HomeMy WebLinkAbout1990 04 17 - Police Station & Road ReviewLINDAHL, BROWNING
FERRARI & HELLSTROM, INC.
CONSULTING ENGINEERS, PLANNERS & SURVEYORS
JUPITER • STUART • FORT PIERCE • VERO BEACH
RICHARD E. WILSON, P.E.
PROJECT MANAGER
10 CENTRAL PARKWAY, SUITE 420 2065 15TH AVENUE
STUART, FLORIDA 34994 VERO BEACH, FLORIDA 32960
(407) 286-3883 • (407) 746-2311 (407) 567-2156 • (407) 567-2065
LINDAHL, BROWNING, FERRARI & (-
CONSULTING ENGINEERS, PLANNERS &
2065 15TH AVENUE
VERO BEACH, FLORIDA 32960
(407) 567-2156 (407) 567-2065
0417901
April 17, 1990
David W. Fisher
Interim City Engineer
City of Sebastian
P.O. Box 780127
Sebastian, Florida 32978
GA
%L,U Y'% C�Q N div
-k V' 2,� ,
RE: Engineering Evaluation and Preliminary
Cost Estimate - Chesser's Gap Police
Station Access Roads
Dear Mr. Fisher:
Thank you for the opportunity to provide professional engineering
services for the City of Sebastian. As detailed in the Notice to
Proceed dated April 12, 1990, Lindahl, Browning, Ferrari &
Hellstrom, Inc. has been retained to perform and provide the fol-
lowing:
1) Review the owner's proposed engineering design for the sub-
ject access roads and evaluate regarding whether appropriate
for the instant case.
Comment on alternative general engineering designs for same
that might be as or more appropriate.
2) Provide itemized preliminary cost estimate(s) for the con-
struction of each access road per the owner's proposed
design and for same pursuant to any alternative engineering
design(s) addressed in item #1 above.
With regard to the emergency access road, Mosby and Associates do
not at this time intend to design an access road. For this
reason, the access road will not be addressed within the scope of
this evaluation.
STUART
JUPITER
FT. PIERCE
VERO BEACH
LINDAHL, BROWNING, FERRARI & HELLSTROM, INC.
CONSULTING ENGINEERS, PLANNERS & SURVEYORS
2065 15TH AVENUE
VERO BEACH, FLORIDA 32960
(407) 567-2156 (407) 567-2065
0417901
April 17, 1990
David W. Fisher
Interim City Engineer
City of Sebastian
P.O. BOX 780127
Sebastian, Florida 32978
RE: Engineering Evaluation and Preliminary
Cost Estimate - Chesser's Gap Police
Station Access Roads
Dear Mr. Fisher:
90-132
Thank you for the opportunity to provide professional engineering
services for the City of Sebastian. As detailed in the Notice to
Proceed dated April 12, 1990, Lindahl, Browning, Ferrari &
Hellstrom, Inc. has been retained to perform and provide the fol-
lowing:
1) Review the owner's proposed engineering design for the sub-
ject access roads and evaluate regarding whether appropriate
for the instant case.
Comment on alternative general engineering designs for same
that might be as or more appropriate.
2) Provide itemized preliminary cost estimate(s) for the con-
struction of each access road per the owner's proposed
design and for same pursuant to any alternative engineering
design(s) addressed in item #1 above.
With regard to the emergency access road, Mosby and Associates do
not at this time intend to design an access road. For this
reason, the access road will not be addressed within the scope of
this evaluation.
STUART
JUPITER
FT. PIERCE
VERO BEACH
Review and Evaluation
On Monday, April 16, 1990, I met with Randy Mosby, P.E. and Bruce
Moia at the Vero Beach office of Mosby and Associates, Inc. to
obtain preliminary engineering design information for the
proposed roadway improvements.
From the information available, it appears that the design for
Fleming Street consists of:
1) A deceleration and right turn lane on S.R. 512
2) Entrance median
3) 24 foot wide pavement section
4) Curb and gutter
5) 15-24 inch RCP storm sewer pipe and inlets
6) 8 inch PVC sanitary sewer
7) Water line(s)
8) Drives for parcels fronting on Fleming Street
The deceleration and turn lane improvements generally consist of
a deceleration taper in range of 180 lineal feet, a 12 foot wide
turn lane 75 to 100 feet in length, grading of the existing road-
side ditch to accommodate the lane addition and possibly replace-
ment of the existing 36 inch culvert.
