HomeMy WebLinkAbout2006 - Bond ReleaseCITY OF SIE I'AN HOME OF PELICAN ISLAND 1225 MAIN STREET • SEBASTIAN, FLORIDA 32958 TELEPHONE: (772) 589-5330 • FAX (772) 589-5570 21 April 2006 Rebecca Grohall Growth Management Director, City of Sebastian City Hall / 1225 Main Street Sebastian, Florida 32958 RE: Ashbury Project — Release of Performance Bond(s) Rebecca: Further to our telecom moments ago, this to further advise and confirm that based on the most recent information and the letter of certification dated 17 April '06 from SBS / Joe Schulke, Engineer of Record for the Ashbury project, the Engineering Department has NO OBJECTION to the release of the subject performance bond(s). Any further enforcement of outstanding items may be done under the notes/letter(s) of commitment from the developer. David Fisher, P.E. City Engineer City of Sebastian, Florida 1. 04/17.,'2006 13:44 TEL 7727709496 SCHULKE Bl'rrLE &STODDARD JOSEPH W. SC HULKE. P, E. JOVA14 9. STME. P F: V&LAM P. STODDARD, M.D., P.E. -SCHULKE, BITTLE & STODDARD, L.L.C. CIVIL AS rpumMA: F1V-4tNEER"VG - LAND OLANNAG - EWRONMENTW FERhOrrW3 Co: Dave Fti#w P,E Joseph Schulke Fax 589-6209 Pages: 3 pages including cover sheet Pho= Date: W17/2006 Re Ashbury Subdivision Rob Roob 321-768-2008 0 Urgert C1 For Review 13 MeasL Comment 0 Please Rr,7)19 If you have wy quesftis, Diem* don't hesitate to contact our office. 1717 Indan diver Blvd., SUITE 201 VERO BEACH, FLORIDA 32960 TEL 772/ 770-9622 FAX 772 17m-9496 EMAIIL i*@sbserigineers.cxirn Z 0 o 1 04/17,2006 18:44 T'EI 7727709496 � RFPH OPJ. SCHULKF, P.E. .I00k, a. 61T%E, P.E. WILLIAM P. STOODDARU, Ph D., RE. April '17.2006 SCHULKE, BITTLE & STODDARD, L.L.G. C10L. & STRUCTURAL ENGINEERING • LAND PLANNING,, ENVIRONINEN7AL RFRJ 177ING David Fisher, P.E. Engineering Department City of Sebastian 1225 Main Street Sebastian, FL 32958 Re: Ashbury Subdivision Dear Mr. Fisher, This is to advise you the asphalt repairs and overlay between stations 100+00 and 105+00 have been completed in accordance with my letter of April 12, 2006. A minimal amount of thermal striping which must be reinstalled cannot be completed until the new asphalt overlay has cared for 30 days. A separate letter from the developer guaranteeing the installation of the rhermal striping within 45 days is attached. As you are aware, the additional work agreed to be completed at the end of Powerline Road by the Developer was not part of the City approved construction plan but will still be completed in accordance with the April. 121fi letter. Since this work was not part of the original construction plans I believe the release of the performance bond should be zt the time of substantial completion of the overall subdivision, rather than delayed until that work is complete. I therefore certify ail construction for the Ashbury Subdivision has been substantially completed in accordance with the City of Sebastian approved construction plans and respectfully request the release of the performance bonds. If you have any questions please do not hesitate to give me a call. Sincerely, ulke. P.E. r' (,'ef Robert Robb FL Reg. No. 1737 INDIAN kIVER BLVD SUITE 201, VEiRO 8E.ACH, FLORIIDA 3460 TFL 772 1 770-.W22 Fsx 772 / 770-5-496 E&WL in*§bsbsengirwers corn 04/17,12006 13A5 TEL 7727709496 SCFULKE BITTLIF &STODD IRD 0" o t) 3 H 17 200!':­� 14. 11 FR CO.� P CLPRK 3-21 768 2009 TO 177—e -'77094*, -254 P.02/02 CZ' ell, COMMOHROAL)MVESTMeNT REALTORS & DEVELOPER'S Cay A. Clark, CCIM April 17, 2006 Dave Fisher City of Sebastian 1225 M&n St. Sebastian FL, 32956 RP: Ashbury Subdivision Letier of Assurance Dear Mr. Fisher, Wc are requesting firvil completion and release of :v perlbrmance bond, We undlerstand due to the curing ofthe tiew pavemem iab-Wlation at the ent.rance- to Ashbury the gripping cannot be installed. As the Developer of the subdivision, we assure the City we -will m -stripe the entrance witkin 30 days of the date of this letter. In addition, we will also have the signage and gmding completed at the, end of Powerline Read %3,ithin 30 days of Phe date of this letter. The addifionW work st Powmfine Rand was not included in the permit documents-, however, we felt your requested work was in the beat interest of all parties involved, Thank