Loading...
HomeMy WebLinkAboutSoil CementTT ' 6 �_ ^SANG �•" ORDER No. NIA 4406 CLIENT'S No. Bil Dr Ge 14 Bi to 16 Bi to 16 Bi 85 75 FORM 407 -MA PITTSBURGH TESTING LABORATORY 3901 N.W. 29th AVENUE, MIAMI. FLORIDA 33142 CLASS "A" ASA MUTUAL PROTECTION TO CLIENTS, THE PUBLIC AND OURSELVES. ALL REPORTS ARC SUBMITTEO AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR ►U SLICATION OF STATEMENTS, CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. LABORATORY No. 367 REPORT OF SOIL CE*SENT CONSTRUCTION CONTROL CLIENT: General Development Corporation 1111 South Bayshore Drive Miami, FL 33131 PROJECT: Sebastian Highlands, w/r 3871 PROCESSING DATE: 8-23-82 DESCRIPTION OF AREA PROCESSED CEMENT USED % BY VOL. FIELD TESTS AASHO T99 METHOD C MOISTURE AT TIME COMPACTED X FIELDIGE4SITY LBS./pCOMP Cll.FT ACTION COMPACTED THICKNESS, INCHES 0 M C % MAX. DEN. LBS/CU FT AVG. MAX. MIN. ;e 'clay Schumann from School to •ard 1650x8' i2 sq. yds. 9 10.8 114.9 10.0 112.2;97.6 6" :e Way from Gerard Admiral 1822'x8 19 sq. yds. 9 10.8 114.9 10.7 113.8'99.0 5 7j8" :e Way from Admiral Englar 1900x8' 39 sq. yds. 9 10.8 114.9 10.1 113.0 98.3 6" ce Way from Englar I' N. 850'x8' 5 sq. yds. 9 10.8 114.9 10.3 111.6 97.1 l 64" TECHNICIAN: J. Cornell - the above tests meet1Fuuk-b�L'j irl— 1—I.— JUJI -1. - - required 950/0' of max. density. PREVIOUSLY PROCESSED: SQ. YDS. cc: 1 Client, Attn: Engr. Dept. PROCESSED TO DATE: 5531 SQ. YDS. 2 Pt. St. Lucie, Engr. Dept., 8380 S. Federal Hwy., Pt. St. Lucie, FL 33452 Respectfully submitted, 1 PTL Tech., Pt. Malabar 1 Cty. Clerk, Cty of Sebastian, P.O. Box 127 PITTSBURGH TESTI'.:G LkBORATORY Sabastian, FL 32958 1 Cty. Engr. Cty. of Sabastian, P.O. Box 127 w Sabastian, FL 32958 Attn: R. Lloyd John W. Harllee 2 MA Vice President V`E71IN(j FORM 407 -MA MP 0. C, PITTSBURGH TESTING L.ABG�ATOR`� DATE SHEET B • < 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 CLASS "A" r �f Fg5AN0 fir_ ORDER No. MA 3707 CLIENT'S No. CLIENT: PROJECT: PROCESSING DATE: ASA MUTUAL PROTECTION TO CLIENTS. THE PUSLIC AND OURSELVES. ALL REPORTS ARE SUSMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PU PLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. 544 LABORATORY No. REPORT OF SOIL CANT CONSTRUCTION CONTROL General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 Sebastian Highlands WR 3871 Dec. 18, 1981 TECHNICIAN: J. Cornell REMARKS: 1 Client, Attn: Enor_ nPnt. 2 Client, Attn: Enqr. Dept., 8380 S. Federal Hwy., Port St. Lucie, Fla. 33452 1 Citv of Sebastian, PO Box 127, Sebastian, F1a..3295R 1 City Enqineer, Robert Lloyd. P.E., PO Box P1 , I Sgbattian, Fla. 3205R 2 MA PROCESSED IH15 DAIL: jJ1P7 .n{. 1LJ• PREVIOUSLY PROCESSED: 55583 SQ. YDS. PROCESSED TO DATE: 60932 SQ. YDS. ED.Zespectfully submitted,ru ?ITTSBURGH TESTING LABO TORY g�� 1 JAN 0 John W. Harllee EAST COAST ENGINEERING Vice President CEMENT FIELD TESTS AASHO T99 MOISTURE FIELD DENSITY _ - COMPACTED "bs , / I % USED METHOD C AT TII� THICRTESS , DESCRIPTION OF % BY COMPACTED U. -t' Comp- INCHES 0 M C I MAX. DEN. AREA PROCESSED 14T. % I LBS/CU FT % action AVG: MAX. MIN. nn E. side from N. uck M to Lot 1, i 609 1620'x7 d 9.4 10.7 117.6 10.6 118.7 100.9 7 nn E. side from Lol ! k 609 to Lot 9, 601 1840x7 1431 y 9.4 10.7 117.6 10.0 117.9 100.2 7 nn E. side