Loading...
HomeMy WebLinkAbout1991 09 09 - Engineer Project 91-167 Support DocsMOSBY AND ASSOCIATES, INC. CONSULTING ENGINEERS 1507 20TH STREET P.O. BOX 6368 VERO BEACH, FLORIDA ^-o 407-569-0035 September 9, 1991 Mr. Hank Fischer Fischer & Sons, Inc. P. O. Box 780068 Sebastian, Florida 32978-0068 Subject: Chesser.'s Gap Sebastian, Florida Engineer's Project No. 91-167 Dear Mr. Fischer: As discussed on the telephone today, enclosed are copies of correspondence documenting our transmittals of the construction drawings for the subject project to Indian -River County Public Works Department for their review. Also attached is a copy of the Right -of -Way permit for construction within the Right -of -Way of CR512 and a copy of a memo to file documenting our traffic engineers telephone discussions with Indian River County estab- lishing the County's criteria for the traffic study. If you should have any further questions, please call. Very r ly C n L. Mo RL :nb Enc. :E. I6o7 20TH sTR yr HAND CARRIED'`'' , P.O. BOX 636 VERO BEACH. FLORID 961 711/27/90 407-569-003b Indian River 1£340 — 25th Street._._.__._._.__.__----- iero Beach, Florida SENDING YOU ® Attached ❑ Under separate cover via ❑ Shop drawings Copy of letter DATE I NO. ATTENTION Bill Meager RE: Chesser's Gap NO. 90-413 the following items: ® Prints O Plans ❑ Samples ❑ Specifications ❑ Change order ggpermit aPDlication DESCRIPTION ;_/27/90 I.R.C. Right -of -Way Permit Application 1-/27/90 sets Signed and sealed site plan drawings Traffic Maintenance Plan FE TRANSMITTED as checked below: ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US IF Bruce A. Moia, Proj.Eng. SIGNED: 11 enc 05 •rs not of noted. Aiodly notify us of once. K ❑ Approved as submitted xl For approval ❑ Approved as noted ❑ For your use As requested ❑ Returned for corrections 'Jl For review and comment ❑ FOR BIDS DUE 19 .,i:S ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US IF Bruce A. Moia, Proj.Eng. SIGNED: 11 enc 05 •rs not of noted. Aiodly notify us of once. K .4 DATE 05/03/91 INDIAN RIVER COUNTY RIGHT OF WAY PERMIT • R.O.W. PERMIT NO. 10 -163 - APPLICANT Sebastian General Partnership Name P.O. Box 780068, Sebastian, FL 32978-0068 (407) 589-3159 Address Phone No. CONTRACTOR Unknoim Name Address Phone No. LOCATION OF WORK C. R. 512 Street Address Chesser's Gan Lot / Block / Subdivision / Unit DESCRIPTION OF WORK Roadway Connection ------------------------------------------------------------------------------ TYPE PERMIT TYPE UTILITY CONSTRUCTION X Driveway" Cable TV Street Paving Electricity Underground Sidewalks/Curbs Telephone Storm Drainage.., Right -of -Way. Overhead Water Systems Clearing Sanitary Sewer Other ----------------------------------------------------------- 7 ----------------- NOTE: 1. Detaile(3 drawing shall be submitted with each application. 2. This permit is issued subject to all conditions on reverse side of this application...- 3. pplication...- 3. A signature by the contractor shall be construed as making the contractor personally liable for all permit conditions unleES contractor attaches written proof of authorization to act on behalf of the applicant. 4. All work is subject -to final inspection by The Engineering Division./ Call 561-8000, ext. .283 to schedule'ins� tions. PERMIT IS TO BE DISPLAYED ON JOB SITE CONTROL is `�------� FDOT TRAFFIC • required Applicant/ ontrector Henry Fischer ---------------=---------7------7------------------------------------------- f OFFICE USE ONLY Canplies with Thoroughfare Plan - Yes No DRAINAGEr Approved Not Approved PERMIT FEE .0"» Revised 11/86 Remarks 72 hJur notification is requ prior to work within CR 512 right-of-way. Issuing Officer May 7, 1991 Date Issued r nr-AJnU-P���[� ,- INC.CONSULTING E � /5orzor"STREET - puBOX 6uso HAND CARRIED vcnoBEACH. FLORIDA ooes, 407'569'0035 O ���������l������lOT���/3U � u=u=������ou u �y����uuueuuu�yuxuuu uuuu= 03/27/91 ATTENTION Indian River Co ~Bill Meager 1840- 25th Street ....... - ./ezm Beach,Florida32960' | ��«ys�e���v� Gap �'ID|N8 YOU R9 Attached [] Under separate cover via. �] Shop drawings 129 Prints [] Plans � Copy of letter [] Change order [] ° .°o 9l -l76 the following Items: []Samples []Specifications RAN3W|TTEDuochecked below: `orupprovo| [] Approved ansubmitted `-ryour use [] Approved mmnoted �a requested [] Returned for corrections '�r,eviowand comment [] 2|D9DUE 1Q___-- []Reuubm|t_--___copieofor approval []Qubmit-____-copieofor distribution [] Return -corrected prints OPRINTS RETURNED AFTER LOAN TOUS SIGNED: Bruce A. Moia, Proj. Eng. ^en"="°are not ","*eo.^mdty.