HomeMy WebLinkAbout1990 04 17 - Access RoadsLINDAHL, BROWNING
FERRARI & HELLSTROM, INC.
CONSULTING ENGINEERS, PLANNERS & SURVEYORS
JUPITER • STUART • FORT PIERCE • VERO BEACH
1 RICHARD E. WILSON, P.E.
PROJECT MANAGER
10 CENTRAL PARKWAY, SUITE 420 2065 15TH AVENUE
STUART, FLORIDA 34994 VERO BEACH, FLORIDA 32960
(407) 286-3883 • (407) 746-2311 (407) 567-2156 • (407) 567-2065
LINDAHL, BROWNING, FERRARI & HELLSTROM, INC.
CONSULTING ENGINEERS, PLANNERS & SURVEYORS
2065 15TH AVENUE
VERO BEACH, FLORIDA 32960
(407) 567-2156 (407) 567-2065
0417901
April 17, 1990
David W. Fisher
Interim City Engineer
City of Sebastian
P.O. Box 780127
Sebastian, Florida 32978
RE: Engineering Evaluation and Preliminary
Cost Estimate - Chesser's Gap Police
Station Access Roads
Dear Mr. Fisher:
90-132
Thank you for the opportunity to provide professional engineering
services for the City of Sebastian. As detailed in the Notice to
Proceed dated April 12, 1990, Lindahl, Browning, Ferrari &
Hellstrom, Inc. has been retained to perform and provide the fol-
lowing:
1) Review the owner's proposed engineering design for the sub-
ject access roads and evaluate regarding whether appropriate
for the instant case.
Comment on alternative general engineering designs for same
that might be as or more appropriate.
2) Provide itemized preliminary cost estimate(s) for the con-
struction of each access road per the owner's proposed
design and for same pursuant to any alternative engineering
design(s) addressed in item #1 above.
With regard to the emergency access road, Mosby and Associates do
not at this time intend to design an access road. For this
reason, the access road will not be addressed within the scope of
this evaluation.
STUART
JUPITER
FT. PIERCE
VERO BEACH
Review and Evaluation
On Monday, April 16, 1990, I met with Randy Mosby, P.E. and Bruce
Moia at the Vero Beach office of Mosby and Associates, Inc. to
obtain preliminary engineering design information for the
proposed roadway improvements.
From the information available, it appears that the design for
Fleming Street consists of:
1) A deceleration and right turn lane on S.R. 512
2) Entrance median
3) 24 foot wide pavement section
4) Curb and gutter
5) 15-24 inch RCP storm sewer pipe and inlets
6) 8 inch PVC sanitary sewer
7) Water line(s)
8) Drives for parcels fronting on Fleming Street
The deceleration and turn lane improvements generally consist of
a deceleration taper in range of 180 lineal feet, a 12 foot wide
turn lane 75 to 100 feet in length, grading of the existing road-
side ditch to accommodate the lane addition and possibly replace-
ment of the existing 36 inch culvert.
The deceleration and right turn lane on S.R. 512 would be con-
sidered a requirements to provide a safe entry into the P.U.D.
Traffic volumes generated by the development during peak hours
could result in stacking on S.R. 512 without the lane. The con-
struction of the police station alone may not warrant the lane
addition. That determination would be based on a study of the an-
ticipated traffic generated by the proposed facility.
From the Dedication Agreement it is unclear which party, the
Dedicator or the City, is obligated to construct the S.R. 512 im-
provements at the intersection.
The entrance median is approximately 8 feet wide and 150 feet
long and is designed with a median curb. The median provides an
entrance feature and is noted in the Agreement.
The 24 foot wide pavement section will consist of 1 1/2 inches of
asphalt, 6 inches of base, and 8 inches of stabilized subgrade.
Given the function of the roadway as an access to the non-
residential parcels and ultimately as an entrance to the
remainder of the P.U.D. this section is appropriate.
The proposed plan include
The curb and gutter seems
Sion relative to the ov(
proposed 80 foot right o
modate a swale drainage s,
for the curb and gutter.
Fleming would require the
s a two foot curb and gutter section.
to be the result of a marketing deci-
rall appearance of the project. The
E way is more than adequate to accom-
,stem thereby eliminating the necessity
In addition, any future widening of
removal of the curb and gutter.
Conveyance of storm run-off will accomplished by the use of rein-
forced concrete pipe ranging in size from 15 inches to 24 inches
in diameter. The inlets would be located in the curb and gutter
section with the pipe running just outside the road above, future
widening would require the relocation of at least the inlets.
Any discussion of the storm sewer system must address provisions
for the stormwater management system, i.e. retention/ detention
lakes, quality treatment, and discharge structures. Mosby and As-
sociates, Inc. apparently have not included the subject parcel in
calculations for stormwater storage in the P.U.D. lake system.
