Loading...
HomeMy WebLinkAbout2004 01 - Updated Concept PlanCHESSER'S GAP JANUARY 2004 (UPDATED) CONCEPT PLAN FOR A COMMERCIAL PLANNED UNIT DEVELOPMENT FOR SEBASTIAN GENERAL PARTNERSHIP B.F.T. PREPARED BY: Schulke, Bittle & Stoddard, L.L.C. 11407 th Court, Suite F Vero Beach, FL 32960 January 2004 Received JAN 200-` P&Z Gpwih Mpi t. TABLE OF CONTENTS L PRESENT USE PLA14NIING OBJECTIVES TOTAL SITE SUMMARY TABLE T LAND USE DEVEL PMENT SCHEDULE ENVIRONMENTAL IMPACT/DRAINAGE PLAN PUBIC FACILITY IMPACT STATEMENT WASTEWATER WATER TABLE - ESTIMATED SEWAGE GENERATION / WATER DEMAND RECREATION FACILITIES ESTIMATED NUMBER OF SCHOOL AGE CHILDREN TRAFFIC INFORMATION SU PAGE 1 PAGE 1 PAGE 1 PAGE 2 PAGE 3 PAGE 4 PAGE 4 PAGE 4 PAGE 4 PAGE 5 PAGE 6 PAGE 7 PAGE 7 PAGE 7 PAGE 8 Modific4tion to Conceptual Development Plan - Narrative Chessa�'s Gap (c) P.U.Q. IXONF- ll The proposed Chesser's Gap Commercial Planned Unit Development is located on a tra t of land lying approximately 3.5 miles west of U.S. #1 and the Florida East C ast Railroad on the south side of C.R. 512. The site comprises 58.1± The C essar's Gap Planned Unit Development was given approval of the conciept al development plan on February 25, 1987. The plan provided for a mix of commercial and light industrial uses. Presently, approximately 20 + acres has l be n developed, consisting of the completion of the Fleming Street exte si n utility infrastructure and stormwater management facilities to serve the dev lop ent areas, and several individual commercial sites. The remaining 38.1 + acres are vacant land. PLANNING It was t e intent of the Sebastian General Partnership to create a Planned Unit Development containing Commercial, Professional and Light Industrial uses blended together in an aesthetically pleasing format. Since receiving approval, the r roj ct has proceeded as planned with only minor deviations from its original intent, yvhich included the development of a supermarket, an assortment of speciali ed retail shops, offices, and high-tech light industrial uses. Howve, since its approval, developments within the city and outside of the Chessar's Gap project have necessitated modifications to this project. • dhange the proposed use of site area No. 5 from light industrial to multi - f mily residential with a maximum density of 8 units/acre. Purs a t to the City of Sebastian code section 54-2-5.12, a maximum of 25% of the re of a commercial P.U.D. may be allocated a residential use at up to 8 units ache. This is calculated as: 58.1± acres x 0.25 = 14.5± acres. The 1 toning/justification for this modification is as follows: ie development of Harbor Point subdivision and Collier Creek Estates ibdivisions east of Chessar's Gap. These estate size residential welopments are accessed via Fleming Street through Chessar's Gap. It Auld not be appropriate to develop industrial uses on the eastern )undary adjacent to the large single-family homes that abut Chessar's ap. Therefore, the multi -family use would serve as an acceptable 1 i i transition from the single family to the more intense commercial office or light industrial uses. 2. The City of Sebastian has commenced development of its industrial zoned proper -ties at the airport. Therefore, opportunities for numerous industrial developments are still available within the city. 3� Multi -family housing has been identified as a necessary alternative hpusing that is needed within the City of Sebastian/North