QUEST FOR PROPOSAL.
GOLF COURSE RENOVATION
PREPARED BY
CITY OF SEBASTIAN GENERAL SERVICES ADMINISTRATOR
IN COOPERATION WITH
CITY OF SEBASTIAN GOLF COURSE DIRECTOR
CONTACT:
Mr. Paul L. Wagner, General Services Administrator 561-388-8241
SEPTEMBER 2000
REQUEST FOR PROPOSAL (RFP)
REQUEST FOR PROPOSAL ARE HEREBY SOLICITED FOR A LICENSED
CONTRACTOR TO PERFORM "GOLF COURSE RENOVATION" AT THE
CITY OF SEBASTIAN MUNICIPAL GOLF COURSE. PROPOSALS WILL
BE ACCEPTED BY THE CITY OF SEBASTIAN, 1225 MAIN STREET,
SEBASTIAN, FLORIDA 32958, UNTIL 2:00 P.M. ON WEDNESDAY,
OCTOBER 25, 2000. PROPOSAL(S) MUST BE SEALED IN
ENVELOPES AND MARKED AS FOLLOWS:
RFP: GOLF COURSE RENOVATION
DEADLINE: OCTOBER 25,2000, @ 2:00 P.M.
The Contractor shall be able to be properly licensed, and shall
show proof of insurance to conduct its business, with all licenses,
permits, and certificates as required by all local, State of
Florida, Federal agencies. Contractor must be capable of obtaining
the appropriate licenses and certificates in the City of Sebastian.
Any Proposal received without Proof of Contractor's License, Public
Entity Crime Form, Drug Free Workplace Form, Proof of Insurance,and
Bid Bond in the amount of 50 of the bid amount, may be considered
incomplete and immediately disqualified. Any person or affiliate
who has been placed on the convicted vendor list following
conviction for a public entity crime may not submit a RFP as
proscribed by Section 287.133, F.S.
This project does have a liquidated damages clause of $250.00 per
day, and requires a payment and performance bond as stipulated in
the bidding documents.
Questions concerning this project should be directed to the General
Services Administrator 561-388-8241.
There is a mandatory pre -submittal conference scheduled for,
Monday, October 16, 2000, @ 2:00 P.M., at the City Municipal Golf
Course, 101 East Airport Drive, Sebastian, Fl. Attendance is
mandatory for all respondents.
Proposals duly submitted will be publicly opened and read aloud at
date and time specified above, in City Hall. The City reserves
the right to reject any and all Proposals, or to accept any
Proposal or portion thereof deemed to be in the best interest of
the City, and to waive any non -substantial irregularities.
BY: Paul L. Wagner
General Services Administrator
City of Sebastian
INGOLF 1
CITY OF SEBASTIAN - RFP
Golf Course Renovation
TABLE OF CONTENTS
1. REQUEST FOR PROPOSAL ADVERTISEMENT
2. INSTRUCTIONS FOR BIDDERS
3. a) DRUG FREE WORKPLACE FORM
b) PUBLIC ENTITY CRIMES FORM
4. BID BOND FORM
5. PAYMENT BOND FORM
6. PERFORMANCE BOND FORM
7. GENERAL SCOPE OF WORK
8. DETAIL SCOPE OF WORK "HOLE BY HOLE"
9. EVALUATION FORM
IMPORTANT NOTICE TO BIDDERS! r r 1 r
SUBMIT FIVE (5) SETS OF THE PROPOSAL AS FOLLOWS:
1. BID PROPOSAL PRICE, ALONG WITH YOUR PROPOSAL OF WORK, INCLUDING INFORMATION
ABOUT YOUR FIRM SUFFICIENT TO ANSWER THE FACTORS ON THE ENCLOSED
"EVALUATION FORM", AND ALL OTHER INFORMATION CALLED FOR OR RELATIVE TO THE
RFP.
2. LIST OF SUBCONTRACTORS, IF ANY
3. REFERENCES INCLUDING ADDRESS AND PHONE NUMBER TO CONTACT
4. PROOF OF INSURANCE AS REQUIRED IN THE INSTRUCTIONS FOR BIDDERS
5. PROOF OF LICENSES
6. DRUG FREE WORKPLACE FORM EXECUTED
7. PUBLIC ENTITY CRIMES FORM EXECUTED
8. BID BOND
FAIL URE TO SUBMIT THE ABOVE MAY SUBJECT YO UR PROPOSAL TO REJECTION. READ ALL OF THE RFP
DOCUMENTS PROVIDED AND THEN SUBMIT YO UR PROPOSAL ACCORDINGLY.
CONIOOLF.WPD
CITY OF SEBASTIAN
INSTRUCTIONS FOR BIDDERS
NOTE: THE USE OF THE WORD(S) BID, REQUEST FOR PROPOSAL, RFP, & PROPOSAL SHALL
HAVE THE SAME MEANING.
PRE-BID CONFERENCE
A mandatory pre-bid conference shall be held at the City Municipal Golf Course, at the time and date specified
in the Request For Proposal advertisement.. All prospective bidders are required to attend this conference.
Questions concerning the project or bid requirements may be addressed at that time.
2. REQUIRED COPIES
Five (5) sets of Proposals shall be submitted , including any other forms, proofs, and documents as required.
3. SEALED BIDS
Bids shall be enclosed in a sealed envelope which shall show (lower left comer) the name of the Bid, and the date
and time of opening. The envelope shall also show the name and address of the Bidder. The Bid shall be submitted
as stipulated in the RFP.
4. BIDS NOT CONSIDERED
Late Bids, telegraphed or faxed Bids and bids which do not conform to the instructions contained in the
Request for Proposal. Bids may be withdrawn by fax or telegraph provided that such notices are received prior
to the date and time specified in the RFP.
5. BID OPENING
Bidders are welcome to attend the bid opening; however, attendance is not mandatory. Opening of the
Bids will commence at the date and time specified in the Notice Of Invitation To Bid, and publicly read
aloud, providing one or more Bidders are in attendance. The Purchasing Agent or his designee shall be
present at all Bid openings.
6. BID EXAMINATION
Bid files may be examined during normal working hours, ten (10) days after bid opening, by appointment only,
by contacting the City Clerk's office at 561-589-5330.
7. REQUIRED INFORMATION
Bidders shall follow all instructions and provide all information requested. Bidders wishing to qualify
all or any portion of the bid shall provide a hand printed or typed explanation on the bid or separate
attachment to be submitted with the bid.
Instructions Page 1 of 5
8. ACCEPTABLE BIDS
Bid proposals shall be typewritten or filled in with ink. Any erasures or corrections must be initialed by
the Bidder in ink.
9. NEW EQUIPMENT AND MATERIALS
Prices shown on the bids must be prices for new equipment and materials, and the successful bidder
shall warrant same for a period of not less than one (1) year from the installation date.
10. SALES TAX
Although the City of Sebastian is exempt from Federal and State Sales and Use taxes, Contractors or
Vendors doing business with the City are not exempted from paying said taxes to their supplier for
goods or services purchased to fulfill the contractual obligations with the City, nor shall any Contractor
or Vendor be authorized to use the City's Tax Exemption Number in securing such materials.
