HomeMy WebLinkAboutContractatvOF
SE
HOME OF PELICAN ISLAND
1225 MAIN STREET • SEBASTIAN, FLORIDA 32958
TELEPHONE: (772) 589-5330 • FAX (772) 589-5570
NOTICE TO PROCEED
SEBASTIAN CITY HALL
ROOFING REPAIR
DATE: April 7, 2015
TO: Jason Carruth
Vice President
Advance Roofing
200 Northstar Court
Sanford, FL 32771
You are hereby notified to commence work on, 2015 per the terms and
conditions based on the piggyback contract, using Orange County, Florida, Contract No.Y12-149
and the signed agreement between the City of Sebastian and Advance Roofing, dated, March 25,
2015 for Sebastian City Hall Roof Repairs, in the amount of $52,111.50. Project completion
time is warranted not to exceed (90) ninety calendar days from the commencement date stated
above.
The Project Manager is Jerry Converse, Public Works Operations Director. All
substantial communication pertaining to this project should be directed to him. Jerry can be
reached at 772-228-7053 / (cell) 633-0897 or by e-mail to jconverseRcityofsebastian.ora
We look forward to working with you on this project
Co rse,
ublic Works
Director of Operations
CONSTRUCTION SERVICES AGREEMENT
THIS AGREEMENT made this day of"Ne 2015, by and between the CITY OF
SEBASTIAN, a municipal corporation of the State of Florida, 1225 Main Street, Sebastian, Florida,
32958, ("City") and Advanced Roofing, Inc, 200 Northstar Court, Sandford, Florida 32771
("Contractor.") authorized to do business in the State of Florida.
WHEREAS, the City desires to engage a Florida licensed contractor who has special and unique
competence and experience in providing construction services necessary to complete the Project
hereunder; and,
WHEREAS, the Contractor represents that it has such competence and experience in providing these
services; and,
WHEREAS, the City in reliance on such representation has selected the Contractor in accordance with
its procedure for selection of Contractor; and,
WHEREAS, the City and the Contractor desire to reduce to writing their understanding and
agreements on such professional services.
IT IS, THEREFORE, AGREED as follows:
ARTICLE I - The Contractual Relationship
1.0 EMPLOYMENT OF CONTRACTOR
The City hereby agrees that it may engage the Contractor and the Contractor hereby agrees to perform
professional services for the City in accordance with this Agreement to PROVIDE ALL LABOR,
MATERIAL, TOOLS, EQUIPM,ENT TO PROPERLY REPAIR THE CITY HALL ROOF PER
PROPOSAL.) This Agreement is not an exclusive agreement and the City may employ other
contractors, professional or technical personnel to furnish services for the City as the City in its sole
discretion finds is in the public interest.
The Agreement shall not be construed to create a contractual relationship of any kind between the City
and the Subcontractor(s), or, between any person or firm other than the City and Contractor.
The Contractor shall not sell, transfer, assign or otherwise dispose of the Contract or any portion
thereof, or of his right, title of interest therein or his obligations thereunder, or moneys due or to
become due under this Contract.
2.0 AGREEMENT DOCUMENTS
The Agreement Documents (also called CONTRACT DOCUMENTS) consist of this Agreement,
Supplemental Agreement(s), Notice of Invitation to bid, Instructions for Bidders, Bid Proposal, Bond
Forms, Bid Specifications and Scope of Work, Work Orders, change Orders, Addenda if any, any other
documents listed in the Agreement Documents, and written modifications issued after execution of
this Agreement, if any.
2.1 INTENT
The Specifications are an integrated part of the Contract Documents and as such will not stand
alone if used independently. The Specifications establish minimum standards of quality for this
Project. They do not purport to cover all details entering into the design and construction of
materials or equipment. The intent of the Agreement Documents is to set forth requirements of
performance, type of equipment and structures, and standards of materials and construction. It is
also intended to include all labor and materials, equipment, and transportation necessary for the
proper execution of the Work, to require new material and equipment unless otherwise indicated,
and to require complete performance of the Work in spite of omission of specific reference to any
minor component part and to include all items necessary for the proper execution and
completion of the Work by the Contractor. Performance by the Contractor shall be required only
to the extent consistent with the Agreement Documents and reasonably inferable from them as
being necessary to produce the intended results.
2.2 ENTIRE AND SOLE AGREEMENT
Except as specifically stated herein, the Agreement Documents constitute the entire agreement
between the parties and supersede all other agreements, representations, warranties, statements,
promises, and understandings not specifically set forth in the Agreement Documents. Neither
party has in any way relied, nor shall in any way rely, upon any oral or written agreements,
representations, warranties, statements, promises or understandings not specifically set forth in
the Agreement Documents.
2.3 AMENDMENTS
The parties may modify this Agreement at any time by written agreement. Neither the Agreement
Documents nor any term thereof may be changed, waived, discharged or terminated orally,
except by an instrument in writing signed by the party against which enforcement of the change,
waiver, discharge or termination is sought.
2.4 CONSTRUING TERMS
This Agreement shall not be construed against the party who drafted the same, as both parties
have obtained experts of their choosing to review the legal and business adequacy of the same.
2.5 GOVERNING LAW AND WAIVER OF TRIAL BY JURY
This Agreement shall be governed by the laws of the State of Florida, and any venue for any
action pursuant to the Agreement Documents shall be in Indian River County, Florida. The
parties hereto expressly waive trial by jury in any action to enforce or otherwise resolve
any dispute arising hereunder.
2.6 TERM
This Agreement shall terminate at the conclusion of the necessary repairs..
3.0 DEFINITION OF TERMS
3.1 GENERAL
Whenever the following terms appear in these Agreement Documents, their intent and meaning
shall, unless specifically stated otherwise, be interpreted as shown.
3.2 ACT OF GOD
The words "Act of God" mean an earthquake, flood, hurricane (or other named tropical event),
tornado or other cataclysmic phenomenon of nature. Rain, Wind or other natural phenomenon
(including tropical waves and depressions) of normal intensity for the locality shall not be
construed as an Act of God.
3.3 ADDENDUM (re: bid documents)
A modification of the plans or other contract documents issued by the Owner and distributed to
prospective bidders prior to the opening of bids. All Addenda shall be considered as part of the
Contract Documents.
3.4 AGREEMENT
A written agreement between the Contractor and Owner defining in detail the work to be
performed. The words Agreement and Contract, are one and the same.
3.5 A.S.T.M. DESIGNATION
Wherever the letters "A.S.T.M." are used in the Specifications, it shall be understood as referring
to the American Society for Testing Materials. When reference is made to a certain Designated
Number of a specification or test as set out or given by the American Society for Testing
Materials, it shall be understood to mean the current, up-to-date standard specification or
tentative specification for that particular process, material or test as currently published by that
group.
The bid or proposal is the written offer of a Bidder to perform work described by the contract
documents when made out and submitted on the prescribed proposal form properly sealed and
guaranteed. The bid or proposal shall be considered as part of the Contract Documents.
3.7 BID BOND or PROPOSAL GUARANTEE:
Bidder shall submit a Bid Bond or Proposal Guarantee in the amount of 5% of the Base Bid, in
the form of a Cashier's Check, Unconditional Irrevocable Letter of Credit drawn in favor of the
City of Sebastian on a National Bank, or a bond from a surety company duly licensed in the State
of Florida.
3.8 BIDDER
An individual, partnership, or corporation submitting a proposal for the work contemplated;
acting directly or through a duly authorized representative.
3.9 CHANGE ORDER
A written order issued to the Contractor by the City and covering changes in the plans,
specifications, or scope of work when the amount of work changed is not deemed sufficient to
require a supplemental agreement, or adjustments in the Contract Price or Contract Time.
3.10 CONTRACT ADDENDUM
A special written provision modifying or clarifying the terms and conditions of the Contract. The
Contract Addendum shall be considered as part of the contract documents.
3.11 CONTRACTOR
The word "Contractor" shall mean an individual, partnership, or corporation, and his, their or its
heirs, executors, administrators, successors and assigns, or the lawful agent of any such
individual, firm, partnership, covenant or corporation, or his, their or its surety under any
contract bond, constituting one of the principals to the Contract and undertaking to perform the
work herein.
3.12 DIRECTED, ORDERED, APPROVED & ETC.
Wherever in the Agreement Document the words "directed", "ordered", "approved", "permitted",
"acceptable", or words of similar import are used, it shall be understood that the direction, order,
approval or acceptance of the Owner is intended unless otherwise stated.
3.13 ENGINEER
A Professional Engineer duly licensed and registered in the State of Florida and designated by the
City as Engineer. The City may designate a staff member as Engineer who is not licensed.
3.14 GENERAL CONDITIONS
The directions, provisions and requirements contained within the Agreement Documents, all
describing the general manner of performing the Work including detailed technical requirements
relative to labor, material equipment, and methods by which the Work is to be performed and
prescribing the relationship between the City and the Contractor.
3.15 INSPECTOR
A duly authorized representative of the City assigned to make official inspections of the materials
furnished and of the work performed by the Contractor.
3.16 LABORATORY
Any licensed and qualified laboratory designated by or acceptable to the Owner to perform
necessary testing of materials.
3.17 OWNER
City of Sebastian
3.18 PERFORMANCE AND PAYMENT BONDS
Contractor shall submit bonds in the form prescribed by State Law, and generally as shown on
sample forms herein, for Performance and Payment, each in the amount of 100% of the Contract
Amount.
3.19 PLANS
The official, approved plans, including reproduction thereof, showing the location, character,
dimensions and details of the work to be done. All shop drawings submitted by the Contractor
shall be considered as part of the contract documents.
3.20 PROPOSAL
The proposal or bid is the written offer of a Bidder to perform the work described by the Contract
Documents when made out and submitted on the prescribed proposal form, properly signed and
guaranteed. The proposal or bid shall be considered as part of the contract documents.
3.21 SPECIAL CONDITIONS
Special clauses or provisions, supplemental to the Plans, Standard Specifications and other
contract documents, setting forth conditions varying from or additional to the Standard
Specifications for a specific project.
3.22 SPECIFICATIONS
The directions, provisions, and requirements together with all written agreements made or to be
made, setting forth or relating to the method and manner of performing the Work, or to the
quantities and qualities of materials, labor and equipment to be furnished under the Agreement.
3.23 SUBCONTRACTOR
An individual, partnership or corporation supplying labor, equipment or materials under a direct
contract with the contractor for work on the project site. Included is the one who supplies
materials fabricated or formulated to a special design according to the plans and specifications
for the particular project.
3.24 SUPPLEMENTAL AGREEMENT
A written understanding, or proposal and acceptance, executed between the City and the
Contractor subsequent to execution of the Agreement herein with the written consent of the
Contractor's Surety, relating to the work covered by the Agreement and clarifying or furthering
the terms thereof. A modification to the Agreement shall be made by Contract Addendum.
3.25 SURETY
Surety is a corporation qualified to act as surety under the laws of Florida, who executes the
Contractor's Performance and Payment Bonds and is bound with the Contractor for the
acceptable performance of the contracted work and for the payment of all debts pertaining
thereto.
3.26 WORK, (The) or PROJECT, (The)
The public improvement contemplated in the Plans and Specifications, and all actions necessary
to construct the same.
3.27 WORK ORDER
Work orders are work instructions including specification and plans that show the location,
character, dimensions and details to the work to be done. Work orders are specific instructions,
of limited scope, that will be a part of this contract. Work orders shall be considered as part of
the contract documents.
ARTICLE II - Performance
4.0 PLANS, SPECIFICATIONS AND RELATED DATA
4.1 INTENT OF PLANS AND SPECIFICATIONS
The intent of the Plans, Specifications, Work Orders and other Contract Documents is that the
Contractor furnishes all labor and materials, equipment, supervision and transportation necessary
for the proper execution of the Work unless specifically noted otherwise. The Contractor shall do
all the work shown on the Plans and described in the Specifications and other Contract
Documents and all incidental work considered necessary to substantially complete the Work
ready for use, occupancy, or operation in a manner acceptable to the City.
4.2 CONFLICT
In the event of any inconsistency, discrepancy or conflict between the Agreement, the Plans,
Specifications, and other Contract Documents, the Agreement shall prevail and govern over all
except a subsequently executed Contract Addendum; in the event of an inconsistency,
discrepancy or conflict between the Plans and Specifications, the Specifications shall prevail and
govern.
4.3 DISCREPANCIES IN PLANS
Any discrepancies found between the Plans and Specifications and site conditions, or any errors
or omissions in the Plans or Specifications, shall be immediately reported to the Engineer and
City. The Engineer shall promptly determine the validity and seriousness of the claimed
condition and correct any such error or omission in writing, or otherwise direct Contractor. Any
work done by the Contractor after his discovery of such discrepancies, errors or omissions shall
be done at the Contractor's risk.
Any correction or errors or omissions in Plans and Specifications may be made by the Engineer
when such correction is necessary for the proper fulfillment of their intention as construed by
him. Where said correction of errors or omissions, except as provided in the next two (2)
paragraphs below, adds to the amount of work to be done by the Contractor, compensation for
said additional work shall be made under the Paragraph 10.7 CHANGES IN THE WORK below,
except where the additional work may be classed under some item of work for which a unit price
is included in the proposal.
