Loading...
HomeMy WebLinkAbout2009 LPA Group Scope of ServicesWORK AUTHORIZATION FORM Work Authorization #: 2 Project #: FAH412032 IT IS AGREED to undertake the following work in accordance with the provisions of our Master Agreement entitled NON-EXCLUSIVE AGREEMENT for CONTINUING PROFESSIONAL ENGINEERING CONSULTING SERVICES dated: May 27, 2009. Description of Assignment: R/W 4-22 Improvements as described in attached SCOPE OF SERVICES Basis of Compensation/Period of Services: Services shall be provided for a payment of. $87,289.00 Work will commence upon execution of this Work Authorization by the parties. Completion of the work will take no longer than: 150 consecutive calendar days henceforth. AGREED as to scope of services, time schedule, and budget this 15th day of October, 2009. CITY OF SEBASTIAN A Florida Municipal Corporation JAt, - By: Al r, tity Manager THE LPA GROUP INCORPORATED By: Paul Holt, Senior ice President Attest: Approved as to Form and Content for Reliance by the City Of Sebastian only: Staff Approvals: Airport Director tij_ _ as to project Finance Director as to budget only Exhibit A Sebastian Municipal Airport — Runway 4-22 Improvements Scope Description Introduction The Sebastian Municipal Airport (Airport) has requested the services of THE LPA GROUP INCORPORATED (LPA) for the following task: + Runway 4-22 Improvements (Project) This project generally consists of the preparation of construction drawings and Technical Specifications. This project also generally consists of construction phase services as described under Phase 3 of this document. This project is more fully described in the document that follows. Exhibit B contains the Hour and Fee estimate for this task and Exhibit C depicts a sketch of the proposed improvements. Project Description This project consists of removing pavement from the shoulders and the useable width of Runway 4-22 for the entire 4,000' length. The runway is currently 100' wide with 25' paved shoulders. This project will narrow the width to 78' and remove all shoulder pavement. Other components of this project involve: • Relocating the elevated runway edge lights to the correct offset from the new edge of pavement. • Relocating flush, in -pavement edge lights at taxiway/ runway intersections. • Adjusting the Runway Threshold Lights (RTL's) to the new pavement width. • Remove conflicting markings on adjoining taxiways and re -mark. • Adjust markings at intersection of Runway 8-26. + Remark the runway for Visual markings. LPA will develop bidding documents and construction documents indicating the proposed improvements including safety and construction phasing details. LPA will perform the necessary coordination with permitting agencies; however, it is assumed that there will be no SJRWMD permit required for this project. 1 Phase 1- Design 1.1 Pre Design Phase Services to be provided by LPA A pre -design field review will be performed by members of the design team. Notes and a photo log will be produced from this visit. Due to the fast track nature of this project, no field survey information will be obtained. Instead, LPA will rely on existing information obtained from the Airport from past projects and as -built field condition data. Geotechnical data will be obtained. Meetings: LPA will attend a kick-off meeting with the Airport to discuss items such as phasing, hours of construction operation, durations, and budgets. LPA will attend a pre -application meeting with SJRWMD and prepare necessary paperwork for a "No Permit Required" submittal. 1.2 Design Phase Services to be provided by LPA LPA will provide the following basic design services for this project (see Exhibit B for hour and cost breakdown): • Coordination with the City — LPA will conduct two (2) meetings with the City of Sebastian to review the progress of the bidding documents. • Technical Specifications — LPA will prepare Technical Specifications for demolition, pavement markings and electrical construction. • Front-End/Contract documents — LPA will prepare the advertisement, bid forms, general conditions, special conditions, and review the City of Sebastian's modified construction contract. The City of Sebastian will provide the Contract and General Provisions document. • Engineers Report — A detailed report of the design parameters will be prepared for the Airport's use. It shall include a detailed cost estimate in budgeting and evaluating bids. Construction Plans will consist of: + Cover Sheet + Project Layout Plans • MOT and Safety Plans • Demolition