11. CONFLICT OF INTEREST
Contract Award is subject to provisions of State Statutes and City Ordinances. All Bidders must
disclose with their bid the name of any officer, director, or agent who is also an employee of the City
of Sebastian; further, all Bidders must disclose the name of any City employee who owns, directly or
indirectly, an interest of ten percent (101/o) or more in the Bidder's fern or any of its branches.
Should the successful Bidder permanently or temporarily hire any City employee who is, or has been,
directly involved with the Bidder prior to or during performance of the resulting contract, the Agreement
shall be subject to immediate termination by the City.
12. LICENSING, CERTIFICATION, AND/OR REGISTRATION
Contractors must show their current Contractors license. Prior to start of work, if the Bidder is a State
Certified General Contractor, the Bidder must be registered with the City of Sebastian; if the Bidder is
a State Registered General Contractor, then the Bidder must hold a Competency Card with the City.
In any event, the Contractor shall contact the Administrative Assistant at the Building Department 561-
589-5518 and insure compliance with all City ordinances, rules and regulations, including Building
Permits if required. Lack of knowledge by the Bidder shall in no way be a cause for relief from
responsibility. Failure to comply with the above may result in the rejection of the Bid.
Two (2) copies of any licence, or certification as required shall be submitted with the bidding
documents.
A certificate, letter, or similar must be obtained from the City's Building Department, & is required on
this project prior to execution of a contract, & should be submitted to the Purchasing & Contract
Administrator with any payment/performance bonds which may be required. In essence, this authorizes
Instructions Page 2 of 5
you to perform work in the City of Sebastian. Any Sub-Contractor(s) must also be certified.
13. CORRECTIONS. CANCELLATION, & WITHDRAWAL
A. Bidders may be asked to provide further information after bid opening to determine the
responsibility of the vendor.
B. Waiver of Technicality; Information shall not be considered after the bid opening if it has been
specifically requested to be provided with the bid and becomes a matter of responsiveness. The
bid shall be considered responsive if it substantially conforms to the requirements of the
Invitation to Bid The City may waive any informality, technicality, or irregularity on any bid.
A minor or non -substantive lack of conformity may be considered a technicality or irregularity
which may be waived by the City.
C. Mathematical errors; Errors in extension of unit prices or in mathematical calculations may be
corrected. In cases of errors in mathematical computations, the unit prices shall not be changed.
D. Cancellation or postponement; The Purchasing & Contract Administrator may cancel or
postpone the bid opening or cancel the Invitation to Bid in its entirety.
E. Withdrawal; Prior to any published bid opening date and time, a bidder may withdraw his or
her bid in writing. A fax is permitted for this purpose, provided a confirming telecon is made.
F. Amendments; Prior to any published bid opening date and time, a bidder may amend the bid
provided that it is in writing, in a sealed envelope, and identified.
14. AVAILABILITY OF FUNDS
The obligations of the City of Sebastian under this award are subject to the availability of funds lawfully
appropriated for its purpose by the City Council of the City of Sebastian.
15. PUBLIC ENTITY CRIMES
Any person or firm submitting a bid in response to this invitation must execute the attached SWORN
STATEMENT UNDER SECTION 287.133, FLORIDA STATUTES, PUBLIC ENTITY CRIMES,
including proper check(s) in the space(s) provided, and enclose it with said bid.
16. DRUG-FREE WORKPLACE
The Drug -Free Workplace form, as attached hereto, shall be submitted with the bidding documents.
17. BID GUARANTEE
The Bidder warrants that the unit prices, terms, and conditions quoted in the bid will be firm
for acceptance for a period of not less than sixty (60) days from the bid opening date. Such prices will
Instructions Page 3 of 5
remain firm for the period of performance of resulting purchase orders or contracts which are to be
performed.
18. BID BOND
A Bid Bond equal to five percent (5%) of the bid amount shall be required on this project, and must
be submitted along with the five (5) copies of the Bid, failure to do so will automatically disqualify the
Bid . Unsuccessful bidders shall be entitled to return of surety after final award of bid. A successful
bidder shall forfeit the amount of its security upon failure on his part to execute a agreement within ten
(10) days after receipt of a proposed agreement from the City unless the time for executing the
agreement is extended by the City.
19. PAYMENT AND PERFORMANCE BONDS
A Payment and Performance Bond equal to one hundred percent (1001/6) of the Agreement price
shall be required on this project, and shall be provided by the successful bidder at the stipulated time
of the execution of the agreement, failure to do so shall cause said bidder to be in default and forfeit
his Bid Bond in its entirety. (Sample Forms are provided for information purposes.)
NOTE: BID BOND AND PAYMENT AND PERFORMANCE BOND REQUIREMENTS:
The bond (s) shall be provided by a surety company authorized to do business in the State of Florida,
and approved by the City Manager and City Attorney. In lieu of a bond(s) the contractor may furnish
as security in favor of the City a certified check, a cashiers check or an irrevocable letter of credit.
The check or letter of credit shall be drawn on or issued by a bank authorized to do business in the State
of Florida. The form of the check or letter of credit must be approved by the City Manager and City
Attorney.
Attorneys -in -fact who sign Bonds must file with each bond a certified and effective dated copy of their
Power- of Attorney. Surety companies executing Bonds must appear on the Treasury Department's
most current list (Circular 570 as amended), and be authorized to transact business in the State of
Florida.
20. LIQUIDATED DAMAGES
The City shall be entitled to liquidated damages in the amount of two hundred fifty Dollars ($250.00)
per day for every day that the Contractor is late in completing the work as stipulated in the agreement,
and bidding documents. Said damages shall be deducted by the City from monies due Contractor.
21. INSURANCE
All bidders shall submit evidence of insurance as follows; Auto Liability, Workers Compensation, and
General Liability. Cost for all insurance shall be born by the bidder. All insurance shall be acceptable
to the City in its sole discretion.
Instructions Page 4 of 5
22. BID AWARD
A RFP is a formal invitation from an organization to a supplier to submitt an offer. The offer is to
provide a solution to a problem or a need the the organization has identified. An RFP is a procurement
process in which the judgment of the supplier's experience, qualifications and solution may take
precedence over price. Hence, award will be made accordingly, however, price will be a major
consideration.
23. REJECTION OF BIDS
The City reserves the right to reject any and all Bids, to waive any and all informalities not involving
price, time, or changes in the work, and to negotiate contract terms with the successful Bidder, and the
right to disregard all non -conforming, non-responsive, imbalanced, or conditional Bids. More than one
Bid from an individual, firm or association under same or different names, will not be considered. Any
or all Bids will be rejected if there is reason to believe that collusion exists among the Bidders, and no
participants in such collusion will be considered in future proposals for the same work.
24. REFERENCES
References are required and must be submitted with your proposal. Failure to submit references
as required may disqualify your Bid. Name and phone number to contact shall be included.
25. LIST OF SUB -CONTRACTORS
A list of Sub -Contractors is required and must be submitted with the Bid proposal. Failure to submit
a list of Sub -Contractors may disqualify your Bid.
