Loading...
HomeMy WebLinkAbout2009 E-Mail with FDOTJoseph Griffin From: Mainardi, Rebecca [Rebecca. Mainardi@dot.state.fl. us] Sent: Friday, February 06, 2009 9:29 AM To: Joseph Griffin; Notz, Nicole; Miguel Martinez (E-mail) Subject: RE: X26 Miguel and I spoke regarding the below and FDOT is in agreement that the 4/22 project should be done first (the issues on this runway were also noted by Dave in his inspection). Keep in mind you need to survey 4/22 to ensure the lights or markings, which ever alternative is selected, are in the correct location. Becky Mainardi Aviation & Rail Section Leader Florida Department of Transportation 3400 W. Commercial Blvd. t Fort Lauderdale, FL 33309 (954) 777-4404 -----Original Message ----- From: Joseph Griffin (mailto:JGriffin@CityOfSebastian.org] Sent: Saturday, January 31, 2009 9:47 AM To: Mainardi, Rebecca; Notz, Nicole; Miguel Martinez (E-mail) Subject: FW: X26 Becky, et al: Since the below e-mail, Miguel and I have spoken re. this subject. He suggests I change my JACIP entry regarding the 09 restriping of 8/26 to engineering planning for the 4/22 project ---I have done that ---please confirm my actions if they are correct. In addition, I have added to the 2010 4/22 rehab project the resurface of Taxilane E. Nicole should have a color coded schematic of taxiways so you can ID T/L 'E' ----the access road project will be complete b-4 that would start and will complement the road access project. Pls. let me know what you think. JG@APHQ -----Original Message ----- From: Notz, Nicole [mailto:Nicole.Notz@dot.state.fl.us] Sent: Tuesday, January 27, 2009 1:29 PM To: Joseph Griffin Subject: RE: X26 Becky is out until Thursday Nicole Notz FDOT Aviation (954) 777-4497 (954) 777-3497 -----Original Message ----- From: Joseph Griffin [mailto:JGriffin@CityOfSebastian.org] Sent: Tuesday, January 27, 2009 1:10 PM To: Mainardi, Rebecca Cc: Notz, Nicole; Miguel Martinez (E-mail); Rob Hambrecht (E-mail); Alfred Minner Subject: X26 Becky: Miguel called me last Friday with second thoughts on the "repaint and outline RW markings" project for 8/26 that we moved up from 10 to 09. His concern is/was that 8/26 1 was rebuilt/reopened less t 5 years ago and that 'perhaps resurvey "only" would suffice for FDOT purposes ---and that the FAA would not participate in the slurry/remark project. He then suggested that that project amount would be better utilized for the engineering/planning of the 4/22 project. To summarize the 4/22 problem: the runway edge lighting is out of compliance and the shoulder is 1943 asphalt with numerous problems ---AND the survey is out and the markings are non-compliant. I am planning a meeting with the consultant to discuss options, cost, etc. Miguel has given me the option to look at the following: the R/W is 150' wide --- 78' of resurfaced asphalt in good condition and 72' of shoulder --36' on either side of the runway. Then: 1. moving the lights inboard to 5' from the edge of the runway; providing another 5' for shoulder (therefore 10' on either side of the r/w); 3. removing 36' on both sides of the r/w of old shoulder asphalt; 4. put down 10' of new asphalt on either side of the r/w; 5. slurry the 78' of good r/w; 6. survey and remark. I would like to start at the above when engaging the consultant on this. I think the completed job would please FDOT/Dave Roberts, decrease maintenance costs for the AP, and increase the pervious surface of the AP that will please FWS and St. Johns. In addition on the ALP, 4/22 is planned to be a 75' r/w with a non -precision approach. Please let me know your thoughts on this. Joe Griffin Airport Director City of Sebastian 202 Airport Drive East Sebastian, FL 32958 772-228-7013 office 772-228-7078 fax 772-633-0151 cell www.sebastianairport.org 2