fromLot k 601 to lot 30 581 1790x7 1392 y 9.4 10.7 117.6 10.8 118.2 100.5 74 nn E. side from I ,blk 581,to S. end ck G i 7' 1260 yd 9.4 10.7 117.6 10.4 118.0 100.3 7 The above tests fleet the -equire ent of 100t of max. de sity. TECHNICIAN: J. Cornell REMARKS: 1 Client, Attn: Enor_ nPnt. 2 Client, Attn: Enqr. Dept., 8380 S. Federal Hwy., Port St. Lucie, Fla. 33452 1 Citv of Sebastian, PO Box 127, Sebastian, F1a..3295R 1 City Enqineer, Robert Lloyd. P.E., PO Box P1 , I Sgbattian, Fla. 3205R 2 MA PROCESSED IH15 DAIL: jJ1P7 .n{. 1LJ• PREVIOUSLY PROCESSED: 55583 SQ. YDS. PROCESSED TO DATE: 60932 SQ. YDS. ED.Zespectfully submitted,ru ?ITTSBURGH TESTING LABO TORY g�� 1 JAN 0 John W. Harllee EAST COAST ENGINEERING Vice President �q5 An0 Gr - 0 "�' O DER No. MA 3707 CLIENT's No. 'abry 85x20 arlso outh 505 y ulian 15'x2 ance 1Ox20. Note CLIENT: PROJECT: PITTSBURGH TESTING LABGr<ATORY 3901 N.W. 29th AVENUE. MIAMI, FLORIDA 33142 PROCESSING DATE: FORM 407 -MA DATE SHEET B CLASS "A" AS A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC AND OURSELVES. ALL REPORTS ARE SUBMITTED AS THE COMFIOENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUBLICATION OP STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEM APPROVAL. 543 LABORATORY No. REPORT OF SOIL CANT CONSTRUCTION CONTROL General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 Sebastian Highlands WR 3871 Dec. 16, 1981 ' FIELD TESTS F IELD DENSIS`' EM CENT AASHO T99 MOISTURE COMPACTED bs.h , USED METHOD C AT TI*E THICKNESS, DESCRIPTION OF % BY0 COMEACTED Cu I Comp- INCHES M C i MAX. DEN. AREA PROCESSED NT. % I LBS/CU FT X 'tartirn AVG.1 MAX. I MIN. from Julian 585' S i 1300 yd 10.6 117.2 10.3 118.5'•101.1 i 7 1 from Julian 651' 651'x20'+ 2 RAdi4 i 1 10.6 117.2 9.9 117.6 100.3 7; from Mabry 815' E 1811 yd 10.6 117.2 10.0 118.0 100.7 6 7/ -rom Julian 210' N i - 2 Radii 525 yd 10.6 117.2 10.5 117.9;100.6 7 The above tests eet the -equire ent of IOU of max. de sity.! i li I TECID;ICIAN: J. Cornell REMARKS : 1 Client, Attn: Enar_ npnt. 2 Client, Attn: Enqr. Dept., 8380 S. Federal Hwy., Port St. Lucie, Fla. 33452 • 1 City of Sebastian, PO Box 121, Sebastian, Fla..32953 1 City Enqineer, Robert Llovd, P.E., PO Box I P]F 7iechbattian, Fla. 320gR 2 MA PROCESSED THIS DATE: 5141 :>!. zllJ• PREVIOUSLY PROCESSED: 50442 SQ. 'MDS. PRCCESSED TO DATE: 55583 SQ. `!DS. kespectfully submitted STUE D PITTSBURGH TESTING LA TORY N 2 01982 John W. Harllee Vice President EAsT COAST ENGINEERING FORM 407 -MA BSPPITTSBURGH TESTING LABG,<ATOR Y DATE SHEET B C. < 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 CLASS 11A'I T .' -- AS A MUTUAL PwOTCCTION TO CLIENTS. TH[ PUlLIC AND OURS[LVEf. ALL R[►ORT] '93 AMO G� ARC SU OMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUBLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING 3 7 O 7 OUR REPORTS 19 RESER VEO PENDING OUR WRITTEN APPROVAL. ORDER No. MA LABORATORY No. 542 CLIENT'S No. REPORT OF SOIL CANT CONSTRUCTION CONTROL CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 .omas '.73'N. ;ulian :20'x2 .eacon Iabry '278 y 'abry ')15' W ')15'x2 ' Note PROJECT: Sebastian Highlands WR 3871 PROCESSING DATE: Dec. 15, 1981 TECH14ICIAN: J. Cornell REMARKS: 1 Client, Attn: Enar. nanr. 2 Client, Attn: Enar. Dept., 3330 S. •Federal Hwy., Port St. Lucie, Fla. 33452 1 City of Sebastian, PO Box 127, Sebastian, Fla..32953 1 City Engineer. Robert Lloyd. P.E., PO Box TF'echbastian, Fla. 32c�R 2 MA PROCESSED THIS DATE: PREVIOUSLY PROCESSED: PROCESSED TO DATE: .tespectfully submitted, `JyIU --rk(. LUJ. 44532 SQ. YDS. 50442 SQ. YDS. pot, 17 TESTING N E nn PITTSBURGH ...STI.