Loading...
HomeMy WebLinkAbout2009 - June Revised - SJRWMD Bid PlansngilL STIAN )ROJECT OCATION C3jeo ge StrwR-­.-.- t Ditc INDIAN RIVER COUNTY, FLORIDA LOCATION MAP Engineering BY: 14L NE EL-SCHAFFER SOLUTIONS YOU CAN BUILD UPON 1201 19th Place, Suite A-100 Verp Beach, Florida 32960 Phone: (772) 770-47@7 FAX: (772) 770-4640 CA 00008556 SHEET INDE>t` C-1 COVER SHEET C-2 GENERAL NO`i-ES C-3 EX3T'jN," CONDITIONS AND PROPOSED IMPROVEMENTS �.7 CD -1 MISCELLANEOUS DETAILS CD -2 MISCELLANEOUS DETAILS RICHARD H. OILLMOR MAYOR JIM HILL VICE MAYOR COUNCIL MEMBER [DALE 1. SIMCHICK COUNCIL MEMBER COUNCIL MEMBER CITY MANAGER CITY ENGINEER REG. 11o. 66735 REVISED: ISSUEID: Project Number: JUNE 2009 APRIL 2005' 'ILS -p- •11 i1 1 GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE CONDUCTED IN ACCORDANCE WITH CITY OF SEBASTIAN ENGINEERING AND PUBLIC WORKS AND THE FDOT STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES, LATEST EDITION. 2. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE SHOWN ACCORDING TO INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS, BUT DO NOT PURPORT TO BE ABSOLUTELY CORRECT. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES AFFECTING HIS WORK. 3. CONTRACTOR SHALL COORDINATE WITH UTILITY OWNERS FOR VERIFICATION OF ALL UTILITIES AND NOTIFY UTILITY OWNERS 72 HOURS PRIOR TO DIGGING IN ANY PORTION OF THE SITE. 4, THE CONTRACTOR SHALL CONTACT THE ENGINEER UPON FINDING ANY CONFLICTS IN THE PLANS DURING CONSTRUCTION OF ANY IMPROVEMENTS SHOWN ON THE DRAWINGS. 5. THE LIMITS OF CONSTRUCTION SHOWN ON THE PLANS SHALL BE STRICTLY OBSERVED BY THE CONTRACTOR. ALL INGRESS, EGRESS AND TRAFFIC PATTERNS ON THE SITE SHALL BE EXISTING ROADWAYS SHOWN ON THE DRAWINGS. 6. FINISHED GRADE FOR GROUND ELEVATIONS ON DRAWINGS REFER TO GRADE AFTER SODDING OR OTHER SURFACE TREATMENT. FINISHED ELEVATIONS SHOWN ON DRAWINGS REFER TO ELEVATIONS AFTER CONCRETE OR ASPHALT PAVEMENT. 7. INSTALLATION OF ALL CONDUITS, PULL BOXES AND FOUNDATIONS SHALL BE IN ACCOPDANCE WITH ALL REQUIREMENTS OF THE APPLICABLE SECTIONS OF THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS AND AS INDICATED ON THE DRAWINGS AND/OR BY THE MANUFACTURER. 8. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS OF ALL TESTINGS BY AN INDEPENDENT GEOTECHNICAL SOILS AND MATERIALS TESTING LABORATORY. THE COST OF ALL TESTINGS REQUIRED BY THESE PLANS & SPECIFICATIONS SHALL BE INCLUDED WITH THE LUMP SUM BID AND NO ADDITIONAL COMPENSATION SHALL BE MADE BY THE OWNER. 9. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN ALL REQUIRED BUILDING PERMITS FOR THIS PROJECT AND SHALL COORDINATE ALL ACTIVITIES WITH CITY OF SEBASTIAN. 10. UNLESS OTHERWISE SHOWN, THE CONTRACTOR SHALL REPLACE ALL PAVING, SODDING, STABILIZED EARTH, LANDSCAPING, DRIVEWAYS, SIDEWALKS, IRRIGATION SYSTEMS, UNDERGROUND PIPING, ETC. LOCATED WITHIN AND OUTSIDE THE CONSTRUCTION LIMIT LINE DISTURBED OR DAMAGED BY THE CONSTRUCTION. THE CONTRACTOR SHALL REPLACE WITH EQUAL MATERIAL OR AS DIRECTED BY THE ENGINEER. 11. WHERI A CONNECTION IS TO BE MADE IN THE FIELD TO AN EXISTING CONDUIT, THE CONTRACTOR SHALL EXCAVATE THE AREA TO VERIFY THE TYPE OF CONDUIT, CONDUIT SIZE, AND REQUIRED CONNECTION AND FITTINGS AND OBTAIN THE OWNERS APPROVAL OF THF" PROPOSED METHOD OF CONNECTION PRIOR TO INSTALLING MATERIALS. 12. THE CONTRACTOR SHALL COORDINATE AND VERIFY ALL DIMENSIONS OF ALL EXISTING AND PFROPOSED FACILITIES PRIOR TO FABRICATION OF PIPING AND EQUIPMENT TO ENSURE PROPER ASSEMBLY OF ALL ITEMS. SOME DIMENSIONS MAY NEED TO BE VERIFIED BY THE CONTRACTOR, FROM THE MANUFACTURER. 13. THE CONTRACTOR IS TO FOLLOW THE CONSTRUCTION PERMITS THAT HAVE BEEN ISSUED FOR THIS PROJECT. ALL SPECIFIC OR GENERAL CONDITIONS APPLY. 14. THE CONTRACTOR IS TO ADHERE TO THE DESIGN AND CONSTRUCTION STANDARDS OF CITY OL SEBASTIAN. 15. MAINTENANCE OF TRAFFIC SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES PART VI, WORK ZONE TRAFFIC CONTROL. CONTRACTOR TO PROVIDE MAINTENANCE OF TRAFFIC PLAN TO ENGINEER PRIOR TO CONSTRUCTION. TRAFFIC CIRCULATION WITHIN EXISTING PARKING LOT AREA MUST BE MAINTAINED DURING CONSTRUCTION. 16. COMPLETE RECORD DRAWINGS, CONFORMING TO CITY OF SEBASTIAN STANDARDS SHALL BE COMPILED DURING CONSTRUCTION FOR PERIODIC REVIEW. FINAL RECORD DRAWINGS, CERTIFIED BY A FLORIDA LICENSED REGISTERED LAND SURVEYOR SHALL BE SUBMITTED TO THE ENGINEER IN DIGITAL FORMAT PRIOR TO FINAL INSPECTION AND ACCEPTANCE ON ANY PART OF THE PROJECT. 17. LOCATIONS AND DIMENSIONS OF EXISTING RIGHTS-OF-WAY AND EASEMENTS ARE BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR SHALL VERIFY THE LIMITS OF THE RIGHTS-OF-WAY AND EASEMENTS IN ORDER TO AVOID ENCROACHMENTS. 18. THE CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AT ALL INTERSECTIONS OF PROPOSED WORK AND EXISTING UTILITIES. THE EXPLORATORY EXCAVATIONS SHALL BE MADE SEVENTY-TWO (72) HOURS IN ADVANCE OF THE WORK. IF THERE IS A POTENTIAL CONFLICT, THE CONTRACTOR IS TO NOTIFY OBSTRUCTION SHALL BE FURNISHED BY THE CONTRACTOR THE OWNER IMMEDIATELY. INFORMATION ON THE AND SHALL INCLUDE: LOCATION, ELEVATION, UTILITY TYPE, MATERIAL AND SIZE. CONTRACTOR SHALL RAISE OR LOWER THE INSTALLED PIPE AS NEEDED AT NO EXTRA EXPENSE TO THE OWNER. 19. ELEVATION DATUM IS LOCAL DATUM. 20. IN AREAS WHERE CONSTRUCTION ACTIVITIES RESTRICT NORMAL ACCESS TO PROPERTIES, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALTERNATIVE ACCESS ROUTES, WHICH ARE SUBJECT TO APPROVAL BY THE ENGINEER. 21. THE CONTRACTOR SHALL NOTIFY THE OWNER 72 HOURS IN ADVANCE OF ANY WATER MAIN OR SANITARY FORCE MAIN SHUT -DOWN. 22. ALL EXCAVATIONS SHALL BE BACKFILLED AT THE END OF EACH WORK DAY. 23. THE CONTRACTOR SHALL NOTIFY FIBER OPTICS COMPANIES SEVEN (7) DAYS PRIOR TO ANY CONSTRUCTION. EXTREME CAUTION SHALL BE EXERCISED IN AREAS OF FIBER OPTICS. 24. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING DAMAGED CURBS, ASPHALT, LANDSCAPING, DRIVEWAYS AND ANY TEMPORARY REPAIRS OF OPEN CUTS. THESE ITEMS SHALL BE PAID UNDER GENERAL REQUIREMENTS. 25. CONTRACTOR SHALL MAINTAIN PEDESTRIAN TRAFFIC, I.E. TEMPORARY SIDEWALKS AROUND WORK AREAS, CONTRACTOR MAY HAVE TO RESTRICT WORK HOURS ON SIDEWALKS, TO RESTORE IMMEDIATELY AND ERECT TEMPORARY FENCING BETWEEN CONSTRUCTION AND TEMPORARY SIDEWALKS, ETC. 26. ALL CONSTRUCTION CONTROL SHALL BE REFERENCED AND REPLACED BY A FLORIDA REGISTERED LAND SURVEYOR AFTER CONSTRUCTION. 27. PIPES SHALL NOT BE DEFLECTED MORE THAN 75% OF THE MANUFACTURER'S RECOMMENDATIONS. ---� NOTICE TO DRAWING HOLDER 7 S DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE DO NOT SCALE TI'• 'CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DOCUMENTS, TH[_ MOR TO CONSTRUCTION, NEEL-SCHAFFER, INC., HEREINAFTER CLARIFICATIONS : -rHE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO REFERRED TO A' ISE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED THE OWNER FOF' '.F THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS ON EXTENSIQNS ,'T WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD DRAWING, WITH*',GINEER FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES, BE AT THE REU',='IEY'S FEES ARISING OUT OF OR RESULTING THEREFROM, I n o n e i C Q Q T14 F 48 HOURS BEFORE DIGGING CALL TOLL FREE mor 1-800-43.-4770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. MAINTENANCE OF TRAFFIC 1. CONTRACTOR SHALL ADHERE TO THE REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) LATEST PUBLISHED EDITION. CHAPTER VI AND THE FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS LATEST PUBLISHED EDITION AT ALL TIMES. 2. ALL TRAFFIC CONTROL DEVICES (TEMPORARY SIGNS, PAVEMENT MARKINGS, BARRIER WALLS, ETC.) REQUIRED DURING A CONSTRUCTION PHASE SHALL BE INSTALLED AND APPROVED BY THE CITY OF SEBASTIAN TRAFFIC OPERATIONS ENGINEER PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND WILL BE MAINTAINED IN ACCORDANCE WITH MUTCD REFER TO INDEX 600. IF CASE IS NOT COVERED IN MUTCD INDEX 600 SHALL BE USED IN CONJUNCTION WITH ALL OTHER INDEXES SPECIFICALLY MENTIONED IN EACH TRAFFIC CONTROL PHASE. 3. ALL EXISTING SIGNS AND PAVEMENT MARKINGS WHICH CONFLICT WITH THE TRAFFIC CONTROL PLAN DURING A CONSTRUCTION PHASE SHALL BE REMOVED OR TEMPORARILY RELOCATED AS NECESSARY PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE COST OF REMOVING AND/OR REPLACING SIGNS AND PAVEMENT MARKINGS FOR MAINTENANCE OF TRAFFIC SHALL BE INCLUDED UNDER PAY ITEM 1-3. 4. ALL SIGNS 48" X 48" OR LARGER SHALL BE MAINTAINED ON TWO (2) BREAKAWAY SUPPORTS OR YIELDING POST AS SHOWN IN FIGURE 6-1 OF THE MUTCD. THE CONTRACTOR SHALL USE THE MUTCD TO DETERMINE THE APPROPRIATE PLACEMENT AND ELEVATION OF CONSTRUCTION SIGN. REFLECTIVITY SHALL ADHERE TO THE FDOT STANDARD SPECIFICATION FOR ROADS AND BRIDGE CONSTRUCTION LATEST PUBLISHED EDITION. 5. AT THE COMPLETION OF CONSTRUCTION DAY THE ROAD SHALL BE RETURNED TO TWO-WAY TRAFFIC. 