The fact that specific mention of any part of work is omitted in the Specifications, whether
intentionally or otherwise, when the same is clearly shown or indicated on the Plans, or is usually
and customarily required to complete fully such work as is specified herein, will not entitle the
Contractor to consideration in the matter of any claim for extra compensation, but the said work
must be installed or done the same as if called for by both the Plans and Specifications.
All work indicated on the Plans and not mentioned in the Specifications or vice versa, and all
work and material usual and necessary to make the Work complete in all its parts, whether or not
they are indicated on the Plans or mentioned in the Specifications, shall be furnished and
executed the same as if they were called for by both the Plans and Specifications.
The Contractor will not be allowed to take advantage of any errors or omissions in the Plans and
Specifications. The Engineer will provide full information when errors or omissions are
discovered.
4.4 DRAWINGS AND SPECIFICATIONS AT JOB SITE
One (1) complete set of all Plans, Specifications, Work Orders, Addenda, Change Orders, Shop
Drawings and samples shall be maintained at the job site, in good order and annotated to show all
changes made during the construction process, and shall be available to the Engineer and City at
all times. A final copy thereof, along with "as -built" record drawings, operations and
maintenance manuals, and data sheets, shall be delivered to the Engineer upon the completion of
the Work.
4.5 DIMENSIONS
Dimensions shown on the Plans will be used. Where the work of the Contractor is affected by
finished dimensions, these shall be verified by the Contractor at site, and he shall assume the
responsibility for their use.
4.6 SAMPLING AND TESTING
Except as otherwise provided, sampling and testing of all materials, and the laboratory methods
and testing equipment, required under the Specifications shall be in accordance with the latest
standards or tenets of the American Society for Testing Materials.
The testing of samples and materials shall be made at the expense of the Contractor, except
where indicated otherwise. The Contractor shall furnish any required samples without charge.
The Contractor shall be given sufficient notification of the placing of orders for materials to
permit testing.
As an exception to the above, when the Contractor represents a material or an item of work as
meeting Specifications and under recognized test procedures it fails, any re -testing shall be at the
Contractor's expense, billed at the Testing Laboratory's standard rate for individual tests.
It is expected that all inspections and testing of materials and equipment will be done locally. If
the Contractor desires that inspections for tests be made outside of the local area, all expenses,
including per diem for the Engineer or Inspectors, shall be borne by the Contractor.
4.7 SHOP DRAWINGS
The Contractor shall provide shop drawings, setting schedules and other drawings as may be
necessary for the prosecution of the Work in the shop and in the field as required by the Plans
and Specifications or Engineer's instructions. Deviations from the Plans and Specifications shall
be called to the attention of the City at the time of the first submission of shop drawings and
other drawings. The City's approval of any shop drawings shall not release the Contractor from
responsibility for errors, corrections of details, or conformance with the Contract. Shop drawings
shall be submitted according to the following schedule:
(a) Seven (7) copies shall be submitted to the City at least thirty (30) days before the
materials indicated thereon are to be needed or earlier if required to prevent delay of work or to
comply with subparagraph (b).
(b) The City shall, within fourteen (14) days of the submittal of any shop drawings,
return three (3) copies to the Contractor marked with any corrections and changes required and
noting if the drawings are acceptable as noted, or if re -submittal is required.
(c) The Contractor shall then correct the shop drawings to conform to the corrections
and changes requested by the City and resubmit six (6) copies to the City.
(d) Three (3) copies of Approved Shop Drawings shall be returned to the Contractor
by the City.
4.8 QUALITY OF EQUIPMENT AND MATERIALS
In order to establish standards of quality, the Specifications may refer to certain products by
name and catalog number. This procedure is not to be construed as eliminating from competition
other products of equal or better quality by other manufacturers where fully suitable in design.
The Contractor shall furnish to the City a complete list of his proposed desired substitutions prior
to the signing of the Contract, together with such engineering and catalog data as the City may
require. Further substitutions may be submitted during the course of work in accordance with
Paragraph 4.10 SUBSTITUTION OF EQUIPMENT AND/OR MATERIAL below.
The Contractor shall abide by the City's judgment when proposed substitution of materials or
items or equipment are judged to be unacceptable and shall furnish the specified material or item
of equipment in such case. All proposals for substitutions shall be submitted to the City in
writing by the Contractor and not by individual trades or material suppliers. The City will advise
of approval or disapproval of proposed substitutions in writing within a reasonable time. No
substitute materials shall be used unless approved by City in writing.
4.9 EQUIPMENT APPROVAL DATA
The Contractor shall furnish one (1) copy of complete catalog data for every manufactured item
of equipment and all components to be used in the Work, including specific performance data,
material description, rating, capacity, material gauge or thickness, brand name, catalog number
and general type.
This submission shall be compiled by the Contractor and submitted to the City for review and
written approval before any of the equipment is ordered.
Each data sheet or catalog in the submission shall be indexed according to specification section
and paragraph for easy reference.
After written approval is received by the Contractor, submission shall become a part of the
Contract and may not be deviated from except upon written approval of the City.
Catalog data for equipment approved by the City does not in any case supersede the Contract
Documents. The acceptance by the City shall not relieve the Contractor from responsibility for
deviations from Plans or Specifications, unless he has called the City's attention, in writing, to
such deviations at the time of submission, nor shall it relieve him from responsibility for errors of
any sort in the items submitted. The Contractor shall check the work described by the catalog
data with the Contract Documents for deviations and errors.
It shall be the responsibility of the Contractor to insure that items to be furnished fit the space
available. He shall make necessary field measurements to ascertain space requirements, including
those for connections, and shall order such sizes and shapes of equipment that the field
installation shall suit the true intent and meaning of the Plans and Specifications.
Where equipment requiring different arrangement of connections from those shown is approved,
it shall be the responsibility of the Contractor to install the equipment to operate properly, and in
harmony with the intent of the Plans and Specifications, and to make all changes in the Work
required by the different arrangement of connections at his own expense.
4.10 SUBSTITUTION OF EQUIPMENT AND/OR MATERIAL
After the execution of the Contract Agreement, the substitution of equipment and/or material for
that specified will be considered if:
(a) The equipment and/or materials proposed for substitution is determined by the
City to be equal or superior to that specified in the Contract;
(b) Unless determined to be of superior quality, the equipment and/or material
proposed for substitution is less expensive than that specified and that such savings to the City,
as proposed by the Contractor, are submitted with the request for substitution. If the substitution
is approved, the Contract price shall be reduced accordingly; and
(c) The equipment and/or material proposed for substitution is readily available and
its delivery and use, if approved as a substitution, will not delay the scheduled start and
completion of the specified work for which it is intended or the scheduled completion of the
entire work to be completed under the contract.
No request will be considered unless submitted in writing to the City and approval by the City
must also be in writing. To receive consideration, requests for substitutions must be accompanied
by documentary proof of the actual difference in cost to the Contractor in the form of quotations
to the contractor covering the original equipment and/or material, and also equipment and/or
material proposed for substitution or other proof satisfactory to the City. It is the intention that
the City shall receive the full benefit of the saving in cost involved in any substitution unless the
item is substituted for one designated in the Specifications by specific manufacturer's name and
type, in which case one-third of the savings shall accrue to the benefit of the Contractor.
In all cases, the burden of proving adequate proof that the equipment and/or material offered for
substitution is equal or superior in construction and/or efficiency to that named in the Contract
shall rest on the Contractor and the proof will be submitted to the City. Request for substitution
of equipment and/or material which the Contractor cannot prove to the satisfaction of the City, at
its sole discretion and judgment, to be equal or superior in construction and/or efficiency to that
named in the Contract will not be approved.
5.0 MATERIALS AND WORKMANSHIP
5.1 MATERIALS FURNISHED BY THE CONTRACTOR
All materials and equipment used in the Work shall meet the requirements of the respective
Specifications, and shall not be used until it has been approved in writing by the City.
Wherever the specifications call for an item of material or equipment by a manufacturer's name
and type, and additional features of the item are specifically required by the specifications, the
additional features specified shall be provided whether or not they are normally included in the
standard manufacturer's item listed.
Wherever the specifications call for an item of material or equipment by a manufacturer's name
and type, and the specified item becomes obsolete and is no longer available, the Contractor shall
provide a substitute item of equal quality and performance which is acceptable to the Engineer
and City and is currently available, at no increase in Contract price.
5.2 STORAGE OF MATERIALS
Materials and equipment shall be stored so as to incur the preservation of their quality and fitness
for the Work. When considered necessary, they shall be placed on wooden platforms or other
hard clean surfaces, and not on the ground, and/or they shall be placed under cover. Stored
materials and equipment shall be located so as to facilitate prompt inspection. Private property
zoned for, or adjacent to land zoned for, residential uses shall not be utilized for storage
purposes.
5.3 REJECTED WORK AND MATERIAL
Any materials, equipment or work which do not satisfactorily meet the Specifications may be
condemned by the Engineer or City by giving a written notice to the Contractor. All condemned
materials, equipment or work shall be promptly taken out and replaced.
All materials and equipment which do not conform to the requirements of the Contract
Documents, are not equal to samples approved by the Engineer and City, or are in any way
unsatisfactory or unsuited to the purpose for which they are intended, shall be rejected. Any
defective work whether the result of poor workmanship, use of defective materials, damaged
through carelessness or from other cause shall be removed within ten (10) days after written
notice is given by the City, and the work shall be re -executed by the Contractor. The fact that the
Engineer or the City may have previously overlooked such defective work shall not constitute an
acceptance of any part of it. Should the Contractor fail to remove rejected work or materials
within ten (10) days after written notice to do so, the City may remove them and may store the
materials and equipment. Satisfaction of warranty work after final payment shall be in
accordance with Paragraph 10.15.
5.4 MANUFACTURER'S DIRECTION
Manufactured articles, materials and equipment shall be applied, installed, connected, erected,
used, cleaned, and conditioned as directed by the manufacturer unless herein specified to the
contrary.
5.5 SKILL AND CHARACTER OF WORKMEN
All workmen must have sufficient knowledge, skill and experience to perform properly the work
assigned to them. Any foreman or workman employed by the Contractor or subcontractors who,
in the opinion of the Engineer or the City does not perform his work in a skillful manner, or
appears to be incompetent or to act in a disorderly or intemperate manner shall, at the written
request of the City, be discharged immediately and shall not be employed again in any portion of
the Work without the approval of the City.
The Contractor shall at all times be responsible for the conduct and discipline of his employees
and/or any subcontractor or persons employed by subcontractors.
5.6 CUTTING AND PATCHING
The Contractor shall do all necessary cutting and patching of the Work that may be required to
properly receive the work of the various trades or as required by the Plans and Specifications to
complete the Work. He shall restore all such cut or patched work as directed by the Engineer or
the City. Cutting of existing structures that could endanger the Work, adjacent property,
workmen or the public shall not be done unless approved by the Engineer and under his
surveillance.
5.7 CLEANING UP
The Contractor shall at all times keep the premises free from accumulation of waste materials or
rubbish caused by his employees or work. At the completion of the Work, he shall remove all his
rubbish, tools, scaffolding and surplus materials and shall leave his work "broom clean" or its
equivalent, unless more exactly specified, and shall insure that all debris and other unsightly
objects are removed and disposed of in a satisfactory manner. At no additional expense to the
City, the Contractor will restore to their original conditions or better, as nearly as practicable,
those portions of the site not designated for alteration and all such property, structure, utilities,
landscaping, etc., disturbed or damaged during the prosecution of the Work. Final payment will
be withheld until such clean up and repairs are completed
The Work will be considered complete only after all debris and unused material due to or
connected with the Work have been removed and the surrounding area left in a condition
satisfactory to the City. In the event the City finds that the Contractor has not complied in
keeping the job site clean, the City may, after twenty-four (24) hours written notice to the
Contractor to correct the situation, elect to have the job site cleaned by an independent labor
force. The cost of cleaning by said independent labor force shall be deducted from moneys due
the Contractor.
5.8 CITY'S OWNERSHIP OF MATERIALS
Any and all materials, whether structural or natural, found within the limits of the project remain
the property of the City unless City ownership is specifically conveyed to the Contractor.
All material, equipment and work become the sole property of the City as installed. These
provisions shall not be construed as relieving the Contractor from the sole responsibility for all
materials and work for which payments have been made, for the restoration of damaged work, or
as a waiver of right of the City to require the fulfillment of all the terms of the Contract.
5.9 GUARANTEE
The Contractor shall warrant all equipment furnished and work performed by him for a period of
one (1) year from the date of final written acceptance of the Work by City.
Satisfaction of warranty work after final payment shall be as per Paragraph 10.15.
All equipment and material warranties or guarantees shall be drawn in favor of the City and the
originals thereof furnished to the Engineer for review and acceptance prior to final payment.
Such guarantee shall in no way limit or relieve the Contractor of liability from subsequent claims
of beach of contract due to substandard materials or workmanship, nor shall such warranty period
shorten the statute of limitations for bringing a breach of contract or other action based upon any
such deficiencies.
6.0 CONSTRUCTION STAKING TO BE PERFORMED BY CONTRACTOR
6.1 PERSONNEL, EQUIPMENT AND RECORD REQUIREMENTS
Adequate field notes and records shall be available for review by the City and Engineer as the
Work progresses and copies shall be available if necessary. Any inspection or checking of the
Contractor's field notes or layout work by the City and the acceptance of all or any part thereof,
shall not relieve the Contractor of his responsibility to achieve the lines, grades and dimensions
shown in the Plans and Specifications.
