HomeMy WebLinkAboutMayor Report to City CouncilCity of Sebastian
POST OFFICE BOX 780127 ❑ SEBASTIAN, FLORIDA 32978
TELEPHONE (407) 589-5330 ❑ FAX (407) 589-5570
M E M O R A N D U M
DATE: June 11, 1990
TO: W. E. Conyers, Mayor Sebastian City Council
FROM: Robert S. McClary
RE: General Development
BACKGROUND
For over a year the City and General Development Corporation
("GDC") officials have been discussing the City's acceptance of
certain street and drainage improvements in units 16 and 17,
Sebastian Highlands. On January 29, 1990 a conference was held
in my office. Representing GDC at this meeting were: George
Kulczycki, Jack O'Neil, Ralph (Cap) Cain and Roger Norton.
Representing the City were: David Fisher, City Engineer and
myself.
On January 31, 1990 in response to our conference of January 29,
1990, I forwarded a memorandum to the Mayor and City Council
which outlined a process by which the City could accept
improvements in unit 17. By that time, GDC had withdrawn its
request for acceptance of unit 16 improvements.
On February 7, 1990 the City Council reviewed my recommendation
at its Regular Workshop Meeting. At that meeting, a number of
other issues were raised regarding GDC and the City. The matter
was to be carried over to the February 14, 1990 meeting. However,
at GDC's request, I withdrew the matter from the agenda in order
to provide GDC more time to respond to our concerns.
On February 20, 1990 I met with George Kulczycki and Ralph (Cap)
Cain to review the City's concerns and requests.
Re: General Development
Page #2
On March 7, 1990 I wrote GDC asking for their position and
response to a number of questions. This was the last
correspondence between the City and GDC. Shortly thereafter, GDC
filed for protection from creditors under Chapter 11.
On June 7, 1990, a meeting was held between the City of
Sebastian ("City") and General Development Corporation. ("GDC").
Representing the City were Bruce Cooper, David Fisher and I.
Representing GDC were Jack O'Neil, Ralph (Cap) Cain and George
Kulczycki. The purpose of the meeting was to discuss the City's
acceptance of street and drainage improvements constructed by
GDC. If the City were to reach an agreement with GDC, the
agreement would have to be submitted and ratified by the
bankruptcy trustee since GDC has filed for protection under
Chapter 11 in federal bankruptcy court.
CITY MANAGER POSITION
Before I review the specific requests, I want to reiterate my
position on several issues regarding units 16 and 17 and other
1979 contract provisions:
1. The City is not required to accept any street or
drainage improvement in units 16 and 17 until all street and
drainage facilities are complete and constructed to the standards
mandated by the 1979 agreement. That agreement states, in part
14. General and City agree that when
General completes construction of the roads
and drainage facilities in Units 16 and 17 it
shall submit them to the City for acceptance
for maintenance by the City.
The City therefore is not compelled pursuant to the terms of the
1979 agreement to accept any of the improvements until all
improvements are completed, inspected and approved by resolution
of the City Council.
2. GDC is responsible for the maintenance of all street
and drainage improvements in unit 16 and 17 until accepted by the
Sebastian City Council by resolution.
3. The City is not required to accept any improvement
unless constructed to the standards established in the 1979,
agreement.
Re: General Development Page #3
4. The City is responsible for only properly aligned
ditches and drainage structures in units 1 -15. GDC is
responsible for correcting any improperly or mis-aligned ditches
and drainage facilities in units 1 - 15, most noticeably is the
"Wentworth" canal.
RECOMMENDATION
The City may wish to pursue negotiations with GDC to accept
maintenance responsibilities for streets and drainage structures
in Units 16 and 17 in exchange of certain assets GDC owns in
the community. Some of these assets may be:
1. Parks and "PS" tracts, including the final tract of
Hardee Park and some 35 small tracts throughout the City which
are zoned "PS".
2. Lot #4, Block 208, Unit 10, Sebastian Highlands as an
addition to the Barber Street Sports Complex. Also, GDC may be
able to effect a trade with the property buyer for the other lot
needed at the Sports Complex - Lot 3, Block 208, Unit 10.
