September 9, 1991
Mr. Hank Fischer
Fischer & Sons, Inc.
P. O. Box 780068
Sebastian, Florida 32978-0068
Subject: Chesser.'s Gap
Sebastian, Florida
Engineer's Project No. 91-167
Dear Mr. Fischer:
As discussed on the telephone today, enclosed are copies of
correspondence documenting our transmittals of the construction
drawings for the subject project to Indian -River County Public
Works Department for their review. Also attached is a copy of
the Right -of -Way permit for construction within the Right -of -Way
of CR512 and a copy of a memo to file documenting our traffic
engineers telephone discussions with Indian River County estab-
lishing the County's criteria for the traffic study.
If you should have any further questions, please call.
Very r ly
C
n L. Mo
RL :nb
Enc.
:E.
I6o7 20TH sTR yr HAND CARRIED'`'' ,
P.O. BOX 636
VERO BEACH. FLORID 961 711/27/90
407-569-003b
Indian River
1£340 — 25th Street._._.__._._.__.__-----
iero Beach, Florida
SENDING YOU ® Attached ❑ Under separate cover via
❑ Shop drawings
Copy of letter
DATE I NO.
ATTENTION
Bill Meager
RE:
Chesser's Gap
NO.
90-413
the following items:
® Prints
O Plans ❑ Samples ❑ Specifications
❑ Change order ggpermit aPDlication
DESCRIPTION
;_/27/90
I.R.C. Right -of -Way Permit Application
1-/27/90 sets Signed and sealed site plan drawings
Traffic Maintenance Plan
FE TRANSMITTED as checked below:
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
❑ PRINTS RETURNED AFTER LOAN TO US
IF
Bruce A. Moia, Proj.Eng.
SIGNED:
11 enc 05 •rs not of noted. Aiodly notify us of once.
K
❑ Approved as submitted
xl For approval
❑ Approved as noted
❑ For your use
As requested
❑ Returned for corrections
'Jl For review and comment
❑
FOR BIDS DUE
19
.,i:S
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
❑ PRINTS RETURNED AFTER LOAN TO US
IF
Bruce A. Moia, Proj.Eng.
SIGNED:
11 enc 05 •rs not of noted. Aiodly notify us of once.
K
.4
DATE 05/03/91
INDIAN RIVER COUNTY
RIGHT OF WAY PERMIT •
R.O.W. PERMIT NO. 10 -163 -
APPLICANT Sebastian General Partnership
Name
P.O. Box 780068, Sebastian, FL 32978-0068 (407) 589-3159
Address Phone No.
CONTRACTOR Unknoim
Name
Address Phone No.
LOCATION OF WORK C. R. 512
Street Address
Chesser's Gan
Lot / Block / Subdivision / Unit
DESCRIPTION OF WORK Roadway Connection
------------------------------------------------------------------------------
TYPE PERMIT TYPE UTILITY
CONSTRUCTION
X Driveway" Cable TV
Street Paving Electricity Underground
Sidewalks/Curbs Telephone
Storm Drainage.., Right -of -Way. Overhead
Water Systems Clearing
Sanitary Sewer Other
-----------------------------------------------------------
7 -----------------
NOTE: 1. Detaile(3 drawing shall be submitted with each application.
2. This permit is issued subject to all conditions on reverse
side of this application...-
3.
pplication...-
3. A signature by the contractor shall be construed as making
the contractor personally liable for all permit conditions
unleES contractor attaches written proof of authorization
to act on behalf of the applicant.
4. All work is subject -to final inspection by The Engineering
Division./ Call 561-8000, ext. .283 to schedule'ins� tions.
PERMIT IS TO BE DISPLAYED
ON JOB SITE
CONTROL is `�------�
FDOT TRAFFIC •
required Applicant/ ontrector Henry Fischer
---------------=---------7------7-------------------------------------------
f OFFICE USE ONLY
Canplies with Thoroughfare
Plan - Yes No
DRAINAGEr
Approved
Not Approved
PERMIT FEE
.0"»
Revised 11/86
Remarks 72 hJur notification
is requ prior to work within
CR 512 right-of-way.
Issuing Officer
May 7, 1991
Date Issued
r
nr-AJnU-P���[� ,- INC.CONSULTING E
�
/5orzor"STREET
-
puBOX 6uso HAND CARRIED
vcnoBEACH. FLORIDA ooes,
407'569'0035
O ���������l������lOT���/3U �
u=u=������ou u �y����uuueuuu�yuxuuu uuuu=
03/27/91
ATTENTION
Indian River Co ~Bill Meager
1840- 25th Street ....... -
./ezm Beach,Florida32960' | ��«ys�e���v� Gap
�'ID|N8 YOU R9 Attached [] Under separate cover via.
�] Shop drawings 129 Prints [] Plans
�
Copy of letter [] Change order []
°
.°o
9l -l76
the following Items:
[]Samples []Specifications
RAN3W|TTEDuochecked below:
`orupprovo| [] Approved ansubmitted
`-ryour use [] Approved mmnoted
�a
requested [] Returned for corrections
'�r,eviowand comment []
2|D9DUE 1Q___--
[]Reuubm|t_--___copieofor approval
[]Qubmit-____-copieofor distribution
[] Return -corrected prints
OPRINTS RETURNED AFTER LOAN TOUS
SIGNED: Bruce A. Moia, Proj. Eng.
