Loading...
HomeMy WebLinkAbout2004 - Powerline SidewalkJOSEPH W. SCHULKE, P.E. JODAH B. BITTLE, P.E. WILLAIM R STODDARD, Ph.D., P.E. SCHULKE, BITTLE & STODDARD, L.L.C. CIVIL & STRUCTURAL ENGINEERING • LAND PLANNHYG • ENVIRONMENTAL PERMITTING November 24, 2004 Dave Fisher P.E. City Engineer City of Sebastian 1225 Main Street Sebastian, FL 32958 Re: Ashbury Subdivision Dear Mr. Fisher, Enclosed please find five (5) sets of revised plans for the above referenced project. We have added the sidewalk in Powerline Road pursuant to staff review and request. This should complete the subdivision review. Please prepare final permit A.S.A.P. If you have any questions, please do not hesitate to call. Shic rel , Jo ah Bittle, P.E. Cc: The Coy A. Clark Company; Coy Clark 1717 INDIAN RIVER BLVD., SUITE 301, VERO BEACH, FLORIDA 32960 TEL 772 / 770-9622 Fac 772 / 770-9496 EMAIL sbseng@bellsouth.net SCHULKE, BITTLE & STODDARD, L.L.C. JOB SHEET NO. CIVIL 8 STRUCTURAL ENGINEERING • LAND PLANNING • ENVIRONMENTAL PERMITTING CALCULATED BY TEL 772 / 770-9622,� FAx 772 / 770-9496 1140 7 COURT, SUITE F CHECKED BY EMAIL sbseng@gate.net VERO BEACH, FL 32960 SCALE OF DATE 1 f.. DATE Ashbury Subdivision Punch List Page 1 of 2 U �i user12 \ CG From: {)a?nEf�t acheC;{dfisher@cityofsebastian.org] `/Sent: Wednesday, March 29, 2006 2:43 PM To: 'Ken Jones' Cc: Alfred Minner; Rich Stringer; Rebecca Grohall; Wayne Eseltine Subject: RE: Ashbury Subdivision Punch List Ken et al. -- In response: We will review and evaluate your proposed traffic barrier / signage / ditch fill-in remedy and get back to you within the coming days. Both the sidewalk and the CMP issues are NOT settled and both require further discussion. Any discussions we have had about that since the field inspection visit (and they have been very brief and not particularly substantive) have been only for issue identification with no mutual concurrence in place. There are some attendant circumstances that need to be documented such as (1) the project staff bringing the sidewalk issue to the attention of the City in a timely manner and the City's response at that time; and (2) regarding the pipe: why the standard pipe spec was not used and an evaluation whether the currently installed pipe is adequate and, if not, whether we will require replacement or a bond or some other measure in the matter. -- Dave Fisher -----Original Message ----- From: Ken Jones[mailto:kjones@sbsengineers.com] Sent: Wednesday, March 29, 2006 2:30 PM To: 'David Fisher' Cc: rob@coyclark.com Subject: Ashbury Subdivision Punch List Dave: One item on the punch list for Ashbury is a remedy to prevent traffic from running into the shallow north -south ditch at the end of Powerline Road. We would like to recommend filling the ditch for a distance of 100 feet to the south and placing FDOT recommended signage at the end of Powerline in accordance with page 17349 Case II of the FDOT Design Standards Manual. This would include three Red reflectors to be located at the end of Powerline (one in addition to the two existing) with a W14-1 Dead End sign facing the oncoming Powerline Road traffic at the Roy Ave. intersection. In addition a two way WI - 7 sign would be placed facing the oncoming Roy Ave. traffic. We feel that this would be a safer solution than erecting a barrier at the end of Powerline road and reduce liability for all. Using signage would be similar to the solution the City used at Larkspur and Grandeur. Please let me know as soon as possible if this solution is acceptable to the City so the developer can proceed to fill the ditch and order the signs. It is my understanding, in previous discussions with Joe Schulke the City has agreed to accept the sidewalk as installed and this is no longer an issue. I also understand the City had a concern regarding the drainage pipe extending from the drainage 3/29/2006 Ashbury Subdivision Punch List Page 2 of 2 structures on Powerline Road to the ditch west of the Right -of -Way. The installed pipe is bituminous coated and provides an extended life over standard CMP. We respectfully request the City concur and approve the installation. All other items on the punch list are being addressed. Please let me know if the solution to the Kenneth Jones Construction Manager Schulke, Bittle & Stoddard LLC 1717 Indian River Boulevard, Ste. 201 Vero Beach, Florida 32960 (772) 770-9622 phone (772) 770-9496 fax PLEASE NOTE: This information is provided solely for your convenience only; SCHULKE, BITTLE & STODDARD LLC makes no representations or warranties, either express or implied, as to its suitability for any specific purpose. While we believe this drawing file to be accurate at the time of retrieval, this media and its contents can be easily altered or corrupted either purposely or inadvertently through any number of sources. For this reason, SCHULKE, BITTLE & STODDARD LLC, its managers and or employees shall be indemnified and held harmless from any and all liability that may arise or result from the use of this information by your firm, employees, agents or sub -contractors. Any use of the file provided herein constitutes acceptance of the provisions stated herein. The information contained in this email is privileged and confidential and intended for the addressee only. If you are not the intended recipient, you are asked to respect that confidentiality and not disclose, copy or make use of its contents. If received in error you are asked to destroy this email and contact the sender immediately. Your assistance is appreciated. 