Loading...
HomeMy WebLinkAboutSlide from meeting with St. Johns• Met with SJRWMD on Seawall Options • Seawall Options • Construct new seawalls (7 miles) • Create slopes with benches & mitigations • Combination of walls and slope banks • Identify wetland mitigation for walls • Phasing: five two year projects • Permitting will be required • Maintain drainage flow capacity of the system • Concerns regarding removal of old walls and any hazardous materials. • Funding by SJRWMD - Cost sharing grant for • projects ready to go (50% match) BAST Cost of project ... SE � N HOME OF PELICAN ISLAND