The deceleration and right turn lane on S.R. 512 would be con-
sidered a requirements to provide a safe entry into the P.U.D.
Traffic volumes generated by the development during peak hours
could result in stacking on S.R. 512 without the lane. The con-
struction of the police station alone may not warrant the lane
addition. That determination would be based on a study of the an-
ticipated traffic generated by the proposed facility.
From the Dedication Agreement it is unclear which party, the
Dedicator or the City, is obligated to construct the S.R. 512 im-
provements at the intersection.
The entrance median is approximately 8 feet wide and 150 feet
long and is designed with a median curb. The median provides an
entrance feature and is noted in the Agreement.
The 24 foot wide pavement section will consist of 1 1/2 inches of
asphalt, 6 inches of base, and 8 inches of stabilized subgrade.
Given the function of the roadway as an access to the non-
residential parcels and ultimately as an entrance to the
remainder of the P.U.D. this section is appropriate.
The proposed plan includes a two foot curb and gutter section.
The curb and gutter seems to be the result of a marketing deci-
sion relative to the overall appearance of the project. The
proposed 80 foot right of way is more than adequate to accom-
modate a swale drainage system thereby eliminating the necessity
for the curb and gutter. In addition, any future widening of
Fleming would require the removal of the curb and gutter.
The remaining items consisting of drainage structures, water dis-
tribution system, and sewage collection system are required for
the site to be served by the infrastructure improvements planned
for the Chesser's Gap P.U.D.
The questions that must be answered at this point are:
1) Is the City of Sebastian responsible for the utility im-
provements or just for the grading, paving and possibly
drainage improvements?
2) Is the City obligated to provide a pavement section com-
patible with the Chesser's Gap P.U.D. or should the
Dedicator bear the additional costs associated with the
planned improvements?
3) Is the site not included in the Chesser's Gap P.U.D. Surface
Water Management System? Is storage allocated in the lake
system for this site?
Upon clarification of these items, the City can establish the
true cost of the road improvements and also some of the site
development constraints with regard to retention/detention
facilities.
FLEMING
Preliminary
Item
No Description
STREET IMPROVEMENTS
Estimate of Quantities
Estimated Unit
Quantity Unit Price
Total
Price
1.Grading/Paving:
$384.00
18" Diameter R.C.P.
30
LF
Rough Grading
1
LS
$2,:000.00
$2,000.00
8" Stabilized Sub -Grade
1400
SY
$2.50
$3,500.00
6" Base, Prime
1400
SY
$5.00
$7,000.00
1 1/2" Asphalt
1100
SY
$3.00
$3,300.00
Median Curb
310
LF
$8.00
$2,480.00
Curb & Gutter
1100
LF
$6.00
$6,600.00
Seed & Mulch
2800
SY
$0.50
$1,400.00
Total Grading/Paving:
$1,000.00
Fire Hydrant
2
$26,280.00
2.Drainage:
15" Diameter R.C.P.
24
LF
$16.00
$384.00
18" Diameter R.C.P.
30
LF
$19.00
$570.00
24" Diameter R.C.P.
275
LF
$24.00
$6,600.00
Inlets w/Grate
4
EA
$2,200.00
$8,800.00
Total Drainage System:
$16,354.00
3.Water Distribution System:
8" Diameter P.V.C.
