Loading...
HomeMy WebLinkAbout2002 - Email from David FisherJesus M. Vieiro From: David Fisher Sent: Saturday, June 29, 2002 8:32 AM To: Jesus M. Vieiro Cc: Burt Jones; Paul Wagner Subject: RE: Veterans' Memorial and Restroom Repairs Jesus -- I am forwarding this to Burt to answer the questions regarding the Veteran's Memorial. Regarding the restroom repairs, I respectfully suggest you go with Flinn Construction because they are familiar with the situation, have done a lot of free homework on this very messy matter, and have given us what I believe is a fair and reasonable basis to determine a competitive price to proceed. Please confer with Paul on this. -- Dave Fisher -----Original Message ----- From: ]esus M. Vieiro Sent: Friday, lune 28, 2002 6:07 PM To: David Fisher Cc: Paul Wagner Subject: Veterans' Memorial and Restroom Repairs I have prepared the Bid packages for these projects and will forward on Monday July 1 for review and approvals; However I have the following questions/concerns: Veterans' Memorial • Is the 12" pipe which goes under access walk to Memorial and connects swales part of this bid or is it by others? Is the Stop Sign relocation by others? Benches are by others? • Stepping Stones and Flag Pole by others? Will Flag Pole require a support pier/footing? Restroom Repairs • Type/size of tile should be specified. If we have acceptable samples that we can show bidders, that will do, • Same goes for tile adhesive. Will we require a thin set or a glue? What about the grout? • Do we have samples of the new push plates? • The shorted -out electric locks are replaced like in kind? x ?/ie w Buyer City of Sebastian Phone 772-589-0743, Fax 772-589-6880 June 11, 2002 David Fisher City Engineer 1225 Main Street Sebastian, FL 32958 Dear Mr. Fisher: Flinn Construction, Inc. GENERAL CONTRACTOR CGCO17670 58'9- oZAI* ecrr 633-/6 3s- �wyE .559-732 .1]JI1L JUN 112002 ------------------------ Flinn Construction performed an on-site inspection of the restrooms located at Hardee Park, Barber Street Sports complex and the Sebastian Yacht Club, based on the deficiency report submitted by Holeman Suman Architects, dated February 20, 2002. Based on discussions with your staff, a large portion of the report deals with cosmetic problems which will be repaired "in house". We propose to furnish materials, equipment and labor to repair the major problems as follows: Barber Street Sport Complex. 1. Chip and grind concrete floors to achieve a proper pitch towards drain in both women's and men's rooms; prepare floor for new tile surface; supply and install new ceramic tile; reset floor drain. (Color of tile to be selected from samples provided.) 2. Remove existing hardware, install new push plates and reinstall hardware on entrance doors. 3. Clean paint from handicap bars. 4. Patch holes in stall doors. Total cost estimated to be less than $4.500.00 Sincerely, James E. Flinn Flinn Construction, Inc. GENERAL CONTRACTOR CGCO17670 June 11, 2002 David Fisher City Engineer 1225 Main Street Sebastian, FL 32958 Dear Mr. Fisher: JUN 112002 E ,1 24. Flinn Construction performed an on-site inspection of the restrooms located at Hardee Park, Barber Street Sports complex and the Sebastian Yacht Club, based on the deficiency report submitted by Holeman Suman Architects, dated February 20, 2002. Based on discussions with your staff, a large portion of the report deals with cosmetic problems which will be repaired "in house". We propose to furnish materials, equipment and labor to repair the major problems as follows: Hardee Park: 1. Chip and grind concrete floors to achieve a proper pitch towards drain in both women's and men's rooms; prepare floor for new tile surface; supply and install new ceramic tile; reset floor drain. (Color of tile to be selected from samples provided.) 2. Remove existing hardware, install new push plates and reinstall hardware on entrance doors. 3. Replace shorted -out electric lock on men's room entry door 4. Clean paint from handicap bars. 5. Patch holes in stall doors. Total cost estimated to be less than $5.000.00 Sincerely, G%�� s E Jame. Flinn Flinn Construction, Inc. GENERAL CONTRACTOR CGCO17670 June 11, 2002 David Fisher City Engineer 1225 Main Street Sebastian, FL 32958 Dear Mr. Fisher: JUN 112002 Flinn Construction performed an on-site inspection of the restrooms located at Hardee Park, Barber Street Sports complex and the Sebastian Yacht Club, based on the deficiency report submitted by Holeman Suman Architects, dated February 20, 2002. Based on discussions with your staff a large portion of the report deals with cosmetic problems which will be repaired "in house". We propose to furnish materials, equipment and labor to repair the major problems as follows: Yacht Club: 1. Chip and grind concrete floors to achieve a proper pitch towards drain in both women's and men's rooms; prepare floor for new tile surface; supply and install new ceramic tile; reset floor drain. (Color of tile to be selected from samples provided.) 2. Remove existing hardware, install new push plates and reinstall hardware on entrance doors. 3. Replace shorted -out electric lock on women's room entry door 4. Clean paint from handicap bars. 5. Patch holes in stall doors. Total cost estimated to be less than $5.000.00 Sincerely, James E. Flinn 02-12-2002 STATE OF FLORIDA DEPARTMENT OF LABOR AND EMPLOYMENT SECURITY DIVISION OF WORKERS' COMPENSATION CONSTRUCTION INDUSTRY CERTIFICATE OF EXEMPTION FROM FLORIDA WORKERS' COMPENSATION LAW This certifies that the individual listed below has elected to be exempt from Florida Workers' Compensation Law. EFFECTIVE DATE 01/25/2002 EXPIRATION DATE 01/25/2004 EXEMPTED INDIVIDUAL NAME FLINN 3AMES E S.& 140-40-9772 BUSINESS NAME FLINN CONSTRUCTION INC FEIN 592214713 BUSINESS ADDRESS 8720 SHORE LANE VERO BEACH Fl, 3290"7 NOTE: Pursuant to Chapter 440.10(11,(g),2 F.S., a sole proprietor, partner, or an officer of a corporation who elects exemption from the Florida Workers' Compensation Lew may not recover benefits or compensation under Chapter 440. ( u SMI an ;i�1111 11111 uc• eR (:) Nu7.18ER_. vr_D11-F 2331.07-55 4 F2. 09735 c dUN' 2'. 2002 IL"_I GTS :'"r. •. DA+./aGE I � ik!::aY FL'Nf:.}4•ANCti&.,AMES MUTL vol. t✓ -./.E +EI, CUE 9FNTIF.C- i Cr u%1B =q 2902 TOYOTA ST8R734102S229246 AGENT DAVID E HEDGES INS AGENCY INC PHONE (561)567-8953 NOT VALID MORE THAN CINE YEAPI FROM EFFECT'V2 L<TE