+G UBOP'fDRY 1, � ,lAN 201982 John W. Harllee vice President EAST COAST ENGINEERING FIELD TESTS FIELD DENSITY CEMENT AASHO T99 MOISTURE COMPACTED `bs'/t °o USED METHOD C AT TIME THICKNESS, DESCRIPTION OF % BY CO*3 ACTED Cu' I Comp- INCHES 0 M C! MAX. DEN. AREA PROCESSED % I LBS/CU FT X -t' ar.tirn, AVG.! MAX. YIN. from Crawford 473'x20 1051 yd 9.4 10.3 116.9 10.1 117.9( 100.9 7 fromLomas 520' :d. i 4'x2 Radii 1214 yj 9.4 10.3 116.9 9.8 117.3 100.3 7 1 from Carlson to 1 999x20+2 Radii d 9.4 10.3 116.9 10.4 117. 100.8 7h from Deacon 1 . and N. 1' 1367 yd 9.4 10.3 116.9 10.3 118.1 101.0 i 7 The above test m ets the repuirement of 100 of max. den;ity. I 1 TECH14ICIAN: J. Cornell REMARKS: 1 Client, Attn: Enar. nanr. 2 Client, Attn: Enar. Dept., 3330 S. •Federal Hwy., Port St. Lucie, Fla. 33452 1 City of Sebastian, PO Box 127, Sebastian, Fla..32953 1 City Engineer. Robert Lloyd. P.E., PO Box TF'echbastian, Fla. 32c�R 2 MA PROCESSED THIS DATE: PREVIOUSLY PROCESSED: PROCESSED TO DATE: .tespectfully submitted, `JyIU --rk(. LUJ. 44532 SQ. YDS. 50442 SQ. YDS. pot, 17 TESTING N E nn PITTSBURGH ...STI.+G UBOP'fDRY 1, � ,lAN 201982 John W. Harllee vice President EAST COAST ENGINEERING I- R(j FORM 407 -MA y: yPITTSBURGH TESTING LABG,<ATORY DATE SHEET B . O W < 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 331 d2 CLASS "A" h C�.j•,' a<'"L 't` ASA rUTV AL PROTECTION TO CLIENTS. TN[ IV !LIG AND OV RS[LV ES. ALL R[PO,RTS 14541 ffAS SRO ��� ARC SU S..ITTCD AS TMC CONFIDENTIAL IROPCRTT OF CLIENTS. AND AUTNORIEATION FOR IU {LIGATION OF STATC„ENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING RDER No. MA 3707 OUR REPORTS 10 RESER V CO PENDING OUR WRITTEN APPROVAL. LABORATORY No. CLIENT'S No. REPORT OF SOIL CANT CONSTRUCTION CONTROL CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 Ithaca 'j1'x2C _omas .rawfc :rawfc :arl sc ?236 y '.arl sc X80 W. )80x2C Note PROJECT: Sebastian Highlands WR 3871 PROCESSING DATE: Dec. 14, 1981 TECtLtiICIAN: J. Cornell R.EE`LaRKS : 1 Client, Attn: Enor. rent. 2 Client, Attn: Enqr. Cept., 3330 S. .Federal Hwy., Port St. Lucie, Fla. 33452 1 City of Sebastian, PO Box 127, Sebastian, Fla..3295R 1 City Engineer. Robert Llovd. P.E., PO Rox llNf27ieSgbastian, Fla. 320FA 2 MA PROCESStll ilii5 DAit: otrc -1-4. 1 V j . PREVICUSLY PROCESSED: 38360 SQ. YDS. PRCCESSED TO DATE: Q�•�` lespect>:ully submitted, PITTSBURGH TESTING LABORATONAN 2 0 1982 John W. Harllee LAST CSAST ENGINEERING Vice President FIELD TESTS CEMENT AASHO T99 MOISTURE FIELD DENSITY COMPACTED `bs . / `; USED METHOD C AT TIME THICKNESS , DESCRIPTION OF % BY CO:�ACTED Cu. ( Comp- INCHES 0 M C MAX. DEN. AREA PROCESSED �'iT. `/, LBS/CU FT X ^t' a-tir•1 AVG. MIN. from Lomas 37' W. '+2 Radii 140 yd 9.5 10.5 117.3 10.6 118.2 100.8 7.2 100' S. of Ithaca o I rd 1128'x20 2507 d 9.5 ! 10.5 117.3 10.4 118.7, 101.3 I 7 rd from Lomas to n 980x20+2 Radii d 9.5 10.5 117.3 10.1 117.q 100.5 I 7 n from Crawford and N. 1289 yd 9.5 10.5 117.3 10.1 118.41. 