Loading...
HomeMy WebLinkAbout2012 Sidewalk & Landscapingoff of SEB?STKN HOME OF PELICAN ISLAND AGENDA TRANSMITTAL Subject: Agenda No. 103q&.01�{ Four Chaplains Memorial Update Department Origin:•t Man r Site Plan Approval Administrative S c Sidewalk/Landscaping Funding City Attorney: City Clerk: ubmittal by:Date JAoV kCitrySManager Submitted: 19 JAN 12 Council Date: 25 JAN 12 Ex ,bits: EXPENDITURE REQUIRED: AMOUNT BUDGETED: APPROPRIATION REQUIRED: 1 $20,000 $0 $20,000 — DST Fund SUMMARY Larry Wapnick has been in contact with Joe Schulke of Schulke, Bittle and Stoddard in order to prepare a more formal site plan of the Four Chaplains Memorial. Attached to this transmittal is an engineered site plan showing (1) memorial dimensions, (2) location; and, (3) equipment locations. With this plan, along with the reflection pool diagram, the Building Department is now in a position to review the construction plans for permit issuance. Specifically the plan calls for an approximately 18" octagonal reflection pool, with a granite Four Chaplain's memorial stone. The stone will be set in a two foot deep reflection pool and will be approximately 6-8 feet tall. The memorial will hold an eternal flame and American Flag. Per the verbal report provided by the City Manager at the last meeting, discussion and direction is also sought from Council for establishing a Memorial budget in the amount of $20,000. These funds would be earmarked for construction of a brick memorial sidewalk linking the Four Chaplain's and War Memorials together. The sidewalk location is also shown on the site plan. In addition, funds would cover new landscaping and enhancement of the P.A. systems. It has also been requested, that local veterans groups be charged with the responsibility of selling memorial bricks. Funds generated by the sale can be used for memorial maintenance, veteran benefits, or refunding construction funds used to construct the walkway. Staff recommends that the Four Chaplains Memorial be approved, authorizing construction to start immediately after permit issuance. Staff also recommends that $20,000 be allocated from the Discretionary Sales Tax funds for additional landscaping and sidewalks enhancements for these memorials. ETERNAL FLAME (PROPME FLRM TORM) faWAIN/POOL SEE PLAN & DETAILS 6Y ,LS MINEERIN6 CON°.LLTANTS. SAND '3ET 6RICK PAVERS--, \t /-MAR6LE / 6RANIrE SaLpw r-fiAO PA �;I �,R ITE ROCK l! Four Chaplains Monume SCHULKE, BITTLE & STODDARD, L.L.C. U\qL 6 STRUCTURAL ENGINECRWG -LAND PLANNING ENVIRONMENTAL PERMITTING Q D La� A NORTH/SOUTH ELEVATION �T �ubEuyESlgl royµLA�w a 1• .I m®.minrmim�,rvnm �o �nor.ou«w.mwu.� _-_ v rSq ��.. uamr ® r m i3" t➢TANK INSTAW DUALT- i Fl-p0p ZONE .A \ \ cRAPwc scARa '0' FLooD z0�E—A, _" s 8 p0 T \ m •\\ F1,000 ZONE AE \ \ \ y 9•� I. NOTE: OWING SHOWN IS KHEMATC, AND DESIGNED �p yE WITH MUTED USING TOKGRVHCA INRNMAWN. rfl0 �pNE Al PROPOSED CONSTRUCTION OWES SHOUT➢ BE ippp 1 RUM VERREO AND ADAISTNENTS MADE TO MEET AY F 2. DECTRCA. MECMANSX AND POOL OONTWTORS �1 SNAll PREPARE YAEMATIC PVNS FOR THEN RES KCI A DSCiPLINES AND SUBMIT FOR A BIAWINC KNIT. rL Imo' i f wr • -� v 6 400vra \ y 9•� I. NOTE: OWING SHOWN IS KHEMATC, AND DESIGNED �p yE WITH MUTED USING TOKGRVHCA INRNMAWN. rfl0 �pNE Al PROPOSED CONSTRUCTION OWES SHOUT➢ BE ippp 1 RUM VERREO AND ADAISTNENTS MADE TO MEET AY F 2. DECTRCA. MECMANSX AND POOL OONTWTORS �1 SNAll PREPARE YAEMATIC PVNS FOR THEN RES KCI A DSCiPLINES AND SUBMIT FOR A BIAWINC KNIT. rL Imo' i f wr • -� v •w i /DETAIL VIEW / N 2 SAND SET PAVER BRICK DETAIL I f I!ila: !� •w i /DETAIL VIEW / N 2 SAND SET PAVER BRICK DETAIL I f (PROPAE ftELEJ TORM) FaNTAN Oa _Ir L SEE PLAN & PETAL6Y .' ,LS EWINEERINO CONSLLTANTS. LV,l r6fUNITE ROCK GOPIN6. •� ' ,�. �.. SMD SET \ i 6RI6K PAVERS - Four Chaplains Monument CHULKE, BITTLE & STODDARD, L.L.C. 6 STRUCTURAL ENGINEERING - "NO PLANNING -ENVIRONMENTAL PERMITTING ..,•. � RIA — NARPLE / GRANITE r -FILM, FGUJTAIN/f'OGL �• I � SEE PLAN & PETALS PY 15 EWoIW-ERI* Ca4SL.LTANTS. ` LLG 1 : �6RANITE ROCK SMA SET \, I � :.. __ _, . _ ..._ - : - - . PRIG( PAVERS -t Four Chaplains Monument SCHULKE, BITTLE & STODDARD, L.L.C. CIVIL 6 STRUCTURAL ENGINEERING • LAND PLANNING ENVIRONMENTAL PERMITTING a j-1vq P . S \ oA J . N/ At W r i i (PROPANE NXIEP TORO) FaKAIN/POM SEE RAN & PETALS PY IS ENGINEERMG O(N51.LTANTS. LLG-'r � (.GPIN6-•� 1 STL"-- SAND SET WICK PAVERS ;\ .%"MARCtE / GRANITE 5„ &RJRE - -RAG --GRANITE ROOK E Four Chaplains Monument SCHULKE, BITTLE & STODDARD, L.L.C. CIVIL S STRUCTURAL ENGINEERING • LAND PLANNING • ENVIRONMENTAL PERMITTING