Loading...
HomeMy WebLinkAboutAsphaltFORM X07 -MA PITTSBURGH TESTING LABORATORY _o < 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 CLASS 11 A11 CAH RE`�r��y AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS FE�j AN()`H� ARE SU BHI T TED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORISATION FOR PUCLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPRDVAL. RDER No. MA 4406 LABORATORY No. 407 R CLIENT'S No. REPORT OF HUBBARD FIELD STABILITY TEST CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands w/r 3871 SAMPLED BY: GDC representative on Sept. 20, 1982. TYPE OF MIX: Type II, asphalt from Dickerson Inc. 1. 2393 1. 2310 2. 2228 2. 2475 3. 2508 3. 2403 Avg. 2376 Ava. 2396 Min. 1200 Technician: Burdick Respectfully submitted, PITTSBURGH TESTING LABORATORY JWH/ck cc: 1 Client-, Attn.-Engr. Dept. 2 Client, Pt. St. Lucie, Engr. Dept., 8380 John W. Harllee, S. Federal; Hwy., Pt. St. Lucie, 33452 Vice President 1 PTL Tech., Pt, -Malabar 1 City Engr. Mr. Earl Masteieer, P.O. Box 127 Sebastian Highlands, FL 32958 1 Cty. Eng Ir'. Cty of. Sebastian, P.O. Box 127 1 Sebastian, FL 32958, Attn: R. Lloyd 2 MA GRADATION AND EXTRACTIONS LOCATION OF SAMPLES SIEVE SIZE % PASSING SPECIFICATIONS A.M. P.M. A.M. P.M. STREET bike path bike path 1/2" 100 100 100" LOT 100` S. of Schuman Dr. 3/811 84 83 BLOCK Osceol Ave. at Schuman #4 60 59 TRUCK 3-10 Waterway 7T, 41 42 90a Max. LOAD 7940 12 13 TIME 10:00 1:00 #80 4.2 2.2 #200 12% Max. % BITUMEN 7.3 6.9 STABILITY RESULTS: A.M. P.M. 1. 2393 1. 2310 2. 2228 2. 2475 3. 2508 3. 2403 Avg. 2376 Ava. 2396 Min. 1200 Technician: Burdick Respectfully submitted, PITTSBURGH TESTING LABORATORY JWH/ck cc: 1 Client-, Attn.-Engr. Dept. 2 Client, Pt. St. Lucie, Engr. Dept., 8380 John W. Harllee, S. Federal; Hwy., Pt. St. Lucie, 33452 Vice President 1 PTL Tech., Pt, -Malabar 1 City Engr. Mr. Earl Masteieer, P.O. Box 127 Sebastian Highlands, FL 32958 1 Cty. Eng Ir'. Cty of. Sebastian, P.O. Box 127 1 Sebastian, FL 32958, Attn: R. Lloyd 2 MA PITTSBURGH TESTING LAB(.., ATORY a < 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS yFEgsANo�ARE SUBMITTEO AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUBLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING MA 3707 OUR REPORTS 19 RESERVED PENDING OUR WRITTEN APPROVAL. DSR No. LABORATORY No. 473 CLIENT'S No. REPORT OF HUBBARD-FIELD STABILITY TEST CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands w/r 3871 SAMPLE: Wearing surface type II asphalt sampled by GDC representative on 11-30-81 at 2:45 p.m. from Dickerson truck 957, Load 26 LOCATION: Englar St., Lot 12, Block 615 RESULTS: GRADATION SIEVE SIZE % PASSING 3/8 98 4 70 10 50 40 36 80 12 200 1.1 EXTRACTION Bitumen: 6.4% STABILIT'f 1. 1980 2. 2145 3, 2310 Tech: J. Nutter CC, 1,Client, Attn: En^.r. Dept. 2 Client, Attn: Enqr. Dept. , 111320 S. Federal Hwy., Port St. Lucie, FL 1 City of Sebastian 1 City Engineer, Robert Lloyd. 