SUBJECT: GDC Bankruptcy
Approved For Submittal By:
C
City Manager
EXPENDITURE
REQUIRED:
Cid i,
Agenda No.
Dept. of Origin: City Manager
Date Submitted: 12/06/90
For Agenda Of: 12/12/90
Exhibits:
- Proof Of Claim
- Mosby Report Dated, 11/30/90
- Mosby Report Dated 12/05/90
AMOUNT
BUDGETED:
SUMMARY STATEMENT
APPROPRIATION
REQUIRED:
In behalf of the City, I filed a Proof of Claim with the United
States Bankruptcy Court in Miami, in the amount of $4,247,959.92.
This represents the total liability which may incur to the City
due to General Development Corporation's breech of the 1979
contract with the City. At my request, Randy L. Mosby, P.E.,
prepared two (2) reports which detail the unmet obligations of
General Development Corporation as outlined in the contract.
These items do not include portions of units 16 & 17 - Sebastian
Highlands which are not yet constructed. They do represent those
street and drainage facilities in other units or in the units of
16 & 17 which are constructed but need either maintenance or
improvement. Additionally, we have included the emergency
repairs made to date in units 16 & 17 in the amount of
$10,603.92.
RECOMMENDED ACTION
No action is necessary at this time.
9U,290
w I
UNITED STATES BANKRUPTCY COURT LLI U L L 3 U ""
OUTHERN DISTRICT OF FLORIDA
PROOF OF CLAIM is
Chapter 1
GENERAL DEVELOPMENT CORPORATION Case Nos, 90-12231-BKC-AJC through
c/o U.S Bankruptcy Court90-12236•BKC-AJC Inclusive
P.O. Box 013391 end 90-12337-BKC-AJC through
90.12339-BKC-AJC Inclusive
Miami, Florida 33101
EASE READ THE INSTRUCTIONS ON THE REVERSE SIDE CAREFULLY BEFORE FILLING OUT THIS PROOF OF CLAIM
A. DEBTOR: GENERAL DEVELOPMENT CORPORATION (GOC) 90-12231-BKC-AJC
B. CREDITOR INFORMATION
(The creditor is the person or other entity to whom the debtors owe money or property)
inns and Address of Creortor 9012231-0301062-00
CITY OF SEBASTIAN
PO BOX 780127
SEBASTIAN FL 32978
If name or address, as printed is not
correct please indicate correct name and
address to which checks and notices
should be delivered
lack here It this claim.
replaces a previously filed claim dated:
amends a previdusly filed claim dated:
supplements a previously filed claim dated:
the amount of claim you previously filed: (if any):
BASIS FOR CLAIM
Check box and attach copy of
assignment if claim has been assigned
to you.
C. CLAIM INFORMATION
CONTRACT FOR PURCHASE OF HOME BONDS and/or DEBENTURES
CONTRACT FOR PURCHASE OF LAND (princoal and Interest)
GOODS SOLD AND/OR SERVICES STOCKS and/or STOCK WARRANTS
PERFORMED WAGES/BENEFITS
MONIES LOANED ---X-OTHER (DESCRIBE BRIEFLY)
PERSONARTYDAMAGEINJURY/WRONGFUL DEATH/ Debtor breached obligation
PROPERTY DAMAGE
TAXES (Describe Briefly) contract to improve and/or
Type of Tax
Taxable Period taln streets and drainage
G
Z
In re:
General Development Corporation (GDC)
General Development Financial Services, Inc.
General Development Resorts, Inc.
Florida Residential Communities, Inc.
Five Star Homes Group, Inc.
GOV Financial Corpbratlon
Environmental Quality Laboratory, Inc.
Five Star Homes, Inc.
Florida Home Finders, Inc.
Debtors.