Plans + Grading Plans + Pavement Marking Plans + Cross Sections (every 50'-100') + Misc. Details + Electrical Plans and Details There shall be a draft bid set prepared for the City's review prior to proceeding to complete bid documents. LPA will provide five (5) half-size sets of Plans, Specifications, and the Engineer's Report to the City and regulatory agencies. Bidding Documents — LPA will prepare the following Final Documents for the City. It is noted that the City of Sebastian will provide contract documents. LPA will provide the five (5) sets of documents for: + Drawings (to be provided by LPA). + Technical Specifications (to be provided by LPA). + Bid Documents (to be provided by LPA). + Contract Documents (to be provided by the City). 2 Phase 2 Bidding Services 2.1 Bidding Services LPA will perform general coordination and: • Prepare for and attend the Pre -Bid Conference; • Assist with the preparation of addenda as necessary; Runway 4-22 Improvements Page A-2 of A-5 September 2009 + Assist the City in opening, tabulating, and evaluating bids; and + Assist the City in preparing the construction contracts. 3 Phase 3 Construction Administration 3.1 Construction Administration LPA will perform construction administration services to include limited project oversight and contract administration. These services shall be utilized to observe the progress of the Contractor(s)' construction, monitor construction progress, perform general coordination with Contractor(s), review shop drawings and submittals, respond to RFUs and questions, attend meetings, prepare minutes, review pay requests, and perform site visits. LPA shall have an advisory role on the following tasks: + Construction Progress Observation: LPA will make visits to the site at bi-weekly intervals in order to observe as an experienced and qualified design professional the progress of the various aspects of the Contractor(s)' work. Based on information obtained during such visits and on such observations, LPA shall endeavor to determine in general if such work is proceeding in accordance with the Approved Contract Documents and LPA shall keep the Airport informed of the progress of the work. + LPA shall not, during such visits or as a result of such observations of the Contractor(s)' work in progress, supervise, direct, or have control over the Contractor(s)' work, nor shall LPA have authority over or responsibility for the means, methods, techniques, sequences, or procedures of construction selected by the Contractor(s), for safety precautions and programs incident to the work of the Contractor(s) or for any failure of the Contractor(s) to comply with laws, rules, regulations, ordinances, codes, or orders applicable to the Contractor(s) furnishing and performing their work. Accordingly, LPA can neither guarantee the performance of the construction contracts by the Contractor(s) nor assume responsibility for the Contractor(s)' failure to furnish and perform their work in accordance with the Documents. + Defective Work: During such visits and on the basis of such observations, LPA will inform the Airport of deficiencies in the Contractor(s)' work while it is in progress if LPA believes that such work will not produce a completed Project that conforms generally to the Approved Design -Build Documents or that it will prejudice the integrity of the design concept of the Project as reflected in the Approved Contract Documents. LPA will prepare a report based on observations of each site visit for distribution to the Airport and the Contractor(s). + Disputes between Airport and Contractor(s): LPA shall act as the initial interpreter of the requirements of the Approved Contract Documents and judge of the acceptability of the work or the interpretation of the requirements of the Approved Contract Documents pertaining to the execution and progress of the work. LPA shall not be liable for the results of any such interpretations or decisions rendered in good faith. + Review Monthly Pay Anplications: LPA shall review the monthly pay applications from the Contractor(s) and verify quantities/percentage of work completed during the pay application period. LPA shall make a recommendation for payment to the Airport for the Airport to then release payment to the Contractor(s). Runway 4-22 Improvements Page A-3 of A-5 September 2009 + Substantial Completion and Final Inspection: LPA shall make a site visits to determine substantial and final completion. LPA shall prepare and issue a punch list of deficient items following the substantial completion site visit for the Contractor(s) to address prior to final completion. LPA shall issue a Letter of Completion following a satisfactory final inspection. Asswnptions: 1. When possible, site visits will be held with the Airport's representative and the Contractor(s) present to review the progress of the work. Exclusive of site visits related to Preconstruction, this task assumes biweekly site visits during the course of the Project, along with the Substantial Completion and Final Inspections (approximately 6 site visits). 