Loading...
HomeMy WebLinkAbout2005 -Traffic Violationsi Message 114, David Fisher From: David Fisher Sent: Friday, April 22, 2005 10:50 AM Page 1 of 2 To: 'SEMoler@bellsouth.net' Cc: 'SBSEngineering'; Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Patnode; Ken Jones; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer; Ginny Sieferd; Bob Korda; Jan King; Dorri Bosworth Subject: RE: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road URGENT ATTENTION: STEVE MOILER, ENGINEER OF RECORD FOR PELICAN ISLES PROJECT (772-564- 8053) Steve -- Further to our telecon moments ago, the immediate response from Joe Schulke's office and a further field visit indicates the offending dump trucks noted below may have in fact been servicing the Pelican Isles Project. This email transmittal to you is to clearly advise you of the situation on Powerline Road and to request you contact the Pelican Isles Project personnel immediately to advise them of the City's position in this matter (as stated below in the email transmittal to Joe Schulke) and which also applies to the Pelican Isles Project. If it continues to happen and we are unable to attribute offending vehicles to any particular project in the future, we will shut down both projects until we can sort it out. With thanks for your attention to this. Dave Fisher City Engineer 589-5490 -----Original Message ----- From: David Fisher Sent: Friday, April 22, 2005 9:58 AM To: 'SBSEngineering' Cc: Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Patnode; Ken Jones; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer Subject: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road URGENT ATTENTION: JOE SCHULKE, ENGINEER OF RECORD FOR ASHBURY PROJECT (772- 770-9622) The Sebastian Police Department reported this morning that at least two dump trucks thought to be servicing the Ashbury Project on Powerline Road yesterday "blew through" the STOP signs at the School Crossing on Powerline Road. There are a number of witnesses. Further to my telephone call to your office moments ago, this is to advise you clearly and in no uncertain terms: 1. The project will be SHUT DOWN immediately if this happens again. 2. The project is now under surveillance by Police Department and other City Inspectors for this and any other matters that may be violating the rules of engagement for the project. 4/22/2005 Message 3. Please contact the Ashbury Project personnel to rectify this situation and report back regarding when/how/ to whom that has been done. Page 2 of 2 Then please arrange to meet with us to review the crossing signage arrangements going forward for both the construction phase and the permanent design. With thanks, Dave Fisher City Engineer 589-5490 4/22/2005 Message Page 1 of 2 David Fisher From: Paul Graves Sent: Friday, April 22, 2005 11:30 AM To: David Fisher Subject: RE: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road This sounds good for now. Later we can see how they are to control the traffic on the southend of the road when their finished. Thanks again. -----Original Message ----- From: David Fisher Sent: Friday, April 22, 2005 11:28 AM To: 'SEMoler@bellsouth.net'; 'SBSEngineering' Cc: Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Patnode; Ken Jones; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer; Ginny Sieferd; Bob Korda; Jan King; Dorri Bosworth Subject: RE: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road Steve and Joe -- It has been suggested we now close off the southern access to Powerline Road now that the northern access is paved. This would clearly prevent any further recurrence of the School Crossing violations at the south end. Do you concur with this approach? If so, please arrange for your projects to work together in closing off the southern access by berm or someother nonviolable barrier. Let us know. Thanks. -- Dave -----Original Message ----- From: David Fisher Sent: Friday, April 22, 2005 10:50 AM To: 'SEMoler@bellsouth.net' Cc: 'SBSEngineering'; Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Patnode; Ken