Your claim is scheduled by the Debtor as:
zero dollars
Disputed
(in U.S. Dollars)
Unsecured
If there is an amount shown, you have a claim
scheduled as shown. If the following appears:
EXECUTORY CONTRACT`, then you do not
have a scheduled claim. If BONDHOLDER,
STOCKHOLDER or BONDHOLDER/
STOCKHOLDER appears, you are or wen a
holder of Bonds, Debentures, Stocks or Stock
Warrants with no scheduled claim otner than
for principal, and/or interest or equity If you
acres with the amount scheduled by the
debtor or you have already filed your claim
you do not need to file this proof of claim
The amount of claim you previously filed, (if any):
If you have chocked STOCKS and/or STOCK
WARRANTS, PLEASE BE ADVISED THAT THE
LIST OF SHAREHOLDERS FILED BY THE
DEBTORS CONSTITUTES PRIMA FACIE
EVIDENCE OF THE VALIDITY AND AMOUNT OF
THOSE SHAREHOLDERS' INTEREST AND IT
under
SHALL NOT BE NECESSARY FOR THEM TO FILE
main -A PROOF OF INTEREST.
in
DATE DEBT WAS INCURRED: 8115L79 eneral Development projects in
the City of Sebastian.
If you have checked BONDS and/or
DEBENTURES, you may not need to file
this Proof of Claim for principal
and/or interest due under such
BONDS/DEBENTURES. See Note 1 on
the reverse side of this form.
CLASSIFICATION OF CLAIM: Under the Bankruptcy Code all claims are classified as one or more of the following: (1) Priority, (2) Secured, (3) All Other Claims. Classify the nature of the claim
/ CHECKING THE APPROPRIATE BOX OR BOXES which you believe best describes the claim.
TATE THE AMOUNT OF THE CLAIM IN U.S. DOLLARS.
Al PRIORITY CLAIM $
You have a priority claim If any of the following
AR"
Wages, salaries or commissions (up to $2000),
earned within 90 days before filing of the
bankruptcy petition - 11 U.S.C. §507 (a)(3)
Contributions to an employee benefit plan (up to
52,000, less amounts claimed under Section
507(a)(3) above) - 11 U.S.C. §507(a)(4)
Up to $900 of deposits toward purchase, lease, or
rental of property or services for personal, family
or household use - 11 U.S.C. §507(a)(6)
Taxes or penalties of governmental units - 11 U.S.C.
§507(a) (7)
Other (specify under Section 507 for Priority treatment):
A2 SECURED CLAIM S
Attach evidence of perfection of security
Brief Description of Collateral :
Real Estate Motor Vehlclo Other
X A3 ALL OTHER CLAIMS $ 4 . 247 9 59. 92
For the purposes of this form, a claim is ALL OTHER If
there is no collataral. or to the extent the value of
collateral is less than the amount of the debt, or if
it does not quality as an Al priority claim under Section
507 of the Bankruptcy Code.
TOTAL AMOUNT OF CLAIM IN U.S. DOLLARS: $ -$4,247, qS � $ 4,247,959.92
(Priority) (Secured) (Unsecured) (Total)
Attach copies of documents In support of this claim, such as purchase orders, Invoices, itemized statements of running accounts, contracts, court Judgments, or evidence of security Interest. If the
ocuments are not available, explain. If the documents are voluminous, attach a summary.
This form should 0.4t be used to make a claim for expenses Incurred of K the flling of the bankruptcy petition. Such expense may be paid only upon proper application and notice pursuant to 11
.S.C. §503.
CREDITS AND SETOFFS: Attach an itemization of all amounts and dates of payments which have been credited against the debt. Set forth any setoff or counterclaim which the debtor may have
3alnst your claim.
To receive an acknowledgment of the receipt of your claim, enclose a stamped, self-addressed envelope and a copy of your claim.
U. UtFiTIFIGATION
is undersigned certifies under penalty of perjury that the debtor named above Is Indebted to the claimant In the amount shown, that there Is no security for
e debt other than that stated above or In an attachment to this form, that no unmatured Interest is Included, and that the undersigned is authorized to make this claim.
y m uie uitor uryvtner rerson Authorized to File this Claim.
Robert S. McClary.
City KgSebastian
ease mall this form to GDC at the address set forth above. All claims must be received by December 10, 1990.
enalty for Presenting Fraudulent Claim: Fine up to $5,000 or imprisonment for up to 5 years, or both. Title 18, U.S.C. §152 and §3571.
9v.ZiJ`o
0.
f
MOSBY AND ASSOCIATES, INC.