1 Tech. 40 2 1'.11A SPECIFICATIONS 900 max. 12'1 max . 1200 min. Respectfully submitted, PITTSBURGH TESTING LABORATORY John W. Harl gee, Vice Presi dent JAN 2 0 1982 I A,%T ENGINEERING FO -11 a,-- PITTSBURGH TESTING LABORATORY < 3901 N.W. 29th AVENGE. MIAMI. FLORIDA 33142 C� •CRf SLr��y AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS yFE/9j ANo (•r�' ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUBLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. 474 QROER No. MA 3707 LABORATORY No. CLIENT'S No. REPORT OF HUBBARD-FIELD STABILITY TEST CLIEUT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands w/r 3871 SAMPLE: Wearing surface, type II asphalt sampled by GDC representative on 11-30-81 from Dickerson truck 311. load 2, at 9:00 a.m. LOCATION: Ormond St., Lot 7, Block 605 RESULTS: GRADATION SIEVE SIZE A PASSING 3/8 99 4 74 10 44 40 39 80 13 200 1.3 Bitumen: 6.2% STABILITY 1. 1805 2. 1815 3. 1815 Avg. 1812 Tech: J. Nutter CC, 1 Client, Attn: Encr. Cept. 2 Client, Attn: Enar. Dept. , 032'0 5. Federal Hwy., Port St. Lucie, ;L 1 City of Sebastian 1 City Engineer, Robert Lloyd. 1 Tech. • 2 IMA SPECIFICATIONS 90% max. 12% max. 1200 min. Respectfully submitted, PITTSBURGH TESTING LABORATORY ITO I ! John W. Harliee, � L:IB Vice President �O Ag82 EAST COAST ENGINEERINQ J WDER No. CLIENT'S No. PITTSBURGH TESTING LABORATORY 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS CLASS 11A" ♦RE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUL.LICATION OF STATEMENTS. CONCLUSIONS OR E. TRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. MA 4406 LABORATORY No. 564 REPORT ON HUBBARD FIELD STABILITY TEST CLIENT! General Development Corporation 1111 South Bayshore Drive Miami, FL 33131 PROJECT: Sebastian Highlands w/r 3871 SAMPLE: Type II LOCATION (AM) Lot 9, Block 603, Caprona St. (PM) Lot 1, Block 601, East Lane Empress Ave. RESULTS: FORM 107 -MA STABILITY A.M. P.M. Z. 2. 3. Avg. 2018 3. Avg. 2051 Min. Technician: Plemmons, Cornell JWH/ck cc: 1 Client, Attn: Engr. Dept. Respectfully submitted, 2 Client, Pt. St. Lucie, Engr. Dept., 8380 S. Federal Hwy., Pt. St. Lucie, 33452 PITTSBURGH TESTING LABORATORY 1 PTL Tech., Pt.*Malabar • 1 Cty. Clerk of Sebastian, Cty. of Sebastian PO . . Box 121, Sebastian,FL 32958 1 Cty. Engr., Cty of Sebastian, P.O. Box 127 John W. Harl lee Sebastian, FL 32958, Attn: R. Lloyd Vice President 2 MA GRADIATION SIEVE SIZE A.M. PASSING P.M. SPECIFICATIONS 1/2° 100 100 100" 3/811 97 98 4 80 79 10 55 57 1 90" MAX 40 38 41 80 19.4 18.6 200 3.4 3.6 12" MAX % AC 6.6 7.0 STABILITY A.M. P.M. Z. 2. 3. Avg. 2018 3. Avg. 2051 Min. Technician: Plemmons, Cornell JWH/ck cc: 1 Client, Attn: Engr. Dept. Respectfully submitted, 2 Client, Pt. St. Lucie, Engr. Dept., 8380 S. Federal Hwy., Pt. St. Lucie, 33452 PITTSBURGH TESTING LABORATORY 1 PTL Tech., Pt.