HomeMy WebLinkAboutUnit 15 PreliminaryGENERAL DEVELOPMENT CORPORATION
September 8, 1970
Col. A. T. Jordan, City Clerk
City of Sebastian
Post Office Box 127
Sebastian, Florida 32958
Re: Preliminary Submission
Sebastian Highlands Unit 15
Dear Colonel Jordan:
Transmitted herewith for preliminary approval are the following:
2 sets of Record Plat
2 Sets of Development Plan
1 Engineer's Estimate
1 Print of Index Map (locating record plat)
Upon approval of the enclosed documents, the record plat (linens,
mylars and prints), Performance Bond, Opinion of Title and filing
fee will be submitted for final filing, according to Ordinance
No. 179.
Very truly yours,
GENERAL DEVELOPMENT -CORPORATION
James E. Clark, P.E.
Manager of Engineering
JEC/EOD/jc
Encls.
cc: Mr. Robert F. Lloyd, w/prints
Mr. R. L. Seeley
i`ir. P. Koehler
1111 SOUTH BAYSHORE DRIVE 0 MIAMI, FLORIDA 33131 • TELEPHONE 350-1111
J A M E S E D W A R D C L A R K
C 1 V I L E N G I N E E R
1111 SOUTH BAYS14ORE DRIVE - MIAMI. FLORIDA 39131
General Development Corporation
1111 South Bayshore Drive
Miami, Florida 33131
May 19, 1970
Re: Sebastian Highlands Unit 15
City of Sebastian, Indian River County, Florida
Gentlemen:
The construction estimate for this subdivision is as follows:
ROADWAYS (5.46 Miles)
Item
Quantity
Unit Price
Amount
Clearing
& Grubbing
34.96
Ac
139.40
$ 4,873.42
Grading -Road Mile
67,990
CY
0.26
17,677.40
Subgrade
Street
15,242
SY
0.15
2,286.30
Road Base
Soil Cement 6"
71,025
SY
0.85
60,371.25
Pavement
67,863
SY
0.42
28,502.46
Pipe, 15"
249
LF
3.50
871.50
1811
194
LF
4.13
801.22
2111
124
LF
4.75
589.00
1811
x 11"
596
LF
3.64
2,169.44
2211
x 13"
520
LF
4.31
2,241.20
2511
x 16"
120
LF
5.50
660.00
Endwalls
24.9
CY
65.00
1,618.50
Rip Rap
-
26.8
CY
35.00
938.00
Grassing
85,389
SY
0.07
5,977.23
Street Signs
31
Ea
17.50
542.50
Roadway
Subtotal
T130,120.42
DRAINAGE
Clearing
& Grubbing
13.07
Ac
139.40
1,821.96
Earthwork
60,900
CY
0.34
20,706.00
Pipe, 36"
(Incl. Bands)
44
LF
10.72
471.68
6011
11
172
LF
21.97
3,778.84
36"
x 22" 11
88
LF
7.72
679.36
4311
x 27" 11
44
LF
11.16
491.04
5011
x 31" 11
44
LF
13.18
579.92
58"
x 36" 11
44
LF
15.09
663.96
Grassing
33,800
SY
0.07
2,366.00
Rip Rap
24
CY
35.00
840.00
Drainage
Subtotal
32,398.76
continued -
General Development Corporation Sebastian Highlands Unit 15
Page Two May 19, 1970
JEC:AG:jc
Roadway Subtotal
- $130,120.42
Drainage Subtotal
= 32,398.76
Lot Fill, 54,328 CY @ 0.31
- 16,841.68
P.R.M.'s 60 @ $20.00 Ea
= 1,200.00
Total
$180.560.86
12 1/2% Engineering
= 22,570.11
17% Contingency
= 30,695.35
Total Bond Amount
$233,826.32
Very truly yours,
��j
James Edward Clark 1
Registered Engineer Na:; `'Pga6 `� �2�'it,
State of Florida '=F. �C�°`°°°
GL00
�i fl
r • o s � .
' y 4� • /
4 /// r p
n