Loading...
HomeMy WebLinkAbout2012 04 11 - City Manager Agenda Transmittalas OF SEBASTMN HOME Or PELICAN ISLAND AGENDA TRANSMITTAL Subject: Agenda No. 12. -014 Four Chaplains Memorial Update —Approval of Department Origin: Cit Man er Expenditure Administrative S City Attorney: A for Submittal by: i City Clerk: Date Submitted: 5 APR 12 City Manager Council Date: 11 APR 12 Ex ibits: EXPENDITURE REQUIRED: AMOUNT BUDGETED: APPROPRIATION REQUIRED: $7,240 — Brick $20,000 $0 $4,860 — Concrete Walk Foundation SUMMARY Pursuant to Council direction City staff and the Four Chaplains Memorial Committee has been moving forward with construction of the memorial. To date the memorial reflection pool is laid -out, framed, reinforced, conduit installed and ready to pour. In an effort to keep the project moving, City staff has procured prices to construct the walkway. After some preliminary review, it has been determined that the best way to build the "brick sidewalk is to lay the brick in a concrete foundation. This process will provide for better future maintenance. In order to start construction, staff is seeking Council authorization on two bid items. First, approval of $7,240 in brick purchases from Island Pavers & Stone (Vero Beach). Second, approval of authorizing Jack Reagan Concrete, under the existing concrete services agreement to install walkway foundation for an amount of $4,860. Please note three bids were received on the brick pavers quotes were: COMPANY BID Island Pavers & Stone (Vero Beach, FL) $7,240.00 Surfside Pavers (Vero Beach, FL) $7,565.50 Seal Rite Pavers (Vero Beach, FL) $7,845.00 Also attached is the sidewalk location schematic. It is the aim to have the project complete at the soonest by Memorial Day — At the latest by July 4t'. RECOMMENDATION Authorize City Manager to execute construction agreements and proceed with construction. 44g0lr y ()N" GRAS cod POOL EQUIPMENT FOR FOUNTAN (BY OTHERS) FLL/SET PAD AT EL. 8.D N.O.V.D. (MIN) CONST. WATER VAC LINE(S) IU Ilk ® RETURN LINE(S) BETW POOL EQUIPM�1ENT AND Sa' JUNTA J CONST. GAS LUNE FOR ETERNAL FLAME- , xS�A irit'ilp, il. r� C flal 3 CONST. 6'f SHALLOW SWALE TO EXI w SHALLOW SNILLE IN R.O.W. 1RG Fp, F,. 1 DONST. f LANDING AREA MAX 2% _-,crnur-� riorr m PAVER STDEYTALNS: 5 LONGITUDINAL SLOPE, /$ 2� TRANSVERSE SLt1P' DEI ABLE MRNNG STRIP \ P —EX IC TABLE IOAL RAI- �g BEEFROMSLATS,UM OAP _\ 1 a ~, IST. FIR ,HYDRAN'�m �{ \ LL/PTT CONSi.. STEPS) d a COW. TRLN CTABLE / MEMORIAL —\\ \ —15 rn W �/'/' 3 0 500 GAL UNDERGROUNQ EST LFT SFA110N COMT PANEL EXIST, ELEC. PANEL ELECTRICAL CONTRACTOR TO C L.P. IAVK &PIPES BY AMERCAS C.O.S. FOR REQUIRED MODIRC (SEE DETAIL SHEET 2) �X�sopF PREPARE DRAWINGS & OBTAIN ESZR �EIE cX�s� ESE IC FOR PUMP rJN�N4� POOL EQUIPMENT FOR FOUNTAN (BY OTHERS) FLL/SET PAD AT EL. 8.D N.O.V.D. (MIN) CONST. WATER VAC LINE(S) IU Ilk ® RETURN LINE(S) BETW POOL EQUIPM�1ENT AND Sa' JUNTA J CONST. GAS LUNE FOR ETERNAL FLAME- , xS�A irit'ilp, il. r� C flal 3 CONST. 6'f SHALLOW SWALE TO EXI w SHALLOW SNILLE IN R.O.W. 1RG Fp, F,. 1 DONST. f LANDING AREA MAX 2% _-,crnur-� riorr m PAVER STDEYTALNS: 5 LONGITUDINAL SLOPE, /$ 2� TRANSVERSE SLt1P' DEI ABLE MRNNG STRIP \ P —EX IC TABLE IOAL RAI- �g BEEFROMSLATS,UM OAP _\ 1 a ~, IST. FIR ,HYDRAN'�m �{ \ LL/PTT CONSi.. STEPS) d a COW. TRLN CTABLE / MEMORIAL —\\ \ —15 rn W �/'/' 3 0