Loading...
HomeMy WebLinkAboutAsphalti=^JP <51 PlTTSBh H TcSTING LABC ATORY s T -C 3901 N.W 29th AVENUE. MIAMI. FLORIDA 33142 AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS !�•,E ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION F �an0 r FOR PUBLiCA TION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING MA 3707 OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. LABORATORY No. 396 DER No. Date: Oct. 2, 1921 CLIENT'S No. REPORT OF HUBBARD-FIELD STABILITY TEST CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands w/r 3261 SAMPLE: Type II Asphalt sampled by GDC representative from unit 16 paving by Cowan Construction. LOCATION: Lot 7 Block 563 RESULTS: GRADATION SIEVE SIZE % PASSING 3/8 99 4 79 10 59 40 33 80 13 200 1.5 EXTRACTION Bitumen: 6.00% STABILITY 1. 1980 2. 1398 3. 1215 Ava. 1393 Tech: J. Burdick CC- 1 Client, Attn: Ener. Cept. 2 Client, Attn: Enqr. Dept. , 3320 S. Federal Hwy., Port St. Lucie, FL 1 City of Sebastian 1 City Engineer, Robert Llovd. 1 Tech. 2 ' �A • SPECI FICATIONS 9010 max. 12°a max . 1200 min. Respectfully submitted, PITTSBURGH TESTING LABORATORY EAST COAST ENGINEERING John W. Harllee, C Vice President�,:��,�, 0.,T 1%'J" 1981 F,�rci iGer. P. S. L. �m PITTSBUI<G; I TESTHNG LABG.:ATORY v C 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 h C�.r''C oC`"C•�`� AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS FFq�4H�(,HE' ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUBLIC A TION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING OMA3707 OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. DER No. LABORATORY No. 397 Date: Oct. 5, 19,81 CLIENT'S No. REPORT OF HUBBARD-FIELD STABILITY TEST CLIENT: General Development Corporation _ 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands w/r 3861 SAMPLE: Type II Asphalt sampled by GDC representative from unit 16, pavine by Cowan Construction. LOCATION: Alamada Drive at Lot 8 Block 557 RESULTS: GRADATION SIEVE SIZE % PASSING 3/8 99 4 79 10 58 40 31 80 12 200 1.3 SPECIFICATIONS 90 max. 12% max. 1200 min. �! *la� r 0G i 1►", Respectfully submitted, EAST COAST ENGINEERING PITTSBURGH TESTING LABORATORY John W. Karl gee, _ Vice President~ '` jF:�9 ri I1J I `Ld VY• l • V u � Bitumen: 5.8" STABILITY 1. 2162 2. 2194 3. 2260 Avo, 2205 Tech: J..Burdick, Mutter CC- I Client, Attn: Ener. Dept. 2 Client, Attn: Engr. Dept. , 3380 S. Federal Hwy., Port St. Lucie, FL 1 City of Sebastian I City Engineer, Robert Lloyd. 1 Tech. SPECIFICATIONS 90 max. 12% max. 1200 min. �! *la� r 0G i 1►", Respectfully submitted, EAST COAST ENGINEERING PITTSBURGH TESTING LABORATORY John W. Karl gee, _ Vice President~ '` jF:�9 ri I1J I `Ld VY• l • V u � PITTSBL.:GH TESTING LABC IATORY 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 90ER No. MA 3707 CLIENT'S No. 15 A "UTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS ARE SU BRIT TEO AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PU [LOCATION OF STATEMENTS. CONCLUSIONS OR ERTR.CTS FROM OR REG AROING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. LABORATORY No. 398 Date: Oct. 5, 1981 REPORT OF HUBBARD-FIELD STABILITY TEST CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands w/r 3861 SAMPLE: Type II asphalt sampled by GDC representative from unit 16 paved by Cowan Construction. LOCATION: Harris Drive at lot 23 block 552 RESULTS: GRADATION SIEVE SIZE A PASSING 3/8 99 4 78 10 55 40 30 80 10 200 6.5 EXTRACTION Bitumen: STABILITY 1. 1315 2. 1898 3. 1365 Avg. 1259 Tech: Burdick, flutter CC- 1 Client, yttn: Ener. Deot. 2 Client, Attn: Enqr. Ceot. , 1131P0 S. Federal Hay., Port St. Lucie, FL 1 City of Sebastian 1 City Engineer, Robert Lloyd. 1 Tech. ? MA • SPECI FICATIO?1S 90% max. 12'a max. 1200 min. 111 El 'VE'u OCT 15 1981 Respectfully submitted, PITTSBURGH TESTING LABORATOfST COAST ENGINEERING 1X1 � • �, �: Q John W. Harl lee, Vice President 61.. � alo9 r C� •tic RLy�'��h SAND PITTSBIj,<GH TESTING LABC,.:ATORY 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 WER No. MA 3707 CLIENT'S No. AS A -UTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PU eLICA TION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. 