Prior to final acceptance of the project, the Contractor shall mark in a permanent manner on the
surface of the completed Work all control points shown on the Plans.
6.2 CONTROL POINTS FURNISHED BY THE CITY
The City will provide boundary or other control points and bench marks as shown on the Plans as
"Contractor's Survey Control Point", if any is provided. The Contractor shall be responsible for
all survey control of his work during construction. The Contractor shall preserve all reference
points and benchmarks furnished by the City.
6.3 FURNISHING OF STAKE MATERIALS
The Contractor shall furnish all stakes, templates and other materials necessary for establishing
and maintaining the lines and grades necessary for control and construction of the Work.
6.4 LAYOUT OF WORK
Utilizing the control points furnished by the City in accordance with Paragraph 6.2, the
Contractor shall establish all horizontal and vertical controls necessary to construct the Work in
conformance with the Plans and Specifications. The Work shall include performing all
calculations required and setting all stakes needed such as grade stakes, offset stakes, reference
point stakes, slope stakes, and other reference marks or points necessary to provide lines and
grades for construction of all roadway, bridge and miscellaneous items.
Survey notes indicating the information and measurements used in establishing locations and
grades shall be kept in notebooks and furnished to the Engineer with the record drawings for the
Project.
6.5 SPECIFIC STAKING REQUIREMENTS
Stakes to establish lines and grades shall be set at appropriate intervals to assure that the Project
is constructed to meet the lines and grades shown on the Plans.
For bridge construction stakes and other control, references shall be set at sufficiently frequent
intervals to assure that all components of a structure are constructed in accordance with the lines
and grades shown in the Plans.
6.6 PAYMENT
The cost of performing layout work as described above shall be included in the contract unit
prices for the various items of work to which it is incidental.
6.7 COORDINATION WITH CITY
The City's recorded subdivision plats shall be considered correct. The distance, bearing and curve
information provided shall be used by the Contractor's surveyor to establish alignment
throughout construction. All surveying activities will be coordinated with the City's surveyor as
needed for proper completion of all work on the site.
Primary control monuments, originally set by the City, that are disturbed or destroyed during
construction shall be accurately replaced by the Contractor's surveyor to the satisfaction of the
City's surveyor.
6.8 LOCATION OF EXISTING UTILITIES AND PIPING
All existing underground utilities, such as telephone, cable television and electrical cables must
be located by the Contractor prior to starting work. The Contractor shall contact the Utilities at
least 48 hours prior to commencing any work within the project area. There may be other
utilities within the project area.
The cost of substantiating the location of utilities shall be borne by the Contractor and included
in the bid price. The Contractor shall be responsible for the repair and/or replacement of utilities
which he damages during the course of construction.
Utilities deemed to require relocation shall be identified by the Contractor prior to commencing
work. The Contractor shall notice the City of the conflict and seek direction from the City prior
to proceeding with work. Directions from the City may be to proceed despite conflict, place
work order on hold and commence work at a different location, or relocate utilities under
separate contract with the utility or a change order to be directed by the City.
7.0 PROGRESS AND COMPLETION OF WORK
7.1 CONTRACTOR'S OBLIGATION
Contractor shall supervise and direct the Work, using Contractor's best skill and attention.
Contractor shall be solely responsible for and have control over construction means, methods,
techniques, sequences and procedures and for coordinating all portions of the Work under this
Contract, unless the Contract Documents give other specific instructions concerning these
matters.
Unless otherwise provided in the Contract Documents, Contractor shall provide and pay for
labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities,
transportation, and other facilities and services necessary for the proper execution and
completion of the Work, whether temporary or permanent and whether or not incorporated or to
be incorporated in the Work.
Unless otherwise provided in the Contract Documents, Contractor shall pay all sales, use and
other similar taxes.
Contractor shall enforce strict discipline and good order among Contractor's employees and other
persons carrying out the Work. Contractor shall not permit employment of unfit persons or
persons not skilled in tasks assigned to them.
Contractor currently holds and shall maintain at all times during the term of this Contract all
required federal, state and local licenses necessary to perform the Work required under the
Contract Documents.
Contractor shall be responsible to the City for the acts and omissions of Contractor's employees,
Subcontractors and their agents and employees, and other persons performing portions of the
Work under a contract with Contractor.
Contractor shall indemnify, defend and hold City harmless from all claims arising out of or
related to its performance of the Work except for acts arising solely from the active negligence of
the City.
7.2 START OF CONSTRUCTION
The Contractor shall commence work on the date specified in the Notice to Proceed subsequently
issued by the City, or as specifically noted in any Contract Addendum. However, in no case shall
the Contractor commence work until the City has been furnished and acknowledges receipt of the
Contractor's Certificates of Insurance and a properly executed performance and payment bond as
required.
7.3 CONTRACT TIME
The contractor shall complete, in an acceptable manner, all of the Work in the time stated in the
Contract Agreement and any Addenda or Change Orders thereto.
7.4 SCHEDULE OF COMPLETION
The Contractor's schedules are subject to the approval of the City, which shall not be
unreasonably withheld, and shall reflect a logical sequence of the various components of work
and the anticipated rates of production necessary to complete the Work on or before the
completion date. Said schedules shall be submitted within ten (10) days of the execution of the
agreement by the City except when requested otherwise and shall be updated and resubmitted to
the City on the twenty-fifth (25th) day of every month with the Contractor's pay request.
7.5 COORDINATION OF CONSTRUCTION/PRECONSTRUCTION CONFERENCE
The Contractor shall coordinate his work with other contractors, the City and utilities to assure
orderly and expeditious progress of work.
The City shall hold a pre -construction conference at Sebastian City Hall at a time and date
mutually agreed upon with the Contractor after the Contract has been awarded and fully
executed.
7.6 PROPERTY OF OTHERS
A. Public Ownership
The Contractor shall be responsible for the preservation of all public property, trees, monuments,
etc., along and adjacent to the street and/or right-of-way, and shall use every precaution necessary
to prevent damage or injury thereto. He shall use suitable precautions to prevent damage to pipes,
conduits and other underground structures, and shall protect carefully from disturbance or
damage all monuments and property marks until a land surveyor has witnessed or otherwise
referenced their location and shall not remove them until so directed by the Engineer in writing.
The City shall remove and relocate all traffic control signs as required.
B. Private Ownership
Mail and newspaper boxes, sprinkler systems, ornamental shrubs, lawn ornaments, house
numbers, fences, etc. may be removed and relocated by the property owners. The City will not
remove, relocate, or re -install mail boxes, sprinkler systems, ornamental shrubs, etc. belonging to
a private property owner. However, should such items not be removed or relocated by the start of
construction, the Contractor shall remove the objects, in a manner which does not damage or
injure the objects at no extra cost to the City, which interfere with the construction of the Project
and place them on the property owner's front lawn just outside the project limits.
Otherwise, the Contractor shall not enter upon private property for any purpose without
obtaining permission from the property Owner thereof. Where extensive intrusions upon private
property are required for construction, the City and Contractor shall cooperate to obtain
Temporary Construction Easements from the landowner.
7.7 PROTECTION OF EXISTING UTILITIES AND FACILITIES
All utilities and all structures of any nature, whether below or above ground, that may be
affected by the Work but are not required to be disturbed or relocated by the very nature of the
project, shall be protected and maintained by the Contractor and shall not be disturbed or
damaged by him during the progress of the Work; provided that, should the Contractor disturb,
disconnect or damage any utility or any structure, all expenses of whatever nature arising from
such disturbance or the replacement or repair and testing thereof shall be borne by the Contractor.
7.8 CROSSING PUBLIC FACILITIES
When new construction crosses highways, railroads, streets or similar public facilities under the
jurisdiction of state, county, city, or other public agency or private entity, the City through the
Engineer shall secure written permission prior to the commencement of construction of such
crossing. The Contractor will be required to furnish evidence of compliance with conditions of
the permit from the proper authority before final acceptance of the Work by City. Road closures
are govrned by Paragraph 8.3 below.
7.9 CHANGES IN THE WORK
The City may order changes in the Work through additions, deletions or modifications without
invalidating the Contract; however, any change in the scope of work or substitution of materials
shall require the written approval of the City. Compensation and time of completion affected by
the change shall be adjusted at the time of ordering such change. New and unforeseen items of
work found to be necessary and which cannot be covered by any item or combination of items for
which there is a contract price shall be classed as changes in the Work. The Contractor shall do
such changes in the Work and furnish such materials, labor and equipment as may be required for
the proper completion of construction of the work contemplated. In the absence of such written
order, no claim for changes in the Work shall be considered. Changes in the Work shall be
performed in accordance with the Specifications where applicable and work not covered by the
specifications or special provisions shall be done in accordance with specifications issued for this
purpose. Changes in the Work required in an emergency to protect life and property shall be
performed by the Contractor as required.
7.10 EXTENSION OF CONTRACT TIME
No extension of time shall be valid unless given in writing by the City. No monetary
compensation shall be given for such delay.
A delay beyond the Contractor's control occasioned by an "Act of God" may entitle the
Contractor to an extension of time in which to complete the Work as determined by the City
provided, however, the Contractor shall immediately give written notice to the City of the cause
of such delay.
"Rain day" extensions shall be granted upon written request of the Contractor to the City's
Project Manager when said Project Manager determines that weather conditions make it
counterproductive to work on said days. "Rain day" requests must be submitted at the end of
each work week or be waived, and the cumulative "rain day" extensions granted shall be
processed as a Change Order with each pay submittal.
In the event that the City suspends the Work as provided in Paragraph 9.3, the Contractor shall be
granted an extension of time to complete the Work for as many calendar days as the Work was
suspended; except, however, that the Contractor will not be granted an extension of time to
complete the Work if the suspension was caused by a fault of the Contractor.
7.11 CORRECTION OF WORK
Contractor shall, at no cost to the City, promptly correct Work failing to conform to requirements
of the Contract Documents, whether observed before or after completion of the Work and
whether or not fabricated, installed or completed, and shall correct any Work found to be not in
accordance with the requirements of the Contract Documents within a period of one (1) year
from the date of completion of the Work or by the terms of an applicable special warranty
required by the Contract Documents. The provisions of this Paragraph apply to the Work done
by Subcontractors as well as to the Work done by direct employees of Contractor.
Nothing contained in this Paragraph shall be construed to establish a period of limitation with
respect to other obligations which Contractor might have under the Contract Documents.
Establishment of the time period of one (1) year as described in Subparagraph 7.11(a) above
relates only to the specific obligation of Contractor to correct the Work, and has no effect on the
time within which the obligations of the Contract Documents may be enforced, nor to the time
within which proceedings may be commenced to establish Contractor's liability with respect to
Contractor's remaining contracual obligations.
7.12 LIQUIDATED DAMAGES
In the event Contractor violates or fails to perform any provision of the Contract Documents,
then the City may elect to receive, and Contractor agrees to pay, liquidated damages in the
amount of one hundred dollars ($100) ner day beyond the agreed completion date. Inspection of
the Work by the City and the subsequent issuance of a notice by the City indicating substantial
completion will be the date used to signify work completion. If completion is beyond the
schedule agreed upon, liquidated damages may be imposed by the City on the Contractor and
will be withheld from payment.
It is expressly acknowledged by Contractor that said payment shall not be interpreted nor
construed as a penalty but is in fact a good faith attempt to fix damages which the City will suffer
in the event Contractor fails to perform as required hereunder or violates any provision of the
Contract Documents.
8.0 PUBLIC HEALTH AND SAFETY
8.1 PROTECTION OF PERSONS AND PROPERTY
The Contractor shall submit, for the City's approval, a project safety and security plan which
describes the Contractor's plans and procedures to protect the safety and property of property
owners, residents, and passers-by. The plan shall describe measures and precautions to be taken
during working hours and non -working hours.
A. Safety Precautions and Programs
The Contractor shall be responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work in accordance with the U.S. Department
of Labor Occupational Safety and Health Act and the laws of the State of Florida.
This Contract requires that the Contractor and any and all subcontractors hired by the Contractor
comply with all relevant standards of the Occupational Safety and Health Act. Failure to comply
with the Act constitutes a failure to perform.
The Contractor agrees to reimburse the City for any fines and/or court costs arising from
penalties charged to the City for violations of OSHA committed by the Contractor or any and all
subcontractors.
B. Safety of Persons and Property
The Contractor shall take all reasonable precautions for the safety of, and shall provide all
reasonable protection to prevent damage, injury or loss to, all employees on the Work and all
other persons who may be affected thereby; all the work materials and equipment to be
incorporated therein, whether in storage on or off the project site, under the care, custody or
control of the Contractor or any of his subcontractors; and other property on the project site or
adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures and
utilities not designated for removal, relocation or replacement in the course of construction.
The Contractor shall be held fully responsible for such safety and protection until final written
acceptance of the Work.
Fire hydrants on or adjacent to the Work shall be kept accessible to fire fighting equipment at all
times. Temporary provisions shall be made by the Contractor to insure the proper functioning of
all swales, gutters, sewer inlets, drainage ditches and irrigation ditches, which shall not be
obstructed except as approved by the City.