6. VEHICULAR ACCESS TO RESIDENCES WILL BE MAINTAINED AT ALL TIMES. 7. PROVISIONS APPROVED BY THE PROJECT ENGINEER WILL BE MADE FOR THE REMOVAL OF STORM WATER FROM THE ROADWAY DURING CONSTRUCTION. 8. ALL TEMPORARY MARKINGS SHALL BE IN PLACE ONE (1) HOUR BEFORE SUNSET. 9. ALL DEVICES WILL BE IN GOOD CONDITION. MINIMUM REFLECTIVE INTENSITY SHALL MEET THE FDOT STANDARD SPECIFICATIONS FOR ROADS AND BRIDGE CONSTRUCTION LATEST PUBLISHED EDITION. 10. INGRESS/EGRESS TO COMPLEX MUST BE MAINTAINED THROUGHOUT CONSTRUCTION SCHEDULE. EROSION CONTROL/WATER QUALITY NOTES 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING AN EROSION CONTROL PLAN AT THE TIME OF PRE -CONSTRUCTION CONFERENCE. THE PROPOSED EROSION CONTROL PLAN SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CRITERIA SET F O RTH IN THE FDOT STANDARD SPECIFICATIONS FOR ROADS AND FDEP LAND DEVELOPMI NT MANUAL SHALL BE SUBJECT TO APPROVAL BY LOCAL GOVERNMENTS AND WATER MANAGEMENT DISTRICT HAVING JURISDICTION. 2. EROSION CONTROL AND SEDIMENTATION CONTROL DEVICES SHALL BE IN PLACE F'RIOR TO BEGINNING ANY CONSTRUCTION. THEY SHALL BE INSTALLED, ATA MINIMUM, `I O THE LIMITS SHOWN IN THE DRAWING, AS REQUIRED IN THE SPECIFICATIONS AND IN ACCORDANCE WITH ALL REGULATORY AGENCY REQUIREMENTS. THE COST TO THE CONTRACTOR FOR ALL EROSION AND SEDIMENTATION CONTROL IS INCLUDED IN THE LUMP SUM BID AND NO ADDITIONAL COMPENSATION SHALL BE MADE BY THE OWNER. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL TEMPORARY EROSION CONTROL FEATURES. 4. CONTRACTOR IS TO PROVIDE EROSION/SEDIMENTATION CONTROL TO PREVENT SILTATION OF ADJACENT PROPERTY, STREETS, STORM SEWERS AND WATER WAYS. IN ADDITION, CONTRACTOR SHALL PLACE STRAW, MULCH OR OTHER SUITABLE MATERIAL ON GROUND ON AREAS WHERE CONSTRUCTION -RELATED TRAFFIC IS TO ENTER AND EXIT SITE:. IF, IN THE OPINION OF THE ENGINEER AND/OR LOCAL AUTHORITIES, EXCESSIVE QUANTITIES OF EARTH ARE TRANSPORTED OFF-SITE EITHER BY NATURAL DRAINAGE OR BY VEHICULAR TRAFFIC, THE CONTRACTOR IS TO REMOVE AND CLEAN SAID EARTH TO THE SATISFACTION OF THE ENGINEER AND/OR AUTHORITIES. AN EROSION CONTKOL BARRIER, SHALL BE ESTABLISHED AS SITE CLEARING PROCEEDS AND MAINTAINED UNTIL SUCH TIME AS VEGETATION OR OTHER CONTROLS BECOME EFFECTIVE. 5. EXISTING DRAINAGE PATTERNS AND CAPACITIES ARE TO BE PROTECTED AND MAINTAINED DURING CONSTRUCTION TO ELIMINATE FLOODING AND PONDING WATER ON PRIVATE PROPERTY. CONTRACTOR TO PROVIDE TEMPORARY DRAINAGE MEASURES AS REQUIRED TO MEET THIS REQUIREMENT. SPECIAL CONDITIONS 1. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH BELLSOUTH, CABLE TV, F.P.L. & I.R.C. UTILITY DEPARTMENT FOR SCHEDULING INSTALLATION AND OR INSPECTIONS WITH REGARD TO THEIR RESPECTIVE SERVICES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL, REPAIR, REINSTALLATION OR RECONSTRUCTION OF PRIVATELY OWNED ITEMS (MAILBOXES, FENCE, ET. AL.) WITHIN PROJECT LIMITS. CONTRACTOR SHALL TAKE DUE CARE AS TO NOT ADVERSELY IMPACT PRIVATE CITIZENS & THEIR ABILITY TO USE SUCH ITEMS. 3. CONTRACTOR SHALL PREPARE & SUBMIT FOR REVIEW A PROJECT MAINTENANCE OF TRAFFIC PLAN. THIS PLAN SHALL BE PREPARED TO INSURE RESIDENTS & BUSINESS OWNERS WITHIN THE PROJECT LIMITS SHALL HAVE REASONABLE & CONTINUOUS ACCESS TO THEIR PROPERTIES DURING THE CONSTRUCTION PHASE. 4. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE SHOP DRAWINGS PRIOR TO START OF CONSTRUCTION. REVISIONS NO. DATE DESCRIPTION 1. 06-11-0�- BY MDS I RESPONSE TO SJRWMD RAI DATED 05-06-09 DRAWING INFORMATION FILENAME: GEORGEST. DITCH SCALE: 1"= 10' SURVEYED BY: HSBS DSGN: FTW DATE: 04-17-09_ DRWN: MDS DATE: 06-11-09 CHKD: LGM DATE: 06-15-09 QAIQC: FTW DATE: 06-15-09 1 1. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 2• SEDIMENT CONTROL MEASURES ARE TO BE ADJUSTED TO MEET FIELD CONDITIONS AT THE TIME OF CONSTRUCTION AND BE CONSTRUCTED PRIOR TO GRADING OR DISTURBANCE OF EXISTING SURFACE MATERIAL ON BALANCE OF SITE. PERIMETER SEDIMENT BARRIERS SHALL BE CONSTRUCTED TO PREVENT SEDIMENT OR TRASH FROM FLOWING OR FLOATING ONTO ADJACENT PROPERTIES. 3. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN UNDISTURBED FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT UNDISTURBED FOR MORE THAN ONE YEAR. 4. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF SOIL STOCKPILES ON SITE AS WELL AS SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. 5• A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT, IN THE OPINION OF THE REVIEWER, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 6• STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 7. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE SEDIMENT BASIN SHALL BE DESIGNED AND CONSTRUCTED TO ACCOMMODATE THE ANTICIPATED SEDIMENT LOADING FROM THE LAND -DISTURBING ACTIVITY_ THE OUTFALL DEVICE OR SYSTEM DESIGN SHALL TAKE INTO ACCOUNT THE TOTAL DRAINAGE AREA FLOWING THROUGH THE DISTURBLD AREA TO BE SERVED BY THE BASIN. 8• AFTER SIGNIFICANT RAINFALL, SEDIMENT CONTROL STRUCI URES WILL BE INSPECTED FOR INTEGRITY. DAMAGED DEVICES SHALL BE CORRECTED BY THE CONTRACTOR IMMEDIATELY. 9. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. 10. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. 11. SEDIMENT WILL BE PREVENTED FROM ENTERING ANY STORM DRAIN SYSTEM, DITCH OR CHANNEL. ALL STORM WATER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHER WISE TREATED TO REMOVE SEDIMENT. 12. UNDERGROUND UTILITY POWER LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: (a) NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. (b) EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. (c) EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. (d) RESTABUIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. 13. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE WITH CURBS AND GUTTERS, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL SUBDIVISION LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. 14. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, IN THE OPINION OF THE PROJECT ENGINEER. DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 15. PROPERTIES AND WATERWAYS DOWNSTREAM FROM CONSTRUCTION SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION AND EROSION. 16. EROSION CONTROL DESIGN AND CONSTRUCTION SHALL FOLLOW THE REQUIREMENTS IN INDEX Nos. 101, 102 AND 103 OF FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS. 17. PERIODIC INSPECTION AND MAINTENANCE OF SEDIMENT CONTROL STRUCTURES MUST BE PROVIDED TO ENSURE INTENDED PURPOSE IS ACCOMPLISHED. THE OWNER AND CONTRACTOR SHALL BE CONTINUALLY RESPONSIBLE FOR SEDIMENT LEAVING THE PROPERTY. SEDIMENT CONTROL MEASURES SHALL BE IN WORKING CONDITION AT THE END OF EACH WORKING DAY. E NEEL-SCHAFFER _ SOLUTIONS YOU CAN BUILD UPON 1201 19th Place, Suite A-100 Vero Beach, Florida 32960 PH: (772) 770-4707 FAX: (772) 770-4640 CA00008556 GENERAL NOTES CONSTRUCTION IN STREETS, ROAD RIGHTS -OF -W & PARKING AREAS I 1. OPEN ROAD CUTS REQUIRE PRIOR APPROVAL OF THE CITY, COUNTY, STATE OR ANY OTHER AGENCY WHICH MAY HAVE JURISDICTION. 2. CONSTRUCTION, MATERIALS AND WORKMANSHIP ARE TO BE IN ACCORDANCE WITH FLORIDA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS AND STANDARDS. 3. AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION SHALL RECEIVE GRASS, MULCH OR SOLID SOD, AS STATED ON THE PLANS. 4. STREET OR HIGHWAY RESTORATION TO BE DONE AS PER LOCAL OR STATE AGENCY HAVING JURISDICTION. 5. THE CONTRACTOR SHALL COMPLY WITH RULES AND REGULATIONS OF THE STATE, COUNTY AND CITY AUTHORITIES REGARDING CLOSING OR RESTRICTING THE USE OF PUBLIC STREETS OR HIGHWAYS. 6. TRAFFIC CONTROL ON COUNTY AND STATE HIGHWAY RIGHTS-OF-WAY SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS OF THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION. 7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND DOCUMENT THE ACTUAL LOCATION AND EXTENT OF EXISTING UTILITIES WHICH MAY AFFECT CONSTRUCTION. EXISTING UTILITIES SHOWN ARE BASED UPON THE BEST AVAILABLE INFORMATION SUPPLIED TO THE OWNER/ENGINEER AND IS SHOWN FOR INFORMATIONAL PURPOSE ONLY. 8. CONTRACTOR IS RESPONSIBLE FOR CHECKING ACTUAL SITE CONDITIONS BEFORE STARTING CONSTRUCTION. 9. DISCREPANCIES ON THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE COMMENCING WORK. 10. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS BEFORE COMMENCING WORK. 11. THE CONTRACTOR SHALL CONTACT ALL IMPACTED UTILITIES AT LEAST 48 HOURS IN ADVANCE OF CONSTRUCTION OPERATIONS. 12. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN TO BE MADE WITHOUT PRIOR APPROVAL OF THE ENGINEER AND THE APPROPRIATE GOVERNMENTAL ENTITY. 