100.9 ;I 7 :.the above tests reet the riequirerrent of 1009 of max. den ity. 4 I i TECtLtiICIAN: J. Cornell R.EE`LaRKS : 1 Client, Attn: Enor. rent. 2 Client, Attn: Enqr. Cept., 3330 S. .Federal Hwy., Port St. Lucie, Fla. 33452 1 City of Sebastian, PO Box 127, Sebastian, Fla..3295R 1 City Engineer. Robert Llovd. P.E., PO Rox llNf27ieSgbastian, Fla. 320FA 2 MA PROCESStll ilii5 DAit: otrc -1-4. 1 V j . PREVICUSLY PROCESSED: 38360 SQ. YDS. PRCCESSED TO DATE: Q�•�` lespect>:ully submitted, PITTSBURGH TESTING LABORATONAN 2 0 1982 John W. Harllee LAST CSAST ENGINEERING Vice President QV�(S Si1NG (�B FORM 407 -MA y PITTSBURGH TESTING LABG,<ATORY DATE SHEET B r < 3901 N.W. 29Th AVENUE. MIAMI. FLORIDA 33142 CLASS "A" h C t' �l`-� �� •f A NUTU wL PROTECTION TO CLIENTS. TMC PUBLIC AND OURSELVES. ALL REPORT! yffgSANOr- ARC {UINITTED A! TMC CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR FU ■LI CATION OF STATCNCNTS. CONCLUSION! OR EXTRACT! FROM OR REGAROINf. 3707 OUR REPORTS IS RC{ERV ED FENDING OUR wRITTEN APPROVAL. 537 ORDER No. MA LABORATORY No. CLIENT•s No. REPORT OF SOIL CE.ENT CONSTRUCTION CONTROL CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 :mpres i97' E 1607 y 'a rl ar )ahl i :818 y )ahl f 3chuma )90x2( 1a rs h '80x2( I ` Note PROJECT: Sebastian Highlands WR 3871 PROCESSING DATE: Dec. 10, 1981 TECINICIA14: J. Cornell REMARKS: 1 Client, Attn: Enar. f1Pnr. 2 Client, Attn: Enar. Dept., 3330 S. Federal Hwy., Port St. Lucie, Fla. 33452 . 1 City of Sebastian, PO Box 127, Sebastian, Fla. 329S3 1 City Engineer, Robert Llovd. P.E., PO Box ��2L Sgbastian, Fla. 3205R ec 2 MA PROCESSLD 1H1S DAIL: Uo'+a .nl• '�'• PREEVICUSLY PROCESSED: 31717 SQ, YDS. PRCCESSED TO DATE: 38360 SQ. YDS. ,tespectfully submitted, PITTSBURGH TESTING LABORA 9(iv y :�•-f.,-� :�•,�-,., . ��IAN a0 1952 John W. Harllee Vice President FAST COAST ENGINEERING FIELD TESTS MELD DEi1SITY I CEMENT AASHO T99 MOISTURE COMPACTED `bs'/I o USED METHOD C AT TIME THICY.NESS, DESCRIPTION OF % BY COMPACTED '�u' Comp- I INCHES 0 M C� MAX. DEN. .AVG.I MAX -1 MIN. AREA PROCESSED iii. % LBS/CU FT i t' artirn s from Schumann I . 697x20+2 Radii d2 9.5 10.4 116.9 9.9 117.2 100.3 7.2 d from Enpress to 1 92x21+2 Radii d2 9.5 10.4 116.9 10.6 117.11 100.7 7 rom Harland to nn +2 Radii 1369 yd2 9.5 10.4 116.9 10.4 118.0 100.9 7 from Empress to Dail +4 Radii 1849 yd2 9.5 10.4 116.9 10.1 117.9, 100.9 7.5 the above tests meet the repuire6ent of 100° of max. den f ity. i i TECINICIA14: J. Cornell REMARKS: 1 Client, Attn: Enar. f1Pnr. 2 Client, Attn: Enar. Dept., 3330 S. Federal Hwy., Port St. Lucie, Fla. 33452 . 1 City of Sebastian, PO Box 127, Sebastian, Fla. 329S3 1 City Engineer, Robert Llovd. P.E., PO Box ��2L Sgbastian, Fla. 3205R ec 2 MA PROCESSLD 1H1S DAIL: Uo'+a .nl• '�'• PREEVICUSLY PROCESSED: 31717 SQ, YDS. PRCCESSED TO DATE: 38360 SQ. YDS. ,tespectfully submitted, PITTSBURGH TESTING LABORA 9(iv y :�•-f.,-� :�•,�-,., . ��IAN a0 1952 John W. Harllee Vice President FAST COAST ENGINEERING FORM 407-M A _o PITTSBURGH TESTING LABG,cATORY DATE SHEET B 3901 N.W. 29th AVENUE. MIAMI. FLORIDA33142 CLASS "A" h� ASA MUTUAL PROTECTION TO CLIENTS. THE PUBLIC ANO OURSELVES. ALL REPORTS ff*SANO�•ARE SUSMITTEO AS THE CONFIDENTIAL PROPERTY OF CLIENTS. ANO