2. Applications for payment will be processed monthly (2 total). Deliverable: Narrative field report of observations after each visit and recommendations for payment following each pay application. + Contractor(s)' Completion Documents: LPA will review maintenance and operation instructions, schedules, guarantees, bonds and certificates of inspection, tests, and approvals which are to be assembled by the Contractor(s) in accordance with the Approved Contract Documents (but such review will only be to determine that their content complies with the requirements of, and in the case of certificates of inspection, tests, and approvals, the results certified indicate compliance with, the Approved Contract Documents), and shall transmit them to the Airport with written comments. + Completion Inspections: LPA shall conduct inspections (maximum of one (1) day for substantial completion) or observe the Contractor(s) demonstrations to determine if the work or parts of the work are partially accepted, substantially complete, or ready for a final inspection as defined in the General Provisions of the Construction Contract. Such inspections shall advise if the completed work is acceptable to the Airport and other governing agencies. Asswnptions: 1. All Contractor(s) completion documents will be presented in one (1) submittal for review and comment. 2. Visits will be held with the City of Sebastian Project Representative and the design -build entity present to review the completion of the work. 3. Exclusive of site visits related to periodic construction observation or other applications for payment, this task assumes an additional one (1) site visit during the course of the Project. Deliverables: 1. Comments on completion documents. 2. Advice for determining the substantial completion of the work and review of the Contractor(s)' list of incomplete items. 4-22 Improvements Page A-4 of A-5 September 2009 4 Phase 4 - Closeout Services 4.1 Closeout Services Upon construction completion, LPA will prepare an updated Airport Layout Plan (ALP) for submission to the appropriate agencies. These revised elements of the overall ALP set will be prepared in conformity with the FAA/FDOT Airport Layout Plan drawing standards. Assumptions: 1. The update of the existing ALP includes only the general area of new construction. 2. Modifications will be made to the existing electronic files. Deliverables: Five (5) prints of an updated Airport Layout Plan for submission to the FAA and the Florida Department of Transportation. 2. One (1) electronic file of the Airport Layout Plan. LPA will assist the Airport with the closeout of the Project with the Contractor(s) as well as with the following agencies: + The Florida Department of Transportation (FDOT) + The Federal Aviation Administration (FAA) The Contractor(s) shall prepare and LPA will certify and deliver as -built drawings, test results, bill of sale, and any other required documentation for agency closeout. 4.2 Subconsultants LPA shall contract with testing firm(s) as necessary for material and construction quality assurance testing during construction. LPA shall have authority, as the Airport's representative, to require special inspection or testing of the work, and shall receive and review all certificates of inspections, testing and approvals required by laws, rules, regulations, ordinances, codes, orders or the Contract Documents (but only to determine generally that their content complies with the requirements of, and the results certified indicate compliance with, the Contract Documents). Testing is expected but not limited to the following elements: earthwork and concrete. LPA will review tests and notify the Airport of the results of each test. Schedule Plans and Specifications shall be completed within two weeks of the Notice to Proceed. The construction services phase shall be shall be 70 days for construction, 30 days for material procurement, and 30 days for punch list and project closeout for a total