13. ALL MUCK OR OTHER SUCH UNSUITABLE MATERIAL ENCOUNTERED WITHIN ROAD RIGHTS-OF- WAY AND LOT AREAS SHALL BE FULLY EXCAVATED AND REPLACED WITH CLEAN, ON-SITE FILL MATERIAL COMPACTED TO 95% MAXIMUM DENSITY. ACTUAL EXTENT AND QUANTITY OF EXCAVATION SHALL BE DETERMINED AT THE TIME OF CONSTRUCTION BY APPROPRIATE FIELD MEASUREMENT. DISPOSAL OF UNSUITABLE MATERIAL SHALL BE AS DIRECTED BY OWNER OR OWNER'S ENGINEER. GEORGE STREET DITCH SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA FRANK T. WATANABE, P.E. FL. REG. NO. 66735-_.__ WORKING NUMBER: X1.07600.001 SHEET NUMBER: C-2 . d d qd W V CONCRETE PADS X \ (APPROXIMATE LOCATION) B.S.B. RIP -RAP " "RCP REMOV 58 L.F. 43x70 \ �0• \ STA 1+30.02 (,6.48'1_T) cn � / I AND RE LACE WITH \ CONNECT 18' CMP o STOCKADE FENCE / f / 56 L.F. 0 (2) 43" x 68" ERC \ INV. 15.11 _ --- / \ � \ � oyy ti\'I \ HEDGES 6' DRAINAGE/UTILITY EASEMENT TSTA 1+00 CENTEk LINE GEORGE ST. n/� \ 0)' / x\' \g. �D. = STA 1+00 COt TRQL IN top of bank STOCKADE FNCE � ti top of bank / SA &e`!'rPAVEMENT ANP X \ �. \ TRA ' SITION TO EXISTING HEDGES `:J \ /�8' SS \ ( ,! 1 0 W H OUT \ �,.: \/" TH.... / %' ` .• .,'' x r, A T AND GRADE W! wa x R, FILL, COMP C /` �' 0 INV: 13.55 r ts' EEP ' �! � . ARI 8" CMP / P RAP 6! 0 i R \ /, V. 15.0011+31.30x IN h ,•R � , rivv/ SOD ON.TOP O �' <, k h°� / ,a '\ 3 ST , �. NV. 15.31 1� 1+25.47 �' •'` h. 5 HEADWALL 1 Qir. / f �' \ ^� - - - -toe o� Q1 \ j g ` f, - e ,'`_ t 52'S 77 ",GMP /� y 1 k `� Og�o�� �.• N L�ONTROLLINEx� y X 43"x70" R.C.P. h \ - + L� NV.=15.31 X x _�_, F' / / x, /.• \1 r• 1. / -� 14 0 50 \x'18" CM / /.� . X' j �: \:\ \' �. /' toe INV.= 4.4 \fir '\ / "•, \, f / 2.5. X2.5' r \ �c \ / r' - � X D! � wasH ouT O�, \�' �' to � � f„' ',,' 1 1.5' DEEP p,' r 0 18" CMP / . g' Toe r a tics. ,�H\ x V.=15.86 / x IN � MAIVHOLE STA 0+69.7 \ Z as r / . ILL, COMPACT AND GRADE WITH' / INV 15.31 \ s L / a / \0 \ r „ i \ % X\ ' ITCH' RE %L X o. o / '. � � \ � ,� � ` : r � /' � . SOD ON TOP OF A \ / 1 x \ STA 1+25.47 / ,2 .0 0 8 9. 5 om. 0 \ I INV. 15:f10 L: .... f ' \25�00'�, - s �g9 PK NAIL FD. FDO J OR B -OX- _. ._. __. _... \� �� oHE xN0 \ \ 1 _ y "TT- top of bank t0 Of \ x g x�0 REMOVE ND DISCARD / 6' DRAINAGE/UTILITY EASEMENT p p \ EXISTING HEADWALL 0' A orE N N = _ STA 1 +29.2 (8.10' RTL_ -- s 4- __Lw-CO"N�pCT 18" CMP d e Ti C0 off = DEMO EXISTING \- x� INV \14.41 CONCRETE POOL rn 0 ASPHALT \/J B. / / x� ° ° d ° EQUIPMENT PAD Lp x� B.S.B. 61' j� 24 O ELEV.=20.22 Me 23. 4„ °d CPNAETEa /C & gPUMP PAD I ° 4. °O d 25 Q com _ w z. co a q' ° w p oz NOTE: HOUSE AND DECK d COVERED 0 0 0 + CO DETAILS ON THIS LOT 4 a a CONCRETE ARE BASED ON A SURVEYd PORCH ° 3 PERFORMED & PROVIDED d d- BY SMITH SURVEYING & O MAPPING, INC. O JOB #03-0856 12" ADS O T LO 8 INV. -18.55 Z d ° ° C.B.S. SINGLE °. BLOCK 180 (VACANT) \g�B j FAMILY RESIDENCE a. POOL pd d ad (APPROXIMATE) +50 ° 4.O ° I O d d O d d nj I"D QCj 0t d d" d ° . a ° a d Vi . d d'° ° d ° F.F.--23.5 ° . °.p I �. �d 16 ' CONCRETE d i)1 DRIVE V ° 4 O O II^^ uM 11 d d (o. .. °O ° ° o W STA 0+70.01 g# I 29.59' a" CMP REMOVE INV -18 2 EXISTING AND REPLACE HEADWALL I ° g �rl. . d d qd W V CONCRETE PADS X \ (APPROXIMATE LOCATION) B.S.B. RIP -RAP " "RCP REMOV 58 L.F. 43x70 \ �0• \ STA 1+30.02 (,6.48'1_T) cn � / I AND RE LACE WITH \ CONNECT 18' CMP o STOCKADE FENCE / f / 56 L.F. 0 (2) 43" x 68" ERC \ INV. 15.11 _ --- / \ � \ � oyy ti\'I \ HEDGES 6' DRAINAGE/UTILITY EASEMENT TSTA 1+00 CENTEk LINE GEORGE ST. n/� \ 0)' / x\' \g. �D. = STA 1+00 COt TRQL IN top of bank STOCKADE FNCE � ti top of bank / SA &e`!'rPAVEMENT ANP X \ �. \ TRA ' SITION TO EXISTING HEDGES `:J \ /�8' SS \ ( ,! 1 0 W H OUT \ �,.: \/" TH.... / %' ` .• .,'' x r, A T AND GRADE W! wa x R, FILL, COMP C /` �' 0 INV: 13.55 r ts' EEP ' �! � . ARI 8" CMP / P RAP 6! 0 i R \ /, V. 15.0011+31.30x IN h ,•R � , rivv/ SOD ON.TOP O �' <, k h°� / ,a '\ 3 ST , �. NV. 15.31 1� 1+25.47 �' •'` h. 5 HEADWALL 1 Qir. / f �' \ ^� - - - -toe o� Q1 \ j g ` f, - e ,'`_ t 52'S 77 ",GMP /� y 1 k `� Og�o�� �.• N L�ONTROLLINEx� y X 43"x70" R.C.P. h \ - + L� NV.=15.31 X x _�_, F' / / x, /.• \1 r• 1. / -� 14 0 50 \x'18" CM / /.� . X' j �: \:\ \' �. /' toe INV.= 4.4 \fir '\ / "•, \, f / 2.5. X2.5' r \ �c \ / r' - � X D! � wasH ouT O�, \�' �' to � � f„' ',,' 1 1.5' DEEP p,' r 0 18" CMP / . g' Toe r a tics. ,�H\ x V.=15.86 / x IN � MAIVHOLE STA 0+69.7 \ Z as r / . ILL, COMPACT AND GRADE WITH' / INV 15.31 \ s L / a / \0 \ r „ i \ % X\ ' ITCH' RE %L X o. o / '. � � \ � ,� � ` : r � /' � . SOD ON TOP OF A \ / 1 x \ STA 1+25.47 / ,2 .0 0 8 9. 5 om. 0 \ I INV. 15:f10 L: .... f ' \25�00'�, - s �g9 PK NAIL FD. FDO J OR B -OX- _. ._. __. _... \� �� oHE xN0 \ \ 1 _ y "TT- top of bank t0 Of \ x g x�0 REMOVE ND DISCARD / 6' DRAINAGE/UTILITY EASEMENT p p \ EXISTING HEADWALL 0' A orE N N = _ STA 1 +29.2 (8.10' RTL_ -- s 4- __Lw-CO"N�pCT 18" CMP d e Ti C0 off = DEMO EXISTING \- x� INV \14.41 CONCRETE POOL rn 0 ASPHALT \/J B. / / x� ° ° d ° EQUIPMENT PAD Lp x� B.S.B. 61' j� 24 O ELEV.=20.22 Me 23. 4„ °d CPNAETEa /C & gPUMP PAD I ° 4. °O d 25 EXISTING GROUND 20 15 10 ----� NOTICE TO DRAWING HOLDER CALE THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE JTS, THE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DO NOT INIONS PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER DOCUM: 7 TO AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO CLARIFP._ THE O,ER FOR USE ON THIS PROJECT ONLY, THIS DRAWING SHOULD NOT BE USED Vi VISIONS OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS THE OV }WITHOUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL ON EXT ., REUSER'S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD MVV wS THE ENGINEER FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES, G ATTORNEY'S FEES ARISING OUT OF OR RESULTING THEREFROM. * Ai EXISTING 43"X70" RCP TO BE REMOVED FDOT TYPE JUNCTION BOX 1+00 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800434110 SUNSHINE STATE ONE CALL OF FLORIDA, INC. mm Q com _ w z. co w p oz w O of 0 0 0 + CO EXISTING ROAD EXISTING GROUND 20 15 10 ----� NOTICE TO DRAWING HOLDER CALE THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE JTS, THE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DO NOT INIONS PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER DOCUM: 7 TO AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO CLARIFP._ THE O,ER FOR USE ON THIS PROJECT ONLY, THIS DRAWING SHOULD NOT BE USED Vi VISIONS OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS THE OV }WITHOUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL ON EXT ., REUSER'S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD MVV wS THE ENGINEER FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES, G ATTORNEY'S FEES ARISING OUT OF OR RESULTING THEREFROM. * Ai EXISTING 43"X70" RCP TO BE REMOVED FDOT TYPE JUNCTION BOX 1+00 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800434110 SUNSHINE STATE ONE CALL OF FLORIDA, INC. mm com _ aZ z ccoo0 H CO NO. [El DATE BY 06-11-09 MDS W 0 z W T OUT IRRIGATION SYSTEM INTAKE (APPROXIMATE) 1.0 HEADWALL 6 PIPE DITCH AND FILL IN AREA REMOVE AND REPLACE EXISTING SEAWALL XSTA: 2+51.30 (5.21' LT) O o° I--) 60" CMP 3.1 4 Ln STA: 2+51.30 INV. 13.14 O REMOVE AND DISCARD 6 35 L.F. 60" CMP bk. U#2EMOVE AND REPLACE EXISTING SEAWALL STA: 2+51.30 (5.21' RT) INSTALL 120 L.F. 52"x77" CMP -- 1' WITNESS IRRIGATION SYSTEM INTAKE (APPROXIMATE) 1.0' cam -HEADWALL EXISTING CANAL 5211 x 77" CMP 0.34% REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 DRAWING INFORMATION FILENAME: GEORGE ST. DITCH SCALE: 1 10' SURVEYED BY: HSBS DSGN: FTW DATE: 04-17--09 DRWN: MDS DATE: 06-11-09 CHKD: LGM DATE: 06-15-09 QAIQC_ F7W DATE: 06-15-09 2+00 Report of Survey: (Ditch) * TYPE OF SURVEY: TOPOGRAPHIC * THIS SURVEY PERFORMED BY: HOUSTON, SCHULKE, BITTLE & STODDARD, INC. L.B. #6905 1717 INDIAN RIVER BLVD. SUITE 101 VERO BEACH, FLORIDA 32960 * PROFESSIONAL SURVEYOR & MAPPER IN RESPONSIBLE CHARGE: STUART A. HOUSTON, P.L.S. #4490 * THE EXPECTED USE OF THE LAND, AS CLASSIFIED IN THE MINIMUM TECHNICAL STANDARDS (61G17-6, FAC) IS SUBURBAN. THE MINIMUM RELATIVE ACCURACY FOR THIS TYPE OF BOUNDARY SURVEY IS 1 FOOT IN 7,500. THE MEASUREMENT AND CALCULATION OF A CLOSED GEOMETRIC FIGURE WAS FOUND TO BE IN EXCESS OF THIS ACCURACY REQUIREMENT. * THIS SURVEY MEETS OR EXCEEDS ALL APPLICABLE REQUIREMENTS OF THE MINIMUM TECHNICAL STANDARDS, AS ESTABLISHED IN CHAPTER 61G17-6, FLORIDA ADMINISTRATIVE CODE. * ELEVATIONS AND DIMENSIONS SHOWN HEREON ARE MEASURED IN FEET AND DECIMAL PARTS THEREOF. * THE LAST DATE OF FIELD WORK WAS: 9/30/08 * THE BEARING BASE FOR THIS SURVEY IS: NOO'04'45"W, ASSUMED ALONG THE CLOF GEORGE STREET, PER THE PLAT, AND SHOWN THEREON. (NOTE: GEORGE STREET IS PLATTED AS "LANDSDOWNE DRIVE".) * THIS SURVEY DOES NOT CERTIFY TO THE EXISTENCE OR LOCATION OF ANY UNDERGROUND IMPROVEMENTS: UTILITIES, FOUNDATIONS, OR ENCROACHMENTS, EXCEPT AS SHOWN. _ * NO INSTRUMENTS OF RECORD REGARDING EASEMENTS, RIGHT-OF---WAY-S,OR OWNERSHIP WERE SUPPLIED TO THIS SURVEYOR, EXCEPT AS SHOWN. * NO TITLE OPINION OR GUARANTEE IS EXPRESSED OR IMPLIED. * UNLESS A COMPARISON IS SHOWN, PLAT VALUES AND MEASURED VALUES ARE THE SAME. * LEGAL DESCRIPTION IS AS PROVIDED BY THE CLIENT. * THE PARCEL OF LAND SHOWN HEREON APPEARS TO BE IN FLOOD ZONE 'X' PER FLOOD INSURANCE RATE MAP #12061CO078 E, DATED MAY 4th., 1989 * THE ELEVATIONS SHOWN HEREON ARE NGVD '29, AND ARE BASED ON A CLOSED BENCH CIRCUIT TO A F.I.R.M. BENCHMARK. (REFERENCE MARK 26, F.I.R.M. PANEL 0078, - CHISELED SQUARE ON THE SOUTHWEST CORNER OF ENGLAR AVE. BRIDGE OVER COLLIER WATERWAY, ELEV.