3/29/2006 Ashbury Subdivision Punch List Pagel of 3 user20 From: David Fisher [dfisher@cityofsebastian.org] Sent: Thursday, March 30, 2006 2:06 PM To: 'ischulke@sbsengineers.com'; 'kjones@sbsengineers.com'; Jan King Cc: rob@coyclark.com; Alfred Minner; Jim Davis; Rich Stringer; Wayne Eseltine; Rebecca Grohall; Jan King; Dorri Bosworth; Bob Korda; David Fishers Interns Subject: FW: Ashbury Subdivision Punch List Joe / Ken — This to confirm the two (2) telecons earlier this afternoon between Joe Schulke and Dave Fisher regarding the subject punch list, with the following results: • City accepts proposal stated below to handle traffic / ditch / signage issues at the current end of Powerline Road. SBS to provide sketch detailing the proposed details and noting the rationale / explanation for filling in the ditch. (Chief Davis was consulted on this matter. He concurs with the option proposed below.) • SBS to provide package of documentation regarding the sidewalk issue (as discussed). Likely to be no further action on that. • SBS to provide documentation / explanation regarding the spec for the currently installed pipe with appropriate assurances as to suitability for intended use. • Other items, we are told, are in progress. SBS to provide further documentation / certification upon actual completion. -- Dave Fisher -----Original Message ----- From: David Fisher Sent: Wednesday, March 29, 2006 2:43 PM To: 'Ken Jones' Cc: Alfred Minner; Rich Stringer; Rebecca Grohall; Wayne Eseltine Subject: RE: Ashbury Subdivision Punch List Ken et al. -- In response: • We will review and evaluate your proposed traffic barrier / signage / ditch fill-in remedy and get back to you within the coming days. • Both the sidewalk and the CMP issues are NOT settled and both require further discussion. Any discussions we have had about that since the field inspection visit (and they have been very brief and not particularly substantive) have been only for issue identification with no mutual concurrence in place. There are some attendant circumstances that need to be documented such as (1) the project staff bringing the sidewalk issue to the attention of the City in a timely manner and the City's response at that time; and (2) regarding the pipe: why the standard pipe spec was not used and an evaluation whether the currently installed pipe is adequate and, if not, whether we will require replacement or a bond or some other measure in the matter. -- Dave Fisher 3/30/2006 Ashbury Subdivision Punch List Page 2 of 3 -----Original Message ----- From: Ken Jones[mailto:kjones@sbsengineers.com] Sent: Wednesday, March 29, 2006 2:30 PM To: 'David Fisher' Cc: rob@coyclark.com Subject: Ashbury Subdivision Punch List Dave: One item on the punch list for Ashbury is a remedy to prevent traffic from running into the shallow north -south ditch at the end of Powerline Road. We would like to recommend filling the ditch for a distance of 100 feet to the south and placing FDOT recommended signage at the end of Powerline in accordance with page 17349 Case II of the FDOT Design Standards Manual. This would include three Red reflectors to be located at the end of Powerline (one in addition to the two existing) with a W14-1 Dead End sign facing the oncoming Powerline Road traffic at the Roy Ave. intersection. In addition a two way WI - 7 sign would be placed facing the oncoming Roy Ave. traffic. We feel that this would be a safer solution than erecting a barrier at the end of Powerline road and reduce liability for all. Using signage would be similar to the solution the City used at Larkspur and Grandeur. Please let me know as soon as possible if this solution is acceptable to the City so the developer can proceed to fill the ditch and order the signs. It is my understanding, in previous discussions with Joe Schulke the City has agreed to accept the sidewalk as installed and this is no longer an issue. I also understand the City had a concern regarding the drainage pipe extending from the drainage structures on Powerline Road to the ditch west of the Right -of -Way. The installed pipe is bituminous coated and provides an extended life over standard CMP. We respectfully request the City concur and approve the installation. All other items on the punch list are being addressed. Please let me know if the solution to the Kenneth Jones Construction Manager Schulke, Bittle & Stoddard LLC 1717 Indian River Boulevard, Ste. 201 Vero Beach, Florida 32960 (772) 770-9622 phone (772) 770-9496 fax PLEASE NOTE: This information is provided solely for your convenience only; SCHULKE, BITTLE & STODDARD LLC makes no representations or warranties, either express or implied, as to its suitability for any specific purpose. While we believe this drawing file to be accurate at the time of retrieval, this media and its contents can be easily altered or corrupted either purposely or inadvertently through any number of sources. For this reason, SCHULKE, BITTLE & STODDARD LLC, its managers and or employees shall be indemnified and held harmless from any and all liability that may arise or result from the use of this information by your firm, employees, agents or sub -contractors. 3/30/2006 Ashbury Subdivision Punch List Any use of the file provided herein constitutes acceptance of the provisions stated herein. The information contained in this email is privileged and confidential and intended for the addressee only. If you are not the intended recipient, you are asked to respect that confidentiality and not disclose, copy or make use of its contents. If received in error you are asked to destroy this email and contact the sender immediately. Your assistance is appreciated. 3/30/2006 Page 3 of 3