HomeMy WebLinkAbout1996 Pre-Construction ConferenceURS Greiner
MEMORANDUM
To: Thomas Frame, City Manager
From: Bud Jackman
Date: October 17, 1996
Subject: Sebastian Municipal Airport
Runway 4-22 Reconstruction
Pre -Construction Conference - Minutes of Meeting
The Pre -Construction Conference for the above referenced project was held on 10/14/96 at 10:00
A.M. Eric Nielsen, the Project Manager for URS Greiner, General Consultant for the Airport,
opened the meeting and discussed the scope of the project, the responsibilities of the respective
participants in the project and administrative procedures to be followed, in general conformance with
the attached Agenda.
Phasing was discussed with a concern by Martin Paving of the short duration of time to complete
work in the runway intersection area. We assured Martin that our testing lab's representative would
be on site when needed and no delay due to testing is anticipated.
Martin Paving submitted a request to substitute Cemented Coquina (Spec. P-212) for Limerock Base
(Spec. P-211) and also requested to be allowed to mix the existing base, asphalt surface course and
new cemented Coquina material into one homogeneous base course material. We requested that they
re -submit, separating the request into two parts -- substitution and homogeneous blending -- so that
they could be evaluated separately. We also requested that they show the cost benefit to the City and
FDOT from the substitution of material.
The Contractor was advised throughout the meeting that safety concerns are of paramount
importance on this project, especially as this airport does not have a control tower. The Contractor
was also advised that his flagman shall coordinate with Garry Fischbach on the proper radio
procedures to be followed.
The FDOT verbally approved the contract with Martin Paving Co. and all parties agreed to a Notice -
to -Proceed date of October 23, 1996.
Other items discussed:
• Payment requests to URS Greiner by the 25th day of the month.
• Working hours will be 7:00 A.M. - 4:30 P.M.
MEMORANDUM
October 17, 1996
Page Two
• FDOT requires a monthly progress report with the request for payment.
URS Greiner hand -delivered five (5) sets of plans to Martin Paving. Five (5) Specification Books
will be forwarded to Martin as soon as we receive an executed set of Contract Documents and can
get conformed sets printed.
►D � ul 7(Ilt7:VI111h�1
B7:dlc
CC: Terry Hill
- Sebastian
Irwin Oster
- FDOT
Gary Goodwin
- Martin Paving
Garry Fischbach
- URS Greiner
PRE -CONSTRUCTION CONFERLNCt AUt:NUA
SEBASTIAN MUNICIPAL AIRPORT
WPI No. 4825349/310
10/14/96 -10:00 A.M.
SIGN -IN SHEET
NAME
COMPANY
PHONE NO.
vd it n
` .e e- Tx
yo7 yea - 0353
zQ 15er4i3iic
ZN�.
(zlo7) 42Z - 0353
•ESI c-
„ . %
�.�' Q,a��r-n
„� ✓;
Gln/� Sff9-�S�
'z,
/�2>7ni %a9✓tn��
o4 76i-8383
R IN
lWfik7f i1u UintC
- - 450b
M I I<EljGttocn
sLtic77O '
4Aj66z. 6&YS7I'VE
07- 7aS-a%oa
14
jo- , a
�`/S /YG%t vs
�P9 Sd'Sr7
N
C ,t/Jwsr Q u
7 er- ={/a -..I
42
516-q -777
Q�.iiw
FDc:>
X54-777 -4�8
FDo
is '7< 67 7.7 07.6
PRE -CONSTRUCTION CONFERENCE AGENDA
SEBASTIAN MUNICIPAL AIRPORT
WPI No. 48253491310
10/14/96 - 10:00 A.M.
I. INTRODUCTION OF PARTICIPANTS
A. Owner - City of Sebastian
Thomas Frame, City Manager
Terry Hill, Airport Manager
(561)589-5330
B. Engineer - URS Greiner, Inc.
Eric Nielsen, Project Manager
(407) 422-0353
C. Resident Project Representative - Garry Fischbach
(Phone # to be provided later)
D. Contractor - Martin Paving Co.
Gary Goodwin
(561)589-6500
E. FDOT
II. PURPOSE
- Irwin Oster
(954)777-4490
To review project scope, establish the Notice -to -Proceed, review the roles of the
participants, review administrative procedures and answer questions.
