Loading...
HomeMy WebLinkAboutUnit 15 PreliminaryGENERAL DEVELOPMENT CORPORATION September 8, 1970 Col. A. T. Jordan, City Clerk City of Sebastian Post Office Box 127 Sebastian, Florida 32958 Re: Preliminary Submission Sebastian Highlands Unit 15 Dear Colonel Jordan: Transmitted herewith for preliminary approval are the following: 2 sets of Record Plat 2 Sets of Development Plan 1 Engineer's Estimate 1 Print of Index Map (locating record plat) Upon approval of the enclosed documents, the record plat (linens, mylars and prints), Performance Bond, Opinion of Title and filing fee will be submitted for final filing, according to Ordinance No. 179. Very truly yours, GENERAL DEVELOPMENT -CORPORATION James E. Clark, P.E. Manager of Engineering JEC/EOD/jc Encls. cc: Mr. Robert F. Lloyd, w/prints Mr. R. L. Seeley i`ir. P. Koehler 1111 SOUTH BAYSHORE DRIVE 0 MIAMI, FLORIDA 33131 • TELEPHONE 350-1111 J A M E S E D W A R D C L A R K C 1 V I L E N G I N E E R 1111 SOUTH BAYS14ORE DRIVE - MIAMI. FLORIDA 39131 General Development Corporation 1111 South Bayshore Drive Miami, Florida 33131 May 19, 1970 Re: Sebastian Highlands Unit 15 City of Sebastian, Indian River County, Florida Gentlemen: The construction estimate for this subdivision is as follows: ROADWAYS (5.46 Miles) Item Quantity Unit Price Amount Clearing & Grubbing 34.96 Ac 139.40 $ 4,873.42 Grading -Road Mile 67,990 CY 0.26 17,677.40 Subgrade Street 15,242 SY 0.15 2,286.30 Road Base Soil Cement 6" 71,025 SY 0.85 60,371.25 Pavement 67,863 SY 0.42 28,502.46 Pipe, 15" 249 LF 3.50 871.50 1811 194 LF 4.13 801.22 2111 124 LF 4.75 589.00 1811 x 11" 596 LF 3.64 2,169.44 2211 x 13" 520 LF 4.31 2,241.20 2511 x 16" 120 LF 5.50 660.00 Endwalls 24.9 CY 65.00 1,618.50 Rip Rap - 26.8 CY 35.00 938.00 Grassing 85,389 SY 0.07 5,977.23 Street Signs 31 Ea 17.50 542.50 Roadway Subtotal T130,120.42 DRAINAGE Clearing & Grubbing 13.07 Ac 139.40 1,821.96 Earthwork 60,900 CY 0.34 20,706.00 Pipe, 36" (Incl. Bands) 44 LF 10.72 471.68 6011 11 172 LF 21.97 3,778.84 36" x 22" 11 88 LF 7.72 679.36 4311 x 27" 11 44 LF 11.16 491.04 5011 x 31" 11 44 LF 13.18 579.92 58" x 36" 11 44 LF 15.09 663.96 Grassing 33,800 SY 0.07 2,366.00 Rip Rap 24 CY 35.00 840.00 Drainage Subtotal 32,398.76 continued - General Development Corporation Sebastian Highlands Unit 15 Page Two May 19, 1970 JEC:AG:jc Roadway Subtotal - $130,120.42 Drainage Subtotal = 32,398.76 Lot Fill, 54,328 CY @ 0.31 - 16,841.68 P.R.M.'s 60 @ $20.00 Ea = 1,200.00 Total $180.560.86 12 1/2% Engineering = 22,570.11 17% Contingency = 30,695.35 Total Bond Amount $233,826.32 Very truly yours, ��j James Edward Clark 1 Registered Engineer Na:; `'Pga6 `� �2�'it, State of Florida '=F. �C�°`°°° GL00 �i fl r • o s � . ' y 4� • / 4 /// r p n