of 130 days. Runway 422 Improvements Page A-5 of A-5 September 2009 Exhibit B : Hour and Fee Estimate Sebastian Municipal Airport Runway 4-22 Improvements IIeMTask Desaiption 2009 Rate $201.00 $171.00 S $171.00 w Q $144.00 o $108.00 $82.00 IT-�z $76.00 Distribute Bidding Documents Phase 1 - Design 2 Pre -Bid Conference 4 4 8 Answers to Bidders/Issue Addenda 4 Coordination with City _ 12 2 1 Review Bids for Responsiveness 8 4 Coordination with Subconsultants 1 2 3 3 Contract Preparation 2 8 & Prepare Base Maps 2 5 7 Geometric Design 2 6 10 18 Site Visit 8 8 16 Coordination with FDOT 1 1 1 2 5 Coordination with FAA (Airspace Checklist) 1 1 2 2 6 Review Meeting with City 4 _ _ n Pre -Application meeting with SJWMD 4 a Prepare/Submit Preliminary Plans Cover Sheet 2 _ 2 Project Layout& Safety Plan 1 1 2 4 4 12 General Notes 8 Summary of Quantities 1 1 1 1 4 Phasing Plan 2 1 1 1 5 9 Typical Sections 1 2 4 7 Demolition Plans 1 4 7 6 18 Grading Plans 1 2 8 5 16 Cross Sections 3 3 6 12 Miscellaneous Details 2 6 8 Runwayl Taxiway Pavement Marking 1 3 1 4 2 10 Erosion Control Details 2 4 6 Construction Cost Estimate 1 2 5 3 11 Engineees Report 6 4 1 10 Technical Specifications 2 3 5 10 Quality Control 1 2 2 5 Project Management 6 6 Phase 1- Design Hours 1 24 21 47 54 53 25 225 Phase 1- Design Fee $201 $4,104 $3,591 $6,768 $5,832 $4,346 $1,900 $26,742.00 Phase 2 - Bidding Advertise and Coordinate 4 _ 4 Distribute Bidding Documents 2 2 Pre -Bid Conference 4 4 8 Answers to Bidders/Issue Addenda 4 8 _ 12 Bid Opening Review Bids for Responsiveness 2 2 4 8 Certified Bid Tabs/Award Contrail 4 4 1 8 Contract Preparation 2 8 10 9/4/2009 Page B-1 of 3 Exhibit B: Hour and Fee Estimate Sebastian Municipal Airport Runway 4-22 Improvements Design Phase Subconsultants (Lump Sum) Topographic Survey y y Electrical Design $15,000.00 A $1,700.00 Fixed Fee on Subconsultants 10% $1,670.00 4 12 Design Phase Subconsultants (Lump Sum) Fee TOTAL AMOUNT DESIGN & BIDDING SERVICES - PHASES 1 & 2 (LUMP SUM): $51,186.00 6 6 N Itemrrask Description a a m w w w o Coordination with Contractor 16 8 2009 Rate $201.00 $171.00 $171.00 $144.00 $108.00 $82.00 $76.00 40 Phase 2- Bidding Hours 0 6 0 14 0 0 32 52 Phase 2 -Bidding Fee $0 $1,026 $0 $2,016 $0 $0 $2,432 55,474.00 Design Phase Subconsultants (Lump Sum) Topographic Survey $0.00 Electrical Design $15,000.00 Geotechnical $1,700.00 Fixed Fee on Subconsultants 10% $1,670.00 4 12 Design Phase Subconsultants (Lump Sum) Fee TOTAL AMOUNT DESIGN & BIDDING SERVICES - PHASES 1 & 2 (LUMP SUM): $51,186.00 6 6 14 $18,370.00 Design Direct Expenses (Lump Sum) Reproduction $500.00 Travel $0.00 Postage _ $100.00 Design Direct Expenses (Lump Sum) Fee 2 4 12 $600.00 TOTAL AMOUNT DESIGN & BIDDING SERVICES - PHASES 1 & 2 (LUMP SUM): $51,186.00 7-7 Phase 3: Construction Administration Review Shop Drawing Submittals 4 2 2 4 12 Prepare for and attend Preconstruction Conference 2 6 6 14 Coordination with Owner 4 4 2 6 Coordination with Contractor 16 8 8 2 10 Weekly Site Visits 40 40 Review Pay Applications 24 4 3 0 20 2 5 Substantial Completion and Punchlist 4 $1,728 4 4 12 Final Inspection 4 4 1 9 Construction Completion Certification 2 2 4 Phase 3: Construction Administration Hours 20 5 64 0 0 23 112 Phase 3., Construction Administration Fee (LS) $3,420 $855 $9,216 $0 _ $0 $1,748 S15,239 Phase 4: Closeout Services FDOT Closeout 2 4 4 1 11 FAA Closeout - Update ALP 2 4 4 1 11 As -Built Certification 4 4 2 10 FAA AIP Survey Certification 16 8 8 4 36 Phase 4: Closeout Services Hours 24 4 12 0 20 T8 68 Phase4: Closeout Services Fee (LS) $4,104 $684 $1,728 $0 $1,640 1 $608 1 $8,764 9/4/2009 Page B-2 of 3 Exhibit B :Hour and Fee Estimate Sebastian Municipal Airport Runway 4-22 improvements TOTAL AMOUNT CONSTRUCTION SERVICES - PHASES 3 & 4 (LUMP SUM): 1 $36,103.0D BIDDING AND CONSTRUCTION SERVICES - PHASES 1, 2, 3 & 4 9/4/2009 Page B-3 of 3 Item?ask Description a a w w w N o ¢ 2009 Rate $201.00 $171.00 $171.00 $144.00 $108.00 $82.00 $76.00 Construction Phase Subconsultants Hillers Electrical Engineering $8,000.00 Quality Assurance Testing $3,000.00 Fixed Fee on Subconsultants 10% $1,100.00 Construction Phase Subconsultants Fee $12,100.00 TOTAL AMOUNT CONSTRUCTION SERVICES - PHASES 3 & 4 (LUMP SUM): 1 $36,103.0D BIDDING AND CONSTRUCTION SERVICES - PHASES 1, 2, 3 & 4 9/4/2009 Page B-3 of 3 THE LPA GROUP INCORPORATED 615 CRESCENT EXECUTIVE COURT, SUITE 200 LAKE MARY, FLORIDA 32746-2146 (407) 306.0200 FAX (407) 306.0460 JOB �4� )I un W" i' -PL -Z --- SHEETNO.- OF CALCULATED BY DATE CHECKED BY