The Contractor acknowledges that, in executing the Project, it will operate machinery and
equipment that may be dangerous to the adjacent property owners and the general public. The
Contractor will be required to conduct excavations for the Project which may be hazardous to
person and property. The Contractor shall develop and implement a job safety and security plan
which will adequately protect all property and the general public.
8.2 TRAFFIC CONTROL
All safety precautions, traffic control, and warning devices necessary to protect the public and
workmen from hazards within the right-of-way shall be in strict accordance with SECTION 102,
MAINTENANCE OF TRAFFIC, in the Florida Dept. of Transportation (FD07) Std. The State
of Florida Manual of Traffic Control and Safe Practices for Street and Highway Construction,
Maintenance and Utility Operations Specifications for Road and Bridge Construction, latest
edition. shall be used as minimum standards, as applicable.
Further, the Contractor shall carry on the Work in a manner that will cause the least possible
obstruction and interruption in traffic, and the least inconvenience to the general public and the
residents in the vicinity of the work.
8.3 ROAD CLOSURE AND DETOURS
Local traffic shall be maintained within the limits of the Project for the duration of the
construction period. Closing to through travel of more than two (2) consecutive blocks, including
the cross street intersected will not be permitted without specific authorization of the City. No
road or street shall be closed to the public except with the permission of the City and proper
governmental authority. When closing of roads are permitted, it shall require forty-eight (48)
hours notification to the City. Traffic detours shall be pre -approved prior to closing. "Street
Closed to through Traffic" signs and "Detour" routes shall be indicated and maintained by the
Contractor when the job is located in a public or private street.
8.4 PROVISION OF ACCESS
Where traffic must cross open trenches, the contractor shall provide adequate ingress and egress
to dwellings, business facilities, utilities and service. Temporary provisions shall be made by the
Contractor to insure the use of sidewalks. The Contractor shall provide suitable crossings at
street intersections and driveways, and supply such aid as may be required for pedestrians and
motorists, including delivery vehicles, to safely negotiate the construction areas.
On completion of Work within any area, the Contractor shall remove all debris, excess materials,
barricades and temporary Work leaving walkways and roads in said area clear of obstructions.
8.5 WARNING SIGNS AND BARRICADES
The Contractor shall provide adequate signs, barricades, warning lights and flagmen, as required,
and all such other necessary precautions for the protection of the Work and the safety of the
public. All barricades and obstructions shall be protected at night by regulatory signal lights
which shall be kept in operation from sunset to sunrise. Barricades shall be of substantial
construction and shall be reflective to increase their visibility at night. Suitable warning signs
shall be so placed and illuminated at night as to show in advance where construction, barricades
or detours exist. Unless so designated in the Bid Documents, no direct payment for this work will
be made, but the cost of providing, erecting and maintaining such protection devices, including
guards, watchmen and/or flagmen as required shall be considered as included and paid for in the
various contract prices of the Work.
Warning signs and barricades shall be in conformance with the State of Florida, Manual of
Trafflc Control and Safe Practices for Street and Highway Construction, Maintenance and
Utility Operations, latest edition.
The Contractor shall provide and maintain adequate barricades, construction signs, torches,
flashers, guards and flagmen as required in pedestrian and vehicular traffic areas. Regulations of
local authorities shall be compiled with. Advance warning signs are required on all streets where
work is being conducted. Lane closures shall be signed and barricaded or coned as indicated in
aforementioned FDOT Index. Flagmen may be required where traffic and length of lane closure
warrant them. Where such a plan is needed, Contractor shall submit and obtain approval of their
traffic control plan by the City.
8.6 OPEN TRENCHES
The Contractor shall fully comply with Florida Statutes and OSHA regulations with regard to
open trenches during construction. The Contractor shall be place construction hazard fencing
along any open trenches during the construction work -day, and shall leave no open trenches or
excavations over -night unless properly fenced and with the specific approval of the Engineer or
the City.
8.7 PLACEMENT OF HEAVY EQUIPMENT
The Contractor shall not leave construction equipment parked in front of or on a residential lot
overnight or on weekends. At the close of work each day, the equipment shall be driven to and
stored in a designated area so that the equipment will not become an "attractive nuisance" to
neighborhood children. All equipment left unattended during the course of working day, such as
during lunch hours or work breaks, shall not be left in a condition or location which would create
a safety hazard to the general public. All keys shall be removed from the machines during those
times.
8.8 TEMPORARY FACILITIES AND CONTROLS
The Contractor shall provide controls for sanitary facilities, environmental protection and safety
controls on site acceptable to the Florida Department of Health and Rehabilitative Services,
Department of Environmental Protection, and St. Johns River Water Management District.
8.9 SANITARY PROVISION
The Contractor shall provide and maintain such sanitary accommodations adequate for the use of
his employees and those of his subcontractors, and as may be necessary to comply with the
requirements and regulations of the local and state departments of health.
Such facilities shall be made available when the first employees arrive on site of the Work, shall
be properly secluded from public observation, and shall be constructed and maintained during the
progress of the Work in suitable numbers and at such points and in such manner as may be
required or approved.
The Contractor shall maintain the sanitary facilities in a satisfactory and sanitary condition at all
times and shall enforce their use. Contractor shall rigorously prohibit the committing of
nuisances on the site of the Work, on the lands of the City or an adjacent property. The City shall
have the right to inspect such facilities at all times to determine whether or not they are being
properly and adequately maintained.
Following the period of necessity for such accommodations, they and all evidence affixed thereto
shall be removed.
8.10 WATER AND ELECTRIC SUPPLY
The Contractor shall make all necessary applications and arrangements, and pay all fees and
charges for water and electrical service necessary for the proper completion of the Project up to
the time of final acceptance. The Contractor shall provide and pay for any temporary piping and
connections.
8.11 NOISE CONTROL
The Contractor shall provide adequate protection against objectionable noise levels caused by the
operation of construction equipment, and shall submit a plan to the Engineer for his review prior
to initiation and implementation of the plan.
8.12 DUST CONTROL
The Contractor shall provide for adequate protection against raising objectionable dust clouds
caused by moving construction equipment, high winds or any other cause, and shall submit a
plan to the Engineer for his review prior to initiation and implementation of the plan.
8.13 WATER CONTROL
The Contractor shall provide for satisfactory disposal of surplus water and shall submit a plan to
the Engineer for his review prior to initiation and implementation of the plan. Prior approval
shall be obtained from the proper authorities for the use of public or private lands or facilities for
such disposal.
8.14 POLLUTION, SILTATION AND EROSION CONTROL
The Contractor shall provide for and take sufficient precautions to prevent pollution of private
and public lands, reservoirs, ponds, rivers, streams, creeks, etc., by the disposal of surplus
materials in the forms of solids, liquids or gases including, but not limited to, fuels, oils bitumen,
calcium chloride or other harmful materials.
Contractor shall conduct and schedule Work operations so as to avoid or otherwise minimize
pollution or siltation of streams, lakes and reservoirs and to avoid interference with movement of
migratory fish where there is a high potential for erosion and subsequent water pollution.
Erosion control features shall be constructed concurrently with other work and at the earliest
practicable time.
The Contractor shall prepare a detailed description of Contractor's plan for Erosion and Turbidity
Control, including location of erosion control and turbidity control devices, marked on a plan set
as needed for clarity. The erosion and turbidity control shall meet the requirements of the St.
John's River Water Management District for control of discharge of Total Suspended Matter, and
shall prevent water and wind erosion of open excavations and swales.
Article III - SUPERVISION AND ADMINISTRATION
9.0 ENGINEER, CITY, CONTRACTOR RELATIONS
9.1 ENGINEER'S RESPONSIBILITY AND AUTHORITY
All work done shall be subject to the construction review of the Engineer and City. Any and all
technical questions which may arise as to the quality and acceptability of materials furnished,
work performed, or work to be performed, interpretation of Plans and Specifications and all
technical questions as to the acceptable fulfillment of the Contract on the part of the Contractor
shall be referred to the Engineer who will resolve such questions.
9.2 ENGINEER'S DECISION
All claims of a technical nature of the City or Contractor shall be presented to the Engineer for
resolution.
9.3 SUSPENSION OF WORK
The City shall have the authority to suspend the Work wholly or in part, for such periods as may
be deemed necessary and for whatever cause, to include but not be limited to, unsuitable weather
or such other conditions as are considered unfavorable for prosecution of the Work, failure on the
part of the Contractor to carry out the provisions of the Contract or to supply materials meeting
the requirements of the Specifications, or the action of a governmental agency, by serving written
notice of suspension to the Contractor. In the event that the Engineer shall become aware of any
condition which may be cause for suspension of the Work, the Engineer shall immediately advise
the City of such condition. The Contractor shall not suspend operations under the provisions of
this Paragraph without the City's permission.
9.4 CONSTRUCTION REVIEW OF WORK
All materials and each part or detail of the Work shall be subject at all times to construction
review by the Engineer and the City. The Engineer and the City may appoint inspectors. The
Contractor will be held strictly to the true intent of the Specifications in regard to quality of
materials, workmanship, and the diligent execution of the Contract. Such construction review
may include mill, plant, or shop inspection, and any material furnished under the Specifications
is subject to such inspection. The Engineer and the City shall be allowed access to all parts of
the Work and shall be furnished with such information and assistance by the Contractor as is
required to make a complete and detailed review. The City shall not be responsible for the acts or
omissions of the Contractor.
9.5 FIELD TESTS AND PRELIMINARY OPERATION
The Contractor shall perform the work of placing in operation all equipment installed under this
Contract, except as specifically noted hereinafter.
The Contractor shall make adjustments necessary for proper operation.
The Contractor shall provide construction labor required for preliminary operation of the
equipment installed under this Contract.
The Contractor shall notify the City when work is considered to be complete, in operating
condition, and ready for inspection and tests. Further inspection requirements may be designated
in the Technical Specifications.
The City will conduct tests it deems necessary to determine if the Work functions properly.
Arrangements for testing laboratory services will be made by the City. Payment for testing to
show compliance with specified requirements will be paid for by the City. The cost of retesting
when materials and workmanship fail to meet specified requirements will be deducted from
moneys due the Contractor.
9.6 EXAMINATION OF COMPLETED WORK
The City may request an examination of completed work of the Contractor at any time before
acceptance by the City of the Work and shall remove or uncover such portions of the finished
work as may be directed. After examination, the Contractor shall restore said portions of the
Work to the standard required by the Specifications. Should the work thus exposed or examined
prove acceptable, the uncovering or removing and the replacing of the covering or making good
of the parts removed shall be paid for as extra work, but should the work so exposed or examined
prove unacceptable, the uncovering, removing and replacing shall be at the Contractor's expense.
9.7 CONTRACTOR'S SUPERINTENDENT
A qualified superintendent, who is acceptable to the City, shall be maintained on the project and
give sufficient supervision to the Work until its completion.
The superintendent shall have full authority to act on behalf of the Contractor, and all
communications given to the superintendent shall be considered given to the Contractor. In
general, such communications shall be confirmed in writing and always upon written request
from the Contractor.
9.8 CITY'S RIGHT TO CORRECT DEFICIENCIES
Upon failure of the contractor to perform the work in accordance with the Contract Documents,
including any requirements with respect to the Schedule of Completion, and after five (5) days
written notice to the Contractor, the City may, without prejudice to any other remedy he may
have, correct such deficiencies. The Contractor shall be charged all costs incurred to correct
deficiencies.
9.9 CITY'S RIGHT TO TERMINATE CONTRACT AND COMPLETE WORK
In the event of any default by the Contractor, the City shall have the right to immediately
terminate the Contract upon issuance of written notice of termination to the Contractor stating the
cause for such action. This Agreement may be terminated by the City without cause provided at
least thirty (30) days written notice of such termination shall be given to the Contractor. In the
event of termination, the City may take possession of the Work and of all materials, tools and
equipment thereon and may finish the Work by whatever method and means it may select.
It shall be considered a default by the Contractor whenever he shall:
(a) Declare bankruptcy, become insolvent or assign his assets for the benefit of his
creditors.
(b) Disregard or violate the provisions of the Contract Documents or City's written
instructions, or fail to prosecute the Work according to the agreed schedule of completion
including extensions thereof.
(c) Fail to provide a qualified superintendent, competent workmen or subcontractors,
or proper materials, or fail to make prompt payment therefore.
9.10 RIGHTS OF VARIOUS INTEREST
Wherever work being done by the City's forces or by other contractors is contiguous to work
covered by the Contract, the respective rights of the various interests involved shall be
established by the City, to secure the completion of the various portions of the Work in general
harmony.
9.11 SEPARATE CONTRACTS
The City may let other contracts in connection with the Work of the Contractor. The Contractor
shall cooperate with other Contractors with regard to storage of materials and execution of their
work. It shall be the Contractor's responsibility to inspect all work by other contractors affecting
his work and to report to the City any irregularities which will not permit him to complete his
work in a satisfactory manner.
His failure to notify the City of such irregularities shall indicate the work of other contractors has
been satisfactorily completed to receive his work. It shall be the responsibility of the Contractor
to inspect the completed work in place and report to the Engineer immediately any difference
between completed work by others and the Plans.
