAINAGE Clearing & Grubbing 6.13 Ac 139.40 854.52 Earthwork 69,850 CY 0.34 23,749.00 Pipe 18" Incl Bands 55 LF 4.13 227.15 21" Incl Bands 4 LF 4.75 19.00 24" Incl Bands 61 LF 6.03 367.83 continued - Sebastian Highlands Unit 16 Construction Estimate Page Two June 22, 1970 36 x 22" Incl Bands 92 LF $ 7.72 $ 710.24 43 x 27" Incl Bands 88 LF 11.16 982.08 50 x 31" Incl Bands 50 LF 13.18 659.00 65 x 40" Incl Bands 44 LF 17.68 777.92 Pipe Inlet Fabrication 12 Unit 120.50 Av 1,446.00 Grassing 13,350 SY 0.07 934.50 Rip Rap 7 CY 35.00 245.00 Drainage Subtotal $ 30,972.24 Roadway Subtotal $316,090.29 Drainage Subtotal 30,972.24 PRM's 65 @ $20 Each 1,300.00 Total $348,362.53 12 1/2% Engineering 43,545.32 17% Contingency 59,221.63 Total Bond Amount $451,129.48 Very truly yours, . mes Edward Clark ;� p ���� a,frr� �,,�,� Registered Engineer heir`' State of Florida ^ e Y e P JEC:AG:jc