Indian River ! gounty area. A breakdown of land use and buildings within the project is as follows (also, see table, nI�xt page): 2 Total Site Summary 1987 2004 Tota Sia Area = 58.09 Acres 58.1 Acres Tota Si�e Area L = ess Fleming Street Extension 54.37 Acres 54.4 Acres Gross Site F.A.R. = 0.42 0.42 Net $ite F.A. R. = 0.44 0.45 Maximurn Building Area = 24.18 Acres 24.51 Acres Mini �IUT Total Open Space = 15.33 Acres 16.38 Acres Maxrul Building Height = 35 Feet 35 Feet 2 3 i LAND USE TABLE ORIGINAL P.U.D.; I CONCEPTUAL PIAN (1987) UPDATED P.U.D. CONCEPTUAL PLAN (JAN. 2004) SITE j1 1 SITE #1 PROPOSED EXISTING POLICE INSTITUTIONAL C'OMM IAL USE: = COMMERCIAL CONVENIENCE STORE W/FUEL FUTURE COMMERCIAL I TOTAL AREA = 1.38 AC TOTAL AREA = 1.40 AC 1.40 AC PROPOSED MAXIMUM F{ R. # = 0.50 AC MAXIMUM FAR. = 0.50 AC 0.03 AC MAXIMUM BUILDING AREk 0.69 AC MAXIMUM BUILDING AREA = 0.70 AC 0.04 AC MINIMUM 25% OPEN SFACE I = 0.35 AC MINIMUM OPEN SPACE = 0.35 AC (25%) 0.78 AC (57.1%) SiTE J2 I SiTE J2 PROPOSED EXISTING UBRARY 1NSTTMTONAL OMMERCIAL USE = COMMUNITY FACILITIES/ COMMERCIAL ELKS LODGE SOCIAL/CMC USE FUNERAL HOM/CREMATORIUM (COMMERCIAL) TOTAL AREA = 3.20 AC TOTAL AREA = 4.00 AC 4.00 AC PROPOSED MAXIMUM F R. = 0.50 AC MAXIMUM FAR. = 0.50 AC 0.09 AC MAXIMUM BUILDING AIREk 1.06 AC MAXIMUM BUILDING AREA = 2.00 AC 0.38 AC MINIMUM 25% OPEN SIACE = 0.80 AC MINIMUM OPEN SPACE = 1.00 AC (25%) 2.11 AC (520%) SITE J3 SiTE 13 PROPOSED EXISTING COMMERCIAL RETAIL USE: = COMMERCIAL/RETAIL/ BANK, GROCERY, SPECIALTY RETAIL, SCHOOL COMMUNITY FACILITIES FUTURE COMMERCIAL TOTAL AREA = 20.10 AC TOTAL AREA = 20.60 AC 20.60 AC PROPOSED MAXIMUM F R. = D.35 AC MAXIMUM FAR = 0.35 AC 0.07 AC MAXIMUM BUILDING = 7.04 AC MAXIMUM BUILDING AREA = 7.21 AC 1.42 AC MINIMUM 25% OPEN SlACE= 5.02 AC MINIMUM OPEN SPACE = 5.15 AC (25%) 14.21 AC (697.) SITE p4 1I SiTE 14 PROPOSED EXISTING PROFES90NAL OFFICE lomm IAL USE: = PROFESSIONAL OFFICE/ N/A - NO EXIST. DEVELOPMENT COMMERCIAL/LIGHT INDUSTRIAL TOTAL AREA = 7.22 AC TOTAL AREA = 9.70 AC PROPOSED MAXIMUM F R. = 0.50 AC MAXIMUM FAR = 0.50 AC MAXIMUM BUILDING AREk 3.61 AC MAXIMUM BUILDING AREA = 5.20 AC MINIMUM 25% OPEN STACE = 1.80 AC MINIMUM OPEN SPACE = 3.60 AC (259,) SiTE 15 SiiE #5 PROPOSED EXISTING UGHT INDUSTRIAL USE = RESIDENTIAL MULTI -FAMILY N/A - NO EXIST. DEVELOPMENT AT 8 UNiTS/ACRE TOTAL AREA = 17.10 AC TOTAL AREA - 14.50 AC PROPOSED MAXIMUM FAR. = 0.50 AC MAXIMUM FAR = 0.50 AC MAXIMUM BUILDING AREk 8.55 AC MAXIMUM BUILDING AREA = 7.30 AC MINIMUM 25% OPEN SFACE = 3.42 AC MINIMUM OPEN SPACE = 3.63 AC (257) SiTE J6 SiTE 16 PROPOSED EXISTING PROFESSIONAL OFFICE OMM CIAL USE _ PROFESSIONAL OFFICE COMMERCIAL N/A NO EXIST. DEVELOPMENT TOTAL AREA 1 4.63 AC TOTAL AREA = 4.20 AC PROPOSED MAXIMUM F R. = 0.50 AC MAXIMUM FAR. = 0.50 AC MAXIMUM BUILDING AREK = 2.32 AC MAXIMUM BUILDING AREA = 2.10 AC MINIMUM 25% OPEN SPACE = 1.16 AC MINIMUM OPEN SPACE = 1.05 AC SITE J1 SiR 17 PROPOSED EXISTING FLEMING STREET THROJGHFARI EXTENSION USE = FLEMING STREET FLEMING STREET THROUGHFARE ERTEN THROUGHFARE ERTEN TOTAL AREA = 3.72 AC TOTAL AREA = 3.70 AC 3.70 AC PAVED AREA = 1.12 AC PAVED AREA = 1.10 AC 1.10 AC OPEN AREA = 2.60 AC OPEN AREA = 2.60 AC 2.60 AC + FAR. (FLOOR -TO -AREA RA IS DEFINED AS A STRUCTURES GROSS �A AREA (GIA) DIVIDED BY THE TOTAL M EA. 3 DEVELOPMENT SCHEDU Devto ment began in the late 1980's, and over 20 acres has been developed. It is anti ipa ed that the remaining 38 acres will be developed