Jones; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer; Ginny Sieferd; Bob Korda; Jan King; Dorri Bosworth Subject: RE: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road URGENT ATTENTION: STEVE MOLER, ENGINEER OF RECORD FOR PELICAN ISLES PROJECT (772-564-8053) Steve -- Further to our telecon moments ago, the immediate response from Joe Schulke's office and a further field visit indicates the offending dump trucks noted below may have in fact been 4/22/2005 Message NO 4/22/2005 Page 2 of 2 servicing the Pelican Isles Project. This email transmittal to you is to clearly advise you of the situation on Powerline Road and to request you contact the Pelican Isles Project personnel immediately to advise them of the City's position in this matter (as stated below in the email transmittal to Joe Schulke) and which also applies to the Pelican Isles Project. If it continues to happen and we are unable to attribute offending vehicles to any particular project in the future, we will shut down both projects until we can sort it out. With thanks for your attention to this. Dave Fisher City Engineer 589-5490 -----Original Message ----- From: David Fisher Sent: Friday, April 22, 2005 9:58 AM To: 'SBSEngineering' Cc: Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Patnode; Ken Jones; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer Subject: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road URGENT ATTENTION: JOE SCHULKE, ENGINEER OF RECORD FOR ASHBURY PROJECT (772-770-9622) The Sebastian Police Department reported this morning that at least two dump trucks thought to be servicing the Ashbury Project on Powerline Road yesterday "blew through" the STOP signs at the School Crossing on Powerline Road. There are a number of witnesses. Further to my telephone call to your office moments ago, this is to advise you clearly and in no uncertain terms: 1. The project will be SHUT DOWN immediately if this happens again. 2. The project is now under surveillance by Police Department and other City Inspectors for this and any other matters that may be violating the rules of engagement for the project. 3. Please contact the Ashbury Project personnel to rectify this situation and report back regarding when/how/ to whom that has been done. Then please arrange to meet with us to review the crossing signage arrangements going forward for both the construction phase and the permanent design. With thanks, Dave Fisher City Engineer 589-5490 y Message David Fisher From: David Fisher Sent: Friday, April 22, 2005 11:28 AM Page 1 of 2 To: 'SEMoler@bellsouth.net'; 'SBSEngineering' Cc: Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Patnode; Ken Jones; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer; Ginny Sieferd; Bob Korda; Jan King; Dorri Bosworth Subject: RE: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road Steve and Joe -- It has been suggested we now close off the southern access to Powerline Road now that the northern access is paved. This would clearly prevent any further recurrence of the School Crossing violations at the south end. Do you concur with this approach? If so, please arrange for your projects to work together in closing off the southern access by berm or someother nonviolable barrier. Let us know. Thanks. -- Dave -----Original Message ----- From: David Fisher Sent: Friday, April 22, 2005 10:50 AM To: 'SEMoler@bellsouth.net' Cc: 'SBSEngineering'; Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Patnode; Ken Jones; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer; Ginny Sieferd; Bob Korda; Jan King; Dorri Bosworth Subject: RE: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road URGENT ATTENTION: STEVE MOLER, ENGINEER OF RECORD FOR PELICAN ISLES PROJECT (772-564-8053) Steve -- Further to our telecon moments ago, the immediate response from Joe Schulke's office and a further field visit indicates the offending dump trucks noted below may have in fact been servicing the Pelican Isles Project. This email transmittal to you is to clearly