*Malabar • 1 Cty. Clerk of Sebastian, Cty. of Sebastian PO . . Box 121, Sebastian,FL 32958 1 Cty. Engr., Cty of Sebastian, P.O. Box 127 John W. Harl lee Sebastian, FL 32958, Attn: R. Lloyd Vice President 2 MA 0 •FE#S A N D RDER No. CLIENT'S No. PITTSBURGH TESTING LABORATORY 7 - a < 3901 N.W 29th AVENUE. MIAMI- FLORIDA 33112 AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS CLASS "A" •RE SUBMI TTEO AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUPLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS REAPPROVAL- PENOING OUR WRITTEN APPROVAL MA 4406 LABORATORY No. 566 REPORT ON HUBBARD FIELD STABILITY TEST CLIENT! General Development Corporation 1111 South Bayshore Drive Miami, FL 33131 PROJECT: Sebastian Highlands w/r 3871 SAMPLE: Type II LOCATION (AM) Lot 3, Block 606, Empress Ave., West Lane (PM) Lot 8, Block 611, Oeceola Ct. West Lane RESULTS: -All A -1 - SIEVE SIZE A.M. PASSING P.M. 1/2" 100 100 3/811 97 99 4 80 77 10 55 56 40 40 38 80 18.1 17.7 200 2.9 2.7 % AC 6.8 7.1 STABILITY A.M. P.M. �ORAA AC7-.A SPECIFICATIONS 100; 900% MAX 12% MAX 1. 1. 2. 2. 3. Avg. 2330 3. Avg. 2290 Min. Technician: Plemmons, Cornell JWH/ck cc: 1 Client, Attn: Engr. Dept. Respectfully submitted, 2 Client, Pt. St. Lucie, Engr. Dept., 8380 S. Federal Hwy., Pt. St. Lucie, 33452 PITTSBURGH TESTING LABORATORY 1 PTL Tech., Pt. Malabar 1 • 1 Cty. Clerk of Sebastian, Cty. of Sebastian P.O. Box 127, SebaStlan,rL 32958 1 Cty. Engr., Cty of Sebastian, P.O. Box 127 John W. Harl lee Sebastian, FL 32958, Attn: R. Lloyd Vice President 2 MA y/ PPITTSBURGH TESTING LABORATORY 3901 NW 29th AVENUE. MIAMI. FLORIDA 3,142 +5 A MUTUAL PROTECTION TO CLIENTS. THE PU9LIC AND OURSELVES. ALL REPORTS CLASS "A" t"E!%3 aNQ Gro' +RE SUBMITTED AS TME CONFIOENTI,AL PROPERTY Of CLIENTS. AND wUTMORI2+TION ;OC PUlLIC A TION Of STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RSVED PENDING OUR WRITTEN APPROVAL. RIDER No. MA 4406 EERWRILABORATORY moo. 568 CLIENT'S No. REPORT ON HUBBARD FIELD STABILITY TEST CLIENT: General Development Corporation 1111 South Bayshore Drive Miami, FL 33131 PROJECT: Sebastian Highlands w/r 3874 SAMPLE: Type II LOCATION (AM) Lot 21, Block 611, Osceola Ct. East Lane (PM) Lot 13, Block 613, Schumann Dr. South Bound RESULTS: SIEVE SIZE A.M. % PASSING P.M. 1/2" 100 100 3/8" 98 97 4 82 80 10 58 55 40 43 41 80 19.4 20.1 200 3.1 3.4 % AC 6.5 6.9 STABILITY A.M. P.M. COk" a,' -"A SPECIFICATIONS 1000 90% MAX 12% MAX 1. I. 2. 2. 