~,(y us*once 0 DESCRIPTION .16/911 Revised C.R. 512 Improvement Plans - Signed & Sealed RAN3W|TTEDuochecked below: `orupprovo| [] Approved ansubmitted `-ryour use [] Approved mmnoted �a requested [] Returned for corrections '�r,eviowand comment [] 2|D9DUE 1Q___-- []Reuubm|t_--___copieofor approval []Qubmit-____-copieofor distribution [] Return -corrected prints OPRINTS RETURNED AFTER LOAN TOUS SIGNED: Bruce A. Moia, Proj. Eng. ^en"="°are not ","*eo.^mdty.~,(y us*once MOSBY AND ASSOCI S, INC. CONSULTING ENOINEE D CARRIED 1 507 20TH STREET P.O. BOX 6368 VERO BEACH, FLORIDA 32961 407-569-0035 "' gineerin Dept. 1840 25th Street pro Beach, Fl L IEE (01F U Mz2RZ1Nt10UUL SENDING YOU El Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Copy of letter :0 Prints ❑ Plans ❑ Change order ❑ ❑ Samples ❑ Specifications OArE NO. DESCRIPTION Sets Revised Right -Of -Way Plans Per Comment Letter Dated April 2, 1991 (sat. no. 20, 21 & 24) TRANSMITTED as checked below: For approval ❑ Approved as submitted .-or your use ❑ Approved as noted >.s requested ❑ Returned for corrections :or review and comment ❑ =•DR BIDS DUE 19 ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US SIGNED: — 11 snalajut #S, Is nal as nota a, Ylnaly naIlly 1~111 an•a Bruce Moia "eieohone:(407)567-8000 April 2, 1991 BO OF COUNTY COMMISSIffRS 840 25th Street, Vero Beach, Florida 329 Mr. Bruce Moia, Project Engineer Mosby and Associates, Inc. 1507 20th Street P.O. Box 6368 Vero Beach, Florida 32960 SUBJECT: Chesser's Gap - CR 512 Improvements Dear Bruce: Svncom Telephone: 224-1011 In reviewing the plans dated March 26, 1991 of the CR 512 Improvements at Chesser's Gap, please consider: 1) The design speed of CR 512 is 55 MPH, which requires a 24' clear zone. "The straight end section "shown on the S.W. and N.E. ends of the proposed 36" R.C.P. should be changed to a mitered end section. 2) A 4' wide paved shoulder should be added along the east edge of the right turn lane. 3) The County will overlay the existing lanes of CR 512 along the project frontage. Use traffic paint and not thermoplastic for pavement markings. ,i 4) What type curb and gutter is proposed? 5; Show solid sod in County right-of-way. 6) Show typical section along widening. We only received Sheet 24. 7) A County Right -of -Way Permit is required prior to construction. ease contact me if you have any questions. =rely, �s W. Davis, P.E. is Works Director .ip ?oger D. Cain, P.E., County Engineer 'ichael S. Dudeck Jr . ,County Traffic Engineer �--) % - 1 %6 1�1EETING WITH MR. JIM DAVIS : Re: Chesser's Gap May 15, 1991 PRESENT: RANDY & BRUCE FROM MOSBY ENG. 4ARREN DILL :ARL FISCHER =D AHO JIM DAVIS im Davis said he would need to have Randy submit a geographical ,wing to show how Fleming street extension was going to tie into #1 before he could recommend a credit for the cost to construct the Chesser's Gap portion of the road. When this is shown in a .isfactory way and agreed to by the City then the road,bike path, j that portion of the site drainage that would be required for road would be permitted. It was suggested that the above cost agreed to BEFORE a meeting with the Commission to see if they _: d consider monetary credit vis impact credit. This cost should established and agreed as soon as possible to expedite. ras agreed by Mr. Davis that monetary credit would be given for work on the right turning lanes, preparation of the traffic ial light and other related work that would not have to be �ved when the twin lane work was done in that area. When the i road work is being completed an overlay would be done at the ging lanes so this is not cosidered a removal of work completed. ;e only flashing signals could be installed until the County fies that the traffic count would be at least 180 cars per hour �uah the intersection Sebastian General Partnership would need address this regarding Food Lion request that a traffic be in ation at the time the store is opened. 'avis said bids would go out for the road work as soon as the are completed and verified through this area and westward.A grill be required of the successful bidder. However if it :-gid to complete this portion of the twin lane so the action is complete that could be done and a credit given for the part that would have to be removed. I could see how :ould be done and not have to remove anything. Again the cost .is would have to be establish and agreed to before doing any -urchase of the 27' right of way would be reviewed at the ,g with the Commission after the price was agreed to regarding -.e credit would be paid (monetaryor impact). The requested could be establish at cost of unimproved land, similar land .-Ind or appraised. 'rst thing that should be done is to show the approved plan ,itinuing Fleming street extension to US#1,the agreement on ;st to build the road, bike path and a portion of site e, then agree on the cost of work on 512 and the sale price 27'. Meet with Commission on method of credit. Doc. Fischer 'Marren Dill Carl Fischer