advise you of the situation on Powerline Road and to request you contact the Pelican Isles Project personnel immediately to advise them of the City's position in this matter (as stated below in the email transmittal to Joe Schulke) and which also applies to the Pelican Isles Project. If it continues to happen and we are unable to attribute offending vehicles to any particular project in the future, we will shut down both projects until we can sort it out. With thanks for your attention to this. 4/22/2005 Message 1 Dave Fisher City Engineer 589-5490 4/22/2005 Page 2 of 2 -----Original Message ----- From: David Fisher Sent: Friday, April 22, 2005 9:58 AM To: 'SBSEngineering' Cc: Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Patnode; Ken Jones; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer Subject: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road URGENT ATTENTION: JOE SCHULKE, ENGINEER OF RECORD FOR ASHBURY PROJECT (772-770-9622) The Sebastian Police Department reported this morning that at least two dump trucks thought to be servicing the Ashbury Project on Powerline Road yesterday "blew through" the STOP signs at the School Crossing on Powerline Road. There are a number of witnesses. Further to my telephone call to your office moments ago, this is to advise you clearly and in no uncertain terms: 1. The project will be SHUT DOWN immediately if this happens again. 2. The project is now under surveillance by Police Department and other City Inspectors for this and any other matters that may be violating the rules of engagement for the project. 3. Please contact the Ashbury Project personnel to rectify this situation and report back regarding when/how/ to whom that has been done. Then please arrange to meet with us to review the crossing signage arrangements going forward for both the construction phase and the permanent design. With thanks, Dave Fisher City Engineer 589-5490 Page 1 of 1 David Fisher From: Ken Jones Sent: Friday, April 22, 2005 10:57 AM To: David Fisher Subject: Ashbury Access Dave: Now that Powerline Rd is paved nearly to the Ashbury project I recommend that Powerline Road South of Ashbury be close to all construction traffic. It was necessary to use this part of Powerline while the road was being paved, but now that the road is complete the construction traffic should not be traveling the dirt road past the school. Just a suggestion. beamed va Stormwater Utility Engineer City of Sebastian phone 772-589-5490 fax 772-589-6209 e-mail kjones cityofsebastian.org 4/22/2005 J060*m W. S"Xxc. RE JCAIW S. Sr'",E. P,E WILLVM P. SMMOMD, Ph.V,. P.E. Lm SCHULKE, 13ITTLE & STODDARD, L.L.C. C/W&S:T7&CnAOLE&T3fJEEflWVG -iAWR-MWM -fWMONMEWTXPEY'-ZW7W�- 'O: Dennis Smith 2005 APR 22 AM 10 27 From EWIEubank Fax- 77S-2862 P-ges: 2 hluding cover Phow. 778-4878 D-tv April 22, 2005 R .,.A- Ashbury Subdimon CC: City of SebaMm fj utgmt Q For Review 13 f"Onase ccamlmt 0 Plftmc Repk, 0 P6we Reevele Attached, OWN Sind email from City of -Sebmban- Plez� caufm ffv "ft to your pro od tuLbey Me VBft signs tD prevent any action by the city. Please mrbid me if t1we are any questions 1717 iridian River UNd, , Sud el 301 VERO WACH. FLOROA 32M TE:L772IT70-9&12 Pm-ft2moam EmAilLsbwqAbehotA,net ► 4!.'LJZUU3 1VICSSage Schulke, Battle & Stoddard LLC Page I of i From: David Fisher rdfisher(Moltyofsebastian.orgj Sent: Friday, April 22, 2005 9:513 AM To: 'SBSEngineering' Cc: Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Philip Patnode Ken ..tones; Bean Grzesiak; Linda Kinchen; Salty Grunzweig; Me Horvath; Rich Stringer Subject: Ashbury Project - Reports of Bump Trucks Ignoring STOP Signs at School Crossing on Powerline Road URGENT ATTENTION: JOE SCHULKE, ENGINEER OF RECORD FOR ASHBURY PROJECT (772-770-9622) The Sebastian Pclice Department reported this morning that at least two dump trucks thought to be servicing the Ashbury Project on Powedine Road yesterday "blew through" the STOP signs at the School CrG,ssing on Powedine Road There are a number of witnesses. Further to my teiephone call to your office moments ago.. this is to advise you Clearly and ir; no uncertain terms 1. The project will be SHUT CLOWN iimm*dletely if this happens agein. 