CONSULTING ENGINEERS
1507 20TH STREET
P.O. BOX 6368
VERO BEACH, FLORIDA 32961
407-569-0035
December 5, 1990
Mr. Robert S. McClary
City Manager
City of Sebastian
Post Office Box 127
Sebastian, Florida 32978-0127
Subject: Collier Creek - Unit 11
General Development Corporation
Sebastian, Florida
Engineer's Project No. 90-101K
Dear Mr. McClary:
Enclosed is a copy of an aerial of the southern portion of Unit
16 and the northern portion of Unit 11. As part of th construc-
tion drawings, for Unit 11, a stormwater managment lake was to be
constructed as part of Collier Creek construction in the area
just north of Caravan Street. The enclosed aerial delineates the
area of the original designed lake which has not been constructed
as part of the original construction of Unit 11. in order to
complete the construction of the lake as designed, we estimate
the construction cost to be as follows:
I. Clearing and
Grubbing 6.7 Acres $3,000/Ac. = $ 20,100.00
2. Excavation 125,000/C.Y. $ 5.00/C.Y. = $625,000.00
3. Slope
Stabilization
& Littoral
Zone Planting 1 LS = $_50,000.00
Total...........................................$695,100.00
Mr. Robert S. Mcory
Decemmber 5, 1990
Page 2
Should you require rther information,
Very t ul o ,
y o by, E.
RLM:bes
cc
enc.
•
please call.
I%L+..L_irtrLJD-0 J J -J
WOSBY AND ASSOCIATES, INC.
CONSULTING f fl(ANEEHS
1507 20TH STREET
P.O. BOX 6368
VERO BEACH, FLORIDA 32961
407-569 0035
November 30, 1990
Mr. Robert S. McClary
City Manager
City of Sebastian
Post Office Box 127
Sebastian, Florida 32978-0127
Subject: Sebastian Highlands Units 16 and 17
Sebastian, Florida
Engineer's Project No. 90-449
Dear Mr. McClary:
As requested, we have completed our on-site inspection and review
of the existing roadway and drainage conditions of Units 16 and
17 of the Sebastian Highlands. The purpose of our inspection was
to determine the extent of the deteriorated roadways and drainage
and to develop a cost estimate for the repair or replacement of
the roadways and drainage structures. Our inspection included
the following items:
I. Unit 16
a. Inspection of the existing roadways.
b. Inspection of the existing roadway curb and gutters.
C. Inspection of the existing drainage ditches.
d. General inspection of the existing drainage culverts
and structures.
II. Unit 17
a. Inspection of the existing roadways. An inspection
of the newly completed portion of Unit 17, located
in the southeast section of Unit 17, was not com-
pleted.
90- I z 96)
Mr. Robert S. MADy 10
November 30, 1990
Page 2
b. Inspection of the existing roadway swales.
C. Inspection of the existing drainage ditches.
d. Inspection of the existing drainage culverts and
structures.
III. Elkcam Waterway
We performed a general inspection of the Elkcam Waterway
to determine the extent of the seawall that has not been
constructed to the west of the Sebastian Highlands. We
have provided an estimate of the construction of Elkcam
Waterway drainage control structure. Since we have not
been provided with construction details of the drainage
overflow structure, the construction cost estimate is sub-
ject to change.
IV. Wentworth Street Drainage Ditch
It is our understanding that the Wentworth Street
drainage ditch has been constructed in the wrong location.
We inspected the ditch to determine what would be
required to relocate the ditch and the cost of the
Improvements.
It should be noted that no inspections were performed in the
areas where the roads have not been constructed.
We have previously submitted, to your office, the following
documents detailing the findings of our on-site inspections:
1. Three (3) copies of drawing Sheet 1 of 3 detailing the lo-
cation of the existing drainage culverts and structures,
within Unit 16 and the older portions of Unit 17.
2. Three (3) copies of drawing Sheet 2 of 3 and 3 of 3
detailing the location of where our construction photo-
graphs were taken and a listing of what the photograph
depicts for Unit 16 and Unit 17 respectively.
3. One (1) set of four (4) aerials of Units 16 and 17 in
which we have noted the drainage ditches which require
Improvements.
9. An album of photographs taken during our on-site Inspec-
tion.
