HomeMy WebLinkAboutSlide from meeting with St. Johns• Met with SJRWMD on Seawall Options
• Seawall Options
• Construct new seawalls (7 miles)
• Create slopes with benches & mitigations
• Combination of walls and slope banks
• Identify wetland mitigation for walls
• Phasing: five two year projects
• Permitting will be required
• Maintain drainage flow capacity of the system
• Concerns regarding removal of old walls and
any hazardous materials.
• Funding by SJRWMD - Cost sharing grant for
• projects ready to go (50% match) BAST
Cost of project ... SE � N