Loading...
HomeMy WebLinkAbout09 11 2009 St Johns River Water Mgmt District Permit 40-061-68172-12 Stormwater Master PlanSt. Johns River Water Management District Environmental Resource Permit Application Stormwater Report for Sebastian Municipal Airport Stormwater Master Plan Update RAI Response #2 SEBAS-TLNN MUNICIPAL AIRPORT August 2009 Index and Certification Page St. Johns River Water Management District Environmental Resource Permit Application Drainage Report Stormwater Master Plan Update August 17, 2009 Drainage Report Narrative & Figures Drainage Computations 24 Pages Appendix B Project Plans Appendix D Patricia Therrien State of Florida P.E. Number 52120 THE LPA GROUP INCORPORATED 615 Crescent Executive Court, Suite 200 Orlando, FL 32817 407-306-0200/0460(Fax) FL Registration 0004307 Addendum to Stormwater Master Plan Update Table of Contents Introduction.......................................................................................................... 3 Soils / Groundwater Information........................................................................4 Floodplain / Wetland Information.......................................................................5 ExistingConditions.............................................................................................5 Stormwater Management....................................................................................5 Proposed Conditions and Analysis...................................................................7 WaterQuality.....................................................................................................10 Summary............................................................................................................13 Permit Application.............................................................................Appendix A Drainage Computations....................................................................Appendix B • Attenuation Summary • Proposed Conditions Data o Curve Number Calculation o Stage -Storage Table o Phosphorus Loading Analysis • Existing Conditions ICPR Input / Output o Input Data o Node Minimum / Maximum o Basin Summary Report • Proposed Conditions ICPR Input / Output o Input Data o Node Minimum / Maximum o Basin Summary Report • Supplemental Information Construction Plans............................................................................Appendix D fl Figures Figure No. Description 1 Aerial Map 2 Quadrangle Map 3 Soils Map 4 100-year Flood FEMA Map 5 FLUCSFS Land Use Map\ 5a Verified Land Use and Cover Map 6 Pre -Development Drainage Map 7 Post -Development Drainage Map 8 Ditch Exhibit 9 Surface Waters Tables Table No. Description Page 1 Summary of Soils Information ................................... 4 2 Summary of Drainage Areas ..................................... 8 3 Summary of Project Area .......................................... 9 4A Summary of Treatment Volume ............................... 10 4B Summary of Treatment Volume ............................... 10 4C Summary of Treatment Volume ............................... 11 4D Summary of Treatment Volume ............................... 11 5 Summary of Basins ................................................. 12 6 Summary of Tailwater Conditions ............................ 13 7 Summary of Peak Stages ........................................ 14 8 Summary of Peak Flows .......................................... 14 4 INTRODUCTION The City of Sebastian wishes to provide improvements to the Sebastian Municipal Airport (Airport). The improvements include the construction of the Maintenance Building, extension of Airport Drive East, and a stormwater management facility. Figure 1 shows a location map for the site and Figure 2 is the USGS quad map. This site is within the jurisdictional limits of Indian River County and the St. Johns River Water Management District (SJRWMD). The existing golf course ponds (Pond 1 and Pond 3) and two additional dry retention ponds will be used to provide treatment and attenuation for the Stormwater Master Plan Update, which includes current proposed development of Airport Drive East and Maintenance Building which has been previously permitted under Permit No. 40-061-68172-14. Please see Figure 7 Proposed Drainage Map. The Airport is located in Sebastian, Florida (Indian River County) in Section 22, Township 30 South, Range 38 East and Sections 28 and 29, Township 31 South, Range 38 East. Roseland Road borders the site to the west and Airport Drive East to the southeast. The Airport is located approximately one mile west of the Indian River and 600 feet east of the South Prong of the Sebastian Creek. The total property area for the Airport is approximately 615.97 acres. The project acreage for which this permit modification application is sought is approximately 86.24 acres. The proposed impervious area for which the permit is sought is approximately 24.97 acres, included in Basins Airport Drive East A, Airport Drive East B, Airport Drive East C, Maintenance Building A, Maintenance Building B, Runway Basin, Depression 3, Hangar A, Pond 1, and Pond 3 only. This acreage includes previously permitted Airport Drive East Extension and Maintenance Building (Permit No. 40-061-68172-14). The site contains a number of small ditch systems. Some of these ditch systems are piped to or outfall directly to the Sebastian Creek west of the Airport. Other ditches drain off the property to the east. There are also a number of low areas throughout the site that do not drain off the Airport property during the 25-year 24- hour storm event. The permitting for these ditches was not found in SJRWMD or the Florida Department of Environmental Protection databases. Stormwater runoff from Airport Drive East A and Airport Drive East B will collected into two dry retention ponds (Airport Drive East A Pond and Airport Drive East B Pond) which will provided treatment and attention. The two dry retention ponds will drain through the existing double 6" metal pipes and will be conveyed to golf course