PROJECT MANAGEMENT CHECKLIST
AIRPORT:
AIP PROJECT NO.:
WORK ITEM:
j�,.�. 8- -�...
-�r .� 4yu�:1. lF, rb :�,i,..}iilfit :�•.".•s:' ds. ; i+ `•.'•r«. r �: tF4Hr�•, r �x' moz"'Y {!:� .Y i. sS r.:: �7 • . L ..yf,S' Ji3>E'.. q s . +. �,'S�.r..:.,ye,7 •,7s y� �.` r:.��:� M�`�f+i rte,
,� �:-r•,�-y..-„ytr,..^_r_ y3"�:.n;,_:?•°�aH P�” '.�y^�t.�„�.--y� a.�'•'�'".?. �•k�'t'a: '?..i nary BMW
�'.;.:., ��
,
F. r r •z.'
i
y '�-,.' •.l. :i':. ':}
�....� .s x, .... .C.rr .F.�.t .,. _.t'ic :!�..:::.>�;, •; t�,, ./� .�`.,r!,t,3 �_ •r..a,i: . r:f :' ¢.��.f :7��'.- ..v�'-: <-^ .z� Saf., l•,. .4., �[�f 4 it ,:i rr..,
:' ...... •.::.:1... i^.+,.. 1 • , r... v.. r '.!i iit F i, , q.;t �;• . t. .::;,�.:;,::ti:,t "?D.�.ri., ,Y-
-�7S.a;�i�,+,;G,:
z ,,�..
.. � Y:-.1.�
f.:.S'
.se.:.... �� ..a ... .,.:: .s ..x - .,`� _ 57;x.., Y:,�;._.
.) ..?1.. r..,.: ..n. x,t.r,.s ,+ �'•,' 4'r::,,, ..-�::
s
IMMEDIATELY FOLLOWING THE FAA'S SUBMITTAL AND THE AIRPORT OWNER'S RECEIPT OF
THE TENTATIVE ALLOCATION LETTER
Owner
Begin consultant selection process.
REFERENCE: AC150/5100-14C
Owner
Prepare independent cost analysis if basic services are expected to exceed $100,000.
Airport owner is allowed to prepare the analysis if qualified.
REFERENCE: AC 15015100-14C, Appendices 3, 4, and 5, and "Summary Guidance for Architects and
Owner
Engineers' Fees for AIP Projects" dated July 1992 prepared by ASO -610
Owner
Select consultant to prepare or update DBE Plan. (Airport owner is allowed to
accomplish this task if qualified personnel available). Project specific DBE goals are to
ADO
be established by the airport owner in accordance with Civil Rights Division (ASO -9)
Engr
guidelines.
The airport owner will work directly with an ASO -9 representative concerning all DBE matters.
ASO -9
Approve DBE goals. Airport owner will notify the ADO when the DBE goals are
approved, and the ADO will subsequently confirm established DBE percentages by
telephone call to ASO -9.
The DBE plan must be approved and confirmation received by the ADO prior to project advertisement.
Owner
I Submit project schedule to ADO for approval.
INDEPENDENT COST ANALYSIS AND EXECUTED CONSULTANT CONTRACT
IF THE INDEPENDENT COST ESTIMATE IS NOT PREPARED BY THE AIRPORT OWNER, AND
INSTEAD PREPARED BY A RESPONSIBLE THIRD PARTY, THE THIRD PARTY SHOULD ATTEND
OWNER/CONSULTANT SCOPING SESSION
Owner
Prepare independent cost analysis for consultant basic service fees.
An independent cost analysis is required when basic services are expected to exceed $100,000.
Owner
Evaluate consultant's proposed fees in accordance with independent cost analysis
and prepare Record of Negotiation
REFERENCE: AC 150/510044C, Appendices 4 & 5.
Owner
Submit consultant contract, independent cost analysis, and Record of Negotiation.
Submittal of Record of Negotiation is required only if proposed fees differ from the independent cost
analysis by more than 10%.
ADO
Concurrence in proposed engineering fees.
Engr
Conduct predesign conference. Provide at least two weeks notice to FAA, airport
tenants, airport users, and other interested parties.
Conference is normally conducted at 30% completion of plans and specifications, safety plan, engineer's
report.
z PRIOR TO SUBMITTAL OF 100% PLANS AND SPECIFICATIONS
9
e
0
R
R
0
0
IS
Page 2of4
PROJECT MANAGEMENT CHECKLIST
�, Na
r 75. Wit ,
.:r
tai �...��.':::.
Led... ', _
;.t• +�
. .. ...... ... _ _. .. ,. .....,... ...� ...,....:.. ,:: ,3�.'
E ��.�- xis T y
.. ,. ..-......... ... .... ......._ ....... _...... �. _. ...-.., .._.. _.. ..r... �: is 's ... .... .. ..... ._.. -... ,.._. .... .,. ,..... ..._. .- .'� . -..� ..r . :: is :�,�.:.. �•�.
:
-_ _ Yl � F • 3"• ��
Engr
Prepare "Operational Safety on Airports During Construction" plan (AC 150/5370-2C)
tailored to the specific project.
Engr
Obtain wage rates from appropriate local source.
Engr
Submit proposed modifications to Federal standards. Preparation and submittal of
proposed modifications shall be in accordance with FAA Order 5300.1 E, Item #8.
The specific number of document sets shall be established by ADO prior to submittal.
ADO
Coordinate proposed modifications to Federal standards with appropriate FAA
division(s).
Owner
NOTE: All modifications must be approved on a case-by-case basis.
ADO
Approve modifications to Federal standards within 30 days).