What this means is that on-site storage will be required and dis-
charge to the proposed storm sewer pipe must be limited to pre -
development rates. Area must then be set aside for on-site
stormwater retention thus limiting the amount of previous area
that can be constructed. The net effect of the plan is that the
City may be asked to construct a section of a stormwater con-
veyance system that does not completely fulfill the requirements
of the parcel.
Sanitary sewer service will be provided via an eight inch PVC
gravity sewer. The sewer is to be located in the centerline of
Fleming Street at a depth of approximately ten feet. The depth is
the result of the lift station siting near the proposed site and
the distance to the upper end of the service area. The sanitary
sewer begins at a depth of four feet and slopes down to the lift
station. The longer the run, the deeper the line. Assuming that
the proposed site would be served by this line an adjustment to
the costs borne by the City to install the deepest section of
sewer may be appropriate.
The Owner has not finalized plans for water and fire service for
the P.U.D. Water lines would not be located within the pavement
section with the possible exception of service laterals. Instal-
lation of the water line(s) on the project side of the road would
reduce the need to cross the road with water lines.
In addition to the proposed site two entrances are planned from
the extension of Fleming Street to adjacent parcels. If the loca-
tion of the entrances is indeed set, the entrance provisions
should be included in the construction. The cost of the entrances
however, should be assumed by the Dedicator.
Alternative
The alternative to the proposed roadway plan consists of a 24
foot wide pavement section, stabilized shoulders and a swale
drainage system including inlets and pipe. The difference between
this alternative and the proposed plan is primarily the removal
of the curb and gutter and the use of the swales for drainage.
The advantages of the alternative section include:
1) Flexibility - The street can be widened without removal of
curb and gutter, inlets or pipe. The inlets and pipe can be
located nearer to the right of way lines to avoid any future
conflict with improvements.
2) Cost - The attached cost estimates reflect the savings.
3) Compatibility - The majority of the surroundings develop-
ments appear to utilize swale drainage.
4) Capacity - The swale section when used with inlets and pipe
provides greater stormwater holdings capacity than curb and
gutter. This can result in greater spacing between inlets
and a corresponding reduction in cost.
The disadvantages to the alternative are:
1) Maintenance - the swale sections would be grassed and would
therefore require maintenance, i.e, cutting, regrading of
washout areas, clogged culverts).
2) Driveways - Each driveway would require either a culvert or
a swale section in the drive to accommodate drainage flow.
3) Compatibility - The Chesser's Gap Project appears to include
the use of curb and gutter.
Conclusions
The road construction plans under development by Mosby and As-
sociates, Inc. are intended to ultimately serve the Chesser's Gap
P.U.D. The pavement section including turning lanes, entrance
median, curb and gutter; the depth of the sanitary sewer lines;
size and configuration of the adjacent parcels, are above and
beyond the requirements of "Parcel A" the proposed Police Station
site.
The minimum road requirements for access to the site are shown on
the following cost estimate for the alternate section. The
projected grading and paving costs are approximately $21,150.
The remaining items consisting of drainage structures, water dis-
tribution system, and sewage collection system are required for
the site to be served by the infrastructure improvements planned
for the Chesser's Gap P.U.D.
The questions that must be answered at this point are:
1) Is the City of Sebastian responsible for the utility im-
provements or just for the grading, paving and possibly
drainage improvements?
2) Is the City obligated to provide a pavement section com-
patible with the Chesser's Gap P.U.D. or should the
Dedicator bear the additional costs associated with the
planned improvements?
3) Is the site not included in the Chesser's Gap P.U.D. Surface
Water Management System? Is storage allocated in the lake
system for this site?
Upon clarification of these items, the City can establish the
true cost of the road improvements and also some of the site
development constraints with regard to retention/detention
facilities.
FLEMING STREET IMPROVEMENTS
Preliminary Estimate of Quantities
Item Estimated Unit Total
No Description Quantity Unit Price Price
1.Grading/Paving:
Rough Grading
1
LS
$2,:000.00
$2,000.00
8" Stabilized Sub -Grade
1400
SY
$2.50
$3,500.00
6" Base, Prime
1400
SY
$5.00
$7,000.00
1 1/2" Asphalt
1100
SY
$3.00
$3,300.00
Median Curb
310
LF
$8.00
$2,480.00
Curb & Gutter
1100
LF
$6.00
$6,600.00
Seed & Mulch
2800
SY
$0.50
$1,400.00
Total Grading/Paving:
3
EA
$300.00
$26,280.00
2.Drainage:
15" Diameter R.C.P.
24
LF
$16.00
$384.00
18" Diameter R.C.P.
30
LF
$19.00
$570.00
24" Diameter R.C.P.
275
LF
$24.00
$6,600.00
Inlets w/Grate
4
EA
$2,200.00
$81800.00
Total Drainage System:
$16,354.00
3.Water Distribution System:
8" Diameter P.V.C.