you .for your cooperation. Sincerely. Robert F. Robb Director of Land Development The Coy A. Clark Company 575 SouTh Wickham Road, suite q - West Melbourne, Florida 32504 Tei 321 .723.9888 * Fax 321-768,20-09 wwwcoyclark.com ** 70TF;L PrCE02 ** 04/17/2600 MON 13;26 1TK/RX NO 64741 ZOO'' JOSEPH W. SCHULKE, P.E. JODAH B. BITTLE, P.E. WILLIAM P. STODDDARD, Ph.D., P.E. April 6, 2006 SCHULKE, BITTLE & STODDARD, L.L.C. CIVIL & STRUCTURAL ENGINEERING • LAND PLANNING • ENVIRONMENTAL PERMITTING Dear Dave, In response to the remaining issues at Ashbury, I have: 1. Sidewalks — Attached is my correspondence to Tracy Haas and to you (Dave Fisher) regarding sidewalk requirements. On November 1, 2004, I attended a TRC meeting at the City to review the construction plans. I had not proposed a sidewalk north of our project frontage (in front of the FP&L substation on Powerline Rd.) for several reasons, which are: a. Typically, we are only required to construct improvements along our frontage. b. The existing grades at FP&L were much lower than the proposed Powerline Rd. grades. In order to construct the sidewalk along the east right-of-way line, we would have to fill several feet, which would cause anencroachment onto FP&L property with the fill sloped. However, at the T.R.C., it was strongly recommended that I add the sidewalk along Powerline Rd. from our northern limits, across FP&L's frontage and connect to the sidewalk at the Pelican Isle Apartments. Your staff suggested I put the 5' sidewalk against the curb to solve the fill slope encroachment problem. Based on this recommendation, I revised the plans and submitted for final approval. Attached are my notes from the meeting and correspondence to you dated November 24, 2004, indicating that we revised the sidewalk pursuant to staff review and request. Based on the above, I would respectfully request your acceptance of the sidewalk construction as completed. 2. Drainage pipe crossing Powerline Rd. — I did not realize the City had a policy or regulation prohibiting B.C.C.M.P. pipe in the right-of-way. On the contrary, I was under the impressions that this was a suitable pipe, and the ADS -N12 pipe, which 1717 INDIAN RIVER BLVD., SUITE 201, VERO BEACH, FLORIDA 32960 TEL 772 / 770-9622 Fax 772 / 770-9496 EMAIL info@sbsengineers.com N David Fisher O " City Engineer =0 1225 Main Street Sebastian, FL 32958 Re: Ashbury Final Comments Dear Dave, In response to the remaining issues at Ashbury, I have: 1. Sidewalks — Attached is my correspondence to Tracy Haas and to you (Dave Fisher) regarding sidewalk requirements. On November 1, 2004, I attended a TRC meeting at the City to review the construction plans. I had not proposed a sidewalk north of our project frontage (in front of the FP&L substation on Powerline Rd.) for several reasons, which are: a. Typically, we are only required to construct improvements along our frontage. b. The existing grades at FP&L were much lower than the proposed Powerline Rd. grades. In order to construct the sidewalk along the east right-of-way line, we would have to fill several feet, which would cause anencroachment onto FP&L property with the fill sloped. However, at the T.R.C., it was strongly recommended that I add the sidewalk along Powerline Rd. from our northern limits, across FP&L's frontage and connect to the sidewalk at the Pelican Isle Apartments. Your staff suggested I put the 5' sidewalk against the curb to solve the fill slope encroachment problem. Based on this recommendation, I revised the plans and submitted for final approval. Attached are my notes from the meeting and correspondence to you dated November 24, 2004, indicating that we revised the sidewalk pursuant to staff review and request. Based on the above, I would respectfully request your acceptance of the sidewalk construction as completed. 