by 2009. ENVIRONMENTAL IMPACT/DRAINAGE PLAN Prioto development, there were not any environmentally sensitive areas or wetland areas on the project site. The earthwork, clearing and grading, as well as a mister wet detention (lakes) stormwater management system has been cons ru4ted to accommodate the environmental/stormwater requirements of the entire 58.1 -acre project at build -out. All disturbed areas were grassed and stabi�liz�d, and the system is presently operating as permitted. Approximately thirty-three percent (33%) of the gross site is to be used as grassed areas for runoff. As the remaining sites are developed, best management practices including grass overflow areas, erosion control measures (sed met fences, hay bales, seed/mulch) will continue to be implemented, and willav a beneficial impact on the water resources in the area, including the opp rtu ity for recharge. Landsc'pe buffers have been established to provide both noise and sight buffers. Mounds of earth with tree and shrub plantings are also utilized. The existing vegetation along the east, west and south property lines has been maintair ed as much as practicable. Whenever possible, existing trees within the prof ct pre maintained. The Jesign of the stormwater management system is such that the runoff from a twenty-five (25) year storm is retained on-site with provisions for an overflow, thus providing a detention time that will allow the collected stormwater to be used to re h rge the surficial aquifer and to make provisions for use of the stormwater for non -potable irrigation water, if desired. The pro osed modification to the plan, changing 14.5 acres of industrial use to resid nt al use will decrease expected run-off discharge rates and pollutant loadi g, as significantly less impervious area is anticipated, as large parking, loadi ig and truck access areas will not be needed. Also, there is less chance for any i d stria) wastes/accidents to occur. ACILITY IMPACT STATEMENT Wastewater The project wastewater collection system infrastructure has been installed, and is tied into the Indian River County utility system, and pumped to the "I.R.C. Central Wastewater Treatment Plant". The site is estimated to generate a maximum of 101,126 gpd at build -out. 4 The Indian River County "Central WWTP" has a 2.0 MGD capacity, and is currently operating at 1.5 MGD+. Additional capacity is provided by the "North WWTP" at 0.85 MGD. This plant is currently not in operation, but could be brought on-line when needed. The project water distribution system has been constructed, and is tied into the Indian River County water distribution system, which is served by both the "North and the South R.O. Water Treatment Plants". The size is estimated to demand a maximum of 101,126 gpd at build -out. The "I.R.C. North/South R.O. W.T.P" permitted capacity is 12.1 MGD, and is currently operating at 6.5 MGD+. 5 Site 1 Site 2 Site 3 Site 4 Site 5 Site 6 Flow rates are t Assumptions m floor area ratios In actuality, alto, *1 A 5( *2 Thei *3 Thei *4 *5 on/Water Dema Pump Rate Total Use Unit Quantity gpd gpd. ce - Bathrooms 2 250 500 Restaurant*' Seats 50 20 1,000 - sf 10,000 0.15 1,500 e - Patron 200 25 5,000 - sf 48,560 0.1 4,856 - sf 5000 0.15 750 Retail*2 sf 78,135sf 0.1 7,814 Office *2 sf 78,135sf 0.15 11,720 Retail*3 sf 78,408 10 7,841 Office *3 sf 78,408 0.15 11,761 Industrial*3 sf 56,628 1 5,663 Multi -Family *4 unit 116 250 29,000 Office -5 sf 91,476 