2. The project is now under survelNance by Police Department and otner City inspectors for this and any other matters that may be violating the rules of engagement for the project. 3. Please contact the Ashbury Project personnel to rectify this situation and report back regarding whenihow/ to whom that has been done Then please arrange to meet with us to review the crossing signage arrangements going forward for both the c:ontruction phase and the permanent design With thanks, Dave Fisher City Engineer 589-6490 4/22/20() Message Page 1 of 1 David Fisher From: Paul Graves Sent: Friday, April 22, 2005 10:08 AM To: David Fisher Subject: RE: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road Thank you. -----Original Message ----- From: David Fisher Sent: Friday, April 22, 2005 9:58 AM To: 'SBSEngineering' Cc: Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Patnode; Ken Jones; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer Subject: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road URGENT ATTENTION: JOE SCHULKE, ENGINEER OF RECORD FOR ASHBURY PROJECT (772- 770-9622) The Sebastian Police Department reported this morning that at least two dump trucks thought to be servicing the Ashbury Project on Powerline Road yesterday "blew through" the STOP signs at the School Crossing on Powerline Road. There are a number of witnesses. Further to my telephone call to your office moments ago, this is to advise you clearly and in no uncertain terms: 1. The project will be SHUT DOWN immediately if this happens again. 2. The project is now under surveillance by Police Department and other City Inspectors for this and any other matters that may be violating the rules of engagement for the project. 3. Please contact the Ashbury Project personnel to rectify this situation and report back regarding when/how/ to whom that has been done. Then please arrange to meet with us to review the crossing signage arrangements going forward for both the contruction phase and the permanent design. With thanks, Dave Fisher City Engineer 589-5490 4/22/2005 Message Page 1 of 1 David Fisher From: David Fisher Sent: Friday, April 22, 2005 9:58 AM To: 'SBSEngineering' Cc: Jim Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Patnode; Ken Jones; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer Subject: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road URGENT ATTENTION: JOE SCHULKE, ENGINEER OF RECORD FOR ASHBURY PROJECT (772-770-9622) The Sebastian Police Department reported this morning that at least two dump trucks thought to be servicing the Ashbury Project on Powerline Road yesterday "blew through" the STOP signs at the School Crossing on Powerline Road. There are a number of witnesses. Further to my telephone call to your office moments ago, this is to advise you clearly and in no uncertain terms: 1. The project will be SHUT DOWN immediately if this happens again. 2. The project is now under surveillance by Police Department and other City Inspectors for this and any other matters that may be violating the rules of engagement for the project. 3. Please contact the Ashbury Project personnel to rectify this situation and report back regarding when/how/ to whom that has been done. Then please arrange to meet with us to review the crossing signage arrangements going forward for both the contruction phase and the permanent design. With thanks, Dave Fisher City Engineer 589-5490 4/22/2005 P„w. SCWLKE, PE SCH ULKE , BCT TLE & ST`ODDARD, L. L.C. uw wrt+ simanao, Ph, D., P F. cjVS d Stq(AC UR& ENGWEE-1; W - WOO PLAWNG • ENVWMA EWAL PF-ROWtTMG Fax 1005 RPR 22 PIS 1 26 To: Dennis SMM. 1Frmw Bid Eutenk Fax, 778-2862 Pates: including cover Phom- 7784878 hate: AprO 22, 2005 Rt: Ashbury Sub+dmsion 0 Uxwnt ❑ For Rmirw . Cox mwnts; Ccs, City of Sebert David Fistier 589-62% 0 Ptease C Anment ❑ Pkase Rq-* O Please rv_x ack Attached, please ” second e-cnaii from City of Sebastian. Again pease cauton tte t—dit to ywr pro)ect to obey the traft signs to prevent any action by tits city Flea oontsct me if there an; any garestioms 1717 Indies River 8W., Sub 301 VERO BEACH, FLOf2M 3"W TEL 7771 T70 -9m FAX 7-72 / 77G -94m Eta NIL sbsengs iFaout.net i22;2(.K)5 Message mage x cit .: tt Y./ Schulke, Bittle & Btoddwd LLC From: David Fisher [c fisherQdtyofseb8stian.org] Sent: Friday, April 22,200510:50 P.M To: 'SEMolerOballsouth-ner Cc: 'SBSFngineering'; Jim Davis; Paul Graves; Tracy Haas; Terry H l; Philip r'atnode; Kien Jones: Brian Grzesirak; Linda Kinchen, Sally Grunzweig; Eine Horvath; Rich Stringer; Ginny Sieferd; Bob Korda; Jan Mrqj; Dam Bosworth Subject: RE: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerkne Road URGENT ATTENTION: STEVE MOLER, ENGINEER OF RECORD FOR PELICAN ISLES PROJECT (772-564- 8053) Steve — Further to our telecon marrrents ago, the 1mrnediate response from Joe Schulke's office and a further field •visit indicates the offending dump trucks rooted below may have in fact been servicing the Pelican Isles Project. This email transmittal to you is to cfearty advise you of the situation on Powrerline Road and to request you contact the Pelican isles Project personnel immediately to advise them of the City's position in this matter (as suited below in the email transmittal to Joe Schulke) and which also applies to the Pelican Isles Project. If it continues to happen and we are unable to attribute offending vehicles to any particular project in the future. we. will shut clown both proilocts until we.can sort _it out. With thanks for your attention to this. Dave Fisher City Engineer 589-5490 - Original Message ----- From: David Fisher Sent: Friday, April 22, 2005 5:58 AM Tn: 'SS.SEngineer'ing' Cru Jim Davis; fetal Greaves; Tracy tfas3; Terry Hill; Phillip Patnode; Keri ]canes; Shirr Grzeriak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer Subject- Ashbury Prp)w_1- Rieports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerlirie Road URGENT ATTENTION: JOE SCHULKE, ENGINEER OF RECORD FOR ASHBURY PROJECT 1772- 770-9623) The Sebastian Police Department reported this rooming that at least two dump trucks thought to be servicing the Ashbury Project on Powertine Road yesterday "blew through" t" ;TOP signs at the School Crossing on Poweriine Road. There are a number of witnesses, Further to my telephone call to your office mOnlents ago. this is to advise you clearly and in rto L)KeflWn torms: I . The project will to SHUT DOWN immediatejy it this happens agaili. 2. The project is now under surveillance by Police Department and other City Inspector; for this and any other matters that may be. violating the rules of engagernent for the proie,-t, 4/22/2005 94/22/2(X)5 Message Page 2 01.2 3, Please contact they Ashbury Project personnei to rectify this situation and report back regarding when/haw.,, to whom that has keen done. Then please arrange to meet with us to review the crtrssiiV signage arrangrfi!tt«3tits fining forward for both the construction pha<_.e and the pemvanent design. With thanks, Dave Fisher- CRY isherCity Engineer 589-5480 4/22i2OO5 0 Apr 22 05 0?:13F Mastelier*Moler M INC. Fax Transmit Z Pel 2 J Rep!yRequesTed LL High t'riotity ❑ Cuafidantial (neliver U No^nal Processing ,�Ves ofAddressee Onl}! Immediateh..) ❑ Other If You Fail Tu Receive A Complete Fax Please Contact Us 4t (772) 567-5300 Hob. '772'7841106 United Builders ention: Bob Brodeur ng: Pelican Isles `ax Number: _228-410,%__-_. f Date: 4122/05 --- From: John Soyer_ Number of wages: _4 (Including This Page) Tile# 0258 Fax Number: (772) 794-1106 Attached is an a -mad received today from David Fisher for the referenced project regarcli►tg the tru%ftc violations at the project site for your information and correction. Please feel free to contact the with any questions. Cc: David Schultz (954) 472-3099 David Fisher 589-6209 Ak (te broduer_viulaLio%042205.docj 1655 27"' Street, Suite 2 Vern Beach, FL 320 (772) 567-53UO (772) 794-1106 