Loading...
HomeMy WebLinkAbout2015 01 15 E-Mail from City EngineerFrank Watanabe From: Frank Watanabe Sent: Thursday, January 15, 2015 9:50 AM To: Joseph Griffin Subject: Seawall Options Joe, Per our discussion with City Council yesterday eve on the Seawall Options, I will proceed in developing an engineering plan in dealing with the Seawall situation. The plan will consider the following: • Field review of the canal system and photos of impacted seawall • Identify locations of impacted seawalls within the existing southern canals • Create preliminary map (CAD Plan) of the southern canal system with impacted walls • Map will show locations of existing seawalls and slope banks • Drainage analysis of the proposed seawall vs grassy slope for drainage capacity • Geotechnical assessment of sample impacted sites to identify soil conditions • Identify phasing of the project based on impacted wall, canal features (straight to curvature) and mitigations • Preliminary meeting with SJRWMD on the phasing and options for wetland mitigations • Engineering cost estimate of the phases Let me know if this is what we discussed yesterday with the City Council. If ok, it will take me a few weeks to develop an action plan/work scope to move forward with these items. Tentative to have an engineering plan to present to the City Council on the February 11, 2015 Council mtg. Frank