26. CO-OPERATIVE PURCHASING
It is the intent of the Notice of Invitation to Bid to secure goods or services to be used by the City of
Sebastian. However, by virtue of bidding, the Bidder accepts the right of other Government Entities to
"piggyback" purchase from this proposal by mutual consent. Any such purchase shall be separate and
apart from the City of Sebastian, and said City assumes no liability for such action.
27. DISCRIMINATION
The Bidder/Contractor shall not practice or condone personnel or supplier discrimination of any nature
whatsoever, in any manner proscribed by Federal or State of Florida laws and regulations.
28. PROPOSAL COST
The City Shall not pay for any cost associated with the RFP process, including interviews if required.
INSGOLF.WPD
Instructions Page 5 of 5
DRUG-FREE WORKPLACE FORM
The undersigned Contractor, in accordance with Florida Statute 287.087 hereby certifies
does:
Publish a statement notifying employees that the unlawful manufacture, distribution,
dispensing, possession, or use of a controlled substance is prohibited in the workplace and
specifying the actions that will be taken against employees for violations of such prohibition.
2. Inform employees about the dangers of drug abuse in the workplace, the business' policy of
maintaining a drug free workplace, any available drug counseling, rehabilitation, employee
assistance programs and the penalties that may be imposed upon employees for drug abuse
violations.
Give each employee engaged in providing the commodities or contractual services that are
under bid a copy of the statement specified in Paragraph 1.
4. In the statement specified in Paragraph 1, notify the employees that, as a condition of
working on the commodities or contractual services that the employee will abide by the
terms of the statement and will notify the employer of any conviction of, or plea of guilty
or nolo contendere to any violation of Chapter 1893 or of any controlled substance law of
the United States or any state, for a violation occurring in the workplace no later than five
(5) days after such conviction.
5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or
rehabilitation program if such is available in the employee's community, by any employee
who is so convicted.
6. Make a good faith effort to continue to maintain a drug free workplace through
implementation of Paragraph 1 through 5.
As the person authorized to sign this statement, I certify that this firm complies fully with
the above requirements.
Date:
Signature
A PURCHASING WPD.
PUBLIC ENTITY CRIMES
Any person submitting a quote, bid, or proposal in response to this invitation or Agreement,
must execute the enclosed form sworn statement under section 287.133(3)(a), FLORID
STATUTES, ON PUBLIC ENTITY CRMffiS, including proper check(s), in the space(s) provided,
and enclose it with his quote, bid, or proposal. If you are submitting a quote, bid or proposal on
behalf of dealers or suppliers who will ship commodities and receive payment from the resulting
Agreement, it is your responsibility to see that copy(ies) of the form are executed by them and are
included with your quote, bid, or proposal. Corrections to the form will not be allowed after the
quote, bid, or proposal opening time and date. Failure to complete this form in every detail and
submit it with your quote, bid, or proposal may result in immediate disqualification of your bid or
proposal.
The 1989 Florida Legislature passed Senate Bill 458 creating Sections 287.132 - 133,
Florida Statutes, effective July 1, 1989. Section 287.132(3)(d), Florida Statutes, requires the
Florida Department of General Services to maintain and make available to other political entities
a "convicted vendor" list consisting of persons and affiliates who are disqualified from public and
purchasing process because they have been found guilty of a public entity crime. A public entity
crime is described by Section 287.133, Florida Statutes, as a violation of any State or Federal law
by a person with respect to and directly related to the transaction of business with any public entity
in Florida or with an agency or political subdivision of any other state or with the United States,
including, but not limited to, any bid or Agreement for goods or services to be provided to any
public entity or with an agency or political subdivision and involving antitrust, fraud, theft, bribery,
collusion, racketeering, conspiracy, or material misrepresentation.
By law no public entity shall accept any bid from, award any Agreement to, or transact any
business in excess of the threshold amount provided in Section 287.017, Florida Statutes, for
category two (currently $10,000) with any person or affiliate on the convicted vendor list for a
period of 36 months from the date that person or affiliate was placed on the convicted vendor list
unless that person or affiliate has been removed from the list pursuant to Section 287.133(3)(f),
Florida Statutes.
Therefore, effective October 1, 1990, prior to entering into an Agreement (formal
Agreement or purchase order) in excess of the threshold amount of $10,000 to provide goods or
services to THE CITY OF SEBASTIAN, a person shall file a sworn statement with the
Contract/Agreement officer or Purchasing Director, as applicable. The attached statement or
affidavit will be the form to be utilized and must be properly signed in the presence of a notary
public or other officer authorized to administer oaths and properly executed.
A PURCHASING WPD.
THE INCLUSION OF THE SWORN STATEMENT OR AFFIDAVIT SHALL BE
SUBMITTED CONCURRENTLY WITH YOUR QUOTE OR BID DOCUMENTS. NON-
INCLUSION OF THIS DOCUMENT MAY NECESSITATE REJECTION OF YOUR
QUOTE OR BID.
SWORN STATEMENT UNDER SECTION 287.133(3)(a),
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR
OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS.
This sworn statement is submitted with Bid, Proposal or Agreement No.
for THE CITY OF SEBASTIAN.
2. This sworn statement is submitted by
(name of entity submitting sworn statement) whose business address is
and (if applicable) its Federal
Employer Identification (FEIN) is (If the entity has no FEIN,
include the Social Security Number of the individual signing this sworn statement:
3. My name is (please print name of
individual signing) and my relationship to the entity named above is
4. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florid
Statutes, means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or with the United States, including, but not limited to, any bid
or Agreement for goods or services to be provided to any public entity or an agency or
political subdivision of any other state or of the United States and involving antitrust, fraud,
theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation.
5. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida
Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought
by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or
entry of a plea of guilty or nolo contendere.
6. I understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means:
(1) A predecessor or successor of a person convicted of a public entity crime; or
(2) An entity under the control of any natural person who is active in the management of
A PURCHASING WPD.
the entity and who has been convicted of a public entity crime. The term "affiliate"
includes those officers, directors, executives, partners, shareholders, employees,
members, and agents who are active in the management of an affiliate. The ownership
by one person of shares constituting a controlling interest in another person, or a
pooling of equipment or income among persons when not for fair market value under
an arm's length agreement, shall be a prima facie case that one person controls another
person. A person who knowingly enters into a joint venture with a person who has
been convicted of a public entity crime in Florida during the preceding 36 months shall
be considered an affiliate.
7. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means
any natural person or entity organized under the laws of any state or of the United States with
the legal power to enter into a binding Agreement and which bids or applies to bid on
Agreements for the provision of goods or services let by a public entity, or which otherwise
transacts or applies to transact business with a public entity. The term "person" includes
those officers, directors, executives, partners, shareholders, employees, members, and agents
who are active in management of an entity.
8. Based on information and belief, the statement which I have marked below is true in relation
to the entity submitting this sworn statement. (Please indicate which statement applies.)
Neither the entity submitting this sworn statement, nor any officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in
management of the entity, nor any affiliate of the entity have been charged with and convicted
of a public entity crime subsequent to July 1, 1989.
The entity submitting this sworn statement, or one or more of the officers, directors,
executives, partners, shareholders, employees, members or agents who are active in
management of the entity, or an affiliate of the entity has been charged with and convicted of
a public entity crime subsequent to July 1, 1989, AND (Please indicate which additional
statement applies.)