= 25.07) ON-SITE BENCHMARK AS SHOWN. Legend & Abbreviations: (symbols not scaleable for size) PLS - PROFESSIONAL LAND SURVEYOR `0- - WOOD UTILITY POLE PSM - PROFESSIONAL SURVEYOR & MAPPER ® - TELEPHONE SERVICE LB - LAND SURVEYING BUSINESS - CABLE T.V. BOX a - CENTERLINE ® - ELECTRIC BOX ESP - EDGE OF PAVEMENT ® - WELL B. M. - BENCHMARK ® - WATER METER O - IRON ROD & CAP LB 6905 ED. ® - SEPTIC TANK FD - FOUND - MITERED END SECTION (MES) (P) - PLAT VALUE - DRAINAGE (M) - MEASURED VALUE MB - MAIL BOX F. F. - FINISH FLOOR OHE - OVERHEAD ELECTRIC CABBAGE PALM - OAK CITRUS LEGEND SURFACE WATER IMPACT (Area = 0.08 Ac) REMOVE EXISTING CABBAGE PALM o-- V - PROPOSED SILT FENCE EXISTING PAVEMENT TO BE REMOVED AND REPLACED BY STRUCTURAL CONCRETE CAP (FROM TOP OF PIPE - EXISTING ROAD ELEVATION). NOTES: - EXISTING CANAL 1. NO MITIGATION IS REQUIRED FOR THE IMPACTS TO UPLAND EXCAVATED DITCHES, PLAT OF SURVEY FOR: CITYOF ..____. .......... -A. SEBASTL" A TOPOGRAPHIC SURVEY OF A PORTION , THE 30' EXISTING 60" CMP EXISTING SEAWALL DRAINAGE R IG ABUTTING LOT, 42 S 43, ON T 176, SEBASTIAN HIGHLANDS UNIT 8, AS SHOWN ON THE PLAT THEREOF, RECORDED IN PLAT BOOK 6, PAGE 13, TO BE REMOVED OF THE PUBLIC RECORDS OF INDIAN RIVER COUNTY, FLORIDA. HOME OF PELICAN ISLAND REVISIONS PCERTT CATEOFAUTHORIZATION � 6905 D 17171NDL4NRIVER BLVD. -SURF 101 0 VEROBEACH, FL. 32960 PK 772) 794-1213 FAX • (772) 794-1096 North GRAPHIC SCALE 0 5 10 ( IN FEET) 1 inch = 10 ft. TYPE: Topogrophic PROJECT# Ditch DA TE: 9/30/08 D R A WN B Y: S. A. H. CHECKED BY: SCALE: =10 THIS SURVEY IS NOT VALID TYPE: lopograpnlc PROJECT# Ditch DATE: 9/30/08 - -- - F. R. PC DRAWN BY: S.A.H. _,. _... CHECKED BY: -.- SCALE: 1"=10' SHEET: 1 of 1 THIS SURVEY IS NOT VALID WITHOUT THE SIGNATURE AND THE ORIGINAL RAISED SEAL OF THE FLORIDA LICENSED SURVEYOR AND MAPPER NAMED BELOW. E-MAIL: 166905Qabe11soat6.vet BY STUART A. HOUSTON, P.L.S.114490 N0. DATE DESCRIPTION WORKING NUMBER: �■• NEEL-SCHAFFER EXISTING CONDITIONS AND PROPOSED IMPROVEMENTS NS.07600.001 , SOLUTIONS YOU CAN BUILD UPON � GEORGE STREET DITCH SHEET NUMBER: 1201 19th Place, Suite A-100 Vero Beach, SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA - C-3 Florida 32960 PH: (772) 770-4707 FRANK T. 'ATAN BE, P. FAX: (772) 770-4640 CA00008556 FI_. REG. No. 6735 UNIFORM CROSS SLOPE TO MATCH — EXISTING AND UNIFORM GRADE PARALLEL TO ROADWAY TO MATCH ELEVATIONS AT LIMITS OF WORK REMOVE EXISTING PAVEMENT SAWCUT EXISTING PAVEMENT 12" TO FORM A SMOOTH AND STRAIGHT JOINT MATCH NEW PAVEMENT TO EXISTING _ O�C / F\ (10 REMOVE EXISTING BACKFILL MATERIAL AND GRADE UNIFORMLY TO RECIEVE 12" MIN. THICK COQUINA BASE COMPACTED TO 100% OF MAXIMUM DRY DENSITY AASHTO T-180 EXISTING PAVEMENT I NEW PAVEMENT (2), SAW CUT AND BUTT JOINT 7 7 SCALE: N.T.S. Type A Or B Riser Bars A Bars B �^ 2 Additional Bars A SECTION C—C ` 2_ 0 5' 0. C. #5 Hoop Bar ALTERNATE B SECTION B -B Perpendicular Bars A (See Section #4 Hoo Bar m eA—A) I �• o (Horizontal Bars cN L _ 2—# 7's Each W h �� Reference Axle Continuous Around Placed On Top 0 a o m 0. Brs Bars A Bars A And B At 45' m 0 I� •0 Parallel Bars B (See Section A— o TOP SLAB REINFORCING STEEL DIAGRAM d u_ a a` Vertical Wall Reinforcing The corner fillets shown are necessary for rectangular structures used with circular rectangular and let in leusof the tbottom slab oflthe AltBBariser nd nwhen t°- c o E c o UJ c a otherwise shown in the plans or other standard drawings. Alt. B structure throats. Filets will besrequired with the Alt. A box. Each fillet shall be reinforced with 2—#5 bars. 0 d U cm d #4®12"B`PI % `om O`N Xm (Horizontal Burs Inlet throats, riser or manhole tops shall be secured to structures as shown on o m N w o ars A 3'-6" Or Continuous Around 6" Corners For 0 cc o �� v.2 4'-0" Rectangular Rloersp Ua ° C Openin At I (See Note) 2—Extra # 4's u> a° M Each Side And shall be straight embedment. c m 8» ars B D0 o sd Above Opening o o U a u .00e ° #4' 0 12" O.C. m v L Each Way a a� °N used In lieu of Class - and Class -- concrete in precast items manufactured for ih at comers. 14. For manhole and junction box tops, for frames and covers, and, for simi�lementary in plants which are under the Standard Operating Procedures � c inspection of precast drainage products. 12" MATCH EXISTING PAVEMENT THICKNESS OR CONSTRUCT 1-Y2" MIN. COMPACTED THICKNESS D.O.T. TYPE SP -12.5 ASPHALTIC CONCRETE SURFACE; PRIME COAT ALL SURFACES AND EDGES PRIOR TO SURFACING 1" MINIMUM TYPE SP-9.5(2ND LIFT) °•moi ► ��i ► j I� Type A Or B Riser Bars A Short Wa (See Section B—B�— 2 Additional Bars 6-- ® 5" Max. 0. C. Eactr Side Of Opening 1 1/2" MINIMUM TYPE SP -12.5 COQUINA BASE 8" MINIMUM THICKNESS COMPACTED TO 98010 OF MAXIMUM DENSITY PER AASHTO. 12" STABILIZED SUBGRADE (FBV 50) j(98% COMPACTION AASHTO T-180) FILL COMPACTED TO 98% MAX! DENSITY 2— #5 Hoop Bars (2 Lap Splices Permitted) 2 Additional Bars A ® 5" 0. C. Bars B Long Wayy (See Section B—B) TOP SLAB REINFORCING STEEL DIAGRAM Top Slab Reinforcin N W i a Y y n U In F � -;Optional Shear Supplemental Bar A Or B AT TOP SLAB R33'r, tp Wall Reinforcin '\Shear Key 10' Dra NOTE: Variations in shear key dimensions will be permitted subject to the Engineer's approval. 10' Draft— Shear Key 3 Optional Shear Kyr AT BOTTOM SLAB d rnr Bottom Slab Reinf•Gin SLAB TO WALL DETAILS FOR PRECAST ALTERNATE WITH 8" WALLS #4 Ties ® 12" O.C. #5 Peripheral Reinforcement Wall Reinforcing 9— # 4 Ties a 12" O.C. (See Section) #5 Peripheral Reinforcement L J Rotate* 4 Bars As Required To Maintain Cover w Bars A Bars B �^ Bars A—' '—Bars B SECTION C—C ` 2_ c .. E o ALTERNATE B SECTION B -B #4 ® 12" BW mL m in (Horizontal Bars cN X a ° Continuous Around NOTE' aximumextrainforcing spacing equal teachioshalf theharea o m 0. Brs Bars A Corners For 6" Rectangular Risers) m 0 I� •0 a FE c — Vertical Wall Reinforcing The corner fillets shown are necessary for rectangular structures used with circular rectangular and let in leusof the tbottom slab oflthe AltBBariser nd nwhen m� = o otherwise shown in the plans or other standard drawings. Alt. B structure throats. Filets will besrequired with the Alt. A box. Each fillet shall be reinforced with 2—#5 bars. (See Table) bottoms may be used in conjunction with curb inlet Types 7 & 8, or ditch bottom inlet unless otherwise shown in the plans or other standard % `om 2. Walls of circular structures Alternate A constructed in place may be ( ), concrete or brick or reinforced concrete. Precast and any drawings. 11. Inlet throats, riser or manhole tops shall be secured to structures as shown on of non—reinforced rectangular structures (Alternate B) shall be constructed of reinforced u_ o Index No. 201. xtra Reinforcin Horizontal Wall Reinforcing Structures with depths over 14' are to be checked for floatation by de ig,ner of ° C Openin At I (See Note) (Se e Table) Except when ACI hooks are specifically required, reinforcement top and slab 13. a° M or A.S.T.M. C-76, Class ---, B Wall, modified where the elliptical steel cage the wall. shall be straight embedment. 8" area is placed In the center one—third of M_ m m larger units shall be furnished at no additional cost a 4. Top and floor slab thickness and reinforcement are for precast and cast in S. All steel bars shall havb}° minimum cover unless otherwise shown except for Alternate A units cannot replace Alternate B units without approval of the TYPE Engineer. This note applies to this Index only. T I r� J ��D P Pp � C Top Slab Reinforcin N W i a Y y n U In F � -;Optional Shear Supplemental Bar A Or B AT TOP SLAB R33'r, tp Wall Reinforcin '\Shear Key 10' Dra NOTE: Variations in shear key dimensions will be permitted subject to the Engineer's approval. 