Mr. Robert S. Mcory •
November 30, 1990
Page 3
The following is a generalization of our findings:
I. Unit 16
The overall condition of Unit 16 is fairly good. All
the roadways require resurfacing with at least one
Inch (111) of asphalt. There are some locations which
require repair to the base and subgrade.
Since the drainage collection system consists of curb
and gutter and drop inlets, we were unable to determine
the condition of the underground culvert pipes. All
the curb and gutter requires cleaning and removal of
weeds. All drainage ditches require cleaning out.
II. Unit 17
We recommend that all the streets, roadway swales and
drainage structures be replaced and regraded within the
older portion of Unit 17, south of Elkcan Waterway. The
roadways of the portion of Unit 17, north of Elkcan Water-
way are constructed with curb and gutter and are in fairly
good shape. We have not included the entire replacement
of the drainage culverts in our cost estimate for this
portion of Unit 17 except for the drainage structures
that need immediate repair.
The following is a list of the streets, along with their
lengths that were inspected. The streets and their
lengths were provided by the City of Sebastian in a memo
from Mr. Dave Fisher dated January 31, 1990. The pipes'
lengths and sizes, outlined in the following cost
estimate, are based on our on-site inspection.
Unit 16
Old Existing Streets
Englar Avenue
7,500'
Kildare Drive
3,000'
Harris Drive
3,000'
LaPlaya Lane
1,500'
Indian Avenue
600'
Ala Meda Avenue
1,000'
Cardinal Drive
1,400'
High Court
1,000'
Conover Avenue
1,000'
Ogden Avenue
1,000'
Total...........................................21,000 LF
Mr. Robert S. McOary
November 30, 1990
Page 4
•
Unit 17
Old Existing Streets
Barber Street
2,300'
Schumann Drive
8,500'
Filbert Street
3,900'
Hinchman
2,050'
Nebraska Circle
21550'
Friar Court
1,750'
Bryant Court
800'
Melton Avenue
1,550'
Lancaster Street
1,000'
Karrigan Street
11000'
Larchmont Terrace
3,550'
Landover Drive
1,000'
Redgrave Drive
1,200'
Joy Haven
200'
Curtis
850'
Thunderbird Drive
1,150-
S. East Street
(Curb
&
Gutter)
1,400'
Caprona Street
(Curb
&
Gutter)
2,600'
Empress Avenue
(Curb
&
Gutter)
11900'
Marsh Street
(Curb
&
Gutter)
800'
Dahl Avenue
(Curb
&
Gutter)
1,400'
Ormand Court
(Curb
&
Gutter)
1,000'
Capri Avenue
(Curb
&
Gutter)
2,100'
Englar Drive
(600' Curb
&
Gutter)
2,000'
Osceola
(Curb
&
Gutter)
800'
Aetna Street
(Curb
&
Gutter)
1,000'
Admiral Circle
(Curb
&
Gutter)
1,900'
Flint Street
(Curb
&
Gutter)
700'
Lance Street
(Curb
&
Gutter)
200'
Mabry Street
(Curb
&
Gutter)
3,330'
Crawford Drive
(Curb
&
Gutter)
2,300'
Spring Valley Avenue
(Curb
&
Gutter)
1,700'
Total...........................................58,480 LF
11.08 Miles
Mr. Robert S. Mcc 9 y
November 30, 1990
Page 5
The following is the cost estimate for the repair and
reconstruction of the roadways and drainage structures within
Units 16 and 17. It should be noted that a cost contingency will
be added to this cost estimate since a very detailed topographic
survey of the existing roadways and drainage swales was not
provided to determine the actual extent of the deteriorated
drainage roadway swale. Since there are so many problems within
the Sebastian Highlands, it could be determined with a detailed
analysis that the entire drainage system may require
reconstruction. Also, it should be noted that the existing pipes
consist of corrugated metal pipe which is not acceptable by
today's standards. Our cost estimate is based on the replacement
of the culverts with corrugated aluminum pipe.
Preliminary Cost Estimate
Item Quantity Unit Cost Cost
I. Unit 16
1. Resurface the
Existing Roadways
21,000
LF
$
7.00/ft
$ 197,000
2.