There has been a proceeding concerning the conviction before a hearing officer of the
State of Florida, Division of Administrative Hearings. The final order entered by the hearing
officer did not place the person or affiliate on the convicted vendor list. (Please attach a copy
of the final order.)
The person or affiliate was placed on the convicted vendor list. There has been a
subsequent proceeding before a hearing officer of the State of Florida, Division of
Administrative Hearings. The final order entered by the hearing officer determined that it was
in the public interest to remove the person or affiliate from the convicted vendor list. (Please
attach a copy of the final order.)
A PURCHASING WPD.
The person or affiliate has not been placed on the convicted vendor fist. (Please
describe any action taken by or pending with the Department of General Services.)
(Signature)
Date:
STATE OF FLORIDA
COUNTY OF
The foregoing instrument was acknowledged before me this day of , 2000
by
has produced
A PURCHASING WPD.
(title) on behalf of
(name of partnership), a partnership. He/she is personally known to me or
as identification and did ( ) did not ( ) take an oath.
Name:
My Commission Expires:
Commission Number:
BID BOND
(This form provided by City of Sebastian as an example of the form of bond; the actual bond
form must conform to the standards required by Florida Statutes)
KNOWNALL MEN BY THESE PRESENTS, that, we the undersigned,
as Bidder, and
as Surety, are hereby held and firmly bound unto the City of Sebastian, Florida, in the penal sum of
five (5%) percent of the Total Bid Amount which is $ for payment of
which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and
assigns.
Signed this day of , 2000.
The Condition of the above obligation is such that whereas the Bidder has submitted to the City of
Sebastian a certain BID, attached hereto and hereby made a part of hereof to enter into a contract in
writing, for GOLF COURSE RENOVATION.
NOW THEREFORE,
(a) If said BID shall be rejected, or
(b) If said BID shall be accepted and the Bidder shall execute and deliver a contract in the form
of Agreement attached hereto (property completed in accordance with said BID) and shall
furnish a Performance Bond for faithful performance of said contract, and Payment Bond for
the payment of all persons performing labor, furnishing materials in connection herewith, and
shall in all other respects perform the agreement created by the acceptance of said BID, then
this obligation shall be void, otherwise the same shall remain in force and effect; it being
expressly understood and agreed that the liability of the Surety of any and all claims hereunder
shall, in no event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety
and its Bid Bond shall be in no way impaired or affected by an extension of the time within
which the City of Sebastian may accept such Bid; and said Surety does hereby waive notice
of any such extension.
PAGE 1 OF 2
IN WITNESS WHEREOF, the Bidder and the Surety have hereunto set their hands and seals, and such of them
as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their
property officers, the day and year first set forth above.
Bidder Name
Printed or Typed
IN
Bidder - Authorized Signature
Surety
Printed or Typed
IM
Bidder - Authorized Signature
Bidder - Printed or typed Name and Title Surety - Printed or Typed Name and Title
IMPORTANT: Surety companies executing BONDS must appear on the Treasury Department's most
current list (Circular 570 as amended) and be authorized to transact business in the State of Florida.
PAGE 2 OF 2
A.Bid Bond.WPD -5/28/97
PAYMENT BOND
(This form provided by City of Sebastian as an example of the form of bond; the actual bond
form must conform to the standards required by Florida Statues)
KNOW ALL PERSONS BY THESE PRESENTS: that
a
(Name of Contractor)
(Address of Contractor)
(Corporation, Partnership, or Individual)
(Name of Surety)
hereinafter called PRINCIPAL, and
hereinafter called SURETY, are held firmly bound unto the City of Sebastian, Florida, whose address
shall be known as "City of Sebastian City Hall, 1225 Main Street, Sebastian, Florida 32958", and unto
all persons, firms and corporations who or which may furnish labor, or who furnish materials to
perform as described under the Contract and to their successors and assigns in the total aggregate
penal sum of 100% of the Contract amount equivalent to
Dollars
(Written amount of Contract)
($ ) in lawful money of the United States, for the payment of which sum well
and truly be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns,
jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the PRINCIPAL, entered into
a certain contract with the City of Sebastian, dated the day of , 2000, a copy
of which is hereto attached and made part hereof for CALF COURSE RENOVATION.
NOW THEREFORE, if the PRINCIPAL shall promptly make payment to all persons, firms, and
corporations furnishing materials for or performing labor in the prosecution of the WORK provided
for in such contract, and any authorized extensions or modification thereof, including all amount due
for materials, lubricants, oil, gasoline, diesel fuel, electricity, repair on machinery, equipment and
tools, consumed or used in connection with the construction of such WORK, and for all labor cost
incurred in such WORK including that by a SUBCONTRACTOR, and to any mechanic or
SCOPE OF WORK
SEBASTIAN GOLF COURSE
RENOVATION PROJECT — JUNE THROUGH SEPTEMBER 2801
Construction Starting Time
Construction is to begin on June 1, 2001. Completion to be 120 calendar days
thereafter. Penalties apply for any completion date after 120 calendar days.
Equipment
All equipment necessary for performance shall be on the project site and approved
before work will be permitted to begin. All equipment shall be equipped with super
flotation tires.
Responsibility of Contractor
The contractor shall be responsible for delivering necessary quantities of
fertilizers, lime, tif--dwarf Bermuda grass sprigs, fumigants, and furnishing all machinery,
equipment and personnel necessary for compliance with scope of work.
Excavation of Green Sites
Contractor will strip existing grass of greens and reconfigured green sites using a
mechanical sod cutter. Contractor will haul the stripped grass to an on-site location.
Contractor will excavate green site and re -configured green site locations to a depth of 16
to 20 inches. Contractor will haul soil to an on-site location. Complete earthwork,
compact and shape reconfigured green sites. Bring sub -surface to final smooth sub -
grade.
Drainage
All green sites will have drainage, herringbone construction. Drainage lines will
be 6 inches wide, a minimum of 8 inches deep, and must be cut into a thoroughly
compacted sub -grade so that drainage lines slope uniformly. Contractor will remove dirt
from the trenches and make sure floor of trench is clean and smooth. Main drainage lines
must be a minimum of four inches. Contractor will place lateral lines approximately 10
feet apart and extend to the perimeter of the green. Contractor will install main drainage
line to properly dispose of drainage waters away from normal play areas. Contractor will
place a layer of gravel in trench before placing PVC drainage pipe in trench. Contractor
will place drainage pipe on gravel bed with holes facing down. Contractor will design
trench so a minimum positive slope of 0.5% is created. Contractor will backfill trench
once drainage pipe is installed with additional gravel.
Intermediate Layers
Once drainage has been installed, Contractor will re-establish contours.
Contractor will cover entire sub -grade with pea gravel or crushed stone to a minimum
thickness of 4 inches. Establish intermediate layer. Particles must be between Imm and
4mm and entire thickness of intermediate layer must be between 2 inches and 4 inches_
Intermediate layer is not necessary.
WITNESS WHEREOF, this instrument is executed in counterparts, each of which
shall be deemed an original, this the day of , 2000.