9.12 SUBCONTRACTS AND PURCHASE ORDERS
Prior to signing the Contract or at the time specified by the City, the Contractor shall submit in
writing to the City the names of the subcontractor proposed for the Work. Subcontractor may not
be changed except at the request or with the approval of the City. The Contractor is responsible
to the City for the acts and omissions of his subcontractors and their direct or indirect employees,
to the same extent as he is responsible for the acts and omissions of his employees. The Contract
Documents shall not be construed as creating a contractual relation between any subcontractors
and the City. The Contractor shall bind every subcontractor by the terms of the Contract
Documents.
For convenience of reference and facilitate the letting of contracts and subcontracts, the
Specifications are separated into title sections. Such separations shall not, however, operate to
make the Engineer or City an arbiter to establish limits to the contracts between the Contractor
and subcontractors.
9.13 WORK DURING AN EMERGENCY
The Contractor shall perform any work and shall furnish and install materials and equipment
necessary during an emergency endangering life or property. In all cases, he shall notify the
Engineer and City of the emergency as soon as practicable, but he shall not wait for instructions
before proceeding to properly protect both life and property.
9.14 ORAL AGREEMENTS
No oral order, objection, claim or notice by any party to the others shall affect or modify any of
the terms or obligations contained in any of the Contract Documents, and none of the provisions
of the Contract Documents shall be held to be waived or modified by reason of any act
whatsoever, other than by a definitely agreed waiver or modification thereof in writing, and no
evidence shall be introduced in any proceeding of any other waiver or modification.
9.15 NIGHT, SATURDAY AND/OR SUNDAY WORK
No night or Saturday and Sunday work will be permitted, except in case of emergency, or with
prior approval from City, and then only to such extent as is absolutely necessary to protect life or
property. This clause shall not pertain to crews organized to perform restoration work which
needs no verifying inspection, maintenance work on equipmen, or to operate and maintain
special equipment such as dewatering pumps which may be required to work 24 hours per day.
All such night, Saturday and/or Sunday work must be authorized by the City.
9.16 UNAUTHORIZED WORK
Work done without lines and grades having been established, work done without proper
inspection, or any changes made or extra work done without written authority will be done at the
Contractor's risk and will be considered unauthorized, and, at the option of the City, may not be
measured and paid for.
9.17 USE OF COMPLETED PORTIONS OF THE WORK
The City shall have the right to use, occupy, or place into operation any portion of the Work that
has been completed sufficiently to permit safe use, occupancy, or operation, as determined by the
Engineer. If such use, occupancy, or operation increases the cost of or delays the Work, the
Contractor shall be entitled to extra compensation, or an extension of time, or both, as
determined by the Engineer. However, if Contractor has failed to complete the Work in
accordance with the time requirements of the Agreement, no compensation (including set -offs to
liquidated damages) shall be allowed for such use or occupancy.
9.18 CONTRACTOR'S RESPONSIBILITY FOR WORK
Until acceptance of the Work by the City, it shall be under the charge and care of the Contractor,
and he shall take every necessary precaution against injury or damage to the Work by the action
of the elements or from any other cause whatsoever, whether arising from the execution or from
the non -execution of the Work. The Contractor shall rebuild, repair, restore and make good,
without additional compensation, all injury or damage to any portion of the Work occasioned by
any cause, other than the sole and active negligence of the City, before its completion and
acceptance.
10.0 MEASUREMENT AND PAYMENT
10.1 DETAILED BREAKDOWN OF CONTRACT
Except in cases where unit prices form the basis for payment under the Contract, the Contractor
shall submit a complete breakdown of the contract amount showing the value assigned to each
part of the Work, including an allowance for profit and overhead within ten (10) days of the
execution of the Contract by the parties. Upon approval of the breakdown of the contract amount
by the Engineer and the City, it shall be used as the basis for all requests for payment.
10.2 REQUEST FOR PAYMENT
The Contractor may submit to the City not more than once each month a request for payment for
work completed. Where applicable, the Contractor may choose to submit a request for payment
at the substantial completion of each work order. The City may elect to provide its own form for
the Contractor to submit progress payment requests. The standard form provided by the City, or a
form presented by the Contractor having received prior approval from the City, can be used for
the submittal of a progress payment.
The Contractor shall furnish the Engineer and the City all reasonable facilities required for
obtaining the necessary information relative to the progress and execution of the Work. In
addition to each month's invoice, an updated project schedule shall be submitted.
Each request for payment shall be computed from the work completed to date on all items listed
in the detailed breakdown of the contract amount less previous payments and back charges.
Progress payments on account of Unit Price Work will be based on the number of units
completed at the time the payment request was dated by the Contractor. If payment is requested
on the basis of materials and equipment not incorporated in the project but delivered and suitably
stored at the site or at another location agreed to in writing, the payment request shall also be
accompanied by a bill of sale, invoice or other documentation warranty that the City has received
the materials and equipment free and clear of all liens, charges, security interests and
encumbrances, all of which shall be satisfactory to the City. No payments shall be made for
materials stored on site without approval of the City.
An amount of 10% of each monthly pay request shall be retained until final completion and
written acceptance of the Work by the City. Payment of the retainage shall be included in the
Contractor's final pay request in accordance with Paragraph 10.14. Any deviation in the release
or partial release of the 10% retainage shall be at the sole discretion of the City, but in no case
earlier than completion of the Engineer's "punch list inspection".
Any request for payment shall be accompanied by claim releases for work done or materials
furnished in accordance with Paragraph 10.13.
Prior to submission of any request for payment by the Contractor, the Engineer shall review the
request for payment to determine the following:
(a) That the work covered by the request for payment has been completed in
accordance with the intent of the Plans and Specifications.
(b) That the quantities of work have been completed as stated in the request for
payment, whether for a unit price contract or for payment on a lump -sum contract.
10.3 CITY'S ACTION ON A REQUEST FOR PAYMENT
Within thirty (30) days from the date of receipt of a request for payment the City shall do one of
the following:
(a) Approve and pay the request for payment as submitted.
(b) Approve and pay such other amount of the request for payment in accordance
with Paragraph 10.4 as the City shall decide is due the Contractor, informing
the Contractor in writing of the reasons for paying the amended amount.
(c) Disapprove the request for payment in accordance with Paragraph 10.4 informing
the Contractor in writing of the reasons for withholding payment.
10.4 CITY'S RIGHT TO WITHHOLD PAYMENT OF A REQUEST FOR PAYMENT
The City may withhold payment in whole or in part on a request for payment to the extent
necessary for any of the following reasons:
(a) Work not performed but included in the request for payment, or the contract Price
has been reduced by written change order.
(b) Work covered by the request for payment which is not in accordance with the
Plans, Specifications and generally accepted construction practices, including if,
in the opinion of the City, there is sufficient evidence that the Work has not been
satisfactorily completed, or based upon tests and/or inspections the work is
defective or has been damaged requiring correction or replacement .
(c) In the event of a filing of a claim or lien, or information received by City of a
potential filing of a claim or lien against the Contractor or City.
(d) Failure of the Contractor to make payments to subcontractors, material suppliers
or labor.
(e) Damage to another contractor.
(f) The City has had to correct a defect in the Work, or there are other items entitling
the City to a set-off against the amount recommended.
(g) Default of any of the provisions of the Contract Documents.
10.5 PAYMENT FOR UNCORRECTED WORK
Should the City direct, in writing, the Contractor not to correct work that has been damaged or
that was not performed in accordance with the Contract Documents, an equitable deduction from
the contract amount shall be made to compensate the City for the uncorrected work.
10.6 PAYMENT FOR REJECTED WORK AND MATERIALS
The removal of work and materials rejected under Paragraph 5.3 and the re-execution of work by
the Contractor shall be at the expense of the Contractor and the Contractor shall pay the cost of
replacing the destroyed or damaged work of other contractors by the removal of the rejected
work or materials and the subsequent re-execution of that work. In the event that City incurs
expenses related thereto, Contractor shall pay for the same within thirty (30) days after written
notice to pay is given by the City. If the Contractor does not pay the expenses of such removal,
after ten (10) days written notice being given by the City of its intent to sell the materials, the
City may sell the materials and shall pay to the Contractor the net proceeds therefrom after
deducting all the costs and expenses that are incurred by the City.
If the proceeds do not cover the expenses incurred by the City, such additional amounts may be
set-off against any payments due Contractor.
10.7 CHANGES IN THE WORK
A. Change Orders
If conditions require a change in the scope of work or additional work varying from the original
Plans or Specifications, such change shall be effected by the Contractor when the City issues a
written Change Order. The Change Order shall set forth in complete detail the nature of the
change, the change in the compensation to be paid the Contractor and whether it is an addition or
a reduction of the original total contract cost. Should additional or supplemental drawings be
required, they will be furnished by the Engineer.
Compensation to be paid to the Contractor for accomplishing the work of a Change Order shall
be established in one of the following ways:
(a) By lump sum proposed by the Contractor and accepted by the City.
(b) By unit prices established and agreed to.
(c) By unit prices established for additional kinds of work.
(d) By other methods as may be mutually agreed upon.
(e) By force account wherein the Contractor provides the labor and materials at
Contractor's direct cost plus 15% for overhead and profit. When the force account method is
used, the Contractor shall provide full and complete records of all costs for review by the City.
B. Claims
Claims arising from changes or revisions made by the Contractor at the City's request shall be
presented to the City before work starts on the changes or revisions. If the Contractor deems that
extra compensation is due for work not covered herein, or in Supplemental Agreement, the
Contractor shall notify the City in writing of its intention to make claim for extra compensation
before work begins on which the claim is based. If such notification is not given and the City is
not afforded by the Contractor a method acceptable to the City for keeping strict account of
actual cost, then the Contractor hereby waives its request for such extra compensation. The City
is not obligated to pay the Contractor if the City is not notified as described above. The
Contractor may refuse to perform additional work requested by the City until an appropriate
agreement is executed by the parties. Such notice by the Contractor and the fact that the City has
kept account of the costs as aforesaid shall not in any way be construed as proving the validity of
the claim.
10.8 CANCELED ITEMS OF WORK
The City shall have the right to cancel those portions of the contract relating to the construction
of any item provided therein. Such cancellation, when ordered by the City in writing, shall entitle
the Contractor to the payment of a fair and equitable amount covering all costs incurred by him
pertaining to the canceled items before the date of cancellation or suspension of the Work. The
Contractor shall be allowed a profit percentage on the materials used and on construction work
actually done, at the same rates as provided for "Changes in the Work", but no allowance will be
made for anticipated profits. Acceptable materials ordered by the Contractor or delivered on the
site before the date of such cancellation or suspension shall be purchased from the Contractor by
the City at actual cost and shall thereupon become the property of the City.
10.9 PAYMENT FOR WORK SUSPENDED BY THE CITY
If the Work or any part thereof shall be suspended by the City as provided in Paragraph 9.3, the
Contractor will then be entitled to payment for all work done except as provided in Paragraph
10.4.
10.10 PAYMENT FOR WORK BY THE CITY
The cost of the work performed by the City removing construction materials, equipment, tools
and supplies in accordance with Paragraph 5.7 and in correcting deficiencies in accordance with
Paragraph 9.8 shall be paid by the Contractor.
10.11 PAYMENT FOR WORK BY CITY FOLLOWING TERMINATION OF CONTRACT
A. Termination by City for Cause
Upon termination of the contract by the City for cause, including abandonment or termination by
Contractor, the City may enter into an agreement with others for the completion of the Work
under this Agreement and the Contractor shall be held harmless for the work of others. No
further payments shall be due the Contractor until the Work is completed and accepted by the
City. If the unpaid balance of the contract amount shall exceed the cost of completing the Work
including all overhead costs, Contractor shall be paid up to the amount of the excess balance on a
quantum meruit basis for the work done prior to termination. If the cost of completing the Work
shall exceed the unpaid balance, the Contractor or its Surety shall pay the difference to the City.
The cost incurred by the City as herein provided shall include the cost of the replacement
contractor and other expenses incurred by the City through the Contractor's default. In either
event, all work done, tracings, plans, specifications, maps, computer programs and data prepared
by the Contractor under this Agreement shall be considered property of the City.
B. Termination by City Without Cause
In the event the City without cause abandons, terminates or suspends this Agreement, the
Contractor shall be compensated for services rendered up to the time of such termination on a
quantum meruit basis and any work done or documents generated by the Contractor shall remain
the property of the City.
10.12 TERMINATION OF CONTRACTOR'S RESPONSIBILITY
The Contract will be considered complete when all work has been finished, the final construction
review is made by the Engineer, and the project accepted in writing by the City.
10. 13 RELEASE OF CLAIMS (INTERIM/FINAL)
The Contractor shall deliver, with each request for payment, a completed Affidavit and Release
of Claim on a form supplied by the City. Also, from each supplier or subcontractor who has
notified the City of his right to file a Claim (Notice to City) or who is listed in the Contractor's
Affidavit and Release of Claim as an unpaid, potential Claimant, a Claimant's Sworn Statement
of Account, executed by the supplier or subcontractor, must be attached to each request for
payment.
If the completed forms are not supplied with the request for payment, the City will notify
Contractor of the outstanding claims of record and, if said completed form(s) are not supplied
within thirty (30) days, the City shall make joint payments to the Contractor and outstanding
claimants.
