Loading...
HomeMy WebLinkAbout2006 03 09 - Punch ListDavid Fisher From: David Fisher Sent: Monday, March 27, 2006 1:26 PM To: 'Ken Jones' Cc: David Fishers Interns; Bob Korda; Phillip Patnode; Ginny Sieferd; Brian Grzesiak Subject: RE: Ashbury Subdivision - Punch List Dated 9 March 06 Ashbury Punch -list 9 March 200... Ken -- Subject punch list is attached. Please advise how you want to handle this. -- Dave -----Original Message ----- From: Ken Jones [mailto:kjones@sbsengineers.com] Sent: Monday, March 27, 2006 1:24 PM To: dfisher@cityofsebastian.org Subject: Ashbury Subdivision Hi Dave: I would like to request the City's punch list for the walk through conducted at the Ashbury S/D the week of March 6th so that we may address any comments and wrap up the project. My fax number and e-mail address are listed below. Thanks Kenneth W. Jones Construction Manager Schulke, Bittle & Stoddard LLC 1717 Indian River Boulevard, Ste. 201 Vero Beach, Florida 32960 Phone: (772) 770-9622 Fax: (772) 770-9496 E-mail: kjones@sbsengineers.com www.sbsengineers.com PLEASE NOTE: This information is provided solely for your convenience only; SCHULKE, BITTLE & STODDARD LLC makes no representations or warranties, either express or implied, as to its suitability for any specific purpose. While we believe this drawing file to be accurate at the time of retrieval, this media and its contents can be easily altered or corrupted either purposely or inadvertently through any number of sources. For this reason, SCHULKE, BITTLE & STODDARD LLC, its managers and or employees shall be indemnified and held harmless from any and all liability that may arise or result from the use of this information by your firm, employees, agents or sub -contractors. Any use of the file provided herein constitutes acceptance of the provisions stated herein. ---------------------------------------------------------------------------- 1 The information contained in this email i intended for the addressee only. If you a are asked to respect that confidentiality of its contents. If received in error you and contact the sender immediately. Your s privileged and confidential and re not the intended recipient, you and not disclose, copy or make use are asked to destroy this email assistance is appreciated. .i ASHBURY PUNCH LIST 3/09/06 Power Line Rd. 1. White Stripe not found corner power line & Roy Ave and needed. 2. Remove pavement over grate, Clean Drainage Structure & pipe. 3. Level, clean Sandy area beside road and stabilize the bank at outfall. 4. Barricade needed at the end of the street. Check Drainage pipe material 1. Corrugated according to plan that is not allowed by code and should be RCP, ADS, or Aluminum. Sidewalk 1. Flush with curb according to plan, not allowed by code 2. Should include 2' buffer or 6' sidewalk 3. Utility poles in sidewalk Other Notes 1. There is a hole in drain pipe 2. All drain pipes must be cleaned 3. Revisit the structure design of surrounding for the severe erosion. 4. Cow Tomato & Brazilian Pepper need to be removed (Entire buffer) 5. Check plans 4 Rear lot line is below existing grade (2:1 slope allowed?) 6. Cedars in buffer on North side are dying. 7. Wet land at north side to be filled and there is no buffer as shown in plan. 8. Exotics should be removed. 9. Silt fences are down and should be erected before construction of the houses. 10. Check pipe west