10' Draft— Shear Key 3 Optional Shear Kyr AT BOTTOM SLAB d rnr Bottom Slab Reinf•Gin SLAB TO WALL DETAILS FOR PRECAST ALTERNATE WITH 8" WALLS #4 Ties ® 12" O.C. #5 Peripheral Reinforcement Wall Reinforcing 9— # 4 Ties a 12" O.C. (See Section) #5 Peripheral Reinforcement L J Rotate* 4 Bars As Required To Maintain Cover w Bars A Bars B �^ Bars A—' '—Bars B SECTION C—C ` 2_ �SE � ALTERNATE B SECTION B -B SPECIAL TOP SLAB! TION A -NATE m Provide of nofgvertical oy * NOTE: When the inside diameter of a round structure is U5 NOTE' aximumextrainforcing spacing equal teachioshalf theharea not more than l'-6" larger than the opening in the riser or top slab, the top of the structure reinforcment removed by the opening and provide the some area of reinforcment above each opening at 3" or riser shall be constructed according to the "Special Top Slab" details on this sheet. maximum spacing as removed by the opening. GENERA. NOTES 1. Standard structure bottoms 4'-0" diameter and smaller (Alt. A) and S-6" 6. Structure bottoms may be used in conjunction with curb inlet 10. tops Types 1, 2, 3, 4, 5, 6, 9, and 10, and any manhole or junction box unless The corner fillets shown are necessary for rectangular structures used with circular rectangular and let in leusof the tbottom slab oflthe AltBBariser nd nwhen square (Alt. B) are designated Type P. Larger standard structure bottoms otherwise shown in the plans or other standard drawings. Alt. B structure throats. Filets will besrequired with the Alt. A box. Each fillet shall be reinforced with 2—#5 bars. are designated Type J. Risers are permitted for all structures. bottoms may be used in conjunction with curb inlet Types 7 & 8, or ditch bottom inlet unless otherwise shown in the plans or other standard used 2. Walls of circular structures Alternate A constructed in place may be ( ), concrete or brick or reinforced concrete. Precast and any drawings. 11. Inlet throats, riser or manhole tops shall be secured to structures as shown on of non—reinforced rectangular structures (Alternate B) shall be constructed of reinforced Rectangular structures may be rotated as directed by the Engineer In order Index No. 201. concrete only. 7. to facilitate connections between the structure walls and storm sewer pipes. 12. Structures with depths over 14' are to be checked for floatation by de ig,ner of 3. Wall thickness and reinforcement are for either reinforced cast—in—place except that precast circular units may be furnished protect drainage. or precast concrete units with walls in accordance with either A.S.T.M. C-478 (up to 96 diameter) 8, Except when ACI hooks are specifically required, reinforcement top and slab 13. Units larger than standard may be substituted the contflicts s option or A.S.T.M. C-76, Class ---, B Wall, modified where the elliptical steel cage the wall. shall be straight embedment. when these units will not cause or increase the severity f ill not utility conflicts. Such STRUCTURE BOTTOMS to the Department. Larger area is placed In the center one—third of larger units shall be furnished at no additional cost a 4. Top and floor slab thickness and reinforcement are for precast and cast in S. All steel bars shall havb}° minimum cover unless otherwise shown except for Alternate A units cannot replace Alternate B units without approval of the TYPE Engineer. This note applies to this Index only. T I r� J ��D P Pp place construction. To and floor slabs shall be of Class -- Top concrete. Concrete as specified in A.S.T.M. C-478 (4000 psi) may be precast circular units manufactured under ASTM C-76 or ASTM C-478, Horizontal steel in rectangular structures shall be lapped a minimum of 24 bar diameters 9 used In lieu of Class - and Class -- concrete in precast items manufactured for ih at comers. 14. For manhole and junction box tops, for frames and covers, and, for simi�lementary in plants which are under the Standard Operating Procedures � details see Index No. 201. inspection of precast drainage products. 5. All reinforcement shall be A.S.T.M. A615, Grade 60 or 65 KSI welded wire fabric, either smooth or deformed. TYPE 'P' AND 'J' STRUCTURE BOTTOM REFER TO FDOT INDEX NO. 200 NTS 03 TYPE 'P' AND 'J' STRUCTURE BOTTOM (FDOT INDEX 200 CD -1 SCALE: N.T.S. mm -----mw � NOTICE TO DRAWING HOLDER IEEE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE DO NOT SCALE : E CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER DOCUMENTS, Tk,S THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO CLARIFICATION USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED REFERRED TO THE OWNER Fr�% OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS ON EXTENSIO,,, `'JUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL 1�I R'S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD gRAWING, VVI I'r)RNEY S FEESENGINEER ARISING R SING OUT OF OR RESULTM ALL CLAIMS, DAMAGES, ISSES NG AND EXPENSES, G TH REFROM mr KT Tu - Wk , 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800-4324170 SUNSHINE STATE ONE CALL OF FLORIDA, INC. NO. DAT 1. 06-114 BY 09 MDS REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 DRAWING INFORMATION FILENAME: GEORGE ST DITCH SCALE: SURVEYED BY: HSBS DSGN: FTW DATE: 04-17-09 DRWN: MDS DATE: 06-11-09 CHKD: LGM DATE: 06-15-09 QAIQC: FTW DATE_ 06-15-09 NEEL=SCHAFFER SOLUTIONS YOU CAN BUILD UPON 1201 19th Place, Suite A-100 Vero Beach, Florida 32960 PH: (772) 770-4707 FAX: (772) 770-4640 CA00008556 EXISTING BASE NEW HOT PATCH ASPHALT TO BE SAME TYPE OF MATERIAL AS EXISTED AT THE TIME OF REMOVAL. EXISTING SURFACE AND BASE TO BE CUT WITH CONCRETE SAW. TRENCH WALL UTILITY PIPE UNDISTURBED EARTH MAX MAX NOTES: `— REPLACEMENT BASE MATERIAL SHALL BE 3000 PSI HIGH EARLY STRENGTH CONCRETE. BACKFILL TRENCH WITH SUITABLE MATERIAL AND TAMP MATERIAL IN LAYERS NOT TO EXCEED 6" IN ACCORDANCE W/ THE SPECIFICATIONS. (95% MAX. PER. AASHTO T-180). THE CONTRACTOR SHALL PROMPTLY FILL OPEN -CUT TO ALLOW TRAFFIC TO PASS FREELY AND SAFELY. IF PERMANENT RESTORATION IS TO BE DEFERRED. THE CONTRACTOR SHALL MAINTAIN THE TEMPORARY CONDITION TO THE ORANGE COUNTY ENGINEERING DEPARTMENT SATISFACTION. 02 ASPHALT ROADWAY OPEN CUT DETAIL CD —1 SCALE: N.T.S. PAVED AREAS MISCELLANEOUS DETAILS GEORGE STREET DITCH SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA WORKING NUMBER: NUMBER: CD -1 FRANK T. WATANABE, P.E. FL. REG. NO. 66735 C D or SparlD or Span I* FRONT VIEW 2-#4 Bar_ n I a N 00 + Const. Joint Permitted 0 4" u See End View o (Enlarged) 10" . 5' Const. Joint Permitted (Keyway & Dowels Required - 7 Dowels #4 Bars, 18" With --- 9" Embedment ® 12" Ctrs For Bar Grade And E Payment See Note 3.) END VIEW (ENLARGED) TOP VIEW ENDWALL DIMENSIONS (EXCLUSIVE OF MULTIPLE PIPE SPACING) FRONT VIEW S g Outside Pipe (Typ.) i TOP VIEW if Interior Pipe (Typ.) Location Reference Line (See Location Control Abov NORMAL PIPE FRONT VIEW ` to] LTA 1I14'I SKEWED PIPE END VIEW 1. Position is set by the intersection of the front slope and Point A where this intersection falls outside the clearzone. 2. Where the front slope and Point A intersects inside the clear zone, the endwall is positioned so the location reference point is at the clear zone limit. The front slope is transitioned to the endwall as shown in Index No. 280. STANDARD LOCATION CONTROL LEGEND or Pipe Skew S Center To Center Pipe Spacing X Centerline To Centerline Dimension At Face Of Headwall ENDWALL POSITIONS FOR SINGLE AND MULTIPLE PIPE AND SPACING FOR MULTIPLE PIPE �1 STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 CD -2 SCALE: N.T.S. DATA AND ESTIMATED QUANTITIES FOR ONEENDWALL GENERAL NOTES 1. Endwall dimensions, locations and positions are for round and elliptical concrete pipe and for round and pipe -arch corrugated metal pipe. Round concrete pipe shown. 2. Front slope and ditch transitions shall be in accordance with Index No. 280. 3. Endwalls may be cast in place or precast concrete. Reinforcing steel shall be Grades 40 or 60. Additional reinforcement necessary for handling precast units shall be determined by the Contractor or the supplier. Cost of reinforcement shall be included in the contract unit price for concrete, (endwalls). 4. All exposed corners and edges of concrete are to be chamfered ,i' . 5. Concrete meeting the requirements of ASTM C-478 (4000 psi) may be used in lieu of Class I concrete in precast items manufactured in plants which are under the Standard Operating Procedures for the inspection of precast drainage products. 6. On outfall ditches with side slopes flatter than 1':11 provide 20' transitions from the endwall to the flatter side slopes, right of way permitting. 7. For sodding around endwalls see Index No. 281. 8. Payment for concrete quantities for endwalls skewed to the pipe shall be made on the following basis: Endwall Skew To Pipe Use Tabulated Value 0' to 5' 0' 6' to 15' 15' 16' to 30' 30' 31' or over 45' 9. Pipe length plan quantities shall be based on the pipe end locations shown in the standard location control end view, or lengths based on special endwall locations called for in the plans. 10. Payment for pipe in pipe culverts shall be based on plan quantities, adjusted for endwall locations subsequently established by the Engineer. 