10.14 ACCEPTANCE AND FINAL PAYMENT
When it is determined, as a result of a joint inspection of the Work by the Contractor, City, and
Engineer that the Work has been completed in accordance with the terms of the Contract
Documents, the Engineer shall certify completion of the Work to the City. At that time, the
Contractor may submit the Contractor's final request for payment. The Contractor's final request
for payment shall be the contract amount plus all approved written additions less all approved
written deductions and less previous payments made. As a condition for Final payment, a
Contractor's Final Affidavit must be received by the City along with his Final Payment Request
and any as -built drawings which may be required. The Contractor shall furnish full and final
releases of Claim for labor, materials and equipment incurred in connection with the Work,
following which the City will release the Contractor except as to the conditions of the
performance bond, any legal rights of the City, required guarantees and satisfaction of all
warranty work, and shall authorize payment of the Contractor's final request for payment.
10.15 SATISFACTION OF WARRANTY WORK AFTER FINAL PAYMENT
The making of the final payment by the City to the Contractor shall not relieve the Contractor of
responsibility for faulty materials or workmanship. The City shall promptly give notice of faulty
materials and workmanship and the Contractor shall promptly replace any such defects
discovered within one (1) year from the date of final written acceptance of the Work by the City.
11.0 PUBLIC CONTRACT REQUIREMENTS
11.1 COVENANT AGAINST CONTINGENT FEES
The Contractor warrants that he has not employed or retained any company or person, other than
a bona fide employee working solely for the Contractor, to solicit or secure this Agreement and
that he has not paid or agreed to pay any person, company, corporation, individual or firm, other
than a bona fide employee working solely for the Contractor, any fee, commission, percentage,
gift or any other consideration contingent upon or resulting from the award or making of this
Agreement. For the breach or violation of this paragraph, the City shall have the right to
terminate the Agreement without liability and, at its discretion, deduct from the Agreement price,
or otherwise recover, the full amount of such fee, commission, percentage, gift or consideration.
11.2 INTEREST OF MEMBERS OF CITY AND OTHERS
No officers, members or employees of the City and no member of its governing body, and no
other public official of the governing body of the locality or localities in which services for the
facilities are situated or carried out, who exercises any functions or responsibilities in the review
or approval of the undertaking or carrying out of this project, shall participate in any decision
relating to this Agreement which affects his personal interest, or have any personal or pecuniary
interest, direct or indirect, in this Agreement or the proceeds thereof.
11.3 CERTIFICATION OF RESTRICTIONS ON LOBBYING
The Contractor agrees that no Federal appropriated funds have been paid or will be paid by or on
behalf of the Contractor to any person for influencing or attempting to influence any officer or
employee of any Federal agency, a member of Congress, an officer or employee of Congress or
an employee of a member of Congress in connection with the awarding of any Federal contract,
the making of any Federal Grant, the making of any Federal loan, the entering into of any
cooperative agreement and the extension, continuation, renewal, amendment or modification of
any Federal contract, Grant, loan or cooperative agreement.
If any funds other than Federal appropriated funds have been paid by the Contractor to any
person for influencing or attempting to influence an officer or employee of any Federal agency, a
member of Congress, an officer or employee of Congress or an employee of a member of
Congress in connection with any FDOT Joint Participation Agreement, the undersigned shall
complete and submit Standard Form- "Disclosure Form to Report Lobbying" in accordance with
its instructions.
11.4 INTEREST OF CONTRACTOR
The Contractor covenants that he presently has no interest and shall not acquire any interest,
direct or indirect, which shall conflict in any manner or degree with the performance of services
required to be performed under this Agreement. The Contractor further covenants that in the
performance of this Agreement, no person having any such interest shall be employed. The
Contractor shall not undertake any professional work which conflicts with his duties as the City's
Contractor without the prior written consent of the City during the term of this Agreement. Any
work where the Contractor can reasonably anticipate that it may be called to testify as a witness
against the City in any litigation or administrative proceeding will constitute a conflict of interest
under this Agreement.
11.5 PUBLIC ENTITY CRIMES
The Contractor shall file the attached sworn statement which is entitled PUBLIC ENTITY
CRIMES, stating whether a person or affiliate as defined in Section 287.133 (1) Florida Statutes,
has been' convicted of a public entity crime subsequent to July 1, 1989, in accordance with the
provisions of said statute.
11.6 DRUG-FREE WORKPLACE
The Agreement documents also consist of the "Drug -Free Workplace Form" which is in
accordance with Florida Statute 287.089 and must be signed and instituted.
11.7 COMPLIANCE WITH LAWS
Contractor shall comply with all applicable federal laws that in any way regulate or impact the
Work, including, but not limited to, The Clean Air Act (42 USC §7506(c)), The Endangered
Species Act (16 USC §1531, et seq.), Executive Order No. 11593, Executive Order No. 11988,
Executive Order No. 11990, The Fish and Wildlife Coordination Act (PL 85-624), The Safe
Water Drinking Act Section 1424(e) (PL 93-523, as amended), The Wild and Scenic Rivers Act
(PL 90-542, as amended), The Demonstration Cities and Metropolitan Development Act of 1966
(PL 89-754), Section 306 of The Clean Air Act, Section 508 of The Clean Water Act, Executive
Order No. 11738, The Civil Rights Act of 1964 (PL 88-352), The Age Discrimination Act (PL
94-135), Section 13 of The Federal Water Pollution Control Act (PL 92-500), Executive Order
No. 11246, Executive Order No. 11625, Executive Order No. 12138, Executive Order No.
12549, The Davis Bacon Act (40 USC §276), the Occupational Safety and Health Act and
applicable regulations, and the Americans with Disabilities Act (PL 101-336).
11.8 INSURANCE
The Contractor agrees to carry insurance, of the types and subject to the limits as set forth below
and maintain said insurance during the life of this agreement:
(a) Workers' Compensation - Contractor shall purchase workers' compensation
insurance as required by law.
(b) Commercial General Liability - Contractor shall purchase Commercial General
Liability insurance with a combined single limit of at least $1,000,000.
(c) Commercial Auto Liability - Contractor shall purchase Commercial Auto Liability
insurance with a combined single limit of at least $1,000,000.
Further, Contractor shall maintain such insurance as is reasonably required to satisfy its
obligations under Paragraph 9.18 for the Work paid for by the City but not yet accepted.
The insurance company selected shall be A+ or better per the Best's Key Rating Guide. The
Contractor and the insurance company(s) shall agree to furnish the City thirty (30) days written
notice of their intent to cancel or terminate said insurance. It is the full responsibility of the
contractor to insure that all sub -contractors have full insurance coverage as stated above.
The Contractor shall not commence the Work under this contract until he has obtained all the
insurance required under this paragraph and certificates of such insurance have been submitted to
the City, nor shall the Contractor allow any subcontractor to commence work on his subcontract
until all insurance required has been so obtained and approved by the City. The Contractor shall
carry and maintain until acceptance of the Work, insurance as specified herein and in such form
as shall protect him and any subcontractor performing work under this Contract, or the City, from
all claims and liability for damages for bodily injury, including accidental death, under this
Contract, whether by himself or by any subcontractor or by any one directly or indirectly
employed by either of them.
The Contractor shall furnish to the City certificates of insurance in duplicate showing proof of
insurance, naming the City as an additional insured party, prior to the start of construction as
provided in the Contract.
The Contractor shall provide Bonds in the form prescribed by State Law, and generally as shown
in these Documents, for Performance and Payment, each in the amount of 100% of the total
contract amount.
11.10 PERMITS
All City and St. John's River Water Management District permits and other permits necessary for
the prosecution of the Work shall be secured by the City, except for Contractor's licenses and
registrations. Contractor shall secure a building permit if required by the City's Building
Official.
11.11 LAWS TO BE OBSERVED
The Contractor shall give all notices and comply with all federal, state and local laws,
ordinances, permit requirements and regulations in any manner affecting the conduct of the
Work, and all such orders and decrees as enacted by bodies or tribunals having any jurisdiction or
authority over the Work, and shall indemnify and save harmless the City and Engineer against
any expense, claim or liability arising from, or based on, the violation of any such law, ordinance,
regulation, permit requirements, order or decree, whether by himself or his employees. The
failure of the Contractor to adhere to any known law or regulation pertaining to furnishing
services under this Agreement shall constitute a material breach of this Agreement.
The Contractor shall keep himself fully informed of all existing and pending state and national
laws and municipal ordinances and regulations in any manner affecting those engaged or
employed in the Work,
or in any way affecting the conduct of tribunals having any jurisdiction or authority over the
same. If any discrepancy or inconsistency is discovered in the Plans, Specifications, or Contract
for this work in relation to any such law, ordinance, regulations, order or decree, he shall
forthwith report the same to the Engineer and City in writing. He shall at all times himself
observe and comply with and cause all his agents, subcontractors and employees to observe and
comply with decrees; and shall protect and indemnify the City and Engineer, their officers,
employees and agents against any expense, claim or liability arising from or based upon violation
of any such law, ordinance, regulations, orders or decree, whether by himself or his employees.
All building construction work alterations, repairs or mechanical installations and appliances
connected therewith shall comply with the applicable building rules and regulations, restrictions
and reservations of record, local ordinances and such other statutory provisions pertaining to this
class of work.
12.0 MISCELLANEOUS
12.1 ADDRESSES FOR NOTICES
All notices given under or in connection with any of the Contract Documents shall be delivered
in person or by telegraph or registered or certified mail to the parties at the address as either party
may by notice designate.
12.2 WRITTEN NOTICE
Written notice shall be considered as served when delivered to the designated representative of
the Contractor and receipt acknowledged or sent by registered mail to the individual, firm, or
corporation to the business address stated in Bid Proposal.
Change of Address: It shall be the duty of each party to advise the other parties to the Contract as
to any changes in his business address until completion of the Contract.
12.3 TAXES
Contractor shall pay all sales or other taxes of any type which may be incurred in connection with
the Work hereunder, and shall reimburse the City for any such taxes paid by the City.
12.4 TIME IS OF VITAL IMPORTANCE
It is agreed and understood that time is of vital importance with respect to the completion date for
the Work and all other provisions of the Contract Documents.
12.5 NO WAIVER OF LEGAL RIGHTS
Neither the payment for, nor acceptance of the whole or any part of the Work by the City or
representatives of the City, nor any extension of time,
nor the withholding of payments, nor any possession taken by the City, nor the termination of
employment of the Contractor shall operate as a waiver of any portion of the Contract or any
power therein reserved or any right therein reserved or any right therein provided, nor shall the
waiver by the City of any of the Contractor's obligations or duties under this Agreement
constitute a waiver of any other obligation or duty of the Contractor under this Agreement.
12.6 RIGHT TO WORK PRODUCT
No reports, data, programs or other material produced in whole or in part under this Agreement
shall be subject to copyright by the Contractor, in the United States or in any other country. The
City or its assigns shall have the unrestricted authority to publish, disclose, distribute and
otherwise use, in whole or in part, any reports, data, programs or other material prepared under
this Agreement. All tracings, plans, specifications, maps, computer programs and data prepared
or obtained under this Agreement shall remain the property of the City. Any use of any plans and
specifications by the City except the use reasonably contemplated by the City at the time the City
entered this Agreement will be at the City's risk and Contractor, its officers, directors and
employees, will be held harmless from such use.
12.7 PUBLIC RECORDS FORM
Contract Name:
Project Descripti
In accordance with the requirements of Chapter 119 Florida statutes, as amended, the
contract between the City of Sebastian and the Contractor shall require the contractor to:
a) Comply with the public records law of the State of Florida, as the same may be
amended from time to time.
b) Keep and maintain public records that ordinarily and necessarily would be
required by the City in order to perform services, and
C) Provide the public with access to public records on the same terms and conditions
that the City would provide the records and at a cost that does not exceed the cost provided in
this chapter or as otherwise provided by law, and
e) Meet all requirements of retaining public records and transfer, at no cost, to the
City all public records in possession of the contractor upon termination of the contact and destroy
any duplicate public records that are exempt or confidential and exempt from public records
disclosure requirements. All records stored electronically must be provided to the City in a
format that is compatible with the information technology systems of the City.
Authorized Signature: Date:
Print cifr�, gn/1,/{ Title:
Company/Firm: Giof* —
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day
and year first above written.
A ! THE CITY OF SEBASTIAN
-27
By:
Sally A. ai MName: Joseph Griffin
MMC Title: City Manager
(SEAL)
Approved as to Form and Content for
Reliance by the City of Sebastian Only
Robert A. Ginsburg, City Attorney
Signed, sealed and delivered
in the presence of-
NAME:
f
NAME:
NAME:
n is�1 D lfor,,
CONTRACTOR
By.
Name:Vic
r S erg Il
Title: �l I GEe Q 5l nP Ar -
To:
Mr. Terry Reno
City of Sebastian
1225 Main Street
Sebastian, FL 32958
Date:
February 12, 2015
EXPERIENCE MATTERS.
ADVANCED ROOFING.=
ESTABLISHED 1983
Florida's Premiere Commercial Roofing Contractor
Committed to Quality
Job Name:
City of Sebastian -City Hall
Address:
1225 Main Street
Sebastian, FL 32958
Reference:
Recover Proposal —Johns Manville
Page 1 of 3
We are pleased to submit the following proposal for your consideration on the above referenced premises as
follows. We agree to provide all labor, material, tools, equipment and proper insurance with excess liability of
eleven (11) million dollars.
