HomeMy WebLinkAboutWater & Sewer InstallationGENERAL DEVELOPMENT UTILITIES INC.
SERVICE AVAILABILITY AND MAIN EXTENSION POLICY
MATERIAL:
Base Cost With Inserts:
Other Material:
Meter box with lid
$ 8.75
Saddle
6.00
Corporation Stop
15.00
Angle Valve
10.00
Watts #7 double "C" Valve
backflow preventor
13.00
25' Service line
8.75
Plumbers piece SP -2 Adaptors
3.85
Total Material:
LABOR:
Average Installation Time = 1
hour for
3 service technicians
EQUIPMENT -
1 backhoe @ $25.00/per hour
2 trucks @ $7.00/per hour
TOTAL COST:
METER INSTALLATION COST
3/4"
$ 29.70
65.35
$ 95.06
23.40
25.00
14.00
$ 157.45
METER SIZE
1 1,
z
$ 64.95 $ 151.60
65.35
$ 130.30
23.40
25.00
14.00
$ 192.70
65.35
$ 216.95
23.40
25.00
14.00
$ 279.35
211
$ 210.90
65.35
$ 276.25
23.40
25.00
14.00
GENERAL DEVELOPMENT UTILITIES, INC.
SERVICE AVAILABILITY AND MAIN EXTENSION POLICY
PER BOOKS
12/31/80
i:ater Treatment Plant Capacity Cost
Cost $ 65,537
Capacity (GPD) 144,000
Water Main Capacity/Main Extension Cost
Transmission and Distribution Mains
CURRENT PROJECTED
CONSTRUCTION CONSTRUCTION
$ 296,000 ---
288,000 ---
COST PER COST PER
TOTAL UNIT FRONT FOOT
$ 371,537 $ .86
432,000
Installed Footage(ft) $ 154,879 $ 154,879--- 16,107 --- 16,107 $ 9.62
Sewage Treatment Plant Capacity Cost
Cost --- $ 665,391 $ 665,391
Capacity (GPD) --- 300,000 --- 300,391 $ 2,22
Sewer Main Capacity/Main Extension Cost
Collection and Pumping Plant
Cost --- $ 338,767 $ 338,767
Installed Footage (ft) --- 16,429 --- 16,429
$ 20.62
NOTE: Over 80% of the lots to be served are 80 x 125. An average of 60 ft. of water main or sewage collection lines is required to
serve the 80 ft. frontage of the lots. Line costs on this schedule are bused upon service to 80 ft. frontage lots.
$ 7.22
$15.47
GENERAL DEVELOPMENT UTILITIES, INC.
SEBASTIAN HIGHLANDS WATER & SEWER DIVISION
SCHEDULE OF SERVICE AVAILABILITY AND MAIN EXTENSION CHARGES
WATER
Plant Capacity
Line Extension
Meter Connection (3/4")
Meter Connection (1")
Meter Connection (1?")
Meter Connection (2")
SEWER
Plant Capacity
Line Extension
PRESENT
$0.36 per GPD
$2.19 per foot
$75.00
$115.00
$190.00
$265.00
L.
PRESENT
$0.36 per GPD
$6.54 per foot
PROPOSED
$0.86 per GPD
$7.22 per foot
$100.00
$150.00
$250.00
$350.00
$2.22 per GPD
$15.47 per foot
The effect on a single family residential unit with a 5/8" X 3/4" water
meter and 80 feet fronting on the water and sewer mains, for example, is
as follows:
PRESENT
PROPOSED
Water $376.20
$978.60
Sewer $649.20
$11,792.60