11. Endwalls to be paid for under the contract unit price for Class I Concrete (Endwalls), CY. Location Reference ROUND CONCRETE (Horizontal Clearance CORRUGATED METAL PIPE Measured to this point) PIPE CORRUGATED METAL PIPE ARCH Opening Area Dimensions (SF) 40" End Of Pipe (See Note 9) Class - Concrete (CY) Number And Type Of Pipe And Skew Angle Of Double Triple Pipe Quadruple Point A Const. Joint Permitted (Keyway & Dowels Required - 7 Dowels #4 Bars, 18" With --- 9" Embedment ® 12" Ctrs For Bar Grade And E Payment See Note 3.) END VIEW (ENLARGED) TOP VIEW ENDWALL DIMENSIONS (EXCLUSIVE OF MULTIPLE PIPE SPACING) FRONT VIEW S g Outside Pipe (Typ.) i TOP VIEW if Interior Pipe (Typ.) Location Reference Line (See Location Control Abov NORMAL PIPE FRONT VIEW ` to] LTA 1I14'I SKEWED PIPE END VIEW 1. Position is set by the intersection of the front slope and Point A where this intersection falls outside the clearzone. 2. Where the front slope and Point A intersects inside the clear zone, the endwall is positioned so the location reference point is at the clear zone limit. The front slope is transitioned to the endwall as shown in Index No. 280. STANDARD LOCATION CONTROL LEGEND or Pipe Skew S Center To Center Pipe Spacing X Centerline To Centerline Dimension At Face Of Headwall ENDWALL POSITIONS FOR SINGLE AND MULTIPLE PIPE AND SPACING FOR MULTIPLE PIPE �1 STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 CD -2 SCALE: N.T.S. DATA AND ESTIMATED QUANTITIES FOR ONEENDWALL GENERAL NOTES 1. Endwall dimensions, locations and positions are for round and elliptical concrete pipe and for round and pipe -arch corrugated metal pipe. Round concrete pipe shown. 2. Front slope and ditch transitions shall be in accordance with Index No. 280. 3. Endwalls may be cast in place or precast concrete. Reinforcing steel shall be Grades 40 or 60. Additional reinforcement necessary for handling precast units shall be determined by the Contractor or the supplier. Cost of reinforcement shall be included in the contract unit price for concrete, (endwalls). 4. All exposed corners and edges of concrete are to be chamfered ,i' . 5. Concrete meeting the requirements of ASTM C-478 (4000 psi) may be used in lieu of Class I concrete in precast items manufactured in plants which are under the Standard Operating Procedures for the inspection of precast drainage products. 6. On outfall ditches with side slopes flatter than 1':11 provide 20' transitions from the endwall to the flatter side slopes, right of way permitting. 7. For sodding around endwalls see Index No. 281. 8. Payment for concrete quantities for endwalls skewed to the pipe shall be made on the following basis: Endwall Skew To Pipe Use Tabulated Value 0' to 5' 0' 6' to 15' 15' 16' to 30' 30' 31' or over 45' 9. Pipe length plan quantities shall be based on the pipe end locations shown in the standard location control end view, or lengths based on special endwall locations called for in the plans. 10. Payment for pipe in pipe culverts shall be based on plan quantities, adjusted for endwall locations subsequently established by the Engineer. 11. Endwalls to be paid for under the contract unit price for Class I Concrete (Endwalls), CY. CD -2 NOTICE T STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 SCALE: N.T.S. E THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE JHE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DO NOT SCAL S PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER DOCUMENTS, AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO CLARIFICATIOOR USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED REFERRED TIC 4S OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS THE OWNER I'HOUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL ON EXTENSICuSER'S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD pAWING, W -E ENGINEER FROM ALL CLAIMS, DAMAGES, LOSSES AND TORNEY'S FE S AR SING OUT OF OR RESULT NG TH REFROM EXPENSES, BE AT THE R 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800-4324770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. NO. DA 1. 06-1'! E BY -09 MDS REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 Note: Use the guidelines of General Note No. 8 for selecting tabular quantities. DRAWING INFORMATION FILENAME: GEORGE ST. DITCH SCALE: SURVEYED BY: HSBS DSGN: FTW DATE: 04-17-09 DRWN: MDS ROUND CONCRETE AND CORRUGATED METAL PIPE CONCRETE ELLIPTICAL PIPE CORRUGATED METAL PIPE ARCH Opening Area Dimensions (SF) FTW Single Class - Concrete (CY) Number And Type Of Pipe And Skew Angle Of Double Triple Pipe Quadruple D Number Of PipesA B C E F G S 1 2 3 4 X 0°15° 30° 45° Concret 0° Metal 0° Concrete Metal Concrete Metal 0° 15° 30° 45° 0° 15° 30° 45° 0° 15 30° 45° 0° 15 30'145' Concrete Metal 0° 15 30° 45° 0° 15 30° 45° D 15" 1.23 2.46 1 3.69 4.92 V-11 ' V-2' 4'-0' 1'-10'1'-2` 0'-6' 2'-7' 2'-7'12'-B" 3'-0' 3'-8" 1.23 1.24 1.59 1.60 1.65 1.74 1.62 1.63 1.68 1.78 1.94 1.96 2.05 2.23 1.99 2.02 2.11 2.30 2.30 2.34 2.47 2.74 2.37 2.41 2.75 2.84 15" 18" 1.77 3.54 1 5.31 7.08 2'-2" 1'-3" 4'-6' V-11 ' V-3" V-0 2'-10 2'-10"2'-11"3'-3" 4'-0" 1.56 1.59 1.99 2.01 2.06 2.17 2.04 2.06 2.11 2.23 2.43 2.46 2.56 2.79 2.51 2,54 2.65 2.89 2.86 2.91 3.06 3.40 2.96 3.01 3.17 3.53 18" 21" 2.41 4.82 7.23 9.64 2'-5" 1'-4' 5'-0' 2'-0" 1'-4' V-6 S-2" 3'-2" 3'-3" 3'-8' 4'-6" 1.97 3.3 4.4 1'-9" V-2" 3'-1 "1'-10' 21" 24" 3.14 6.28 9.42 12.56 2'-8" 1'-4 5'-6'2'-D" V-4' 2'-0' S-5" 3'-5" 3'-6' 3'-114'-10' 2.24 2.29 2.82 2.84 2.91 3.06 2.91 2.93 3.01 3.17 3.39 3.43 3.57 3.87 3.52 3.56 3.71 4.03 3.97 4.03 4.24 4.69 4.14 4.20 4.43 4.91 24" 27" 3.98 7.96 11.94 15.92 2'-11 V-5 6'-0" 2'-1" 1'-5' 2'-6' 3'-10' 3'-10'4'-0' 4'-5' 5'-5" 2.73 6.4 -1'-11 ' 1'-2" 4'-3" 1'-10' 1'-2' 0'-9" 2'-10'2'-10' 2'-11 '3'-3" 4'-0" 27" 30" 4.91 9.82 14.73 19.64 S-2" 1'-6' 6'-6" 2'-2" 1'-6' 3'-0' 4'-3" 4'-3' 4-5' 4'-1 "6'-0" 3.26 3.34 4.13 4.16 4.26 4.49 4.28 4.31 4.43 4.67 4.98 5.04 5.25 5.69 5.20 5.27 5.49 5.97 5.84 5.93 6.24 6.91 6.13 6.23 6.56 7.29 30" 36" 7.07 14.14 21.21 28.28 3'-8" V-8' 7'-6' 2'-4" 1'-8"4'-0' 5-1" 5'-1'5'-3' 5'-10' 7'-2" 4.53 4.64 5.73 5.77 5.92 6.23 5.95 6.00 6.15 6.49 6.92 7.00 7.29 7.91 7.25 7.34 7.65 8.33 8.13 8.26 8.69 9.62 8.57 8.71 9.18 10.20 36" 42" 9.62 19.24 28.86 38.48 4'-2" 1'-1 "8'-6" 2'-6" 2'-0' 5'-0' 6'-0' 6'-0' 6'-3' 6'-11"8'-6" 6.33 6.49 8.11 8.17 8.39 8.85 8.43 8.50 8.73 9.23 9.90 10.0210.45 11.38 10.3 10.5410.9E 11.99 11.68 11.8-1'12.5113.8912.3212.5213.2214.73 42" 48" 12.57 25.14 37.71 50.28 4'-8" 2'-1" 9'-6' 2'-9" 2'-0' 6'-0' 6'-9' 6'-9' 7' -O:'7' -10j'9'-7" 8.15 8.38 10.4 10.4 10.7 11.3 10.8 10.9 11.2 11.8-,12.6412.8013.3414.5013,3 13.51 14.1115 39 14.8 15.1 15.9 17.6 15.8 16.0 16.9 18.90 48" 54" 115.90 31.80 47.70 63.60 5'-2" 2'-6'10'-6j 3'-2" 2'-3' 7'-0' 7'-8' 7'-8 7'-11S'-10'10'-11' 11.71 11.77 15.2 15.35 15-.7E 16.6 9 18.7 9.0 19.86 21.69 22.2 2.6 23.9 26.6 54" 23.6 3'-1" 1'-5"6'-1 2'-1" 1'-5'3'� 4'-9" 4'-9" 4'-11'5'-6" 6'-9" 3.13 4.06 4.09 4.20 4.45 4.99 5.06 5.28 5.76 5.93 6.03 6.36 7.09 42" 29" CD -2 NOTICE T STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 SCALE: N.T.S. E THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE JHE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DO NOT SCAL S PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER DOCUMENTS, AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO CLARIFICATIOOR USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED REFERRED TIC 4S OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS THE OWNER I'HOUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL ON EXTENSICuSER'S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD pAWING, W -E ENGINEER FROM ALL CLAIMS, DAMAGES, LOSSES AND TORNEY'S FE S AR SING OUT OF OR RESULT NG TH REFROM EXPENSES, BE AT THE R 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800-4324770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. NO. DA 1. 