AUTHORIZATION FOR PU ■LICA TION OF STATEMENTS. CONCLUSIONS OR EXTRACTS TROY OR REGAROING MA OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. ROER No. 3707 TLABORATORY No. 533 CLIENT'S No. REPORT Or SOIL C=NT CONSTRUCTION CONTROL CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands WR 3871 PROCESSING DATE: Dec. 9, 1981 TECID;ICIAN : Bill Plemmons REMARKS: 1 Client, Attn : Enar- IlPnt _ 2 Clidnt, Attn: Enqr. Dept., 3330 S. Federal HWy., Port St. Lucie, Fla. 33452 • 1 City of Sebastian, PO Box 127. Sebastian, Fla..32952 1 City Enqineer. Robert Llovd.,P.E., PO Box I N(C7ieSgbast.ian, Fla. 32osR 2 MA PROCESSED THIS DATE: 7552 SQ. Y -DS. PREVIOUSLY PROCESSED: 24165 SQ. YDS. PRCCESSED TO DATE: 31717 SQ. YDS. lespectfully submitted, A PITTSBURGH TESTING LABORA i tl4N 2 01982 John W. Harilee Vice President EAST COAST ENGINEERING FIELD TESTS FIELD DENSITY �. CEMENT AASHO T99 MOISTURE COMPACTED bs' % � % USED METHOD C AT TI*E THIC:INESS , DESCRIPTION OF % BY COMPACTED t -u' f Comp- INCHES 0 M C� MAX. DEN. AREA PROCESSED iii . % LBS/CU FT X t' artirn AVG -1 bQX.j MIN. i from Schumann to 9.5 10.3 116.7 10.2 i 116.9'100.2 6.75 36x20+2 Radii 12 I I from Schumann to 9.5 10.3 116.7 10.0 116.71100.0 7.50 36x20+2 Radii I 12 i St. from Schumanr 9.5 10.3 116.7 9.5 116.81100.1 7.25 530x24+2 Radii 12 I rom Admiral to 9.5 10.3 116.7 10.1 116.91100.2 7.15 1 730x20+4 Radii 12 s 'om Osceola to i i 12 9.5 10.3 116.7 10.5 116 71 . 100.0 7.25 * Note: the a ove testj meet the _reQuiref d TECID;ICIAN : Bill Plemmons REMARKS: 1 Client, Attn : Enar- IlPnt _ 2 Clidnt, Attn: Enqr. Dept., 3330 S. Federal HWy., Port St. Lucie, Fla. 33452 • 1 City of Sebastian, PO Box 127. Sebastian, Fla..32952 1 City Enqineer. Robert Llovd.,P.E., PO Box I N(C7ieSgbast.ian, Fla. 32osR 2 MA PROCESSED THIS DATE: 7552 SQ. Y -DS. PREVIOUSLY PROCESSED: 24165 SQ. YDS. PRCCESSED TO DATE: 31717 SQ. YDS. lespectfully submitted, A PITTSBURGH TESTING LABORA i tl4N 2 01982 John W. Harilee Vice President EAST COAST ENGINEERING SSI'^ti (�9 FORM 407 -MA y: PITTSBURGH TESTING L.ABGr<ATORY DATE SHEET B 61` < 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 CLASS "A" .S A MUTUAL PROTECTION TO CLIENTS. THE PUBLIC ANO OURSELVES. ALL REPORTS • fFpS AN�`Y� AR[ SUBMITTED AS TMC CONF ID[NTIAL PROPERTY OF CLIENTS. AND AUTNORIXATION FOR PUBLICATION OF STATCN[NTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING MA 3707 OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL. ORDER No. LABORATORY No. 532 CLIENT'S No. REPORT OF SOIL CANT CONSTRUCTION CONTROL CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 .mpres :o S& .105x2 .apror Eas 094 y Eas ine E ;02x24 Note PROJECT: Sebastian Highlands wjr 3871 PROCESSING DATE: Dec. 8, 1981 TECI;LNICIAN: B. Plemmons REMARKS: 1 Client, Attn: Enar- nPnt. 2 Client, Attn: Enqr. Dept., 3380 S. Federal Hwy., Port St. Lucie, Fla. 33452 . 