ATTEST:
(SEAL)
(Principal Secretary)
(Witness as to Principal)
(Address)
ATTEST:
(Witness as to Surety)
(Address)
(Principal)
By:
(Signature)
(Printed Name and Title)
(Address)
(Surety Typed or Printed)
(Attorney -in Fact Signature)
(Printed Name and Title)
(Address)
Note: Date of Bond must not be prior to date of the Agreement.
If Contractor is a partnership, all partners should execute the Bond.
IMPORTANT: SURETY COMPANIES EXECUTING BONDS MUST APPEAR ON THE TREASURY
DEPARTMENT'S MOST CURRENT LIST (CIRCULAR 570 AS AMENDED) AND BE AUTHORIZED TO
TRANSACT BUSINESS IN THE STATE OF FLORIDA.
A -Performance Bond.wpd -5/28/97
3
PROVIDED, FURTHER, that the said SURETY, for value received hereby stipulates and agrees that no change,
extension of time, alteration or addition to the terms of the contract or to WORK to be performed thereunder or
the SPECIFICATIONS accompanying same shall in any way affect its obligation on this BOND, and it does
hereby waive notice of any such changes, extension of time, alteration or addition to the terms of contract or to
the WORK or to the SPECIFICATIONS.
PROVIDED, FURTHER, that it is expressly agreed that the BOND shall be deemed amended, automatically and
immediately, without formal and separate amendments hereto, upon amendment to the Contract not increasing
the contract price more than 20 percent, so as to bind the PRINCIPAL and the SURETY to the full and faithful
performance of the contract as so amended, the term "Amendment", wherever used in this BOND, and whether
referring to this BOND, the Contract or the Loan Documents shall include any alteration, addition, extension,
or modification of any character whatsoever.
PROVIDED, FURTHER, that no final settlement between the City of Sebastian and the PRINCIPAL shall
abridge the right of the other beneficiary hereunder, whose claim may be unsatisfied. The City is the only
beneficiary hereunder.
IN WITNESS WHEREOF, this instrument is executed in counterparts, each of which shall be deemed an
original, this the day of , 2000.
ATTEST:
(Principal) Secretary
(SEAL)
(Witness as to Principal)
(Principal)
By:
Signature
Printed Name & Title
Address
PROVIDED, FURTHER, that no final settlement between the CITY and the CONTRACTOR shall abridge the
right of any beneficiary hereunder, whose claim may be unsatisfied.
A:Perfonnance Bond.wpd -5/28/97
2
PERFORMANCE BOND
(This form provided by City of Sebastian as an example of the form of bond; the actual bond
form must conform to the standards required by Florida Statues)
KNOWN ALL PERSONS BY THESE PRESENTS: that
(Name of Contractor)
(Address of Contractor)
a
, hereinafter called Principal and
(Corporation, Partnership or Individual)
(Name of Surety)
(Address of Surety)
hereinafter called Surety, are held and finnly bound unto the City of Sebastian, Florida, whose address shall be
known as "City of Sebastian City Hall, 1225 Main Street, Sebastian, Florida 32958, in the total aggregate penal
sum of 100% of the contract amount equivalent to
Dollars
(written amount of contract)
(numerical amount)
in lawful money of the United States, for the payment of which sum well and truly to be made, we bind
ourselves, our heirs, executors, administrators, successors, and assigns jointly and severally firmly by these
presents.
THE CONDITION OF THIS OBLIGATION is such that whereas, the Principal entered into a certain Agreement
with the City of Sebastian, dated the day of , 2000, a copy of which is hereto attached and
made a part hereof, for GOLF COURSE RENOVATION.
NOW THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings,
covenants, terms, conditions, and agreements of said contracts during the original term thereof, and any
extension thereof which may be granted by the City of Sebastian, with or without notice to the SURETY and
during the one year guaranty period and if the
PRINCIPAL shall satisfy all claims and demands incurred under such contract, and shall fully indemnify and
save harmless the City from all costs and damages which it may suffer by reason of failure to do so, and shall
reimburse and repay the City for all costs which it may incur in making good any default, then this obligation
shall be void, otherwise to remain in full force and effect.
A-Perfonnance Bondwpd -5/28/97
materialman lien holder whether it acquires its lien by operation of State or Federal law; then this
obligation shall be void, otherwise to remain in full force and effect.
PROVIDED, that beneficiaries or claimants hereunder shall be limited to the SUBCONTRACTORS,
and persons, firms, and corporations having a direct contract with the PRINCIPAL or its
SUBCONTRACTORS.
PROVIDED, FURTHER, that the said SURETY for value received hereby stipulates and agrees that
no change, extension of time, alteration or addition to the terms of the contract or to the WORK to
be performed thereunder or the SPECIFICATIONS accompanying the same shall in any way effect
its obligation on this BOND, and it does hereby waive notice of any such change, extension of time,
alteration or addition to the terms of this contract or to the WORK or to the SPECIFICATIONS.
PROVIDED, FURTHER, that no suit or action shall be commenced hereunder by any claimant: (a)
Unless claimant, other than one having a direct contract with the PRINCIPAL shall have given
written notice to any two of the following: The PRINCIPAL, the CITY, or the SURETY above
named, within ninety (90) days after such claimant did or performed the last of the work or labor,
or furnished the last of the materials for which said claim is made, stating with substantial accuracy
the amount claimed and the name of the party to whom the materials were furnished, or for whom
the work or labor was done or performed. Such notice shall be served by mailing the same by
registered mail or certified mail, postage prepaid, in an envelope address to the PRINCIPAL, CITY,
or SURETY, at any place where an office is regularly maintained for the transaction of business, or
served in any manner in which legal process may be served in the State of Florida save that such
service need not be made by a public officer. (b) After the expiration of the one (1) year following
the date on which PRINCIPAL ceased work on said CONTRACT, it being understood, however,
that if any limitation embodied in the BOND is prohibited by any law controlling the construction
hereof, such limitation shall be deemed to be amended so as to be equal to the minimum period of
limitation permitted by such law controlling the construction hereof.
PROVIDED, FURTHER, that it is expressly agreed that this BOND shall be deemed amended
automatically and immediately, without formal and separate amendments hereto, upon amendment
to the Contract not increasing the contract price more that 20 percent, so as to bind the PRINCIPAL
and the SURETY to the full and faithful performance of the Contract as so amended. The term
"Amendment", where ever used in this BOND and whether referring to this BOND, the contract or
the Loan Documents shall include any alteration, addition, extension or modification of any character
whatsoever. THIS SPACE LEFT BLANK INTENTIONALLY, CONTINUED NEXT PAGE.
2
(Address)
ATTEST:
(Witness to Surety)
(Address)
(Surety Typed or Printed)
By:
(Attorney -in -Fact (Signature)
Printed Name and Title
(Address)
Note: Date of Bond must not be prior to date of Agreement. If the Contractor is a partnership, all
partners should execute the Bond.
IMPORTANT: SURETY COMPANIES EXECUTING BONDS MUST APPEAR ON THE TREASURY
DEPARTMENT'S MOST CURRENT LIST (CIRCULAR 570 AS AMENDED) AND BE AUTHORIZED TO
TRANSACT BUSINESS IN THE STATE OF FLORIDA.