PERMITTING AND TESTING
Permitting and testing that is required to secure a roofing permit is included in our bid proposal. The following
test will be completed in order to pull your permit:
• Roof plan with elevations of deck and parapet walls.
• Perform moisture scan in accordance with Florida Building Code 2010 Edition -Testing Application
Standard TAS 126-95.1.
• Provide roof attachment and fastening pattern in accordance with ASCE 7-02 and Florida Building
Code 2010 Edition Roof Application Standard RAS 117.
• Notice of Commencement filing with the county and fees before the start of the project.
WORK SCOPE
PREPARATORY WORK
1. Broom clean the entire roof. Remove all dust and dirt and thoroughly clean with a power air blower.
2. Inspect the roof surface for any defects in the existing modified bitumen membrane and repair as
needed. Any existing blisters in the modified membrane to be cut out and removed prior to the
installation of the new roof system.
3. Remove roofing debris and cart away to the local dumpsite or landfill.
GYPSUM COVERBOARD
4. Furnish and install one (1) layer of A" securock gypsum coverboard over the entire roof mechanically
fastened to the metal roof substrate utilizing screws and 3" metal plates.
Page 2 of 3
SINGLE PLY ROOF SYSTEM
S. Mechanically attach Johns Manville .060 mil single ply TPO roof system in accordance with manufacturer
specifications and local building code requirements.
6. All detail work including vent pipes, roof drains and other miscellaneous roof projections to be done in
accordance with Johns Manville standard details.
ADVANCED ROOFING, INC. is an approved applicator of Single Ply Systems for Johns Manville.
MISCELLANEOUS INSTALLATIONS
7. Shop fabricate and install new TPO clad metal drip edge. Set same in mastic and flash per
manufacturer's recommendations.
8. Shop fabricate and install new 24 gauge galvanized surface mounted counterflashings. All metal to be
nailed off for proper securement and sealed with a caulk bead of Tremco Dymonic Sealant.
9. Top of all base flashing to be secured with an 1/8" thick aluminum termination bar. Same to be sealed
with a three course of mastic and membrane.
10. Furnish and install new TPO stack flashing at all plumbing vents where existing are removed. Set same
in mastic and flash per manufacturer's recommendations.
11. Shop fabricate and install new TPO clad metal pitch pans around all other penetrations. Set same in
mastic and flash per manufacturer's recommendations. All pans to be filled with mortar mix, crowned
with mastic and aluminized.
12. Shop fabricate and install new TPO clad metal overflow or flow-thru parapet wall scupper drains.
13. City or county roofing permit, crane and sales tax are included.
14. Digitized roof drawing and photographs depicting work areas and details for this work scope are
attached.
GUARANTEE
Twenty (20) year No Dollar Limit (N.D.L.) guarantee on materials and labor by Johns Manville.
WARRANTY
Two (2) year warranty on materials and labor by ARI Insurance, Inc.
QUOTATION
Pricing as per IFB NO.Y12-149 (Option Year 2)
Term Contract for County Wide Roof Repair and Replacement for Orange County Facilities
Line item 028b Thermoplastic single -ply roofing
9,926 square feet X$5.25/sf.............................................................................................$52,111.50
Page 3 of 3
Please be advised that the amount quoted in this proposal has been reduced by the amount of any applicable
rebates. The contractor shall receive all rebates, in which Owner agrees to execute any documents necessary
for the contractor to recover payment for same.
Our work is done in a workmanlike manner by trained, qualified mechanics using the latest technical
equipment for the job. During the course of the job the progress, workmanship and housekeeping is
documented and reviewed by management for quality control. As always, ADVANCED ROOFING, INC. is
"Committed to Quality".
Extended guarantees are available with a maintenance program.
Safety and protection of the property is our concern ad we take precautions to protect people and property
from damage or injury during the course of the job. All work areas will be cleaned daily and equipment will be
removed immediately upon completion of work.
TERMS OF PAYMENT
Project to be billed upon completion
ATTENTION PROPERTY OWNERS - DON'T JEOPARDIZE YOUR INSURANCE
We are fully and properly insured with excess coverage of eleven (11) million dollars. Proof of insurance will
be sent upon request. It is in the best interest of the owner to make sure a contractor carries the amount of
insurance as stated above and ask for proof.
Thank you for the opportunity to bid on this work. Should you have any questions or require any additional
information, please do not hesitate to call.
All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or
deviation from above specifications involving extra costs will be executed only upon written order, and will become an extra charge over and above the
estimate. All agreements continent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado, and other necessary insurance.
Authorized Signature. 4444f % C"444
Jason Carruth
NOTE: This proposal may be withdrawn by us if not accepted within Thirty (30) days_
Owner is responsible for asbestos testing and related cost to remove.
Acceptance of Proposal
The undersigned as (check or(a OwrU Authorized agent of Owner hereby accepts and agrees to the prices, specifications and
conditions indicated above and on the reverse side of this contract.
Accepted-.* ............................................................................. Signature:................................................................................................
Date: ...................................................................................... Signature:................................................................................................
*Terms & Conditions on last page(s) apply. State License: CCC 024413
Advanced Goofing, Inc.
"Committed to Quality"
200 Northstar Court, Sanford, F132771
Tel. (407) 322-1555 Fax (407) 322-0010
Project: Sebastian City Hall Roof
Advanced Roofing, Inc.
"Committed to Quality"
200 Northstar Court, Sanford, FI 32771
Tel. (407) 322-1555 Fax (407) 322-0010
Project:
'oL��C»W+L�ai +O WUM
3 G37WnoV P'�d •x �'s�H.va
S 1 N �s SIOZ-OL-Z
u0sor-
^9 9,
uoµsogas jo .4i0
IIVH A.10 04s0gaG —,-
LUZE
.Jf10, JOySg}lOVQ �Z
'9NI�DOTJ Q�:JN`d/�Q'd
wapa� 6+sFodX,[X.vT'X�X'J�
ws,� • 5upad LCL✓
salo-iv+� uyio_� y
Tuan sx ®
YYsroaaym;u
MbJgYJ
vza5 vroa5lvui.. O aL'+sw�
puoys uo OM
q.n, uo yiufl 4—. Jooa VLm
WBwfs ® qm, uo 7VAH z
ww ao_.oab
PU05a-7
www +ww..%�uM anrooxa� y �v.,wu va �i'J�iCOM �WMv P wmoa w. • 6avaa
Takeoff Record - Roof Plan -City Hall
02/12/15 - 08:12:05 This report produced by RoofCAD 5.1.45.2 page 1/1
(Units: Feet)
Area
Length
Count
Roof A
Flat Roof
7901.00
502'0'
16
—
Parapet 18'
1255.00
502'0'
Curb (HVAC)
108.00
72'0'
3
{
Drain (E)isting)
10
Roof B
Flat Roof
2025.00
216'0'
6
—
Parapet 18'
540.00
216'0'
/
Curb (HVAC)
72.00
48'0'
2
{
Drain (Existing)
3
02/12/15 - 08:12:05 This report produced by RoofCAD 5.1.45.2 page 1/1
July 28, 2014
BOARD OF COUNTY COMMISSIONERS
ORANGE COUNTY, FLORIDA
AMENDMENT NO.2 / CONTRACT NO. Y12-149
TERM CONTRACT FOR COUNTY -WIDE ROOF REPAIR AND REPLACEMENT
ADVANCED ROOFING, INC.
3551 West First Street
Sanford, Florida 32771
EFFECTIVE DATE: AUGUST 3, 2014
This amendment is hereby incorporated into the contract documents of the project
referenced above. The following items are clarifications, corrections, additions,
deletions and/or revisions to and shall take precedence over the original documents.
Additions are indicated by underlining, deletions are indicated by suikethi:,,,.,�,.
1. In accordance with Article 26 of the Contract, Option to Extend the Term of the
Contract, the County hereby exercises its unilateral right to extend the term of this
Contract. Option Year4w.o of this contract is exercised from August 3, 2014
through August 2, 2015. The prices for Option Year Two will remain in effect during
aforementioned period.
2. All other terms, conditions and specifications remain the same.
BOARD OF COUNTY COMMISSIONERS ADVANCED ROOFING, INC.
ORANGE COUNTY, FLORIDA _ SANFORD, FLORIDA
hnnyRic cKonXPPO, CFCM
anager, urchasing and Contracts Division
DATE: �"'//�-
t h
Title: Vice President
September 17, 2013
BOARD OF COUNTY COMMISSIONERS
ORANGE COUNTY, FLORIDA
AMENDMENT NO.2 / CONTRACT NO. Y12-149
TERM CONTRACT FOR COUNTY -WIDE ROOF REPAIR AND REPLACEMENT
ADVANCED ROOFING, INC.
200 Northstar Court
Sanford, Florida 32771
EFFECTIVE DATE: September 17, 2013
This amendment is hereby incorporated into the contract documents of the project
referenced above. The following items are clarifications, corrections, additions, deletions
and/or revisions to and shall take precedence over the original documents. Additions
are indicated by underlining, deletions are indicated by stFikethrough.
1. Make the following change to General Conditions, ARTICLE 15 - WARRANTY AND
PAYMENT, fourth paragraph:
Based upon Applications for Payment submitted to the Project Manager by the
Contractor and Certificates for Payment issued by the Project Manager the County shall
make progress payments on account of the Contract Amount to the Contractor as
provided in the Contract Documents as follows:
In the timeframes outlined in FS 218.735, Section 2, for delivery orders exceeding 15000
ninety percent (90%) of the portion of the Contract Amount properly allocable to labor,
materials and equipment incorporated in the Work and ninety percent (90%) of the portion
of the Contract Amount properly allocable to materials and equipment suitably stored at
the site or at some other location agreed upon in writing, for the period covered by the
application for payment, less the aggregate of previous payments made by the Owner.
The Project Manager, shall reduce the retainage percentage withheld to 5% when the
completion of the Work ascertained as payable exceeds fifty percent (50%) of the total
contract amount. Upon Final completion of the entire Work, a sum sufficient to increase
the total payments to one hundred percent (100%) of the Contract Amount, less such
amounts as the Owner shall determine for all incomplete work and unsettled claims as
provided in the Contract Documents.
2. Make the following change to page one of the contract:
ADVANCED ROOFING, INC.
200 Northstar Court
Sanford, Florida 32771
Y12-149
Amendment 2
Page 1 of 2
3. All other terms, conditions and specifications remain the same.
BOARD OF COUNTY COMMISSIONERS ADVANCED ROOFING, INC
ORANGE COUNTY, FLORIDA
rchasing and Contracts Division
DATE:
(For County use on y)
Y12-149
Amendment 2
Page 2 of 2
SANFORD, FLORIDA
BY:
Type or print name
May 3, 2013
BOARD OF COUNTY COMMISSIONERS
ORANGE COUNTY, FLORIDA
AMENDMENT NO.1 / CONTRACT NO. Y12-149
TERM CONTRACT FOR COUNTY -WIDE ROOF REPAIR AND REPLACEMENT
ADVANCED ROOFING, INC.
3551 West First Street
Sanford, Florida 32771
EFFECTIVE DATE: AUGUST % 2013
This amendment is hereby incorporated into the contract documents of the project
referenced above. The following items are clarifications, corrections, additions,
deletions and/or revisions to and shall take precedence over the original documents.
Additions are indicated by underlinim deletions are indicated by StFilkethFOUgh.
1. In accordance with Article 26 of the Contract, Option to Extend the Term of the
Contract, the County hereby exercises its unilateral right to extend the term of this
Contract. Option Year One of this contract is exercised from August 3, 2013
through August 2, 2014. The prices for Option Year One will remain in effect during
aforementioned period.
2. All other terms, conditions and specifications remain the same.
BOARD OF COUNTY COMMISSIONERS
ORANGE COUNTY, FLORIDA
Phnny Rpardson, CPPD, CFCM
Manager, Purchasing and Contracts Division
DATE: .r—(3
BOARD OF COUNTY COMMISSIONERS
ORANGE COUNTY, FLORIDA
CONSTRUCTION TERM CONTRACT
CONTRACT:
Contract No: Y12-149
Made between the Board of County Commissioners, Orange County, Florida
(hereinafter called COUNTY), represented by the Manager of Purchasing and Contracts
executing this Contract, and:
ADVANCED ROOFING, INC.
3551 West First Street
Sanford, Florida 32771
Federal Identification Number: 59-2360591
The CONTRACTOR shall perform all the Work required by the Contract Documents for
the proper execution and completion of COUNTY WIDE ROOF REPAIR AND
REPLACEMENT in full accordance with the drawings and as elaborated in the
specifications of Invitation for Bids No. Y12 -149 -EZ (hereinafter referred to as I FB)
which is made a part of this Contract as completely as if set forth herein.
I
AMOUNT OF CONTRACT:
The County shall pay the Contractor in current funds, and in accordance with the
progress payment schedule as stated herein, for the performance of the work, subject to
additions and deductions by Change Order as provided in the Contract Documents, the
estimated amount of Five Hundred Forty -Eight Thousand Three Hundred Thirty and
001100 Dollars ($548,330.00).
The minimum guaranteed contract amount for the initial contract performance period is
($25,000.00).