1 City of Sebastian, PO Box 127, Sebastian, Fla. -32958 1 Cllity Enqineer. Robert Llovd. P.E., PO Rox I NIL71'eSRbattian, Fla. 32135A 2 MA PROCESSED THIS DATE: CANT USED FIELD TESTS AASHO T99 METHOD C MOISTURE AT TIME FIELD DENSITY' COMPACTED THICMESS, ',bs'/ °; DESCRIPTION OF AREA PROCESSED 7. BY IST. COMPACTED °: Cu. rt. Comp- ar.ticn INCHES 0 M CI MAX. DEN. % I LBS/CU FT AVG..! 1,LkX.1 MIN. s Ave. from Capront 9.5 10.3 117.0 10.7 f 117.2.100.2 7.2 umann 0+4 Radii 2572 yd2 9.5 10.3 117.0 11.1 117.1 100.1 7.1 a from Empress to I y St. 890x20+4 Rad i d2 9.5 10.3 117.0 9.9 117.0 100.0 7.20 y st. from Power 9.5 10.3 117.0 9.6 117.3 100.3 7.15 02 ' East = 2139 yd2 9.5 10.3 117.0 10.0 117.0i 100.0 6.95 the above test me tS the requirement of 1000 f max. dens I ty. ! I i TECI;LNICIAN: B. Plemmons REMARKS: 1 Client, Attn: Enar- nPnt. 2 Client, Attn: Enqr. Dept., 3380 S. Federal Hwy., Port St. Lucie, Fla. 33452 . 1 City of Sebastian, PO Box 127, Sebastian, Fla. -32958 1 Cllity Enqineer. Robert Llovd. P.E., PO Rox I NIL71'eSRbattian, Fla. 32135A 2 MA PROCESSED THIS DATE: DODU 'N. .1j3. PRb`VICUSLY PROCESSED: 17360 SQ. YDS. PRCCESSED TO DATE: 24165 SQ. YDS. .tespectfully submitte� ,t it PITTSBURGH TESTING LA TORY �Arl ta 01952 John W. Harllee R' Vice President EAST COAST ENGINE IS�Ilnti,14 FORM 407 -MA :. PITTSBURGH TESTING LABOrcATORY DATE SHEET B 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 CLASS "A„ •/yf ,; +l�'��'(* AS A MUTUAL PROTECTION TO CLIENTS. TMC PUSLIC ANO OURSCLVCS. ALL REPORTS FgSAND�r ARC SUSNITAUT.ORI..TI.N TO AS TMC CONIID[NTIAL PROPCRT♦ 0/ CLI[NTi. AMD POR IU •LIC A TION OI STATEMENTS. CONCLUSIONS OR EXTRACTS IRON OR REGARDING OUR REPORTS IS RESER VCO PENDING OUR WRITTEN APPROVAL. ORDER No. MA 3707 LABORATORY No. 531 CLIENT'S No. REPORT OF SOIL CEMENT CONSTRUCTION CONTROL CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands WR 3871 PROCESSING DATE: Dec. 7, 1981 TECEINICIAN: Bill Plemmons REMARKS: 1 Client, Attn: Enar. npnr. 2 Client, Attn: Engr. Dept., 3330 S. Federal Hwy., Port St. Lucie, Fla. 33452 1 Citv of Sebastian, PO Box 127, Sebastian, Fla..32958 1 City Engineer, Robert Llovd. P.E., PO Box ll Nf�71'er,R S bastian, Fla. 320 2 MA PROCESSED I:H15 DAit: :)C3L -N. ice'• PREVIOUSLY PROCESSED: 12128 SQ. YDS. PRCCESSED TO DATE: 17360 SQ. YDS. kespectfully submitted, �llSA4, `�� Tim 1� PITTSBURGH TESTING LABO J�n� 2 0198` John N. Harllee t ' Vice President EAST COAST ENGiNEER"(1 CEMENT USED MELD TESTS AASHO T99 METHOD C MOISTUREFIELD AT TI`E DENSITY' COMPACTED THICKNESS, LbS./ °! DESCRIPTION OF AREA PROCESSED % BY COMPACTED `�u� ' t' Comp- artirn1 INCHES 0 M CI MAX. DEN. LBS/CU FT AVG. MAX.1 MIN. 3 Ave. from Schuma n 9.5 10.3 117.0 9.8 117.1;100.1 7.33 of Cul-de-sac 20+ 4 Radii 2697 'd 9.5 10.3 117.0 10.7 117.31100.3 7.25 St. from Osceola t 1 715'x20+2 Radii 9.5 10.3 117.0 10.9 117.0 100.0 7.50 J2 I Ave. from Aetna t. imann 277'x20+2 Ra ii9.5 10.3 117.0 10.8 117.1 100.1 7.20 2 i Ct. from Empress rIve. 70'x20+2 Radii I 9.5 10.3 117.0 10.1 117.0'100.0 7.35 The above tests m t the reluireme t of 100ro f max. dens tv. TECEINICIAN: Bill Plemmons REMARKS: 1 Client, Attn: Enar. npnr. 2 Client, Attn: Engr. Dept., 3330 S. Federal Hwy., Port St. Lucie, Fla. 33452 1 Citv of Sebastian, PO Box 127, Sebastian, Fla..32958 1 City Engineer, Robert Llovd. P.E., PO Box ll Nf�71'er,R S bastian, Fla. 320 2 MA PROCESSED I:H15 DAit: :)C3L -N. ice'• PREVIOUSLY PROCESSED: 12128 SQ. YDS. PRCCESSED TO DATE: 17360 SQ. YDS. kespectfully submitted, �llSA4, `�� Tim 1� PITTSBURGH TESTING LABO J�n� 2 0198` John N. Harllee t ' Vice President EAST COAST ENGiNEER"(1 �R�'11-�SAND�•• DER No. MA 3707 CLIENT'S No. En, Sc Av Sc la 14 at 34 