3 9 9# LABORATORY No. `_1 Date: Oct. 5, 1921 REPORT OF HUBBARD-FIELD STABILITY TEST CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands w/r 3861 SAMPLE: Type II asphalt sampled by GDC representative from unit 15 paved by Cowan Construction. LOCATION: Conover at lot 18 block 553 RESULTS: GRADATION SIEVE SIZE ' PASSING 3/8 99 4 76 10 55 40 30 80 11 200 1.1 rV TT,A /`TT/,►1 Bi tumen : 5.8°'- STABILITY 1. 1°98 2. 1997 3. 1931 Avg. 1942 Tech: Burdick, Flutter CC' 1 Client, Attn: Enar. Dept. 2 Client, Attn: Engr. Dept. , °380 S. Federal Hwy., Port St. Lucie, FL 1 City of Sebastian 1 City Engineer, Robert Lloyd. 1 Tech. 2 MA • SPECIFICATIONS 90%0 max. 12'0 max. 1200 min. Pt Tier. Zai 0 i 1 5 19 61 1 Respectfully submitted, EAST COAST ENGINEERING PITTSBURGH TESTING LABORATORY John W. Ilarl tee, Vice President w-7 PITTSBL. ,GH Tc STING LABC ;ATORY 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 ffq� Ano r. WER No. MA 3707 CLIENT'S No. AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS ARE SV BMITT ED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUCLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. LABORATORY No. a00 Date: Oct. 5, 1941 REPORT OF HUBBARD-FIELD STABILITY TEST CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands w/r 3861 SAMPLE: Type II asphalt sampled by GDC representative from unit 16 paved by Cowan Construction LOCATION: Kildare at lot 27 block 559 RESULTS: GRADATION SIEVE SIZE % PASSING 3/8 99 4 78 10 59 40 33 80 13 200 1.5 P'VTIIA I�TTI'1 AI Bitumen: 6.4% - STABILITY 1. 1600 2. 1650 3. 1733 Avo. 1661 Tech: Burdick, Mutter CC, 1 Client, Attn: Ener. Ceot. 2 Client, Attn: Enqr. Deot. , °3P0 5. Federal H:•,y. , Port St. Lucie, FL 1 City of Sebastian I City Engineer, Robert Lloyd. 1 Tech. 2 i•tA 0 SPECIFICATIONS 909 max. 12 a max. rqR 7 1200 min. 1PP = 1�1 l:f OCT 151""'11 Respectfully submitted, EAST COAST. ENG!NE-E-R � G PITTSBURGH TESTING LABORATORY John W. Narllee, Vice President %y<<---PITTSB�. Gy TASTING LABC :ATORY < 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 r - AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES, All RETORTS F11 SAN (01 ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUBLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING MA 3707 OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. No LABORATORY No. 401 WE:R Date: Oct. 5, 1981 CLIENT'S No. REPORT OF HUBBARD-FIELD STABILITY TEST CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands w/r 3861 SAMPLE: Type II asphalt sampled by GDC representative from unit 16 paved by Cowan Construction. LOCATION: Kildare at Conover RESULTS: GRADATION SIEVE SIZE A PASSING 3/8 99 4 77 10 57 40 32 80 12 200 1.3 Bi tumen : 6.0°' STABILITY 1. 1980 2. 1947 3. 2030 Avg. 1986 Tech: Burdick, Mutter CC' 1 Client, Attn: Enar. Deot. 2 Client, Attn: Engr. Dept. , 8380 S. Federal Hwy., Port St. Lucie, FL 1 City of Sebastian 1 City Engineer, Robert Lloyd. 1 Tech. 2 IMA 0 SPECI FICATIOINS 90' max. 12'10 max. 1200 min. Respectfully submitted, bf'T I fi ly8l PITTSBURGH TESTING LABORj>gR:YCCAS.J ENGINEERING John W. Harl lee, Vice President y ' • :' J �•'• • A • -� FORM A07 -MA !moi' PITTSBUr<GH TESTING LABOt,ATORY . o a 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS CLASS "A" N0 CNS ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUCLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVEO PENDING OUR WRITTEN APPROVAL. ORDER No. MA 4406 LA80RATORY No. 697 Date: May 20, 1982 CLIENT'S No. REPORT ON HUBBARD FIELD STABILITY TEST CLIENT: General Development Corporation 1111 South Bayshore Drive Miami, FL 33131 PROJECT: Sebastian Highlands w/r 3861 SAMPLE: Wearing surface, type II, Cowan Const. Co., sampled by a GDC rep. on 5--18-82 in unit 16. LOCATION AM- Lot 7/8, blk 561, load 2 time 10:00 a.m. RESULTS: GRADIATION SIEVE SIZE A.M. n PASSING P.M. 1/2" 100 3/8" 98 4 78 10 56 40 29 80 13.3 200 1.5 Bitumem: 6.24h STABILITY A.M. P.M. 1. 2071 1. 2. 1575 2. 3. 1785 Avg. 1810 3. Avg. Technician: Plemmons JWH/ck SPECIFICATIONS 100N cc: 1 Client, Attn: Engr. Dept. Respectfully submitted, 2 Client, Pt. St. Lucie, Engr. Dept., 8380 S. Federal Hwy., Pt. St. Lucie, 33452 PITTSBURGH TESTING LABORATORY 1 PTL Tech., Pt. Malabar ` • 1 Cty. Clerk of Sebastian, Cty. of Sebastian PO . . Box 127, SebastIan,FL 32958 1 Cty. Engr., Cty of Sebastian, P.O. Box 127 John W. Harllee Sebastian, FL 32958, Attn: R. Lloyd Vice President 2 MA 902M MAX 1200 MAX Min. 1800