Loading...
HomeMy WebLinkAboutConcrete Road Patch ProblemCity of Sebastian Pat Flood, Jr. POST OFFICE BOX 127 ❑ SEBASTIAN, FLORIDA 32958 Robert Doherty Mayor TELEPHONE (305) 589-5330 Supt., Public Works April 5, 1988 General Development Corporation Construction Division Sebastian Highlands Unit 17 16 Sebastian Florida Attnt Jim Pope RE: GDC Unit 17 Improvements Dear Mr. Pope: Please be advised that an on site inspection was performed by our city Engineer on March 30th, 1988 and again on April 1st, 1988. The following recommendations were made and must be complied with: The west pour of the concrete patch is showing signs of structural distress and failure. We discussed the installation of the patch with our on-site inspector Mr. D. Floward, and he indicated that traffic may have been allowed to use the roadway patch to soon before the concrete had cured. We have reviewed GDC's detail -for the concrete patch replacement. It appears that no structural consideration was given to the concrete patch detail for traffic impact loading. The reinforcement specified is minimal and mainly for temperature and shrinkage. Based on our inspections and review of the detail for concrete roadway patch replacement, it is our recommendation that the concrete patch be removed. We recommend that a asphalt patch be used instead of the concrete patch. This will prevent future problems between the Interface of the flexible roadway and the ridge concrete patch. If GDC insists on the concrete patch, it should be structurally re- designed to carry the anticipated traffic loading. In addition, traffic shall be prevented from travel on the patch until the concrete has adequate time to cure. It is imperative that these recommendations be taken care of as soon as possible and if you should have any questions, Please feel free to contact my office regarding this matter. We look forward to hearing from you with regards to this matter. Very truly yours, a Jerry Thomas Engineering Department JT: 1-k This letter was hand delivered on April 5th, -1988. Received by General Development Representative