FORM 407 -MA PITTSBL,rRGH TESTING LABL-ZATORY DATE SHEET B 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 CLASS "A" AS A MUTUAL PROTECTION TO CLIENTS. TMC PUBLIC AND OURSELVES. ALL REPORTS ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORISATION FOR PUBLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGAROING OUR REPORTS IB RESERVEO PENDING OUR WRITTEN APPROVAL. LABORATORY No. 480 REPORT OF SOIL CANT CONSTRUCTION CONTROL CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: - Seas i an- T§hUfids-WR `38714 PROCESSING DATE: 10-29-81 TECHNICIAN: B. Plemmons PROCESSED THIS DATE: 1441) �'q. TllJ. The above test meets the require- PREVIOUSLY PROCESSED: 8730 SQ. YDS. UIMARKS: ment of 100ro of max, density. PROCESSED TO DATE: 12,156 SQ. YDS. 1 Client, Attn: Enar_ Slant. 2 Client, Attn: Enar. Dept., 8380 S. zespectfully submitted, Federal It4y., Port St. Lucie, Fla. 33452 i1 Citv of Sebastian, PO Box 127, Sebastian, PITTSBURGH TESTING LABORATORY Fla. 32953 / 1 City Engineer, Robert Llovd. P.E., PO Rox L ll QQ John W. Harllee I NIz7�eChb�ttian, Fla. Z2o�s2 Vice President 2 MA FIELD TESTS `TEED DENSITY -- ----�- -- -- CEMENT AASHO T99 MOISTURE COMPACTED LbS'� to USED METHOD C AT TIME THICMESS, DESCRIPTION OF % BY COMPACTED Cu. Comp- INCHES 0 M C MAX. DEN. AREA PROCESSED 14T. % LBS/CU FT X -t. artirn AVG.1 MAX. MIN. llar Dr. from 9.5 10.3 116.6 11.2 116.8 100.2 711 lumann Dr. to Capr !. Capri Ave. from lumann Ave. to Eng., 9.5 10.3 116.6 12.2 116.6 100.0 7" Dr. 77 x. 2d + 4 Radii 9.5 10.3 116.6 13.5 116.6 100.0 711 36 sy each = ?6 sy E TECHNICIAN: B. Plemmons PROCESSED THIS DATE: 1441) �'q. TllJ. The above test meets the require- PREVIOUSLY PROCESSED: 8730 SQ. YDS. UIMARKS: ment of 100ro of max, density. PROCESSED TO DATE: 12,156 SQ. YDS. 1 Client, Attn: Enar_ Slant. 2 Client, Attn: Enar. Dept., 8380 S. zespectfully submitted, Federal It4y., Port St. Lucie, Fla. 33452 i1 Citv of Sebastian, PO Box 127, Sebastian, PITTSBURGH TESTING LABORATORY Fla. 32953 / 1 City Engineer, Robert Llovd. P.E., PO Rox L ll QQ John W. Harllee I NIz7�eChb�ttian, Fla. Z2o�s2 Vice President 2 MA FORM A07 -MA y:PITTSBURGH TESTING LABG. <ATORY DATE SHEET B .0 a` < 3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 n n CLASS A �•\'' oC''�'t\h AS A MUTUAL PROTECTION TO CLIENTS. TMC PUBLIC ANO OURSELVES. ALL REPORTS fERSANG ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION FOR PUBLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDIMG OUR REPORTS is RESERVED PENDING OUR WRITTEN APPROVAL. RDER No. MA 3707 LABORATORY No. 452 CLIENT's No. REPORT OF SOIL CEMENT CONSTRUCTION CONTROL CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands WR 3'871 PROCESSING DATE: October 13, 1981 TEC11NICIAN: B. Plemmons PROCESSED THIS DATE: 2583 tet• Iva. The above test meets the requirementPREVIOUSLY PROCESSED: SQ. YDS. REHARyS: of 10000 of maximum density. PRCCESSED TO DATE 2583 SQ. YDS. 1 Client, Attn: Enar_ npnt. RVED 2 Client, Attn: Enqr. Dept., 8380 S. respectfully submitt Federal Hwy., Port St. Lucie, Fla. 33452 01 Citv of Sebastian, PO Box 127, Sebastian, PITTSBURGH TESTING ORATORY 5 1981 Fla .. 