III. SCOPE OF WORK
A. Description of Project
1. Reconstruction of Runway 4-22
B. Mobilization, access and staging areas (Plan Sheet No. 4, Special Provision Nos.
2&8)
C. Safety and Security (Special Provision No. 3, Plan Sheet No. 3)
D. Schedule to Greiner
1
IV. NOTICE -TO -PROCEED
A. Contract status
B. Establishment of Notice -to -Proceed date subject to concurrence of Owner,
Contractor and FDOT.
V. RESPONSIBILITIES OF PARTICIPANTS
A. Owner
Make payments to Contractor
Approve Change Orders
Issue Scope revisions and all other instructions and directions
Issue NOTAMS
B. Engineer
Responsible for design intent
Interpretation of plans and specifications
Review and approve progress payments and shop drawings/submittals
C. Resident Project Representative
General coordination and interface
Quality control and monitoring of work
Authorized to suspend operations due to safety violations or non-conformance
with plans and specifications.
D. Contractor
Perform the work in accordance with the Contract Documents
Provide progress schedule and updates
Advise Owner of dates NOTAMS are needed
E. FDOT
Provide project funding
Review/approve changes
Make periodic inspections and attend final inspection
VI. ADMINISTRATION
A. Correspondence to Greiner - Orlando:
05
Address all correspondence to:
Eric Nielsen, Project Manager
URS Greiner, Inc.
315 E. Robinson St., Suite 245
Orlando, FL 32801
Tel. (407) 422-0353
Fax (407)423-2695
Correspondence to the City of Sebastian:
Thomas W. Frame, City Manager
City of Sebastian
1225 Main St.
Sebastian, FL 32958
Tel. (561) 589-5330
Fax(561)589-5570
Correspondence to Resident Project Representative:
Garry Fischbach
Address and phone number to be provided at a later date.
B. Shop drawing submittals - submit 5 copies to URS Greiner, Orlando
C. Payment requests and quantities - Coordinate submitted quantities with RPR.
Submit (3) copies of certified pay requests to URS Greiner. (Submit typical format
for Engineers/Owner's approval two weeks prior to initial request.)
D. Change Orders - URS Greiner prepares and submits to Contractor; Contractor
submits to Owner; Owner submits to FDOT.
E. Wage Rate/Certified Payrolls - submit to URS Greiner, Inc. (2 copies).
F. DBE and EEO requirements - comply with Bid and Contract Conditions.
G. Coordination meetings
H. Working hours
As -Built drawings
J. Testing reports - copy to RPR/URS Greiner, Orlando/Contractor/Owner
K. Reports to Owner -weekly report by RPR
L. Contractor's schedule - update with monthly pay request
3
M. Safety/Security
VII. CONTRACTOR
A. Review responsibility and authority of on-site personnel
1. Project Manager
2. Superintendent
& Provide list and responsibilities of subcontractors
C. Provide after-hours emergency numbers
Vlll. GENERAL DISCUSSION
Questions/Answers
[V1000101agnda]
V,
PRE -CONSTRUCTION CONFERENCE AGENDA
SEBASTIAN MUNICIPAL AIRPORT
WPI No. 4825349/310
10/14/96 - 10:00 A.M.
SIGN -IN SHEET
NAME
COMPANY
PHONE NO.
L
yo7 yea - 0 3S3
IZR
�SctEi3 ac
C flu ElkINc-.
(Z`1d7) 422 - 0353
n4xLl4
o4 76I-1383
R Aral N
MN61mc
56L,5W 45o
M 1146 6/t0c n/4nj6ER
� 1Si su�c7�o^'
07 `7aS-a7oa
- Z
D"
388-
JO -4m pa//�%S
�G/a t' az
X89 S�ScY
/J
mei"\ y
��iPUTRfJc /mac
X88 /i,��°
Qey y
9�j r2
Dv 7
-751(-777 -4(G9
�raA��anl 1 a3
FDa —,
SS `f - 67 7 •-:3- 07-6
T