Repair & Clean
Curb & Gutter
92,000
LF
$
1.00/ft
$ 92,000
3.
Improve Existing
Drainage Ditches
3,390
LF
$
5.00/ft
$ 16,700
4.
Replace Curb
Inlets
3
Ea.
$
5,000/Ea.
$ 15,000
Sub -Total ...........................................$
220,700
II.
Unit 17
1.
Roadway Replacement
w/Swales
39,750
LF
$
16.00/ft
$ 556,000
2.
Roadway Resurfacing
w/Curb & Gutter
23,730
LF
$
7.00/ft
$ 166,110
3.
Remove Existing
Roadway
390P750
LF
$
3.00/ft
$ 109,250
7 � r7
Mr. Robert S. Mary 9
November 30, 1990
Page 6
Item Quantity Unit Cost
4. Drainage Culverts
Sub-Total...........................................$1,531,250
a. 15110 CAP
15
LF
$ 19.00/LF
$
285
b. 18110 CAP
749
LF
$ 23.00/LF
$
17,227
c. 21110 CAP
135
LF
$ 26.00/LF
$
3,510
d. 24110 CAP
374
LF
$ 30.00/LF
$
11,220
e. 48110 CAP
68
LF
$ 97.00/LF
$
6,596
f. 54110 CAP
51
LF
$ 110.00/LF
$
5,610
g. 28" x 20" CAP
62
LF
$ 40.00/LF
$
2,480
5.
Remove Existing
Culverts
1,454
LF
$ 6.00/LF
$
8,724
6.
Concrete Headwalls
a. 15110 CAP
2
Ea.
$ 500.00/Ea.
$
1,000
b. 18110 CAP
36
Ea.
$1000.00/Ea.
$
36,000
c. 21110 CAP
2
Ea.
$1800.00/Ea.
$
3,600
d. 24110 CAP
14
Ea.
$2000.00/Ea.
$
28,000
e. 48110 CAP
2
Ea.
$4500.00/Ea.
$
9,000
f. 54110 CAP
2
Ea.
$5500.00/Ea.
$
11,000
g. Double 18"0 CAP
4
Ea.
$1800.00/Ea.
$
7,200
h. 17" x 13110 CAP
9
Ea.
$1600.00/Ea.
$
14,400
1. 21" x 15"0 CAP
3
Ea.
$1800.00/Ea.
$
5,400
7.
Dispose of Existing
Concrete Headwalls
1
LS
$ 50,000/Ea.
$
50,000
8.
Regrade Roadway
Swales
69,500
LF
$ 3.00/ft
$
208,500
9.
Improve Existing
Drainage Ditches
12,180
LF
$ 5.00/ft
$
60,900
1O.Repair
& Clean
Curb & Gutter
471460
LF
$ 1.00/ft
$
4'/01460
Sub-Total...........................................$1,364,472
III.
Elkcam Waterway
1.
Complete Seawall
9,850
LF
$ 125.00/ft
$1,231,250
2.
Drainage Control
Structure
1
Ea.
$300,000/Ea.
$
300,000
Sub-Total...........................................$1,531,250
Mr. Robert S. McC ary
November 30, 1990
Page 7
Item
IV. Wentworth
Drainage Ditch
1. Fill Existing Ditch
2. Reconstruct New
Drainage Ditch
Quantity
Unit
Cost
12,963 Cu.Yd. $ 9.00/CY $ 58,339
13,000 Cu.Yd. $ 3.50/CY $ 45,500
Sub -Total ...........................................$ 103,834
Sub -Total Items I, II, III & IV .....................$3,220,256
Construction Contingency (10%) ......................$ 322,000
Total Cost..........................................$3,542,256
Roadway replacement includes new asphalt and coquina base.
The existing soil cement base is proposed to be used for the
required stabilized subgrade.
The herein cost estimate is based on a limited amount of time in
the field. During construction, as items are uncovered,
additional required improvements may be discovered. The unit
costs for pavement replacement does not include fill nor new
subgrade construction.
We are available to meet and discuss any aspect of this report at
your earliest convenience.
Should Vou require further information, please call.
Ver ru y �u
C �►
Randy,, Mosby, E.