HomeMy WebLinkAboutWater & Sewer InstallationGENERAL DEVELOPMENT UTILITIES INC. SERVICE AVAILABILITY AND MAIN EXTENSION POLICY MATERIAL: Base Cost With Inserts: Other Material: Meter box with lid $ 8.75 Saddle 6.00 Corporation Stop 15.00 Angle Valve 10.00 Watts #7 double "C" Valve backflow preventor 13.00 25' Service line 8.75 Plumbers piece SP -2 Adaptors 3.85 Total Material: LABOR: Average Installation Time = 1 hour for 3 service technicians EQUIPMENT - 1 backhoe @ $25.00/per hour 2 trucks @ $7.00/per hour TOTAL COST: METER INSTALLATION COST 3/4" $ 29.70 65.35 $ 95.06 23.40 25.00 14.00 $ 157.45 METER SIZE 1 1, z $ 64.95 $ 151.60 65.35 $ 130.30 23.40 25.00 14.00 $ 192.70 65.35 $ 216.95 23.40 25.00 14.00 $ 279.35 211 $ 210.90 65.35 $ 276.25 23.40 25.00 14.00 GENERAL DEVELOPMENT UTILITIES, INC. SERVICE AVAILABILITY AND MAIN EXTENSION POLICY PER BOOKS 12/31/80 i:ater Treatment Plant Capacity Cost Cost $ 65,537 Capacity (GPD) 144,000 Water Main Capacity/Main Extension Cost Transmission and Distribution Mains CURRENT PROJECTED CONSTRUCTION CONSTRUCTION $ 296,000 --- 288,000 --- COST PER COST PER TOTAL UNIT FRONT FOOT $ 371,537 $ .86 432,000 Installed Footage(ft) $ 154,879 $ 154,879--- 16,107 --- 16,107 $ 9.62 Sewage Treatment Plant Capacity Cost Cost --- $ 665,391 $ 665,391 Capacity (GPD) --- 300,000 --- 300,391 $ 2,22 Sewer Main Capacity/Main Extension Cost Collection and Pumping Plant Cost --- $ 338,767 $ 338,767 Installed Footage (ft) --- 16,429 --- 16,429 $ 20.62 NOTE: Over 80% of the lots to be served are 80 x 125. An average of 60 ft. of water main or sewage collection lines is required to serve the 80 ft. frontage of the lots. Line costs on this schedule are bused upon service to 80 ft. frontage lots. $ 7.22 $15.47 GENERAL DEVELOPMENT UTILITIES, INC. SEBASTIAN HIGHLANDS WATER & SEWER DIVISION SCHEDULE OF SERVICE AVAILABILITY AND MAIN EXTENSION CHARGES WATER Plant Capacity Line Extension Meter Connection (3/4") Meter Connection (1") Meter Connection (1?") Meter Connection (2") SEWER Plant Capacity Line Extension PRESENT $0.36 per GPD $2.19 per foot $75.00 $115.00 $190.00 $265.00 L. PRESENT $0.36 per GPD $6.54 per foot PROPOSED $0.86 per GPD $7.22 per foot $100.00 $150.00 $250.00 $350.00 $2.22 per GPD $15.47 per foot The effect on a single family residential unit with a 5/8" X 3/4" water meter and 80 feet fronting on the water and sewer mains, for example, is as follows: PRESENT PROPOSED Water $376.20 $978.60 Sewer $649.20 $11,792.60