Loading...
HomeMy WebLinkAbout2014 Power Point PresentationV) a--+ m W iJ CL W a-.+ M i LL .. i W lqt r -I O N • Northern canal systems • Collier Canal • Southern canals/retention • South Collier Canal • George St Canal • Schumann Waterway • Elkcam Waterway • Stormwater park i � iE6T SNIPI.ES / bm iFv Fvo' .�. •. �.�^. uaro N. 512 1,769 ACRES %_ �m o I i S. CR 512 4,583 ACRES h rl - ,L LL, Pf 2014 - WATER QUALITY TESTING SEBASTIAN. FLORIDA uu\n OI PRIL N ISI \ND Col ier a J -Seawalls- �' • Collier Canal Construction completed in aoo6. • Collier Canal limits were 5,000 LF from CR512 to Hardy Park Dam. • Project included dredging canal for drainage capacity. • Seawalls were 9o% in City right of way and io% were on private property. • Dredging funded with grant and seawall was bond funded. • Total Collier Canal was $4.9 million. 'I,, SEAT" HOME OF PELICAN ISLAND Q CD Q) v Im .-. +� v b .'., v �, 00 00 ... v .� c, A v ... 3 .� �. v a b v v �. +r v �. r� v v 3 v • Field investigation of the canal seawalls along Joy Haven during Oct 2014. • Identified three locations of damaged seawalls at 197,219 and 243 Joy Haven. • Researched past documents and right of way maps of properties. • Conducted property survey to locate City right of way within canal. • Subject seawalls along Joy Haven are not within City's right of way. • City mailed letters to the three residents with damaged seawalls. ML -f SEBASTLAN HOME OF PELICAN ISLAND 0 r. IVICCIL1116 VVIL11 .1Vy 1 10VG11 I GJIVI�rI1{.J • Held a meeting on Friday 11/7 to review findings with Joy Haven residents. • Reviewed past history of canal system and seawalls. • Identified the seawalls along Joy Haven are on private property per surveys. • Need to work together on a long term option to replace the canal seawalls. • Look into options. LRF SEe��A1V HOME OF PELICAN ISLAND on 66 91