Loading...
HomeMy WebLinkAboutUnit 16 Drainage Plan Revisions16 General Development Corporation June 12, 1980 Mayor Pat Flood City of Sebastian P.O. Box 127 Sebastian FL 32958 Re: Unit 16 - Drainage Plan Revisions Dear Mayor Flood: RECEIVED JUN 1 6 1980 Wayne L. Allen Vice President and Assistant General Counsel In accordance with our discussions on Thursday, June 5, 1980, and sub- sequent discussions with the City Engineer, we agree to make the follow- ing changes to the revised drainage plans presented to the City last week. 1. We will grass the bottom of drainage ditches in lieu of putting down soil cement, although the latter is still our recommended procedure. 2. The slopes of drainage ditches will be graded to a 5 to 1 slope. If there are unusual conditions such as large trees which this slope is going to interfer with, we will discuss such individual problems with the City Engineer at the time. 3. Where we disturb areas above the slope necessary for the drainage ditches we will mulch and seed these areas to prevent erosion. 4. We will install rip rap, three bags high, using standard DOT grout filled bags extending from Tract "R" through Tract "T" as shown on sheets 7 & 8 of the drainage plans. Bags will be installed on the lot purchaser's property. The first bag will be dug in and we will back fill. We were unable to reach the City Engineer but I believe this meets his requirements fron our prior discussion. When the bridge goes in a proper tie-in will be made to protect against erosion. I want to thank you for your cooperation in this matter and you can be assured that in the future we will review any major drainage plan 1111 South Bayshore Drive, Miami, Florida 33131 Telephone 305 3501261 i Mayor Pat Flood Re: Unit 16 - Drainage Plan Revisions June 12, 1980 Page -2- changes with the City at the earliest opportunity prior to ommencing any construction changes. Sincerely, 4� Wayne L. Allen Vice President & Assistant General Counsel WL A/hw cc: Daniel Kilbride, Esq.