2. Drainage pipe crossing Powerline Rd. — I did not realize the City had a policy or regulation prohibiting B.C.C.M.P. pipe in the right-of-way. On the contrary, I was under the impressions that this was a suitable pipe, and the ADS -N12 pipe, which 1717 INDIAN RIVER BLVD., SUITE 201, VERO BEACH, FLORIDA 32960 TEL 772 / 770-9622 Fax 772 / 770-9496 EMAIL info@sbsengineers.com the entire site was specified to have, would not be allowed - many agencies do not allow plastic pipe in their right-of-way (i.e.: I.R.C.). The pipe was specifically changed in the right-of-way to B.C.C.M.P. for this reason, and because, as a rule, we do not specify plastic pipe where it will be exposed to direct sunlight. This pipe outfalls into a ditch and is exposed to sunlight. Our use of B.C.C.M.P. was not proposed as a cost saving measure, but based on our understanding of what the City would prefer and approve. At this point, the pipe is installed crossing Powerline Rd., and I do not believe the removal and replacement with ADS or RCP is in the City's best interest. This would leave a patch and potential area where settlement would likely occur now or in the future. I also believe that the expected design life of the B.C.C.M.P. is adequate and will outlast the pavement design life. Based on the above, I would respectfully request your acceptance of the drainage pipe as installed. 3. Dead end condition at Powerline Rd. — Based on my recent conversation with you, I understand that the Police Department concurs that a clear and level area is more desirable than the installation of a guardrail. We have submitted specifications to your office for approval. In general, we proposed to add additional signage and clear and level a suitable area beyond the pavement terminus to permit a vehicle to stop if it were to run through the warning signs. I believe this addresses the remaining items on the punchlist for Ashbury subdivision that require your additional consideration. Please let me know your decisions on these matters as soon as possible. If you have any questions or need additional information, please do not hesitate to contact my office. Sincere , Joseph W. chulke, P.E. r cc: ob Robb JOSEPH DAHB.BSCHULKE,P.E. SCHULKE BITTLE & STODDARD, L.L.C. JODAH B. BITRE, P.E. � WILLIAM P. STODDARD, Ph.D., P.E. CIVIL & STRUCTURAL ENGINEERING • LAND PLANNING • ENVIRONMENTAL PERMITTING FAX � FILE To: Tracy Haas From: Joseph Schulke, P.E. Fax: 589-2566 Pages: 2 including cover Phone: 589-5330 Date: 11/29/2004 Re: Ashbury Subdivision CC: The Coy A. Clark Company; Coy Clark ❑ Urgent ❑ For Review ❑ Please Comment ❑ Please Reply ❑ Please Recycle . Comments: Attached, please find the comment letter dated November 24, 2004 for the City of Sebastian, referring to Ashbury Subdivision/Powerline Road for the addition of the sidewalk. 1140 7`' COURT, SUITE F VERO BEACH, FLORIDA 32960 TEL 772/ 770-9622 FAX 772 / 770-9496 EmAilLsbseng@gate.net SCHT.'UF 13I PAY &S'TODP." PU ;0.^+A" it J. SriiULKc F. k. I SCC U L i B I'/��' �1 ('1� R D ! {� JMAHfl�B►ITZE,?.E. II V � T� I ��.� Qf ��\./'���f��.J� �.l...L, `VILLIAMP. $TOWARD, P-i3O., P.E ,iWL & STRUC7,RAL FN3�FF?W* • LAND PLANWX, - ENV1R0AMEN7AL PFRW7TfNG To: Robert Robb Pvy al; Bill E-LbaO .Fax: 321-768-2009 pu.-..s i including cover Phcaa flim March 16% 2406 Re Ashbury CC: Dennis amAh SPS 778-2892 David Fisher a City of Sebastian 589�L19 0 UxAmd d F0, Re:Kr.w 13 i lease Corcawall U Phase Reph 0 '!'lessee Rervdp Robb, Folfowin2 is SSS punch list for chis prpject, items wen discovered will be added to this list. This [ yt dies not wrcjude any punch li--t'terr►s that the City of Sebastian has, When I receive the City's list I v ill forward ii to you. I. Therr-io Plastic over concreta valve fixes Roy & Paiver Line Road, Repeat comment. 2. Thermo plastic strips at radii @ Roy & Foo~ line rd 3, Need city approved remedy to proverd traffic from running into the ditch at the south end of powif line Rd 4. Clean out inlets at the @ v:es} edge of Power Line Rd. Also clear asphalt out of rim of inlet. 5. Clean silt from edge of rJorxis 6. Repair damaged Pipe at bract D 7. Clean out pipe c@ control str icture far tract 0, 8. Reshape the slopes are, Ad the ocntrol structure at Tract D 9. Grade the bitch 9" CR 512 east of entrance 10. Clear, up all the dells tai rocreation Tract K 11. Replace concrete cuits fro+*. 08 -20 ig lots 53, 51, 52, 49. 48, & 47 also from DS -21 at iots 11 +, 118, 119, `20, 121, 122, '123, '124,125, & 126 Please contact me 0 f m are any questions. 1.717 ADlAt+l RIVER BLVD. SUITE 201 VERO REACH, FL OP,IJA 3M TEL Til! 770 -OW FAX T?2 / 77o4496 OMNI, ue sbserVirwers.coim