RE: Chesser Gap PUD
After reviewing the revised coi
Chesser's Gap Commercial PUD submitted on
the following are my comments:
Hector Franco
En®ureenn(j/Hublrc Works
January 21, 1987
) Applicant to provide as per section 20A -4.1"A) a
vie-ini.ty map drawn to scale which clearly shows the
site in r.elcitionship to its surroundings.
2) Conceptual Plan needs to be completed as per Section
20A-4.12 (c). All the existing conditions as described
in this article shall be on drawings.
3) Development Plan as per section 20A-4.12 (D) needs
to address the total site summary showing data of all
proposed use and proposed intensity use. Articles 1,
3 and 5 need to be addressed in more detail.
i
4) An estimate of the overall parking requirementslis not
shown on the revised plans.
5) The written material as presented seems to comply wi.ttl
existing city land development code. No additional
comments are required.
6) Data on written report in reference to site No. 2
Library Institutional/Commer.cial shows discrepancy
with data presented on the plan. This discrepancy
needs to be corrected.
7) Applicant shall comply with Section 20A-4.6 (F').
8) As per section 20A -4.6(K), the Planning and Zoning
Board or the City Council have the right to request
screening to minimize impact on potentially objectionable
areas.
. 0
(z)
As a summary, the overall C_hesser's Gap Conceptual Plan
is correct and can be approved once these minor changes
are done.
This office has received no written comments from the
Mayor's office or the City Attorney. The Building Officials
comments are attached.
L. Gene Harris
Mayor
Cit.) of Sebastian
POST OFFICE BOX 127 ❑ SEBASTIAN, FLORIDA 32958-0127
TELEPHONE (305) 589-5330
January 22, 1987
TO: Planning and Zoning
FROM; Hector A. Franco
Engineering/Public Works
RE: Chesser Gap PUD
After reviewing the revised co
Chesser's Gap Commercial .PUD submitted on January
the following are my comments:
Hector Franco
Engineering/Public Works
21, 1987
Applicant to provide as per section 20A-4.1JUA) a
vicinity map drawn to scale which clearly shows the
site in relationship to its surroundings.
Conceptual Plan needs to be completed as per Section
20A-4.12 (c). All the existing conditions as described
in this article shall be on drawings.
Development Plan as per section 20A-4.12 (D) needs
to address the total site summary showing data of all
proposed use and proposed intensity use. Articles 1,
3 and (�) nee,d/ to be addressed in% more detail. J
v • 1 rM•�i'��N yi,.G� 4t� r.3'W4a�'� rz'..
4) An estimate of the(overall parking requirements is not
shown on the revised plans.
5) The written material as presented seems to comply with
existing city land development code. No additional
comments are required.
6) Data on written report in reference to site No. 2
Library Institutional/Commercial shows discrepancy
with data presented on the plan. This discrepancy
needs to be corrected.
7) Applicant shall comply with Section 20A-4.6 (F).
8) As per section 20A -4.6(K), the Planning and Zoning
Board or the City Council have the right to request
screening to minimize impact on potentially objectionable
areas.
(2)
As a summary, the overall Chesser's Cap Conceptual Plan
is correct and can be approved once these minor changes
are done.
This office has received no written comments from the
Mayor's office or the City Attorney. The Building Officials
comments are attached.