Owner
Submit proposed utility relocation.
ADO
An attorney's opinion is required stating that the airport owner is legally
ADO
and financially obligated to relocate the utilities in question.
ADO
Review and concurrence with Construction Management Plan
Engr
Complete plans and specifications in accordance with AC 150/5300-13, and other
applicable advisory circulars, and Federal standards.
COORDINATION OF PLANS AND SPECIFICATIONS
Engr
Submit Engineer's Report (separate, "stand-alone", bound document). Report shall
include, but is not limited to, cost estimates for total project costs (including
construction, design engineering, testing, construction management, and resident
inspection), pavement design (FAA Form 5100-1), testing data, and design
alternatives considered. If cost estimates reveal that total project costs are expected
to exceed originally identified funding levels (tentative allocation letter), the plans and
specifications must be prepared with deductible/alternative bid items to allow for the
award of com tete and usable units of work which match the TA letter funding levels .
Owner
Submit 100% plans and specifications for coordination with appropriate FAA divisions
(ATL -FPO, ASO -472, ASO -532, etc.). The specific number of plans and
specifications sets shall be established by the ADO prior to submittal.
ADO
Review plans and s ecifications
ADO
Approve plans andspecifications
Owner
Submit revised ALP
Page 3 of 4
PROJECT MANAGEMENT CHECKLIST
L -T: '_ sy' - )l .-q.a..'SYr.' �_? •�' .`'.�•-.. sy«p :jJii?� r'i•_ _ '- • _ - .
��C 'L3J a*`- ] :}' "xc �k�'a• *-�..y:i. ••v .:7. V$'• fx �i ,� � � r '<nr.:L.Lf�:$� f •�• ?fYi..a;' � i � is
. ...�. �'1. .�... ... ..- 4 ........ ..... ... .....�.:..T �..x...:... '�..7:.' .�Llx� �.C._ i. ._'1: - .->rr.:..:: f• -. Zl. - Y:~:'..
.. ....r ..... ..... i �.:. � ....... ... _f .... ..... ... ..... . _.. .. �. �• �:: Ti' :: Eve' .';�� � " :•i . _ ' U.
.I .'.x'3.. _... .... L .. .. - 1..... 1�.... �.... .. .e.... ,. ........ .. ;ia. .... .. -./ .x i H.7 .. �......al �... � .:.. - -I'...
.r.
'L
BID OPENING
Engr
Oen bids.
Engr
Determine low responsive bidder, in accordance with bid specifications and DBE
re uirements.
Owner
1 Submit DBE reporting forms to ASO -9 with copy to ADO.
APPLICATION FOR FEDERAL ASSISTANCE
ADO
Provide airport owner with updated Advisory Circular List
Engr
Submit certified bid tabulation with airport owner's intent to award.
Owner
Submit application package. The specific number of packages required shall be
established by ADO prior to submittal.
CONSTRUCTION MANAGEMENT PLAN
Engr
If project includes runway, taxiway and/or apron paving costs greater than or equal to
ADO
$250,000, submittal of a Construction Management Plan (CMP) is required.
ADO
Notice -To -Proceed shall not be authorized by the airport owner prior to completion and submittal of the
Owner
Construction Management Plan.
ADO
Construction Management Plan approval
GRANT OFFER
ADO
Prepare paper work for Phase 4 programming.
ADO
Verify and notate reservation of Federal funds.
ADO
Forward original and two 2 copies of grant offer to airport owner.
Owner
Submit executed original and one (1) executed copy of grant offer to ADO.
Airport owner must sign grant offer on or before expiration date. Airport owner's attorney must sign grant
offer on or after date of airport owner's signature.
ADO
Determination of proper grant execution.
ADO
Prepare paper work for Phase 5 programming.
ADO
Forward original executed grant offer to ASO -22.
Page 4 of 4
PROJECT MANAGEMENT CHECKLIST
,Y' s 'SYS:
::".�...� �., .;
.�.... -
r
•' �• I sr--+'�„ "S! a r ^••t�,.,.^""'•^• � a ?it7x x;-'--'-�•— yi'-•ems
^fi —•'„� �Y^+YaC-'.'—T ' �f.i :!- +rT=-�f";�':-.� SMS�.i^'-^+t;r:���`=g�i+'^�Y �r x� � '1°k T���• .?.x�',
�{
.r.. .. 4. ....: ..�:. :.... a'x�. .t-... . .... � r.. ..... a .� .� .fie., .. •. .:].... "..F.':%� '��<� _:�..�
i, !
� .... .. ...•
�
.r
.. rf ... ,. ...... .. a .r .. ... ... .1 •(%�" ,g �iA° s:� .-...^.i :....: •. .
1..[ x .. �. :.... ... .:,5::..-. X71 --Y"
...
- .. ..... ....... .. .. ... ... .. .. ..
PRECONSTRUCTION CONFERENCE
Owner
Establish date of preconstruction conference and notify FDOT, ADO, other
Owner
appropriate parties (airport users, airport tenants, etc.) at least two weeks prior to
ADO
meeting.
ADO
Notify appropriate FAA divisions.
Engr
Conduct preconstruction conference, with emphasis on "Safety During Construction
Plan."
CONSTRUCTION PHASE
Owner Change order submittals and approvals shall be accomplished in accordancewith the
attached guidance.
z PROJECT COMPLETION AND FINANCIAL CLOSEOUT
0
Owner
Provide two week notice to FAA, FDOT, and other appropriate agencies of scheduled
final inspection.
Owner
Complete construction.
ADO
Request closeout documents.
Owner
Submit requested documents
ADO
Close project.