II
ASBESTOS FREE MATERIALS:
All work under this Contract will be constructed with asbestos free materials. A written,
notarized statement on company letterhead is to be submitted with the executed Contract
certifying this fact. All payments shall be withheld until such statement is submitted.
Contractor shall agree that if materials containing asbestos are subsequently discovered at
any future time to have been included in the construction done by the Contractor or any of
its Subcontractors or agents and were not specified in the design or required by the
Contract document, Contractor shall be liable for all costs related to the abatement of such
asbestos and damages or claims against the County.
Contract ##Y12-149 — Page 1
III
ADMINISTRATIVE DATA:
Payments: Based upon invoices submitted to the Project Manager by the Contractor and
Delivery Orders issued by the Project Manager, the County shall make payments against
the Contract to the Contractor as provided in the Contract Documents.
Should the Contractor fail to complete all Work on or before the date stipulated for
completion on a Delivery Order, or such later date as may result from an extension
granted by the County, he shall pay and/or the County may retain from the compensation
otherwise to be paid to the Contractor, as liquidated damages, the sum of up to $200.00
(see Part G) for each consecutive calendar day after the date allowed by the Delivery
Order until the entire work is complete, which sum is agreed upon as a reasonable and
proper measure of damages which County will sustain per diem by failure of Contractor to
complete the Work within time as stipulated; it being recognized by County and Contractor
that the injury to County which could result from a failure of Contractor to complete on
schedule is uncertain and cannot be computed exactly. In no way shall costs for liquidated
damages be construed as a penalty on the Contractor.
IV
CONTRACT DOCUMENTS:
This Contract entered into this date by the Board of County Commissioners hereinafter
called the County, represented by the Manager of Purchasing and Contracts executing
this Contract and the individual, partnership or corporation named above, hereinafter
called the Contractor. Witnesseth that the parties hereto do mutually agree as follows:
A. The Contractor shall furnish all labor, equipment and materials and perform the
Work described for the amount specified in individual Delivery Order in strict
accordance with the General Conditions, Supplementary Conditions/Special
Provisions, Plans and Specifications and other Contract Documents, all of which
are made a part hereof and designated as follows:
1. Orange County Invitation for Bids/Project Manual, IFB No. Y12 -149 -EZ,
dated October 20, 2011; (which contains the Invitation for Bids, Notice,
Instruction to Bidders, Bid Form and Attachments, this Contract, required
Bonds and insurance certificates, General Conditions, Supplementary
Conditions/Special Provisions, and Specifications);
2. Reserved.
3. Advanced Roofing, Inc.'s Bid Proposal dated November 22, 2011;
4. Certificates of Insurance;
5. Payment/Performance Bonds;
Contract #Y12-149 -- Page 2
B. The order of precedence of items and documents is as follows:
Construction Contract
Permits
Supplemental Conditions/Special Provisions
General Conditions
Specifications/Technical Provisions
Drawings/Plans
Road Design, Structures, and Traffic Operations Standards (If applicable)
Florida Department of Transportation Standard Specifications for Road
and Bridge Construction (If applicable)
Bid Proposal
Instructions to Bidders
C. Contract Type:
This is a Requirements Contract and the County shall order from the Contractor all
of the goods and/or services specified in the contract's price schedule that are
required to be purchased by the County. If the County urgently requires delivery of
goods or services before the earliest date that delivery may be required under this
contract, and if the Contractor will not accept an order providing for accelerated
delivery, the County may acquire the goods or services from another source. Also,
if the contractor is unable to deliver goods or services that meet the county's needs,
the county may order same from another source.
Except as this contract may otherwise provide, if the County's requirements do not
result in orders in the quantities described as "estimated" in the contract's price
schedule, that fact shall not constitute the basis for an equitable adjustment.
D. Delivery Orders shall not exceed $200,000,00 without the express written authority
of the Manager, Purchasing and Contracts Division.
E. This Contract is effective August 3, 2012 and shall remain effective through August
2, 2013.
F. This Contract may be unilaterally renewed as provided in the Contract Documents,
Part F, Article 26, "Option to Extend the Term of the Contract". Any amendments to
this Contract must be in writing.
G. This Contract may be cancelled or terminated as provided for in the Invitation for
Bids.
H. Ordering against the Contract:
1. Unless otherwise specified in the Contract, the County will place orders by
issuance of a numbered Delivery Order against this Contract. Each Delivery
Order will specify the locations, description and completion time of the work.
2. The obligations of Orange County under this Contract are subject to need
and availability of funds lawfully appropriated for its purpose by the Board of
County Commissioners, or other specified funding source for this contract.
Contract #Y12-149 — Page 3
I. Taxes:
The County has the following tax exemption certificates assigned:
1. Certificate of Registry No. 59-70-004K for tax free transactions under
Chapter 32, Internal Revenue Code;
2. Florida Sales and Use Tax Exemption Certificate No. 58-12-090729-53C.
J. Invoicing:
1. Invoices must be submitted, in duplicate, referencing this Contract number
and the Delivery Order number to:
For all Delivery Orders issued by:
Facilities Management Division
2010 E. Michigan Street
Orlando, Florida
For all Delivery Orders issued by:
Orange County Convention Center
Warehouse Division
P.O. Box 691509
Orlando, Florida 32869-1509
2. Invoices against this Contract are authorized only at the prices stated in your
Bid response, unless otherwise provided in the Invitation for Bid.
V
TIME OF COMMENCEMENT AND FINAL COMPLETION:
Work to be completed within period specified on individual Delivery Orders, unless
amended by written Change Order executed by both parties to this Contract.
VI
COMPLIANCE WITH MIWBE CONTRACT REQUIREMENTS:
By entering into this Contract, the Contractor affirmatively commits to comply with the
M/WBE subcontracting requirements submitted with his/her bid. The failure of the
Contractor to comply with this commitment during the Contract's performance period may
be considered a breach of Contract.
The County may take action up to and including termination for default if this condition is
not remedied within the time period specified by the Manager, Purchasing and Contracts.
VII
MISCELLANEOUS PROVISIONS:
A. Terms used in this Contract which are defined in the General Conditions shall have
the meanings designated in those conditions.
Contract #Y12-149 — Page 4
B. No price adjustments shall be made on this contract to the bid price of any
products or materials including but not limited to gasoline, diesel or other fuels,
and bituminous materials, including asphalt, due to fluctuations in market prices,
changes in suppliers or any other reason.
C. County and Contractor each binds himself, his partners, successors, assigns and
legal representatives to the other party hereto, his partners, successors, assigns,
and legal representatives in respect to all covenants, agreements, and obligations
contained in the Contract Documents.
D. This Contract shall be governed by the laws of the State of Florida. Any and all
legal action necessary to enforce the provisions of this Contract will be held in
Orange County, Florida. Venue for any litigation involving this Contract shall be the
Ninth Circuit Court in and for Orange County, Florida.
BOARD OF COUNTY COMMISSIONERS ADVANCED ROOFING, INC.
ORANGE COUNTY, FLORIDA SANFORD, FLORIDA
., y_. • v, - v...
ing and Contracts Division
DATE:
(for CounTy use only)
BY:
nature
,2f
Type or Print Name
Contract #Y12-149 — Page 5
04-02-'15 15:39 FROM- Advanced Roofing
407-322-0010 T-259 P0001/0001 F-620
ACKAZV CERTIFICATE OF LIABILITY' INSURANCE
�i
3/31/20OATB 15
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to
the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the
certificate holder in lieu of such endorsement(s).
PRODUCER
Frank H. Furman, Inc.
1314 East Atlantic Blvd.
P. 0. BOX 1927
Pompano Beach FL 33061
C ACT
NAMIE-
PONE . (954) 943-5050 aC No. (994)949-5617
A,n RIF.IL Sandi@fuxmaninsurance.com
INSURE S AFFORDING COVERAGE NAIC B
INSURERA:National Fire Ins of Hartford 0458
INSURED
Advanced Roofing Inc
Advanced Leasing Inc
200 Northstar court
Sanford FL 32771
u s:Coritinental Insurance Co 5289
1NsuRI:RrAmeriean Guarantee and Liab 6247
INSURER D :grid efield casualt ins Co 10335
suE E:Continental CasualtyCo 0993
INSURERP:
r_nvalzncFe r_FQTIF:tr-ATF MIIMRFI2.2015 APR
SANFORD REVISION NUMBER:
TMIS IS TO CERTIFY THAT TKE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS.
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SMOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
(IVS
TYPE OF INSURANCE
GENERAL LIABILITY
ADDLSUSRTR
POLICY NU-MRER
Mwnnr OLICYEFF
NPw D
LWITS
EACH OCCURRENCE 5 1, OOO,QOO
PR c c (Ea ocimanrAl S 100, 000
X COMMERCIAL GENERAL LIABILITY
MED EXP (Any one person) 5 5,000
A
CLAIMS-MAOE ❑X OCCUR
Y
Y
6017071866
/1/2015
/1/2Q16
PERSONAL& ADV INJURY S 1,000,000
X Per Pro9 Agg
ontractual Lisbillty &
X -Broad Force BD
GENERAL AGGREGATE S 2,000,000
CU Liability Included
GEML AGGREGATE LthuT APPLIES PER:
PRODUCTS - COMPIOP AGG S 21000,000
S
POLICY Fx-1 PI APT -LOC
AUTOMo13tLIJACILITY
6
COMB
den SINGLE uMl 9 1,000,000
BODILY INJURY (Pe! Person) S
H
X ANY AUTO
ALL O NEO SCHEDULED
AuTOItIREO AUTOS NON WNEO
AUTOS
X Ncnown•PRy om
Y
y
6017071649
/X/2015
4/1/2016
600tLY INJURY (Per accident) S
PROPER A E 3
3
X UMBRELLA UAB X OCCUR
2�C
30367413
EACH OCCURRENCE S 10, 000, 000
AGGREGATE $ 10,000,000
EXCESS LIAO CLAIMS -MACE
is excess of all
Fo9wxagoincl WC
/1/2015
4/1/2016
OEO X RETENTIONS S
s
D
WORKERS COMPENSATION
Y
X CSTATU- 02H1
AND E=MPLOYERS' LIABILITY YIN
ANY PROPRIETOFdPARTNERIEXECUTIVE
OFFICERIMEMaER EXCLUDED?
(Mandatory In NH)
NIA
83037231
/1/201'
/1/2016
E.L. EACH ACCIDENT 4 1,000,00
E.L. DISEASE -FA EMPLOYE S a 1 000 1 000
E.L. DISE=ASE- POLICY LIMIT -1 5 11000,00
trvac ftcAtteundar
DESCRIPTION OF OPERATIONS below
E WSTALIAT1019 FLOATER 4016260407 /1/2015 /1/2016 EACH SITE $2,000,000
59r WIND/NAIL DED$1000 .AOP ANY ONE Loss $2,000,000
DESCRIPTION OF OPERATIONS 1 LOCATIONS I VEHICLE'S (Attach ACORO 101, Addlllonal Remyks Schedule. If more Space Is required)
Project: City of Sebastian City Hall
17725892566@efaxsend.com
City of Sebastian
Attn: Construction Board
1225 Main street
Sebastian, FL 32958
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATN TMEREOP, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
Dejong/CS �'�� •���s��
®1988-2010 ACORD CORPORATION. All rights reserved.
INSO25 rAiIt mani Tho annan n2mo anel Innn ArA ronicfnrcd m2rlcc of Arf%DPI
EXRERIENCE MATTERS,
CCC -02441 3 ESTABLISHED 1 983
ADVANCED ROOFING.
Ms. Jean M. Tarbell
City of Sebastian
1225 Main Street
Sebastian, FL 32958
We are transmitting the following:
RE: City Hall Building Roof
DATE: April 1, 2015
FOR APPROVAL
INFORMATION ONLY
COMMENTS :
ADVANCED
Dawn Emery/Construction
www. a dvancedroo fin g. cc
CENTRAL FLORIDA
200 NORTHSTAR COURT I SANFORD, FLORIDA 32771 1 866. 365.6071 TEL 407.322.1 555 FAX 407.322.0010
HOME OF PELICAN
1225 MAIN STREET • SEBASTIAN, FLORIDA 32958
TELEPHONE: (772) 589-5330 • FAX (772) 589-5570
March 27, 2015
Mr. Jason Carruth
Vice President
Advanced Roofing
200 Northstar Court
Sanford, FL 32771
Dear Mr. Carruth:
This is to advise that at their Regular City Council Meeting, held on Wednesday, March 25, 2015,
members of the Sebastian City Council approved the Advanced Roofing Contract, in the amount of
$52,111.50, based on piggy back pricing from Orange County, FL Contract No.Y12-149.
Enclosed please find two (2) original Contracts between the City of Sebastian and Advanced Roofing for
roof repairs to City Hall building.
Once the Contracts have been signed, please retain one (1) original copy and return one (1) original copy
to my attention as soon as possible. Also, please note that 12.7 Public Records Form must be filled out
and signed.
In the meantime, if you should have any questions, please feel free to contact Project Manager, Jerry
Converse, at 772-228-7053.
Sincerely,
Jean M. Tarbell
Executive Assistant
Enclosure (2)