3
GENERAL SCOPE OF WORK
USGA Root Zone Mix
After intermediate layer is established, 12 inches of USGA-approved root zone
mix shall be applied. Root zone shall be a 90%/10% mix and must be tested by
independent laboratory to insure conformity to USGA mix standards. Compact root zone
mix and keep moist.
Sterilization/Fumigation
The putting surfaces and approximately 4 feet beyond all putting surfaces,
including the practice green, shall be sterilized with Methyl Bromide applied under
plastic covers in accordance with the manufacturers recommendations at the rate of not
less than one pound Methyl Bromide per every one hundred square feet area. Covers
shall be in place a minimum of 24 hours. The greens must ventilate for at least 24 hours
after the covers are removed. Depending on cleanliness of USGA root zone mix,
sterilization/fumigation may not be necessary.
Irrigation
Install new irrigation heads to ensure adequate coverage around putting surfaces
and surrounding areas. Install one quick coupler around each putting surface in a low -
traffic area decided upon by Head Golf Professional and Head Superintendent.
Fertilizing/Liming
All putting surfaces and surrounding areas to be grassed shall be fertilized
immediately ahead of the grassing (sprigging) operation with approximately 50 pounds of
Dolomite and 25 pounds of 10-10-10 fertilizer per 1,000 square feet of surface. This will
be applied with a walk -behind broadcast spreader. All dolomite and fertilizer must
conform to applicable laws and regulations. It must be manufactured from quality
materials, be free from impurities, meet standards for effectiveness and be free flowing
and suitable for applications. Soil pH must be in 6.0 to 6.5 range.
Final Grade
See grading plans. After final grade, putting surfaces shall be constructed so that
the surface will be visible from the point where shot is to be played. All grades shall be
drawn out with long, sweeping slopes in order to reduce maintenance costs, playability,
and creation of a natural condition. All final grades must meet approval from Head Golf
Professional and Head Golf Course Superintendent.
Sprigging
Tifdwarf Bermuda grass shall be used on the greens and Tifway (419) Bermuda
grass shall be used on green banks, slopes, etc. All grass, sprigs or sod, shall be certified
and shall be free of weeds and other varieties of Bermuda grass. Tifdwarf Bermuda
grass shall be planted on the putting surfaces at a rate of 30 bushels per one thousand
(1,000) square feet. All sprigs shall be delivered to the site as soon as practical after
harvest at the nursery, kept watered, sheltered from the sun and planted as soon as
practical. A bushel is defined as one (1) yard of dense mature turf at the time of harvest
and without significant loss of sprigs during harvest. Sprigs should be an average of four
(4) inches in length and carry at least two (2) nodes. Sprigs may be harvested with a
mechanical sod cutter and shredded with a mechanical grinder, or it may be harvested by
machinery which in one continuous operation separates the sprigs from the soil, shreds
sprigs and loads them onto a truck or trailer. Sprigs must not be exposed to wind and sun
for any length of time after removal from the soil. Harvesting and planting operations
must be synchronized with not more than twenty-four (24) hours elapsing between the
start of harvesting and planting. The same circumstances shall apply for sprigging green
banks and slopes with 419 Bermuda.
Planting
Planting on the green shall be accomplished by manually broadcasting grass
sprigs and promptly embedding them with self-propelled disc planters of an approved
type which leaves no wheel tracks. If necessary, to produce a moist seedbed, Golf
Course Superintendent will irrigate before planting. After planting, Golf Course
Superintendent will apply a heavy irrigation adequate to "seal" the surface of the soil and
to thoroughly moisten the soil to a depth of at least six (6) inches. Thereafter, the Golf
Course Superintendent will irrigate frequently, keeping the surface moist for at least 10
days following planting.
Survival Warranty
The contractor shall be responsible for producing an average survival rate of at
least 8 sprigs per square foot on putting green surfaces. Survival shall be evidenced by
new leaf growth, and a survival count shall be made within fifteen (15) days of planting.
Contractor shall re -prepare and replant, at Contractor's expense, isolated areas having
less than six (6) -surviving sprigs per square foot. As soon as sprigged areas have met the
previously mentioned survival warranty, the Head Golf Professional and Head Golf
Course Superintendent will grant acceptance to the Contractor, which will relieve the
Contractor of any further responsibility regarding the sprigs.
Green -side Bunkers
See greenside bunker plans regarding scope of work for each specific bunker.
According to greenside bunker plans, Contractor will eliminate certain bunkers, decrease
certain bunkers in size, and will renovate all other greenside bunkers. Regarding bunker
renovation, all greenside bunkers shall have new drainage installed which entails creation
of six- (6) inch wide trench the length of bunker. Trench will then extend out of bunker
and will be directed to a body of water or to an area not to be considered in the normal
course of play. Four- (4) inch drainage pipe shall then be placed in trench. Pea gravel
shall then be placed in trench, covering drainage pipe. Contractor will then re -grade
subgrade of bunker, with Head Golf Professional and Head Golf Course superintendent
approving subgrade. All subgrade must have a slight uphill slope, with the highest part
of slope being on putting green side of bunker. Bunker faces shall be re -shaped as
needed, to make bunker more golfer and maintenance friendly. Contractor shall sod (419
Bermuda) areas where bunker faces were altered. Contractor will add at least four
(inches) of bunker sand and smooth. As previously mentioned, bunker plans will show a
more detailed description of what to do with each individual bunker.
Clean -Up / Site Restoration
At the completion of all work shown on the scope of work, the Contractor shall
remove all stakes, tools equipment, debris, plastic covers, paper bags, etc. from the site.
The contractor shall repair areas that may have been disturbed by his operations, and
leave the affected areas of site in equal to or better than pre -construction condition. Site
restoration shall be approved by the Head Golf Professional.
DETAIL SCOPE OF WORK
HOLE BY HOLE
SEBASTIAN GOLF COURSE RENOVATION PROJECT
DETAILED SCOPE OF WORK
HOLE -BY -HOLE
#1 A) Eliminate bunker behind green.
B) Decrease size of left bunker approx. 18 x 28 feet from west side of bunker,
Reduce size of bunker face on east side approx. 6 feet in height.
C) Enlarge green approx. 22 feet from right or east side of green.
D) Add new bunker, approx. 35 feet by 35 feet at front right of green.
E) Overall green slope — flat in middle(plateau), tapering off each side with
gentle, sweeping slopes.
E) Increase front of green 20 feet
F) Overall green(only) size is presently 55 x 66 feet.
#2 A) Left bunker — reduce size of bunker face 10 feet.
B) Right bunker — reduce size of bunker face 8 feet.
C) Entire dimension of green -expand approx. 4 feet.
D) Green slope — raise front portion of green to level with rest of green. Overall
slope — left to right — gentle, sweeping slope towards water.
E) Overall green size is presently 71 x 72 feet.
#3 A) Entire dimensions of green -expand 5 feet.
B) Green slope — gentle, sweeping slope favoring left to right.
C) Present green size — 75 x 67 feet.
#4 A) Front bunker -reduce size of bunker face 8 feet.
B) Expand back of green 22 feet.
C) Expand left side of green 20 feet.
D) Expand front of green 0 feet.
E) Green slope — relatively flat, with gentle, sweeping undulations.
F) Expand right side of green 5 feet.