Fax Apr 22 05 02:13p Masteller*Moler 7727941106 p.2 MJ IVMASTELLER & MOL.ER, INC. MI — CIVIL. ENGINEERS — April 22, 2005 Via Fax \It- Bob Brodeur Superintendent -- United Buiiders Pelican Isles Construction Site City of Sebastian, Florida RE: Traffic Violations Dear Bob, As we discussed earlier today, the City of Sebastian iias expressed concern about the apparent disregard of traffic laws recently exhibited by dump trick operators believed to have originated from either the Ashbury or the Pelican isles construction sites. Please refer to the attached copy of an email from W David Fischer, City Engineer, City of Sebastian, to Steve Moler of this office. Mr. Fischer has iDdicated that if the violations continue the City «iii take action against the related projetA. It is recommnended that you inform all subcontractors and private dump truck operators in writing as to the location of traffic control devices (stop signs- etc) and scbool zones in the vicinity of the Pelican Isles project. Also inform timers that they may be held responsible for the cost of any delays or fines imposed on the project as a result of careless driving. Thank volt for your prompt attention to this matter. Sincerely, MASTELLER & MOL.ER, INC. Yohn M. Boyer, P.E. Project Engineer Jmhh'k Co David Sct�l David Fischer — City of S&asu Fila 025SHC (hRxiu r _ 042205.da:) 1655 27T street, Suite 2 Fero 'Beach, Florida 3296!) Phone, (772) 567.5300 Fix: (772) 7�4-1106 hfoduer vamo042205 E -Mail: tnastsnoir(wbetfsoutn-net Rpr 22 05 0?:13p Masteller,*Moler Steve Moler 772')941106 P.3 Page 1 of 2 From: "David Fisher" <dfisherQcityofsebastian.org> To: <SEMoler(Abellsouth.net> Cc: '"S8SEngineering'" <sbseng@bellsouth.net>; "Jim Davis" <jdavisGckyofs8ba%ban.org>; "Paul Graves" <pgrave&(Mcltyoisebastian.org>; "Tracy Hass" <thassGcityofsebasban.org>; ."Terry Hili" <thiUQcityofsebsstian.org>; "Phillip Patnode" <ppatnodeQCityOfSsbastian.org>; "Ken Jones" <kjones6dtyofsebastian.org>; "Brian Grzesiak"<bgrzesiak4CityCfSebastian.org>; "finds Klnchen" <lklnchen@dtyofsebestlan.org>; "Sally Grunmotg"<sgrunzwe1gacityo1sebastian.cr9>; "El?ie Horvath" <ehorvath@cityofsebaatian.org>; "Rich Stringer"<rstrrngerar-ityofsebastan.org>; "Ginny Sieferd" <gsieferdG0yofsebasban,org>; "Bob Korda" <bkorda@oityofsebazben.org>; "Jai, King„ <jking@dtyofsebestian.org>; "Dord Bosworth" <dbosworthGcityctsebastian.org> Sent: Friday, April 22, 2005 10:50 AM Subject: RE: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road URGENT ATTENTION: STEVE MOLER, ENGINEER OF RECORD FOR PELICAN ISLES PROJECT (772-564- 8053) Steve -- Further to our telecon moments ago, the immediate response from Joe Schulke's office and a further field visit indicates the offending dump trucks noted below may have in fact been servicing the Pelican Isles Project. This email transmittal to you is to clearly advise you of the situation on Powerline Road and to request you contact the Pelican Isles Project personnel immediately to advise them of the City's position in this matter (as stated below iri the email transmittal to Joe Schulke) and which also applies to the Pelican Isles Project. It it continues to happen and we are unable to attribute offending vehmle'to any particular project in the future, we.wi_II shut_gown-both..erolects_untii we can sort it out. With thanks for your attention to this. Dave Fisher City Engineer 589-5490 -----Original Message ----- From: David Fisher Sent: Friday, April 22, 2005 9:58 AM To; 'SBSEngineering' Cc; Ym Davis; Paul Graves; Tracy Hass; Terry Hill; Phillip Pdtnode; Ken lonF+s; Brian Grzesiak; Linda Kinchen; Sally Grunzweig; Ellie Horvath; Rich Stringer Subject: Ashbury Project Reports of Dump Trucks Ignoring S rDP Signs at School Crossing ort Powerline Road URGENT ATTENTION: JOE SCHULKE, ENGINEER OF RECORD FOR ASHBURY PROJECT (772- 770-9622) The Sebastian Police Uepartrnent reported this morning that at least two dump trucks 0!uughl to be servicing the Ashbury Project on Powerline Road yesterday "blew through" the STOP signs at the School Crossing on Powerline Road. There are a number of witnesses. Further to my telephone call to your office moments ago, this is to advise you clearly and ir, no uncertain terms: 1 The project will be SHUT DOWN mn-iodjateN it this happens again. 