Loading...
HomeMy WebLinkAboutAsphalt DensityATEC Associates, Inc. VV/1779 Canova Street, S.E Palm Bay, Florida 32909 (407) 724-1273 REPORT of IN-PLACE DENSITY ASPHALT TESTS PROJECT: Sebastian Highlands Unit #17 CLIENT : General Development Corp. TEST METHOD : ASTM D-2922 WORK RELEASE: 3871-04 FIELD TEST DATA SPECIFIED MINIMUM PERCENT COMPACTION: 98.0 %. TEST LOCATION DENSITY (PCF) NO. FIELD Class A PROJECT NO.: 71-72-046 CLIENT NO. 66 TEST DATE 6/02/88 LAB NO. SH880898 MAX. COMP 1 200' E of Schumann R/S 125.8 126.1 99.8 2 600' E of Schumann L/S 125.5 126.1 99.5 3 1000' E of Schumann C/L 125.1 126.1 99.2 4 1400' E of Schumann R/S 126.0 126.1 99.9 5 1800' E of Schumann L/S 125.7 126.1 99.7 2200' E of Schumann C/L 126.2 126.1 100.1 •6 7 2600' E of Schumann R/S 125.9 126.1 99.8 8 3000' E of Schumann L/S 125.2 126.1 99.3 9 3400' E of Schumann C/L 126.5 126.1 100.3 10 3800' E of Schumann R/S 127.1 126.1 100.8 11 4200' E of Schumann L/S 127.0 126.1 100.7 12 4600' E of Schumann C/L 127.8 126.1 101.3 13 5000' E of Schumann R/S 128.3 126.1 101.7 14 5400' E of Schumann L/S 126.9 126.1 100.6 15 5800' E of Schumann C/L 126.7 126.1 100.5 16 6200' E of Schumann R/S 127.3 126.1 101.0 Technician: R.Plemmons/J.Mckenna Remarks: Footage pulled from South Intersection of Barber Street',&, .y Schumann Drive. (Barber Street) ALL TESTS MEET THE MINIMUM REQUIREMENT Res d�£4;1y- .Subrri t'ted, OF 98% OF THE MAXIMUM DENSITY. ATEA rsicates , John: E_ Vice Pret,ident Offices: Cincinnati OH Corporate Office: i^^arra lu ris IN Raleigh. NC Anenorage. AK Dallas TX Griffith. IN Longmont, CO Salisbury, MD Affiliates: Alltrnla. RaI (ilkDavion more %1C OH DPnver. CO Huntsville, AL Indianapolis, IN Lousiville, KY Miami, FL Savannah. GA Toledo. OH f:nrrunghanr A,. Ft Wavne. IN Jacksonville. FL Montgomery. AL Washington. DC Garherhurg, MD Lexington KY Nashville. TN West Palm Beach. FL tin"''• ATEC Associates, Inc. 'V 1779 Canova Street, S.E. ` Palm Bay, Florida 32909 (407) 724-1273 REPORT Class A of Page 1 of 2 IN-PLACE ASPHALT DENSITY TESTS PROJECT: Sebastian Highlands Unit #17 PROJECT NO.: 71-72-046 CLIENT : General Development Corp. CLIENT NO. 66 TEST METHOD : ASTM D-2922 TEST DATE 5/12/88 WORK RELEASE: 3871-04 LAB NO. SH880737 • Offices: Anchorage AK Awinta (;A Hati'mnrr MCS uiryhav Corporate Office: 1,o-anapubs it. FIELD TEST DATA Cmcmnan OH SPECIFIED MINIMUM PERCENT COMPACTION 98.0 9a. Raleigh. NC TEST LOCATION Gr ft lh. IN DENSITY (PCF) Salisbury. MD % NO. Huntsville. AL FIELD MAX. COMP 1 Arcadia 50' W of W Miami. FL 128.8 126.1 102.1 Jacksonville FL end of pavement C/L Washington. DC Gaitherhurq. MD Lexington KY 2 Arcadia 450' W of W �- 126.2 126.1 100.1 end of pavement L/S 3 Arcadia 850' W of W 126.7 126.1 100.5 end of pavement R/S • 4 Arcadia 1250' W of W 130.6 126.1 103.6 end of pavement C/L 5 Arcadia 1450' W of W 129.8 126.1 102.9 end of pavement L/S 6 Tracy Dr 50' N of 128.5 126.1 101.9 edge of Arcadia R/S 7 Tracy Dr 450' N of 125.0 126.1 99.1 edge of