32952 / Nov _ 1 City Engineer, Robert Llovd. P.E., PO Box 7 S Bastian, Fja, 32oJohn W. Hatllee I F' f 12 L 1'ec�t . �s2 Vice President LAST. COAST COAST ENCINSER 2 MA FIELD TESTS FIELD DENSITY CEMENT AASHO T99 MOISTURE COMPACTED `bs• 0 USED METHOD C AT TIME THICKNESS, DESCRIPTION OF % BY COMPACTED '�u' Comp- INCHES 0 M C MAX. DEN. AREA PROCESSED I'iT. % LBS/CU FTI X ' t' ar.tirn AVG -.1 . MAX. MIN. Capri from Caprona to Aschumann 1110 x 20 + 4 Radii 2583 s.y. 9 10.8 116.3 11.0 116.E 100.2 7 116. 100.0 7 TEC11NICIAN: B. Plemmons PROCESSED THIS DATE: 2583 tet• Iva. The above test meets the requirementPREVIOUSLY PROCESSED: SQ. YDS. REHARyS: of 10000 of maximum density. PRCCESSED TO DATE 2583 SQ. YDS. 1 Client, Attn: Enar_ npnt. RVED 2 Client, Attn: Enqr. Dept., 8380 S. respectfully submitt Federal Hwy., Port St. Lucie, Fla. 33452 01 Citv of Sebastian, PO Box 127, Sebastian, PITTSBURGH TESTING ORATORY 5 1981 Fla .. 32952 / Nov _ 1 City Engineer, Robert Llovd. P.E., PO Box 7 S Bastian, Fja, 32oJohn W. Hatllee I F' f 12 L 1'ec�t . �s2 Vice President LAST. COAST COAST ENCINSER 2 MA J ��tE711R�j\O FORM A07 -MA �o PITTSBURGH TESTING LABO"ATORv ► DATE SHEET B -3901 N.W. 29th AVENUE. MIAMI. FLORIDA 33142 CLASS „API h \C-��`'<•\ AS A MUTUAL PROTECTION TO CLIENTS. THE ►U ELIC AND OURSCLV EI. ALL REPORTS yffgj AN()`r� ARE SU■MITTCO AS THE CONFIDENTIAL PROPERTY OF CLIENTS. AND AUTHORIZATION 7 0 7 FOR PUSLICATION OF STATEMENTS. CONCLUSIONS OR EXTRACTS FROM OR REGARDING 31 OUR REPORTS 19 R[S[RV[O PENDING OUR WRITTEN APPROVAL. ROER No. MA LABORATORY No. 464 CLIENT's No. REPORT OF SOIL CANT CONSTRUCTION CONTROL CLIENT: General Development Corporation 1111 S. Bayshore Drive Miami, Florida 33131 PROJECT: Sebastian Highlands WR 3871 PROCESSING DATE: 10-21-81 TECHlilcl'N: B. ?lemmons PROCESSED THIS DATE: 014/ tet• iL.D• FREVICUSLY PROCESSED: 2583 SQ. '..DS. USS: The above test meets the require-aRCCESSED TO DATE: 8730 SQ. YDS. en of 1 nOa of Max. density. 1 Client, Atte. na,-. f�Pnt. zo 2 Client, Attn: Engr. Dept., II3S0 S. tespectfully submitted , ��� a � Federal Hwy., Port St. Lucie, Fla. 33452 PITTSBURGH TESTING LAB �'R • 1 Citv of Sebastian, PO Box 127. Sebastian, Fla . _ 32958`NOV 3 0 1981 1 City Enqineer, Robert Llovd. P.E., PO Box John W. Harllee I F'IC7�eShbastian, Fla. 3?-o5Q Vice President 2 MAL tl EAST COAST ENGINEERING FIELD TESTS CEIENT AASHO T99 MOISTURE FIELD DENSITY MLpACTED `bS'� I w USED METHOD C AT TIME THICESS, T.NT DESCRIPTION OF % BY COMPACTED 1-U Comp- INCHES _ 0 M C MAX. DEN. AVG.' MAX. MIN. AREA PROCESSED IST. % LBS/CU FT .4 rt. artirn Ormond Ct. from 9.6 10.3 117.9 9.5 118.1 100.2 7 Enpress to Caprona 983 x 20 + 2 Radii 2242 sy 9.6 10.3 117.9 10.1 117.9 100.0 7 Caprona from 9.6 10.3 117.9 10.0 118.0 100.1 7 Englar to Empress 1731 x 20 + 2 Radii 3905 sy 9.6 10.3 117.9 9.8 118. 100.2 1 I 7 TECHlilcl'N: B. ?lemmons PROCESSED THIS DATE: 014/ tet• iL.D• FREVICUSLY PROCESSED: 2583 SQ. '..DS. USS: The above test meets the require-aRCCESSED TO DATE: 8730 SQ. YDS. en of 1 nOa of Max. density. 1 Client, Atte. na,-. f�Pnt. zo 2 Client, Attn: Engr. Dept., II3S0 S. tespectfully submitted , ��� a � Federal Hwy., Port St. Lucie, Fla. 33452 PITTSBURGH TESTING LAB �'R • 1 Citv of Sebastian, PO Box 127. Sebastian, Fla . _ 32958`NOV 3 0 1981 1 City Enqineer, Robert Llovd. P.E., PO Box John W. Harllee I F'IC7�eShbastian, Fla. 3?-o5Q Vice President 2 MAL tl EAST COAST ENGINEERING