2 The project is now under surveillance by Police Department and other City Inspectors for this and 4l22i2005 Apr 22 05 02:14p Masteller*Moler '7`727:341106' p.a Page 2 of 2 any other matters that may be violating the rules of engagement for the project. 3. Please contact the Ashbury Project personnel to rectify this situation and report back regarding when/how/ to whom that has been done. Then please arrange to meet with us to review the crossing signage arran.gemerits gui,,g forrrard for bv;h the construction phase and the permanent design. With thanks, Dave Fisher City Engineer 599-5490 4122/2QU5 JOSEPH W MMAKE, P F. XXIM 0 BrfTLF p.E. WILLAU P. STODDARG, Ph.D., P Lon SCHULKE, BITTLE & STODDA RD, L.L.C. cmc 6 STRcicrtittAt �NG.NVEEfiAV(' • OWV ptAMA * • EWMONAA ENrA.. PERW 7WS 2005 APR 25 AM 8 08 To: Dennis Smith From: Nil Eubank Fax: 778-2852 y Pages: 2 inducing ockw PIKme- 7784878 Date: April 22, IM Rx• Ashbury Subdivision rL: City sof SebasWn David Fisher 68rj-520p Rob Robb Fax 321-76&2009 ❑ Uxgmt 0 For Review C! Please Comment 0 Pleawc Reply U Plrasa Rcicvck° . ccXr9Y=ts: Attached, please find third e-mail from City of Sebastian, Since wee concur with the City plead install an earth barrier loge enough so no vehicle can pass it on power tires road just south of the entnance to this project. Let us know if there are any problems using 11'►e neer Power Line Row. Please oor btd me if there are any questions. 1717 Indian Rivet 81vd., SLAB 301 VERO BEACH, Fl ORIDA 320M TEI- Tw 770 -gm Fuc r, 2 mu -94w EMk1I * ,r%O Schwlke, Butte & Stoddard LLC From: David Fisher ;dfisheriMc kyofsebastian.org] Sent: Friday, April 22, 2005 11:28 AM To., 'SEM01er@beHs0uth net, 'SBSEngineer+ing' Cc: Jim Davis; Paul Graves; Tracy Hers, Terry MR; Philip Patnode- Ken ,tones; Brian Grzgsiak, 1-InQa Kinchen; Sally Grunzweig!; Elie Horvath; Rich Stringer; Ginny Sieferd; Bots Korda; Jan King, Uorn Bosworth Subject: RE: Ashbury Project - Reports of Dump Trucks Ignoring STOP Signs at School Crossing on Powerline Road Steve and Joe - It has been suggested we now close oft the southern access to Powerline Road now that the northern access is paved. This wpukf clearly prevent any further recurrence of the School Cro%%ing viviations a! the south �,nd. Do you concur with this approach? t So le arra a for your projects to work together in closing oft the scuthorn access by perm or someother nonvinieble barrier. - -- -- — �-- - --. - - Let us know. % i hanks IVY f(71tl / -r - Dave;Avll �r o -----Original Message: ---- From: David Fisher Sent: Friday, April 22, 2005 10:50 AM To: '5EMolerobellsouth.nK Cc: 'SBSE nglneering'; Jim Davis; Paul GrayeS; Tracy Hass; Terry (till; Phillip Patnode; Ken Jones; Brian Grceslak; Linda Kinchen; Baily Grunzweig; Ellie Horvath, Rich String; Ginny Siefert#; Bob Korda; )an King; Dwi Bosworth Subject; RE: Ashbury Project - Reports of Durnp Trucks ignamq 51 -OP Signs at School Grossing on Poweriine Road URGENT ATTEN71ON: STEVE MOILER, ENGINEER OF RECORD FOR PELICAN ISLES PROJECT (772-564-8053) Steve - Further to our telecon moments ago. the immediate response from .toe Schulke's office and a further field visit indicates the offending dump trucks noted below may have in tact been servicing the Pelican Isles Project. This email transmittal to you is to clearly advise you of the situation on Powerline Road and to request you contact the PeNcan isles Project personnel immediately to advise them of the City's position in this matter Jas stated below in the email transmittal to Joe Schulke) and which also applies to the Pelican Isles project.. if it continues to happen and we arp unable to attribute offending vehicles to any particular project in the future, we will shut_dAwn-both Drojects. unt11-we ca.n sort. it put. With thanks for your attention to ibis. 4/22/2005