Arcadia C/L 8 Tracy Dr 850' N of 125.1 126.1 99.2 edge of Arcadia L/S 9 Keystone Dr 50' N of 123.6 126.1 98.0 edge of Arcadia R/S 10 Keystone Dr 450' N of 131.3 126.1 104.1 edge of Arcadia C/L 11 Keystone Dr 850' N of 125.6 126.1 99.6 edge of Arcadia L/S 12 Keystone Dr 1250' N of 126.4 100.2 edge of Arcadia R/S • Offices: Anchorage AK Awinta (;A Hati'mnrr MCS uiryhav Corporate Office: 1,o-anapubs it. Cmcmnan OH Raleigh. NC Dallas TX Gr ft lh. IN Longmont. CO Salisbury. MD Affiliates: Davlon OH Huntsville. AL Lousiville. KY Savannah. GA "'>+ Danvei CO Indianapolis, IN Miami. FL Toledo. OH Ft Wavne. IN Jacksonville FL Montgomery, AL Washington. DC Gaitherhurq. MD Lexington KY Nashville, TN West Palm Beach. FL �- • ATEC Associates, Inc. VV1779 Canova Street, S.E. Palm Bay, Florida 32909 (407) 7241273 REPORT Class A of Page 2 of 2 IN-PLACE ASPHALT DENSITY TESTS PROJECT: Sebastian Highlands Unit #17 PROJECT NO.: 71-72-046 CLIENT : General Development Corp. CLIENT NO. 66 TEST METHOD : ASTM D-2922 TEST DATE 5/11/88 WORK RELEASE: 3871-04 LAB NO. PM880737 FIELD TEST DATA SPECIFIED MINIMUM PERCENT COMPACTION 98.0 %. TEST LOCATION DENSITY (PCF) John- W.,'Har1lee P.E. % NO. V i ci: .President FIELD MAX. COMP 13 Stratton Ave. 50' W of W 126.1 126.1 100.0 edge of Bristol L/S Ancnnraye. AK Dalla< TX Griffith. IN Longmont, CO Salisbury,, 100 - Affiliates: 14 Stratton Ave. 450' W of W 127.2 126.1 100.9 Miami. FL edge of Bristol R/S Ft Wavne. IN Jacksonville. FL Montgomery. AL Washington, DC - ��" • 15 Stratton Ave. 850' W of W 124.8 126.1 99.0 �6 edge of Bristol Stratton Ave. 1250' C/L W of W 124.3 126.1 98.6 edge of Bristol L/S 17 Miller Dr 50' S of N 127,7 126.1 101.3 end of pavement R/S 18 Miller Dr 450' S of N 127.2 126.1 100.9 end of pavement C/L 19 Miller Dr 850' S of N 126.8 126.1 100.6 end of pavement L/S 20 Miller Dr 1250' S of N 126.5 126.1 100.3 end of pavement R/S 21 Miller Dr 1650' S of N 123.9 126.1 98.3 end of pavement C/L 22 Miller Dr 2050' S of N 127.7 126.1 101.3 end of pavement L/S 23 Birtle Ct 100' S of N 128.7 126.1 102.1 end of pavement R/S Technician: R.Plemmons Remarks:THE ABOVE TESTS MEET THE MINIMUM REQUIREMENT OF 98% OF MAXO. ''EENSITY. Respectfuid'y 'S'dbi,itted, ATEC Associates, Inc,. -- nc..-.John John- W.,'Har1lee P.E. V i ci: .President Corporate Office: innw aIx i, m: Offices' Cincinnati OH Raieigh.l4!C',s Ancnnraye. AK Dalla< TX Griffith. IN Longmont, CO Salisbury,, 100 - Affiliates: Ari:,nta GA Davton OH Huntsville. AL Lousiville. KY Savannah. Of firawilo e P,ffi D' -rive, CO Indianapoli,,:, IN Miami. FL Toledo. OH Ft Wavne. IN Jacksonville. FL Montgomery. AL Washington, DC - ��" • Gallherburq. MD Lexington KY Nashville. TN West Palm Beach, FL � is ATEC Associates, Inc. VV1779 Canova Street S E Palm Bay, Florida 32509 (407) 724-1273 REPORT of IN-PLACE ASPHALT DENSITY TESTS PROJECT: Sebastian Highlands Unit #17 CLIENT : General Development Corp. TEST METHOD : ASTM D-2922 WORK RELEASE: 3871-04 FIELD TEST DATA Class