G) Present green size- 90 x 64 feet
H) Right bunker — reduce back lip, 4 feet.
#5 A) Expand front of green 0 feet.
B) Expand back left portion of green 12 feet.
C) Green slope — gentle, sweeping slope back to front.
D) Present green size 98 x 35 feet.
E) Expand right side of green 5 feet.
F) Eliminate 43 x 16 feet of front of left bunker.
G) Reduce bunker lips (left and right bunker) 5 feet.
#6 A) Expand front of green 10 feet.
B) Reduce size of right bunker face 6 feet.
C) Green slope- three (3) tiered green, sloping back to front, gentle slope.
D) Present green size is 88 x 82 feet.
#7 A) Expand entire green dimension 5 feet.
B) Raise elevation of green 3 - 5 feet.
C) Green slope — plateau, gentle, sweeping slope coming off of plateau.
D) Eliminate extreme left bunker 50 x 45
E) Reduce size of left bunker 0 feet.
F) Reduce size of front bunker 42 x 38 feet from front location.
G) Reduce size of back bunker 8 feet, by reducing back bunker lip.
H) Reduce front bunker lip by 8 feet.
I) Present green size — 60 x 92 feet.
#8 A) Reduce size of front bunker 5 feet, by reducing front lip.
B) Reduce size of left bunker 6 feet, by reducing back bunker lip.
C) Elevate green 4 feet, if possible.
D) Increase back of green 10 feet.
E) Increase front of green 0 feet.
F) Increase left and right side of green 5 feet.
G) Slope -gentle sweeping slope, left to right, two (2) tiered layout.
H) Expand front left portion of green 20 feet.
1) Present green size is 102 x 56 feet.
#9 A) Replace fairway bunker to original dimensions of 76 x 30 feet.
B) Decrease size of front bunker 4 feet, by reducing front lip.
C) Eliminate left fairway bunker across cart path 120 x 65
D) Decrease size of back bunker 20 feet.
E) Increase overall green dimensions 5 feet.
F) Present green size — 54 x 123 feet.
#10 A) Present green size is 74 x 45
B) Reduce bunker lips on front middle and front left 6 feet.
C) Reduce back bunker 5 feet from south side(back of green)
D) Increase front of green 5 feet.
E) Increase left of green 8 feet.
F) Increase right of green 5 feet.
G) Increase back of green 15 feet.
H) Gentle, sweeping slope back to front.
#11 A) Present green size is 82 X 94
B) Reduce front right bunker 25 X 51
C) Two (2) tiered green, gentle slope back to front.
D) Reduce front right bunker lip 3-5 feet.
#12 A) Present green size is 109 x 46
B) Reduce front right bunker 15 x 15 feet
C) Reduce front right bunker lip 6 feet
D) Increase right side of green 6 feet
E) Increase left side of green 5 feet
F) Increase right back of green 12 feet, with curvature favoring right side
G) Two-tiered green, gentle slope.
#13 A) Present green size is 83 x 85
B) Replace left fairway bunker to original dimensions of 66 x 52
C) Reduce front left bunker 26 x 33
D) Reduce front left bunker lip 5 feet
E) Increase overall green size 6 feet
F) Reduce right bunker lip 3 to 5 feet
#14 A) Present green size is 86 x 78
B) Eliminate left bunker next to 66 x 52 left greenside bunker
C) Increase back of green 16 feet
D) Two tiered green, gentle slope, back tier sloped toward back of green
E) Front tier generally flat
#15 A)
Present green size is 62 x 82
B)
Reduce front right bunker lip 3 to 5 feet
C)
Reduce left bunker lip 3 to 5 feet
D)
Reduce back bunker 10 x 51
E)
Increase back of green 18 to 20 feet
F)
Gentle sweeping slope, right to left
#16 A) Present green size is 104 x 66
B) Reduce right greenside bunker lip 5 to 7 feet
C) Reduce mounding around left side of green
D) Increase overall green size 6 feet.
E) Gentle slope, front to back sweeping toward right side
#17 A) Present green size is 64 x 84
B) Eliminate front bunker in front of greenside front bunker (34 x 28)
C) Reduce front bunker lip 10 feet
D) Reduce size of left bunker 28 x 26 feet
E) Reduce right bunker lip 3 to 5 feet
F) Increase overall green size by 6 feet
G) Gentle, sweeping slope.
H) Reduce size of front bunker 20 x 17
#18 A)
Present green size is 83 x 62
B)
Reduce left bunker lip 4 — 6 feet
Q
Increase front of green 20 feet
D)
Increase left side of green 6 feet
E)
Reduce front bunker lip 6 feet
F)
Gentle, sweeping slope back to front.
Practice Green
A) Present size is 130 x 50
B) Dimensions stay approx. the same
Q Move chipping area of green (52 X 32) toward west.
D) To make room for chipping area, extend north side of green 52 x 32
E) Gentle, sweeping slope throughout green
CITY OF SEBASTIAN - RFP
Golf Course Renovation
EVALUATION FORM
FIRM NAME:
RATING DONE BY:
FACTORS TO BE RATED:
1. COST
2. CAPABILITIES, REFERENCES, PAST RECORD,
EXPERIENCE, SPECIAL RESOURCES.
3. ANTICIPATED RAPPORT & COMPATIBILITY
WITH THE FIRM, OVERALL PRESENTATION
AND/OR IMPRESSION OF THE FIRM.
EVN.GOLF.ArM
97.1 r
POINTS
AVAILABLE
50
25
25
TOTAL
TOTAL
AWARD
Office of General Services Administrator
(A DI VISION OF THE OFFICE OF THE CITY MANAGER)
1225 MAIN STREET - SEBASTIAN, FLORIDA 32958
TELEPHONE (561) 388 - 8241 FAX (561-581-0149
ADDEINDUMI 0
GOLF COURSE RENOVATION
DATE: October 16, 2000
TO: All Bidders
This Addendum is an integral part of the bid ('RFP") package under consideration by
you as a Bidder. The City of Sebastian deems all sealed proposals to have been proffered
in recognition of the entire RFP package - including all issued addenda.
Should you have any question pertaining to this Addendum please contact me at the above
address and/or phone number.
ADDENDUM MESSAGE
Liquidated Damages is hereby changed to $2,500 per day.
2. Contractor must secure Insurance prior to start of work in the amount and type as
stated in the Agreement Document.
3. °Golf Course Renovation Agreement' document is hereby incorporated and made a
part of the RFP document(s).
4. The page entitled "Revised (Addendum #1)' is a replacement page for the one
contained in General Scope of Work section, and is herewith submitted.
Paul Wagner, Gener ervices Administrator
Authorized Signature Receipt Acknowledgement Firm Name
ADDGOLF.WPO
Date
REVISED (ADDENDUM ¢#1)
practical. A bushel is defined as one (1) yard of dense mature turf at the time of harvest
and without significant loss of sprigs during harvest. Sprigs should be an average of four
(4) inches in length and carry at least two (2) nodes. Sprigs may be harvested. with a
mechanical sod cutter and shredded with a mechanical grinder, or it may be harvested by
machinery which in one continuous operation separates the sprigs from the soil, shreds
sprigs and loads them onto a truck or trailer. Sprigs must not be exposed to wind and sun
for any length of time after removal from the soil. Harvesting and planting operations
must be. synchronized with not more than twenty-four (24) hours elapsing between the
start of harvesting and placating. The same circumstances shall apply for sprigging green
banks and slopes with 419 Bermuda.