170
LF
$12.00
$2,040.00
Water Services
3
EA
$300.00
$900.00
8" G.V. & Box
2
EA
$500.00
$1,000.00
Fire Hydrant
2
EA
$1,500.00
$3,000.00
Total Water Distribution System: $6,940.00
4.Sewage System:
8" Diameter P.V.C. 500 LF $19.00 $9,500.00
Sanitary Manholes 3 EA $1,500.00 $4,500.00
Sanitary Services 3 EA $300.00 $900.00
Total Sewage System: $14,9,00.00
TOTAL $64,474.00
S.R. 512 and FLEMING STREET.INTERSECTION IMPROVEMENTS
1.Grading/Paving:
Rough Grading
1
LS
$500.00
$500.00
8" Stabilized Sub -Grade
375
SY
$2.50
$937.50
6" Base, Prime
375
SY
$5.00
$1,875.00
1 1/2" Asphalt
350
SY
$3.00
$1,050.00
Regrade Ditch
300
LF
$3.00
$900.00
Flush Header. Curb
47
LF
$8.00
$:376.00
Total Grading/Paving: $5,638.50
2.Drainage:
Culvert Replacement 100 LF "$30.00 $3,000.00
Rip -Rap Endwall 1 LS $500.00 $500.00
Total Drainage System: $3,500.00
TOTAL $9,138.50
FLEMING STREET IMPROVEMENTS (ALTERNATE)
Preliminary Estimate of Quantities
Item Estimated Unit Total
No Description Quantity Unit Price Price
1.Grading/Paving:
Rough Grading
1
LS
$2,000.00
$2,000.00
8" Stabilized Sub -Grade
1900
SY
$2.50
$4,750.00
6" Base, Prime
1400
SY
$5.00
$7,000.00
1 1/2" Asphalt
1300
SY
$3.00
$3,900.00
Swale Grade
1400
SY
$1.50
$2,100.00
Seed & Mulch
2800
SY
$0.50
$1,400.00
Total Grading/Paving:
$21,150.00
2.Drainage:
15" Diameter R.C.P.
24
LF
$16.00
$384.00
18" Diameter R.C.P.
80
LF
$19.00
$1,520.00
24" Diameter R.C.P.
170
LF
$24.00
$4,080.00
Inlets w/Grate
2
EA
$2,200.00
$4,400.00
Total Drainage System:
$10,384.00
3.Water Distribution System:
8" Diameter P.V.C.
170
LF
$12.00
$2,040.00
Water Services
3
EA
$300.00
$900.00
8" G.V. & Box
2
EA
$500.00
$1,000.00
Fire Hydrant
2
EA
$1,500.00
$3,000.00,
Total Water Distribution System: $6,940.00
4.Sewage System:
8" Diameter P.V.C. 500 LF $19.00 $9,500.00
Sanitary Manholes 3 EA $1,500.00 $4,500.00
Sanitary Services 3 EA $300.00 $900.00
Total Sewage System: $14,900.00
TOTAL $53,374.00
ACCESS EASEMENT DRIVEWAY IMPROVEMENTS
Preliminary Estimate of Quantities
Item
No Description
1.Grading/Paving:
Estimated Unit Total
Quantity Unit Price Price
Rough Grading
1
LS
$1,500.00
$1,500.00
8" Stabilized Sub -Grade
1000
SY
$2.50
$2,500.00
6" Base, Prime
1000
SY
$5.00
$5,000.00
Curb/Gutter
800
LF
$8.00
$6,400.00
1 1/2" Asphalt
930
SY
$3.00
$2,790.00
Fill
200
SY
$1.50
$300.00
Flush Header Curb
47
LF
$8.00
$376.00
Total Grading/Paving: $18,866.00
2.Drainage:
18" Diameter R.C.P. 200 LF $19.00 $3,800.00
30" Diameter R.C.P. 50 LF $30.00 $1,500.00
Rip -Rap Endwalls 1 LS $500.00 $500.00
Inlets 2 EA $2,200.00 $4,400.00
Total Drainage System: $10,200.00
TOTAL $29,066.00
ACCESS EASEMENT DRIVEWAY IMPROVEMENTS
(ALTERNATE)
Preliminary
Estimate of Quantities
Item
Estimated
Unit
Total
No Description
Quantity Unit
Price
Price
1.Grading/Paving:
Rough Grading
1 LS
$1,500.00
$1,500.00
8" Stabilized Sub -Grade
1000 SY
$2.50
$2,500.00
6" Base, Prime
1000 SY
$5.00
$5,000.00
Swale
800 LF
$5.00
$4,000.00
Fill
200 SY
$1.50
$300.00
1 1/2" Asphalt
930 SY
$3.00
$2,790.00
Total Grading/Paving:
$16,090.00
2.Drainage:
36" Diameter R.C.P. 50 LF $30.00 $1,500.00
Rip -Rap Endwalls 1 LS $500.00 $500.00
Total Drainage System: $2,000.00
TOTAL $18,090.00