3. Avg. 2131 3. Avg. 2305 Min. Technician: Plemmons, Cornell JWH/ck cc: 1 Client, Attn: Engr. Dept. Respectfully submitted, 2 Client, Pt. St. Lucie, Engr. Dept., 8380 S. Federal Hwy., Pt. St. Lucie, 33452 PITTSBURGH TESTING LABORATORY 1 PTL Tech., Pt. Malabar • 1 Cty. Clerk of Sebastian, Cty. of Sebastian v. P.O. Box 121, Sebdstldn,FL 32958 1 Cty. Engr., Cty of Sebastian, P.O. Box 121 John W. Harl lee Sebastian, FL 32958, Attn: R. Lloyd Vice President 2 MA PITTSBURGH TESTING LABORATORY 3901 N.W 29th AVENUE. MIAMI. FLORIDA 33142 OROER No. MA 4406 CLIENT'S No. .0 • PROTECTION TO CLIENTS- THE PUBLIC AND OURSELVES. ALL REPDRTS CLASS "A 11 +RE SUBMITT EO AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORISATION AOR PUCLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FRO. OR REGARDING OUR REPORT% IS RE%ERVEO PENDING OUR WRITTEN APPROVAL. LABORATORY No. 570 REPORT ON HUBBARD FIELD STABILITY TEST CLIENT: General Development Corporation 1111 South. Bayshore Drive Miami, FL 33131 PROJECT: Sebastian Highlands w/r 3871 SAMPLE: TYpe II LOCATION (AM) Lot 18, Block 605, Schumann Dr.SOUTH Bound (PM) Lot 1 , Block 601, Julian RESULTS: f%n Ar%TRTTAAI SIEVE SIZE A.M. 0% PASSING P.M. 1/211 100 100 3/811 98 97 4 80 78 10 58 60 40 44 41 80 20.4 19.3 200 3.5 3.0 A AC 6.8 7.1 STABILITY A.M. P.M. 1, 1. 2. 2. 3. Avg. 2430 3. Avg. Technician_: Plemmons, Cornell JWH/ck =ORM A07 -MA SPECIFICATIONS 1004 90% MAX 124 MAX 2310 Min. cc: 1 Client, Attn: Engr. Dept. Respectfully submitted, 2 Client, Pt. St. Lucie, Engr. Dept., 8380 S. Federal Hwy., Pt. St. Lucie, 33452 PITTSBURGH TESTING LABORATORY 1 PTL Tech., Pt. Malabar • 1 Cty. Clerk of Sebastian, Cty. of Sebastian P.O. Box 121, SebaStian,FL 32958 1 Cty. Engr., Cty of Sebastian, P.O. Box 127 John W. Harl lee Sebastian, FL 32958, Attn: R. Lloyd Vice President 2 MA `1 r' �f'o9 PITTSBURGH TESTING LABORATORY . t a O a < 3901 N.W 29Th AVENUE_ MIAMI. FLORIDA 33142 r 'CLASS "A" AS A MUTUAL PROTECTION TO CLIENTS. THE IV ELIC AND OURSELVES. ALL REPORTS Ff'94NO GNB ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. wNO AUTHORIZATION EOR IU9LICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS (ROM OR REGARDING MA 4406 OUR REPORTS IS REIERVED PENDING OUR WRITTEN APPROVAL. 572 *RDER No. LABORATORY No. CLIENT'S No. REPORT ON HUBBARD FIELD STABILITY TEST CLIENT: General Development Corporation 1111 South Bayshore Drive Miami, FL 33131 PROJECT: Sebastian Highlands w/r 3871 SAMPLE: Type II LOCATION (AM) Lot 26, Block 618 (PM) Lot 5, Block 615, Mabry St. North bound RESULTS: SIEVE SIZE 1/2" 3/8" 4 10 40 80 200 p AC GRADIATION A.M. PASSING P.M. 100 99 81 59 45 20.4 3.2 7.1 A.M. STABILITY 100 98 79 61 47 21.1 3.4 6,8 P.M. 1. 1. 2. 2. 3. Avg. 2215 3. Avg. 2188 Technician: Plemmons JWH/ck 'OR- 407 -MA SPECIFICATIONS 100N 90*/U' MAX 120V MAX cc: 1 Client, Attn: .Engr..Dept. Respectfully submitted, 2 Client, Pt. St. Lucie, Engr. Dept., 8380 S. Federal Hwy., Pt. St. Lucie, 33452 PITTSBURGH TESTING LABORATORY 1 PTL Tech., Pt. Malabar_. t • 1 Cty. Clerk of Sebastian, Cty. of Sebastian P.O. Box 127, Sebastian,FL 32958 1 Cty. Engr., Cty of Sebastian, P.O. Box 127 John W. Harl lee Sebastian, FL 32958, Attn: R. Lloyd Vice President 2 MA Min.