3. GDC's lot (s) necessary for Airport Drive East to
connect from Main Street to airport property.
4. Tracts A, B, and D in Unit 13, Sebastian Highlands
which are known as "the old swimming hole" and are adjacent to
Stonecrop along the banks of the St. Sebastian River.
5. GDC's tracts in unit 17 which are used for drainage
retention but not so designated on the plat.
6. The GDC warehouse property on Barber Street, located to
the south of the Fire Station.
7. GDC owned property for additional right-of-way for an
extension of Fleming Street from "Chesser's Gap" to intersect
with South Easy Street within unit 16.
8. Schuman Lake including the "island" and property need
for access from Kildare.
9. To ask GDC to upgrade the construction standards of
South Easy Street in unit 16 by widening the pavement to 24 feet
and constructing a bike path.
Re: General Development Page #4
CONCLUSION
I understand GDC's desire to transfer to the City the maintenance
responsibilities for street and drainage improvements in units 16
& 17. The City is very concerned about GDC's lack of maintenance
in units 16 and 17. We want to work with GDC to bring these
facilities up to appropriate standards. However, the City needs
appropriate trade - offs from GDC to justify the acceptance of
street and drainage improvements in units 16 and 17.
It is my hope to further refine the elements of a possible
agreement with GDC, review any proposal with GDC, then to submit
a plan and recommendations to the Mayor and City Council for
review and action.
/jmt
CITY OF SEBASTIAN
PARK SITE (PUBLIC SERVICE LAND USE)
STATUS
PLAT PARKS(PS) PARKS (PS) PARKS SHOWN
UNIT SHOWN ON DEDICATED ON GDC
CITY LU MAP ON PLAT MASTER PLAN
SH -1
SH -2
SH -3
SH -4
SF1-5
SH -6
SH -7
SH -8
Tract A
None
None
None
None
Lake Hardee Pk.
L.H. Park
Lake Hardee
-
Park
Park
None
None
Tract A
Tract C -
Block 193 -
SH -9 Tract A * -
SH -10 Tract A
Tract
B -
Tract
C -
Tract
D -
Tract
E -
Tract
F ** -
Block
300 -
STATUS
Tract
A
Deeded
L.H.
Park
Portion
B -
Tract
Deeded
Lake
Hardee
-
2.68
Ac. Tract
Deeded
Tract
B
Deeded
Lot 9
Deeded
Tract
A
Diocese
of Cen.
Florida
Tract
C
-
Block
193
-
Tract
A
(Portion) -
Tract
A -
Tract
B -
Tract
C
Tract
D Deeded
Tract
E Deeded
-
Deeded
Block
300 -
* Tract A in SH -9 platted in 2 parts
** Less Fire Station
�1o/9
Park Site (Public Service Land Use)
Status,
(Cont.)
Page -2-
PLAT
PARKS(PS)
PARKS (PS)
PARKS
SHOWN
STATUS
UNIT
SHOWN ON
DEDICATED
ON
GDC
CITY LU MAP
ON PLAT
MASTER
PLAN
SH -11
Tract A
-
Tracts
A
-
Tract B
Tract C
-
Tract
C
-
Tract D
-
Tract
D
-
Tract E
-
Tract
E
-
SH -12
None
None
SH -13
Tract A
Tract B
Tract D
SH -14
Tract B
-
Tract
B
-
SH -15
Tract G
-
Tract
G
-
SH -16
Tract C
Tract D
-
Tract
D
-
Tract E
-
Tract
E
-
Tract F
-
Tract
F
-
Tract G
-
Tract
G
-
Tract H
-
Tract
H
-
Tract J
-
Tract
J
-
Tract K
-
Tract
K
-
Tract M
-
-
First
Baptist
Church
Vero,
Tract N
-
-
Deeded
Tract P
-
Tract
P
-
SH -17
Tract A
-
Tract
A
-
Tract D
-
-
G.D.U.
Tract F
-
-
Ind. R.
Christian
Church
Tract G
-
-
Ind.R.