Planting
Planting on the green shall be accomplished by manually broadcasting grass
sprigs and promptly embedding them with self-propelled disc planters of an approved
type which leaves no wheel tracks. If necessary, to produce a moist seedbed, Golf
Course Superintendent will irrigate before planting. After planting, Golf Course
Superintendent will apply a heavy irrigation adequate to "seal" the surface of the soil and
to thoroughly moisten the soil to a depth of at least six (6) inches. Thereafter, the Golf
Course Superintendent will irrigate frequently, keeping the surface moist for at least 10
days following planting. The contractor will actively monitor initial. "sealing" and
irrigation of sprigs. The contractor will concur that "sealing" and irrigation is adequate.
Survival Warranty
The contractor shall be responsible for producing an average survival rate of at
least S sprigs per square foot on putting green surfaces. Survival shall be evidenced by
new leaf growth, and a survival count shall be made within fifteen (15) days of planting.
Contractor shall re -prepare and replant, at Contractor's expense, isolated areas having
less than six (6) -surviving sprigs per square foot. As soon as sprigged areas have met the
previously mentioned survival warranty, the Head Golf Professional and Head Golf
Course Superintendent will grant acceptance to the Contractor, which will relieve the
Contractor of any further responsibility regarding the sprigs.
Green -side Bunkers
See greenside bunker plans regarding scope of work for each specific bunker.
According to greenside bunker plans, Contractor will eliminate certain bunkers, decrease
certain bunkers in size, and will renovate all other greenside bunkers. Regarding bunker
renovation, all greenside bunkers shall have new drainage installed which entails creation
of six- (6) inch wide trench the length of bunker. Trench will them extend out of bunker
and will be directed to a body of water or to an area not to be considered in the normal
course of play. Four- (4) inch drainage pipe shall then be placed in trench. Pea gravel
shall then be placed in trench, covering drainage pipe. Contractor will then re -grade
subgrade of bunker, with Head Golf Professional and Head Golf Course superintendent
approving subgrade. All subgrade must have a slight uphill slope, with the highest part
of slope being on putting green side of bunker. Bunker faces shall be re -shaped as
Office of General Services Administrator
0 DIVISION OF TRE OFFICE OF THE CITY AUNAGER)
1225 MAIN STREET - SEBASTIAN. FLORIDA 32958
TELEPHONE (561) 388 - 8241 FAX (561-581-0149
ADDENDUM N
GOLF COURSE RENOVATION
DATE: November 2, 2000
TO: All Bidders
This Addendum is an integral part of the bid ("RFP") package under consideration by
you as a Bidder. The City of Sebastian deems all sealed proposals to have been proffered
in recognition of the entire RFP package - including all issued addenda.
Should you have any question pertaining to this Addendum please contact me at the above
address and/or phone number.
ADDENDUM MESSAGE
The Addendum Message includes this page and the attached two (2) pages.
2. In order for your Proposal to be accepted, you must sign and fill out as indicated
below, and submitt with your Proposal this executed Addendum.
Paul Wagner, Gen Services Administrator
Authorized Signature Receipt Acknowledgement Firm Name
Printed Name As Signed Above
ADDGOLF.WPD
Date
Sebastian Municipal Golf Course
Addendum Additions to Golf Course Renovation Project
1. Reference Scope of Work, Paragraph 1 entitled "Construction Starting Time" should
read as follows: Construction is to begin on May 215`, 2001. On this date, Contractor
will begin renovation of first nine holes. Completion to be 132 calendar days
thereafter. Liquidated damages apply for any completion date after 132 calendar
days.
2. Reference Scope of Work, Paragraph 1 entitled "Sprigging" should have the
following added: The Contractor shall plan construction schedules so as to have all
nineteen (19) greens sprigged by July 23`d, 2001.
3. Reference Scope of Work, Paragraph 1 entitled "Intermediate Layer" should read as
follows: The intermediate layer will not be used.
4. Reference Scope of Work, Paragraph 1 entitled "Equipment" should read as follows:
The Head Golf Professional shall approve all equipment used by the contractor. Any
cart path damaged by the Contractor, will be repaired by the Contractor at the
Contractor's expense.
5. Reference Scope of Work, Paragraph 1 entitled "Irrigation" should read as follows:
Existing irrigation heads will be used around the greens, however, to ensure adequate
irrigation coverage, one (1) additional irrigation head and one (1) quick coupler shall
be added around each green. The location of the quick coupler will be decided upon
be the Head Golf Professional. The Contractor will not be responsible for irrigation
and hydraulic line breakage.
6. Reference Scope of Work, Paragraph 1 entitled "USGA Root Zone Mix" should read
as follows: Root zone mix shall consist of 80%/20% Canadian Peat Mix. The mix
will be applied at twelve inches (12) and must be tested by an independent laboratory
to insure conformity to USGA mix standards. Root zone mix must be compacted and
kept moist.
7. Reference Scope of Work, Paragraph 1 entitled "Sterilization/Fumigation should read
as follows: Sterilization/Fumigation will be necessary.
8. Reference Scope of Work, Paragraph 1 entitled "Green -Side Bunkers" should include
the following: The square footage of the bunkers to be renovated is 60,180 square
feet. Bunker renovation entails stripping sod on bunker faces, lowering faces/lips,
and replacing/adding sod in bunkers which are already determined in detailed scope
of work. Other renovation needs for all bunkers listed in Detailed Scope of Work
include adding drainage (see Scope of Work) and adding four (4) inches of new sand
(also specified in Scope of Work).
9. Reference Detailed Scope of Work, the total square footage of all nineteen (19)
greens and collars to be renovated is 128,172 square feet.
10. Reference Detailed Scope of Work, hole number six (6), letter "C" should read:
green slope — two (2) tiered green, sloping back to front, gentle sweeping slope.
11. Reference Detailed Scope of Work, hole number seven (7), letter "B" should read:
raise elevation of green slope one and a half (1.5) feet.
12. Reference Detailed Scope of Work, hole number eight (8), letter "C" should read:
green shall not be elevated, however, water draining onto green from back left
mounding must be addressed.
13. Reference Detailed Scope of Work, hole number nine (9), letter "C" should read:
eliminate right fairway bunker located across cart path. Dimension of bunker:
120 x 65.
14. Reference Detailed Scope of Work, hole number fifteen (15), should include:
Eliminate fust fairway bunker on left side of fairway.
15. Liquidated Damages referred to in Addendum 41 is hereby changed to that which is
stated in the Golf Course Renovation Agreement document.
16. Include in your proposal a Bid Proposal Amount stated as a "lump sum" amount for
the entire job.
17. Where stated "Head Golf CourseSuperintendent" shall be changed to "Head Golf
Professional", or "Project Manager".
18. The Request For Proposal, Golf Course Renovation deadline is hereby changed to,
Monday, November 13", 2000 at 2:00 P.M. The location remains the same. Any
Proposal received late shall be rejected.