170
LF
$12.00
$2,040.00
Water Services
3
EA
$300.00
$900.00
8" G.V. & Box
2
EA
$500.00
$1,000.00
Fire hydrant
2
EA
$1,500.00
$3,000.00
Total Water Distribution System: $6,940.00
4.Sewage System:
8" Diameter P.V.C. 500 LF $19.00 $9,500.00
Sanitary Manholes 3 EA $1,500.00 $4,500.00
Sanitary Services 3 EA $300.00 $900.00
Total Sewage System: $14,9,00.00
TOTAL $64,474.00
S.R. 512 and FLEMING STREET INTERSECTION IMPROVEMENTS
1.Grading/Paving:
Rough Grading
1
LS
$500.00
$500.00
8" Stabilized Sub -Grade
375
SY
$2.50
$937.50
6" Base, Prime
375
SY
$5.00
$1,875.00
1 1/2" Asphalt
350
SY
$3.00
$1,050.00
Regrade Ditch
300
LF
$3.00
$900.00
Flush tieader.Curb
47
LF
$8.00
$376.00
Total Grading/Paving: $5,638.50
2.Drainage:
Culvert Replacement 100 LF "$30.00 $3,000.00
Rip -Rap Endwall 1 LS $500.00 $500.00
Total Drainage System: $3,500.00
TOTAL $9,138.50
FLEMING STREET
Preliminary
Item
No Description
IMPROVEMENTS (ALTERNATE)
Estimate of Quantities
Estimated Unit
Quantity Unit Price
Total
Price
1.Grading/Paving:
Rough Grading
1
LS
$2,000.00
$2,000.00
8" Stabilized Sub -Grade
1900
SY
$2.50
$4,750.00
6" Base, Prime
1400
SY
$5.00
$7,000.00
1 1/2" Asphalt
1300
SY
$3.00
$3,900.00
Swale Grade
1400
SY
$1.50
$2,100.00
Seed & Mulch
2800
SY
$0.50
$1,400.00
Total Grading/Paving:
$21,150.00
2.Drainage:
15" Diameter R.C.P.
24
LF
$16.00
$384.00
18" Diameter R.C.P.
80
LF
$19.00
$1,520.00
24" Diameter R.C.P.
170
LF
$24.00
$4,080.00
Inlets w/Grate
2
EA
$2,200.00
$4,400.00
Total Drainage System:
$10,384.00
3.Water Distribution System:
8" Diameter P.V.C.
170
LF
$12.00
$2,040.00
Water Services
3
EA
$300.00
$900.00
8" G.V. & Box
2
EA
$500.00
$1,000.00
Fire Hydrant
2
EA
$1,500.00
$3,000.00
Total Water Distribution
System:
$6,940.00
4.Sewage System:
8" Diameter P.V.C.
500
LF
$19.00
$9,500.00
Sanitary Manholes
3
EA
$1,500.00
$4,500.00
Sanitary Services
3
EA
$300.00
$900.00
Total Sewage System:
$14,900.00
TOTAL
$53,374.00
ACCESS EASEMENT DRIVEWAY IMPROVEMENTS
Preliminary Estimate of Quantities
Item Estimated Unit Total
No Description Quantity Unit Price Price
1.Grading/Paving:
Rough Grading
1
LS
$1,500.00
$1,500.00
8" Stabilized Sub -Grade
1000
SY
$2.50
$2,500.00
6" Base, Prime
1000
SY
$5.00
$5,000.00
Curb/Gutter
800
LF
$8.00
$6,400.00
1 1/2" Asphalt
930
SY
$3.00
$2,790.00
Fill
200
SY
$1.50
$300.00
Flush Header Curb
47
LF
$8.00
$376.00
Total Grading/Paving: $18,866.00
2.Drainage:
18" Diameter R.C.P. 200 LF $19.00 $3,800.00
30" Diameter R.C.P. 50 LF $30.00 $1,500.00
Rip -Rap Endwalls 1 LS $500.00 $500.00
Inlets 2 EA $2,200.00 $4,400.00
Total Drainage System: $10,200.00
TOTAL $29,066.00
v
ACCESS EASEMENT DRIVEWAY IMPROVEMENTS (ALTERNATE)
Preliminary Estimate of Quantities
Item Estimated Unit Total
No Description Quantity Unit Price Price
1.Grading/Paving:
Rough Grading
1
LS
$1,500.00
$1,500.00
8" Stabilized Sub -Grade
1000
SY
$2.50
$2,500.00
611 Base, Prime
1000
SY
$5.00
$5,000.00
Swale
800
LF
$5.00
$4,000.00
Fill
200
SY
$1.50
$300.00
1 1/2" Asphalt
930
SY
$3.00
$2,790.00
Total Grading/Paving:
$16,090.00
2.Drainage:
36" Diameter R.C.P.
50
LF
$30.00
$1,500.00
Rip -Rap Endwalls
1
LS
$500.00
$500.00
Total Drainage System: $2,000.00