County
School
Tract H
-
Tract
H
-
Tract I
-
Tract
I
-
Tract K
-
Tract
K
-
Tract M
-
Tract
M
-
Tract N
-
_
PARK SITE (PUBLIC SERVICE LAND USE)
STATUS, (CONT.)
PAGE -3-
PLAT PARKS(PS) PARKS(PS) PARKS SHOWN STATUS
UNIT SHOWN ON DEDICATED ON ON GDC
CITY LU MAP PLAT MASTER PLAN
SH -17 Tract O
Tract Q - Tract Q -
Tract R - Tract R -
Tract S - Tract S -
49 Parcels 2 Parcels 38 Parcels 9 Deeds
DATE:
TO:
FROM:
RE:
City of Sebastian
r
POST OFFICE BOX 780127 ❑ SEBASTIAN, FLORIDA 32978
TELEPHONE (407) 589-5330
FAX 407-589-5570
M E M 0
31 January 1990
Robert S. McClary
Dave Fisherlv!%- r
LIST OF STREETS PAVED TO DA'Z'E WITHIN UNIT 17
Followinq for your information and use is the subject list
with approximate paved distances as of this date.
OLD EXISTING STREETS
BARBER ST.
2300
SCHUMANN DR.
8500
FILBERT ST.
3900
HINCHMAN
2050
NEBRASKA CIRCLE
2550
FRIAR CT.
1750
DRYANT CT.
800
MELTON AVE.
1550
LANCASTER ST.
1000
KARRIGAN ST.
1000
LARC1iMONT TERRACE
3550
LANDOVER DR.
1000
REDGRAVE DR.
1200
JOY RAVEN
200
CURTIS
85 f)
THUNDERBIRD DR.
1150
S. EASY ST.
1900
CAPRONA ST.
2500
EMPRESS AVE.
1900
MARSH ST.
800
DAHL AVE.
1900
ORMAND CT.
1000
CAPRI AVE.
2100
LF
M () R E
Cr Gl
PAVED STREETS IN UNIT 17
31 JAN 90
PG 2 OF 3
EN( -',LAR DR.
2000
OSCF(?LA
900
AE'ItIA ST.
1000
ADMIRAL CIRCLE
1900
H.,IIIi' ST.
700
LANi'F S'I' .
200
MAPRY ST.
3330
CRAWr'(')RI) DR.
2300
SPRING= VALLEY AVE.
1700
----------------------------------------------------------
TOTAL
58.480 LF - 11.08 MILES
NEWLY COMPLETED ROADS
PARPER S1'.
6'750
MIDWAY CT.
500
PRISPAtlE ST.
525
AL.UFA DR.
2050
A1,IIAIIRRA AVE.
105n
H IPAII ST.
800
11.11ICAN .9'r.
800
131IST01, ST.
2500
KEYSTONE UR.
1000
!1 LRA I'T011 AVE.
1500
ARC AD I A DR.
1800
TRACY UR.
1050
PIPIRF TERRACE
305n
1)(_11101,11SS AVE.
1450
Al r1IE1IS CT.
200
DARI)E11 CT.
.-,on
PIRTLE Cr.
15n
fl I L,LER DR.
2,100
I ALTOCK ST.
600
1�►3I1tJE DR.
1100
MA1,17 AVE.
250
CAMILO CT.
250
DAY UR.
4800
ALEX 19 S'I' .
200
LF
'IOTA1. 35.275 LF 6.67 MILES
--------------------------
M () 11 E
PAVED STREETS IN UNIT 17 31 JAN 90
PG 3 'UF 3
------------------------------------------------------------------
STREETS NOT YET CONSTRUCTED
TRACY DRIVE
1300 LF
BRISTOL ST.
300
EMPIRE TERRACE
300
BRISBANE ST.
300
ALHAMBRA AVE.
700
I'T HACA AVE.
1300
EMPRESS AVE.
1600
SPRING VALLEY AVE
2,100
ALEXIS ST.
1-0
GIRARD AVE.
1500
CHERRY CT.
£300
ARI-TTER ST.
1100
APPLEBERG
1100
SUNBURST
1200
THUNDERBIRD DR.
4500
CAPRONA ST.
1000
TOTAL 19,650 LF 3.71 MILES
* ff ff