A PROJECT NO.: 71-72-046 CLIENT NO. 66 TEST DATE 5/11/88 LAB NO. SH880726 SPECIFIED MINIMUM PERCENT COMPACTION 98.0 %. TEST LOCATION DENSITY (PCF) % NO. FIELD MAX. COMP 1 50' E of W end of pavement 129.7 126.1 101.4 Alhambra L/S 2 450' E of W end ofP avement 123.4 126.1 97.9 Alhambra R/S 3 850' E of W end of pavement 128.8 126.1 102.1 C/L .Alhambra 4 50' N of Alhambra on 127.5 126.1 101.1 Bristol Drive L/S 5 450' N of Alhambra on 130.2 126.1 103.3 Bristol Drive R/S 6 850' N of Alhambra on 127.6 126.1 101.2 Bristol Drive C/L 7 1250' N of Alhambra on 124.1 126.1 98.4 Bristol Drive L/S 8 1450' N of Alhambra on 132.2 126.1 104.8 Bristol Drive R/S 9 1850' N of Alhambra on 126.3 126.1 100.2 Bristol Drive C/L 10 2050' N of Alhambra on 128.5 126.1 101.9 Bristol Drive L/S Technician: R.Plemmons Remarks:THE ABOVE TESTS MEET THE MINIMUM REQUIREMENT OF 98% OF MAX, DENSITY. Respectfully Submitted, ATEC-A4sociates,::Tnc. John W.; Hardee P_' Vice. President • Offices: Cinunnati Or Corporate Office: Raleigh. NC Ancnnragr- Ar Dalla,. TX Griffith. IN Longmont, CO Salisbury, MD Affiliates: AlJarnla GA Davton OH Huntsville. AL Lousiville, KY Savannah. GA •'"'+''" ' iltt 1tinl0rr• t,+;-' [lan it'i CO Indianapolis. IN Miami. FL Toledo. OH r''+^°'' r''•"'' `•"'' ;;n n•.ngr,arA, Fi Wavne. IN Jacksonville. FL Montgomery. AL Washington. DC Garherhurq, MD Lexington KY Nashville. TN West Palm Beach. FL "" V� ATEC Associates, Inc. vy177 Canova Street, S.E Pam Flay, Florida 32909 (407)724-1273 REPORT of IN-PLACE ASPHALT DENSITY TESTS PROJECT: Sebastian Highlands Unit #17 CLIENT : General Development Corp. TEST METHOD : ASTM D-2922 WORK RELEASE: 3871-04 FIELD TEST DATA SPECIFIED MINIMUM PERCENT COMPACTION 98.0 %. TEST LOCATION Remarks:THE DENSITY (PCF) NO 0+0 is at Barber Street for Aldea. FIELD 1 Sta 1+50 L/S Aldea Drive 129.2 2 Sta 5+50 R/S Aldea Drive 130.0 3 Sta 9+50 C/L Aldea Drive 125.3 4 Sta 13+50 L/S Aldea Drive 129.1 5 Sta 17+50 R/S Aldea Drive 129.1 6 Sta 0+50 L/S Duban Street 134.7 7 Sta 4+50 R/S Duban Street 125.1 8 Sta 1+50 R/S Duncan Street 128.5 � 9 Sta 5+50 L/S Duncan Street 130.2 Class A PROJECT NO.: 71-72-046 CLIENT NO. 66 TEST DATE 5/10/88 LAB NO. SH880716 MAX. 126.1 126.1 126.1 126.1 126.1 126.1 126.1 126.1 126.1 COMP 102.5 103.1 99.4 102.4 102.4 106.8 99.2 101.9 103.3 Technician: R.Plemmons Remarks:THE ABOVE TESTS MEET THE MINIMUM REQUIREMENT OF 98% OF MAX. DENSITY. 0+0 is at Barber Street for Aldea. 0+0 is at Bristol for Duban & Duncan. Resa-sect�f ully Submitted, AT;Efi_ Associates,, Inc. John W. Harllee P. E. Vice President Corporate Office: ,, i rvlan „r, r Offices' Cincinnati OH Raleigh, NC Affiliates: me c,raae A Da!ia< TX Griffith. IN Longmont, CO Salisbury, MD �!i;,nta GA Davin❑ OH Huntsville, AL Lousrvrlle, KY Savannah. GA ^" Ei:+l:rnnr�R"( C)enn'i CO Indianapolis, IN Miami. FL Toledo. OH F? wavne. IN Jacksonville. FL Monlqomery, AL Washington. DC P4,.: r! a n !. f;a;t!ir•rhurq, MD Lexington KY Nashville. TN West Palm Beach, FL "'