^en"="°are not ","*eo.^mdty.~,(y us*once
0
DESCRIPTION
.16/911
Revised C.R. 512 Improvement Plans - Signed & Sealed
RAN3W|TTEDuochecked below:
`orupprovo| [] Approved ansubmitted
`-ryour use [] Approved mmnoted
�a
requested [] Returned for corrections
'�r,eviowand comment []
2|D9DUE 1Q___--
[]Reuubm|t_--___copieofor approval
[]Qubmit-____-copieofor distribution
[] Return -corrected prints
OPRINTS RETURNED AFTER LOAN TOUS
SIGNED: Bruce A. Moia, Proj. Eng.
^en"="°are not ","*eo.^mdty.~,(y us*once
MOSBY AND ASSOCI S, INC.
CONSULTING ENOINEE
D CARRIED
1 507 20TH STREET
P.O. BOX 6368
VERO BEACH, FLORIDA 32961
407-569-0035
"' gineerin Dept.
1840 25th Street
pro Beach, Fl
L IEE (01F U Mz2RZ1Nt10UUL
SENDING YOU El Attached ❑ Under separate cover via the following items:
❑ Shop drawings
❑ Copy of letter
:0 Prints ❑ Plans
❑ Change order ❑
❑ Samples ❑ Specifications
OArE
NO.
DESCRIPTION
Sets
Revised Right -Of -Way Plans Per Comment
Letter Dated April 2, 1991 (sat. no. 20, 21 & 24)
TRANSMITTED as checked below:
For approval ❑ Approved as submitted
.-or your use ❑ Approved as noted
>.s requested ❑ Returned for corrections
:or review and comment ❑
=•DR BIDS DUE 19
❑ Resubmit copies for approval
❑ Submit copies for distribution
❑ Return corrected prints
❑ PRINTS RETURNED AFTER LOAN TO US
SIGNED: —
11 snalajut #S, Is nal as nota a, Ylnaly naIlly 1~111 an•a
Bruce Moia
"eieohone:(407)567-8000
April 2, 1991
BO OF COUNTY COMMISSIffRS
840 25th Street, Vero Beach, Florida 329
Mr. Bruce Moia, Project Engineer
Mosby and Associates, Inc.
1507 20th Street
P.O. Box 6368
Vero Beach, Florida 32960
SUBJECT: Chesser's Gap - CR 512 Improvements
Dear Bruce:
Svncom Telephone: 224-1011
In reviewing the plans dated March 26, 1991 of the CR 512
Improvements at Chesser's Gap, please consider:
1) The design speed of CR 512 is 55 MPH, which requires a
24' clear zone. "The straight end section "shown on
the S.W. and N.E. ends of the proposed 36" R.C.P.
should be changed to a mitered end section.
2) A 4' wide paved shoulder should be added along the east
edge of the right turn lane.
3) The County will overlay the existing lanes of CR 512
along the project frontage. Use traffic paint and not
thermoplastic for pavement markings. ,i
4) What type curb and gutter is proposed?
5; Show solid sod in County right-of-way.
6) Show typical section along widening. We only received
Sheet 24.
7) A County Right -of -Way Permit is required prior to
construction.
ease contact me if you have any questions.
=rely,
�s W. Davis, P.E.
is Works Director
.ip
?oger D. Cain, P.E., County Engineer
'ichael S. Dudeck Jr . ,County Traffic Engineer �--) % - 1 %6
1�1EETING WITH MR. JIM DAVIS : Re: Chesser's Gap May 15, 1991
PRESENT:
RANDY & BRUCE FROM MOSBY ENG.
4ARREN DILL
:ARL FISCHER
=D AHO
JIM DAVIS
im Davis said he would need to have Randy submit a geographical
,wing to show how Fleming street extension was going to tie into
#1 before he could recommend a credit for the cost to construct
the Chesser's Gap portion of the road. When this is shown in a
.isfactory way and agreed to by the City then the road,bike path,
j that portion of the site drainage that would be required for
road would be permitted. It was suggested that the above cost
agreed to BEFORE a meeting with the Commission to see if they
_: d consider monetary credit vis impact credit. This cost should
established and agreed as soon as possible to expedite.
ras agreed by Mr. Davis that monetary credit would be given for
work on the right turning lanes, preparation of the traffic
ial light and other related work that would not have to be
�ved when the twin lane work was done in that area. When the
i road work is being completed an overlay would be done at the
ging lanes so this is not cosidered a removal of work completed.
;e only flashing signals could be installed until the County
fies that the traffic count would be at least 180 cars per hour
�uah the intersection Sebastian General Partnership would need
address this regarding Food Lion request that a traffic be in
ation at the time the store is opened.
'avis said bids would go out for the road work as soon as the
are completed and verified through this area and westward.A
grill be required of the successful bidder. However if it
:-gid to complete this portion of the twin lane so the
action is complete that could be done and a credit given
for the part that would have to be removed. I could see how
:ould be done and not have to remove anything. Again the cost
.is would have to be establish and agreed to before doing any
-urchase of the 27' right of way would be reviewed at the
,g with the Commission after the price was agreed to regarding
-.e credit would be paid (monetaryor impact). The requested
could be establish at cost of unimproved land, similar land
.-Ind or appraised.
'rst thing that should be done is to show the approved plan
,itinuing Fleming street extension to US#1,the agreement on
;st to build the road, bike path and a portion of site
e, then agree on the cost of work on 512 and the sale price
27'. Meet with Commission on method of credit.
Doc. Fischer
'Marren Dill