0.15 13,721 Total 101,126 gpd >ed on published data in 64E-6 F.A.C. e for proposed uses are only an estimate using worst case (most demanding uses) assuming allowable -.A R.). ible F.A.R.'s are not typically achieved. eal restaurant is assumed. A fast food restaurant had considered developing next to the convenience store. is 0.25 acres of undeveloped area. Assuming 1/2 is retail and 1/2 is office, and a 0.35 F.A.R. is .7 + acres of undeveloped area. Assumptions made are: Retail: 3.6 acres Office: 3.6 acres Industrial: 2.6 acres F.A. R. = 0.50 a ily = 14.5 acres x 8 units/acre = 116 units is .20 acres + of undeveloped property. It is assumed to be developed at 100% office, with a F.A.R. of 0.50. iD Recreation Facilities The Green areas around the professional office area adjacent to the lakes will be equipped with facilities such as benches and tables for the employees of these buildings. It is anticipated that recreation facilities will be provided within the newly designated residential area. This will be a site specific design consideration that will be addressed upon submittal of a formal site plan for the residential area. Estimated Number of School Age Children Assuming 1 child/household, it is estimated that 116 school age children may be "generated" by the development of the 14.5 -acre residential area. At present time, I.R.C/ City of Sebastian does not require funding of the school board ("impact fees"). At this time, the I.R.C. School Board has indicated they have sufficient capacity. Traffic Information During the development of the preliminary plan, a detailed traffic study was performed. This was required as a part of the development order/approval (resolution no. R-90-46) for the preliminary development plan for the "Commercial Planned Unit Development". As a result, the developer was required to construct certain traffic/roadway improvements as outlined in the traffic study, including a traffic light, right turn lane and left turn lane at the intersection of Fleming Street and CR 512. These improvements have been constructed. The development has progressed in accordance with its original intent, without significant deviations. The proposed modification, changing 14.5 acres from light industrial to residential multi -family is expected to decrease traffic impacts: • Industrial: 14.5 acre x 43,560 x 0.50 F.A.R. x 7.0 ADT/1,000 = 2,211 ADT Assuming a F.A.R. of 0.50. Using a more realistic F.A.R. of 0.20, the trips generated are: 14.5 x 43,560 x 0.20 F.A.R. x 7.0 ADT/1,000 = 885 ADT • Residential: 14.5 acre x 8 units/Acre x 60.1 ADT/unit = 707.6 ADT The residential use change generates less traffic then any anticipated industrial uses. Also of importance is that the number of heavy vehicle traffic trips (trucks, deliveries, etc.) will be reduced dramatically. 7 Because the actual impact has been reduced, additional study is unwarranted. SUMMARY The Chessar's Gap commercial P.U.D. has been an asset to the community, providing centralized commercial and retail opportunities for city residents. The project has developed in accordance with its original intent, and proposed changes outlined herein have been shown to have acceptable or lower impacts to public facilities, and is consistent with and in consideration of developments outside of this project but within the city. E:3 >I S` ¢ �^ J ccI rc w �Kr.cr 0 107 Olaf ; / Y4" 1 r / / I r I I S�-{6 ,(RLY Ktt,Opp05,� y I ,kVMN31VM N311100 .05 s' Y� l53