06-1'! E BY -09 MDS REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 Note: Use the guidelines of General Note No. 8 for selecting tabular quantities. DRAWING INFORMATION FILENAME: GEORGE ST. DITCH SCALE: SURVEYED BY: HSBS DSGN: FTW DATE: 04-17-09 DRWN: MDS DATE: 06-11-09 CHT, CONCRETE ELLIPTICAL PIPE CORRUGATED METAL PIPE ARCH QAIQC: FTW DATE: 06-15-09 Opening Area (SF) Dimensions Class - Concrete (CY) Number Of Pipe And Skew Angle Of Pipe Opening Area (SF) Approx E uiv. q Span Round Rise Dimensions Number 1 2 Class - Concrete (CY) Number Of Pipe And Skew Angle Of Pipe Span Rise Approx E uiv. q Round Span Rise Number 1 2 Of 3 Pipe 4 A B C E X F G S 0° 15° 30° 45° Sinle 0° Double 0° 15° 30° Triple 45° 0° 15 30° 45° Quadruple 0° 15° 30° 45° 12" 18" Pipe 17" 13" 1.1 2.2 3.3 4.4 1'-9" V-2" 3'-1 "1'-10' V-2" 0'-4' 2'-6" 2'-6" 2'-7" 2'-11' 3'-6" 1.16 1.47 1.48 1.52 1.60 1.78 1.80 1.88 2.04 2.09 2.12 2.23 2.48 17" 13" 15" 21" 15" 1.6 3.2 4.8 6.4 -1'-11 ' 1'-2" 4'-3" 1'-10' 1'-2' 0'-9" 2'-10'2'-10' 2'-11 '3'-3" 4'-0" 1.33 1.69 1.70 1.75 1.84 2.04 2.06 2.15 2.33 2.40 2.44 2.57 2.84 21" 15" 18" 24" 20" 2.8 5.6 8.4 11.2 2'-4' V-3" 5'-2" V-11' 1'-3' 1'-8' 3'-5" 3'-5" 3'-11' 4'-10 1.78 2.31 2.33 2.39 2.53 2.83 2.87 2.99 3.26 3.36 3.42 3.60 4.01 28" 20" 24" 53" 24" 4.3 8.6 12.9 17.2 2'-8' V-4' S'-112 --2-7-74-2-5j--Z-0' ' " 4'-0" 4'-2' 4'-7" 5'-8" 2.34 3.03 3.05 3.14 3.32 3.72 3.77 3.93 4.29 4.40 4.47 4.72 5.25 35" 24" 30" 38.7 29" 5.9 11.8 17.7 23.6 3'-1" 1'-5"6'-1 2'-1" 1'-5'3'� 4'-9" 4'-9" 4'-11'5'-6" 6'-9" 3.13 4.06 4.09 4.20 4.45 4.99 5.06 5.28 5.76 5.93 6.03 6.36 7.09 42" 29" 36" r49 33" 8.4 16.8 25.2 33.6 3'-5" V-6" 7'-8' 2'-2' V-6' 4'-2' 5'-6" 5'-6" 5'-8' 6'-4" 7'-9" 3.83 5.00 5.04 5.18 5.48 6.16 6.24 6.52 7.12 7.32 7.447.86 8.76 49" 33" 42" 53" 38" 10.6 21.2 31.8 42.4 3'-10' V-7' 8- 2'-3" 1'-7' 5'4 6'-4" 6'-4" 6'-7' 7'-4' 8'-11' 4,87 6.31 6.36 6.53 6.91 7.74 7.84 8.18 8.93 9.18 9.33 9.85 10.9 57" 38" 48" 88.5 43" 13.2 26.4 39.6 52.8 4'-3" 1'-8" 9'-6� 2'-4" 1'-8"6'-0 7'-1" 7'-1" 7'-4" 8'-2" 10'-0' 5.88 7.64 7.70 7.91 8.37 9.40 9.52 9.94 10.8 11.1 11.3311.9 13.33 64" 43" 54" 71" 47" 16.9 33.8 50.7 67.6 4'-7" 1'-10' 10'- "2'-6" 2'-0" 6'-10'7'-10 '-10' 8'-1" 9'-1" 11'-1" 7.80 10.1510.2 10.51 11.1212.4 12.6 13.2214.4 14.8515.1 C15.9 17.7 71" 47" 60" CD -2 NOTICE T STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 SCALE: N.T.S. E THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE JHE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DO NOT SCAL S PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER DOCUMENTS, AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO CLARIFICATIOOR USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED REFERRED TIC 4S OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS THE OWNER I'HOUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL ON EXTENSICuSER'S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD pAWING, W -E ENGINEER FROM ALL CLAIMS, DAMAGES, LOSSES AND TORNEY'S FE S AR SING OUT OF OR RESULT NG TH REFROM EXPENSES, BE AT THE R 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800-4324770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. NO. DA 1. 06-1'! E BY -09 MDS REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 Note: Use the guidelines of General Note No. 8 for selecting tabular quantities. DRAWING INFORMATION FILENAME: GEORGE ST. DITCH SCALE: SURVEYED BY: HSBS DSGN: FTW DATE: 04-17-09 DRWN: MDS DATE: 06-11-09 CHT, CONCRETE ELLIPTICAL PIPE 06-15-09 QAIQC: FTW DATE: 06-15-09 Opening Area (SF) Dimensions Class - Concrete (CY) Number Of Pipe And Skew Angle Of Pipe Rise Approx E uiv. q Span Round Rise Span Number 1 2 Of 3 Pi e X 30° 45° 4 A B C E F G S 0°q7'-4' Single 0° Double Triple Quadruple 0° 15 30° 45° 0° 15130' 45° 0° 15 30° 45° Pipe 12" 18" 1.3 2.6 3.9 5.2 1'-8" 1'-2' 3'-9' V-10' 1'-2' 0'-S2'-10'2'-10'2'-11 3'-3" 4'-0" 1.09 1.45 1.46 1.51 1.60 1.80 1.82 1.91 2.09 2.16 2.20 2.33 2.60 12" 18" 15" 14" 23" 1.8 3.6 5.4 7.2 V-10 1'-3' 4'-2 1'-11' 1'-3' 8 3'-5" 3'-5"3'-11' 4'-10' 1.36 1.82 1.84 1.89 2.01 2.29 2.32 2.43 2.68 2.75 2.80 2.97 3.33 14" 23" 18" 19" 30" 3.3 6.6 9.9 13.2 2'-3" V-4' 5'-1" Y-0-7-4' V-7 4'-2" 4'-2'4'-10'5'-11' 1.$9 2.55 2.57 2.65 2.82 3.22 3.27 3.43 3.77 3.88 3.95 4.19 4.70 19" 30" 24" 24" 38" 5.1 10.2 15.3 20.4 2'-8" 1'-5' 6'-3' 2'-1" 1'-5' 2'-9' 5'-2" 5'-2"6'-0" 7'-4" 2.64 3.55 3.58 3.69 3.93 4.48 4.54 4.77 5.24 5.39 5.49 5.82 6.53 24" 38" 30" 29" 45" 7.4 14.8 22.2 29.6 3'-1" 1'-6' 7'-0 2'-2" V-6' S-6" 6'-0" 6'-0'16'-3"6'-11' 8'-6" 3.32 4.48 4.52 4.66 4.96 5.64 5.72 6.00 6.60 6.80 6.92 7.34 8.24 29" 45" 36" 34" 53" 10.2 20.4 30.6 40.8 3'-6" 1'-7' 7'-1j} 2'-3" V-7'4'-5 7'-1" 7'-1"8'-2" 10'-0' 4.24 5.76 5.81 6.00 6.39 7.29 7.40 7.76 8.55 8.81 18.97 9.52 10.7 34" 53" 42" 38" 60" 12.9 25.81 38.7 51.6 3'-10' 1'-8' 8'-9'2'-4"1 1'-8' 5'-3' 7'-11 7'-11'8'-2" 9'-2" 11'-2" 5.22 7.16 7.23 7.46 7.96 9.10 9.24 9.70 10.71 11.0J11.2511.9513.46 38" 60" 48" 43" 68" 16.6 33.2 49.8 66.4 4'-3" 1'-10'9'-8 2'-6" 1'-1 Ij'-2 8'-10'8'-10 9'-2" 10'-2' 12'-6' 6.Co3 9.01 9.09 9.38 10.0 11.3 11.5 12.1 13.36 13.7 14.0 14.8 16.73 43" 68" 54" 48" 76" 1 20.5 41.0 61.5 82.0 4'-8" 2'-1' 10'-8' 2'-9" 2'-0' 7'-2' 9'-9" 9'-9" 10'-1 '11'-3' 13'-9' 8.666 11.7 11.8 12.22 13.0 14.8 15.0 15.7717.3 17.9'118,2 19.3 21.7 48" 1 76" 60" 53" 83"24.8 49.6 74.4 99.2 5'-1" 2'-6" 11'-7'3'-2" 2'-6 8'-1' 10'-7"10'-7'10'-1 T'2'-3'15'-0' 12.50 16.9 16.9 17.6 18.8 21.4721.7 22.8 25.1 25.97 6.4 28.0 31.5 53" 83" 66" 58" 91" 29.5 59.0 88.5 118.05'-6" 2' -10'I2' --6J 3'-6" 2'-1013'-0 11'-4'11'- "11'-9'13'-1'16'-0' 16.46 22.26 2.4 23.1624.6628.0 28.4 29.8 2.8533.8534.4 6.5541.0 CD -2 NOTICE T STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 SCALE: N.T.S. E THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE JHE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DO NOT SCAL S PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER DOCUMENTS, AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO CLARIFICATIOOR USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED REFERRED TIC 4S OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS THE OWNER I'HOUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL ON EXTENSICuSER'S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD pAWING, W -E ENGINEER FROM ALL CLAIMS, DAMAGES, LOSSES AND TORNEY'S FE S AR SING OUT OF OR RESULT NG TH REFROM EXPENSES, BE AT THE R 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800-4324770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. NO. DA 1. 06-1'! E BY -09 MDS REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 Note: Use the guidelines of General Note No. 8 for selecting tabular quantities. DRAWING INFORMATION FILENAME: GEORGE ST. DITCH SCALE: SURVEYED BY: HSBS DSGN: FTW DATE: 04-17-09 DRWN: MDS DATE: 06-11-09 CHT, LGM DATE: 06-15-09 QAIQC: FTW DATE: 06-15-09 F� NEEL=SCHAFFER NW ® SOLUTIONS YOU CAN BU/LD UPON 1201 19th Place, Suite A-100 Vero Beach, Florida 32960 PH: (772) 770-4707 FAX: (772) 770-4640 CA00008556 MISCELLANEOUS DETAILS GEORGE STREET DITCH SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA FRANK T.`'(NATANABI=, P. E. FL. REG. NO. 56735 WORKING NUMBER: N 5.07600.001 SHEET NUMBER: CD -2 01Z 01 oil 31 rw GEORGE ST. \ \ F \ CARNATION DR. SEAGRASS AVE. ME PROJECT LOCATION -"6, o r t Itc G- qAo =0 g%= Stree D H LOCATION MAP Engineering By: 14L NEEL-SCHAFFER 11w SOLU77ONS YOU CAN BU/L® UPON 1201 19th Place, Suite A-100 Vero teach, Florida 32960 Phone: (772) 770-470 i FAX: (772) 770-4640 CA 00006556 JIM, HILL kyl COUNCIL MEN BER DALE: I. SIMCHICK EU ENE WOLFF COUNCIL MEMBER I��Er7 CITY MANAGER CITY ENGINEER FOR BIDDING PURPOSES ONLY FRANK T. WATANABE, P.E. FLO REG. No. 66735 REVISED: ISSUED: Project Number: DATE 11• /1• 1 •11 10 SHEET INDEX C-1 C-2 C-3 CD -1 CD -2 COVER SHEET GENERAL NOTES EXISTING CONDITIONS AND PROPOSED IMPROVEMENTS MISCELLANEOUS DETAILS MISCELLANEOUS DETAILS JIM, HILL kyl COUNCIL MEN BER DALE: I. SIMCHICK EU ENE WOLFF COUNCIL MEMBER I��Er7 CITY MANAGER CITY ENGINEER FOR BIDDING PURPOSES ONLY FRANK T. WATANABE, P.E. FLO REG. No. 66735 REVISED: ISSUED: Project Number: DATE 11• /1• 1 •11 10 GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE CONDUCTED IN ACCORDANCE WITH CITY OF SEBASTIAN ENGINE ERING AND PUBLIC WORKS AND THE FDOT STANDARD SPECIFICATIONS FOR ROADS AND BRIDGES, LATEST EDITION. 2. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE SHOWN ACCORDING TO INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS, BUT DO NOT PURPORT TO BE ,ABSOLUTELY CORRE=CT. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES AFFECTING HIS WORK. 3. CONTRACTOR SHALL COORDINATE WITH UTILITY OWNERS FOR VERIFICATION OF ALL UTILITIES AND NOTIFY UTILITY OWNERS 72 HOURS PRIOR TO DIGGING IN ANY PORTION OF THE SITE. 4. THE CONTRACTOR SHALL CONTACT THE ENGINEER UPON FINDING ANY CONFLICTS IN THE PLANS DURING CONSTRUCTION OF ANY IMPROVEMENTS SHOWN ON THE DRAWINGS. Ei. THE LIMITS OF CONSTRUCTION SHOWN ON THE PLANS SHALL BE STRICTLY OBSERVED BY THE CONTRACTOR. ALL INGRESS, EGRESS AND TRAFFIC PATTERNS ON THE SITE SHALL BE EXISTING ROADWAYS SHOWN ON THE DRAWINGS. 6. FINISHED GRADE FOR GROUND ELEVATIONS ON DRAWINGS REFER TO GRADE AFTER SODDING OR OTHER SURFACE TREATMENT. FINISHED ELEVATIONS SHOWN ON DRAWINGS REFER TO ELEVATIONS AFTER CONCRETE OR ASPHALT PAVEMENT. 7. INSTALLATION OF ALL CONDUITS, PULL BOXES AND FOUNDATIONS SHALL BE IN ACCORDANCE WITH ALL REQUIREMENTS OF THE APPLICABLE SECTIONS OF THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS AND AS INDICATED ON THE DRAWINGS AND/OR BY THE MANUFACTURER. 8. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS OF ALL TESTINGS BY AN INDEPENDENT GEOTECHNICAL SOILS AND MATERIALS TESTING LABORATORY. THE COST OF ALL TESTINGS REQUIRED BY THESE PLANS & SPECIFICATIONS SHALL BE INCLUDED WITH THE LUMP SUM BID AND NO ADDITIONAL COMPENSATION SHALL BE MADE BY THE OWNER. 9. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN ALL REQUIRED BUILDING PERMITS FOR THIS PROJECT AND SHALL COORDINATE ALL ACTIVITIES WITH CITY OF SEBASTIAN. 10. UNLESS OTHERWISE SHOWN, THE CONTRACTOR SHALL REPLACE ALL PAVING, SODDING, STABILIZED EARTH, LANDSCAPING, DRIVEWAYS, SIDEWALKS, IRRIGATION SYSTEMS, UNDERGROUND PIPING, ETC. LOCATED WITHIN AND OUTSIDE THE CONSTRUCTION LIMIT LINE DISTURBED OR DAMAGED BY THE CONSTRUCTION. THE CONTRACTOR SHALL REPLACE WITH EQUAL MATERIAL OR AS DIRECTED BY THE ENGINEER. 11. WHERE A CONNECTION IS TO BE MADE IN THE FIELD TO AN EXISTING CONDUIT, THE CONTRACTOR SHALL EXCAVATE THE AREA TO VERIFY THE TYPE OF CONDUIT, CONDUIT SIZE, AND REQUIRED CONNECTION AND FITTINGS AND OBTAIN THE OWNERS APPROVAL OF THI - PROPOSED METHOD OF CONNECTION PRIOR TO INSTALLING MATERIALS. 12. THE Cf )NTRACTOR SHALL COORDINATE AND VERIFY ALL DIMENSIONS OF ALL EXISTING AND F"1'OPOSED FACILITIES PRIOR TO FABRICATION OF PIPING AND EQUIPMENT TO ENSUI,E PROPER ASSEMBLY OF ALL ITEMS. SOME DIMENSIONS MAY NEED TO BE VERIFIED BY THE CONTRACTOR, FROM THE MANUFACTURER. 13. THE CONTRACTOR IS TO FOLLOW THE CONSTRUCTION PERMITS THAT HAVE BEEN ISSUED FOR THIS PROJECT. ALL SPECIFIC OR GENERAL CONDITIONS APPLY. 14. THE CONTRACTOR IS TO ADHERE TO THE DESIGN AND CONSTRUCTION STANDARDS OF CITY OF SEBASTIAN. 15. MAINTErNANCE OF TRAFFIC SHALL BE IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES PART VI, WORK ZONE TRAFFIC CONTROL. CONTRACTOR TO PROVIDE MAINTENANCE OF TRAFFIC PLAN TO ENGINEER PRIOR TO CONSTRUCTION. TRAFFIC CIRCULATION WITHIN EXISTING PARKING LOT AREA MUST BE MAINTAINED DURING CONSTRUCTION. 16. COMPLETE RECORD DRAWINGS, CONFORMING TO CITY OF SEBASTIAN STANDARDS SHALL BE COMPILED DURING CONSTRUCTION FOR PERIODIC REVIEW. FINAL RECORD DRAWINGS, CERTIFIED BY A FLORIDA LICENSED REGISTERED LAND SURVEYOR SHALL BE SUBMITTED TO THE ENGINEER IN DIGITAL FORMAT PRIOR TO FINAL INSPECTION AND ACCEPTANCE ON ANY PART OF THE PROJECT. 17. LOCATIONS AND DIMENSIONS OF EXISTING RIGHTS-OF-WAY AND EASEMENTS ARE BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR SHALL VERIFY THE LIMITS OF THE RIGHTS-OF-WAY AND EASEMENTS IN ORDER TO AVOID ENCROACHMENTS. 18. THE CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AT ALL INTERSECTIONS OF PROPOSED WORK AND EXISTING UTILITIES. THE EXPLORATORY EXCAVATIONS SHALL BE MADE SEVENTY-TWO (72) HOURS IN ADVANCE OF THE WORK. IF THERE IS A POTENTIAL CONFLICT, THE CONTRACTOR IS TO NOTIFY OBSTRUCTION SHALL BE FURNISHED BY THE CONTRACTOR THE OWNER IMMEDIATELY. INFORMATION ON THE AND SHALL INCLUDE: LOCATION, ELEVATION, UTILITY TYPE, MATERIAL AND SIZE. CONTRACTOR SHALL RAISE OR LOWER THE INSTALLED PIPE AS NEEDED AT NO EXTRA EXPENSE TO THE OWNER. 19. ELEVATION DATUM IS LOCAL DATUM. 20. IN AREAS WHERE CONSTRUCTION ACTIVITIES RESTRICT NORMAL ACCESS TO PROPERTIES, THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ALTERNATIVE ACCESS ROUTES, WHICH ARE SUBJECT TO APPROVAL BY THE ENGINEER. 21. THE CONTRACTOR SHALL NOTIFY THE OWNER 72 HOURS IN ADVANCE OF ANY WATER MAIN OR SANITARY FORCE MAIN SHUT -DOWN. 22. ALL EXCAVATIONS SHALL BE BACKFILLED AT THE END OF EACH WORK DAY. 23. THE CONTRACTOR SHALL NOTIFY FIBER OPTICS COMPANIES SEVEN (7) DAYS PRIOR TO ANY CONSTRUCTION. EXTREME CAUTION SHALL BE EXERCISED IN AREAS OF FIBER OPTICS. 24. CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING DAMAGED CURBS, ASPHALT, LANC)SCAPING, DRIVEWAYS AND ANY TEMPORARY REPAIRS OF OPEN CUTS. THESE ITEM '� SHALL BE PAID UNDER GENERAL REQUIREMENTS. 25. CONTRACTOR SHALL MAINTAIN PEDESTRIAN TRAFFIC, I.E. TEMPORARY SIDEWALKS AROUND WORK AREAS, CONTRACTOR MAY HAVE TO RESTRICT WORK HOURS ON SIDE`NALKS, TO RESTORE IMMEDIATELY AND ERECT' TEMPORARY FENCING BETWEEN CONSTRUCTION AND TEMPORARY SIDEWALKS, ETC. 26. ALL CONSTRUCTION CONTROL SHALL BE REFERENCED AND REPLACED BY A FLORIDA REGISTERED LAND SURVEYOR AFTER CONSTRUCTION. 27. PIPES SHALL NOT BE DEFLECTED MORE THAN 75% OF THE MANUFACTURER'S RECOMMENDATIONS. NOTICE TO DRAWING HOLDER ESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE DO NOT SCALE 1' ; CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DOCUMENTS, THE. °RIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER CLARIFICATIONSTTHE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO REFERRED TO AS USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED THE OWNER FDppOF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS ')UT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL ON EXTENSIO%R's SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD i DRAWING, WITH IGINEER FROM oll ^ LAI I'Mn DnP QI=SS1 TING THEREFROM LASES, 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800-4324-7-7-0 SUNSHINE STATE ONE CALL OF FLORIDA, INC. MAINTENANCE OF TRAFFIC 1. CONTRACTOR SHALL ADHERE TO THE REQUIREMENTS SET FORTH IN THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) LATEST PUBLISHED EDITION. CHAPTER VI AND THE FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS LATEST PUBLISHED EDITION AT ALL TIMES. 2. ALL TRAFFIC CONTROL DEVICES (TEMPORARY SIGNS, PAVEMENT MARKINGS, BARRIER WALLS, ETC.) REQUIRED DURING A CONSTRUCTION PHASE SHALL BE INSTALLED AND APPROVED BY THE CITY OF SEBASTIAN TRAFFIC OPERATIONS ENGINEER PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND WILL BE MAINTAINED IN ACCORDANCE WITH MUTCD REFER TO INDEX 600. IF CASE IS NOT COVERED IN MUTCD INDEX 600 SHALL BE USED IN CONJUNCTION WITH ALL OTHER INDEXES SPECIFICALLY MENTIONED IN EACH TRAFFIC CONTROL PHASE. 3. ALL EXISTING SIGNS AND PAVEMENT MARKINGS WHICH CONFLICT WITH THE TRAFFIC CONTROL PLAN DURING A CONSTRUCTION PHASE SHALL BE REMOVED OR TEMPORARILY RELOCATED AS NECESSARY PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE COST OF REMOVING AND/OR REPLACING SIGNS AND PAVEMENT MARKINGS FOR MAINTENANCE OF TRAFFIC SHALL BE INCLUDED UNDER PAY ITEM 1-3. 4. ALL SIGNS 48" X 48" OR LARGER SHALL BE MAINTAINED ON TWO (2) BREAKAWAY SUPPORTS OR YIELDING POST AS SHOWN IN FIGURE 6-1 OF THE MUTCD. THE CONTRACTOR SHALL USE THE MUTCD TO DETERMINE THE APPROPRIATE PLACEMENT AND ELEVATION OF CONSTRUCTION SIGN. REFLECTIVITY SHALL ADHERE TO THE FDOT STANDARD SPECIFICATION FOR ROADS AND BRIDGE CONSTRUCTION LATEST PUBLISHED EDITION. 5. AT THE COMPLETION OF CONSTRUCTION DAY THE ROAD SHALL BE RETURNED TO TWO-WAY TRAFFIC. 6. VEHICULAR ACCESS TO RESIDENCES WILL BE MAINTAINED AT ALL TIMES. 7. PROVISIONS APPROVED BY THE PROJECT ENGINEER WILL BE MADE FOR THE REMOVAL OF STORM WATER FROM THE ROADWAY DURING CONSTRUCTION. 8. ALL TEMPORARY MARKINGS SHALL BE IN PLACE ONE (1) HOUR BEFORE SUNSET. 9. ALL DEVICES WILL BE IN GOOD CONDITION. MINIMUM REFLECTIVE INTENSITY SHALL MEET THE FDOT STANDARD SPECIFICATIONS FOR ROADS AND BRIDGE CONSTRUCTION LATEST PUBLISHED EDITION. 10. INGRESS/EGRESS TO COMPLEX MUST BE MAINTAINED THROUGHOUT CONSTRUCTION SCHEDULE. EROSION CONTROL/WATER QUALITY NOTES 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING AN EROSION CONTROL PLAN AT THE TIME OF PRE -CONSTRUCTION CONFERENCE. THE PROPOSED EROSION CONTROL PLAN SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CRITERIA SET FORTH IN THE FDOT STANDARD SPECIFICATIONS FOR ROADS AND FDEP LAND DEVELOPMENT MANUAL SHALL BE SUBJECT TO APPROVAL BY LOCAL GOVERNMENTS AND WATER MANAGEMENT DISTRICT HAVING JURISDICTION. 2. EROSION CONTROL AND SEDIMENTATION CONTROL DEVICES SHALL BE IN PLACE PRIOR TO BEGINNING ANY CONSTRUCTION. THEY SHALL BE INSTALLED, ATA MINIMUM, ZO THE LIMITS SHOWN IN THE DRAWING, AS REQUIRED IN THE SPECIFICATIONS AND IN ACCORDANCE WITH ALL REGULATORY AGENCY REQUIREMENTS. THE COST TO THE CONTRACTOR FOR ALL EROSION AND SEDIMENTATION CONTROL IS INCLUDED IN THE LUMP SUM BID AND NO ADDITIONAL COMPENSATION SHALL BE MADE BY THE OWNER. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE OF ALL TEMPORARY EROSION CONTROL FEATURES. 4. CONTRACTOR IS TO PROVIDE EROSION/SEDIMENTATION CONTROL TO PREVENT SILTATION OF ADJACENT PROPERTY, STREETS, STORM SEWERS AND WATER WAYS. IN ADDITION, CONTRACTOR SHALL PLACE STRAW, MULCH OR OTHER SUITABLE MATERIAL ON GROUND ON AREAS WHERE CONSTRUCTION -RELATED TRAFFIC IS TO ENTER AND EXIT SITE. IF, IN THE OPINION OF THE ENGINEER AND/OR LOCAL AUTHORITIES, EXCESSIVE QUANTITIES OF EARTH ARE TRANSPORTED OFF-SITE EITHER BY NATURAL DRAINAGE OR BY VEHICULAR TRAFFIC, THE CONTRACTOR IS TO REMOVE AND CLEAN SAID EARTH TO THE SATISFACTION OF THE ENGINEER AND/OR AUTHORITIES. AN EROSION CONTROL BARRIER SHALL BE ESTABLISHED AS SITE CLEARING PROCEEDS AND MAINTAINED UNTIL SUCH TIME AS VEGETATION OR OTHER CONTROLS BECOME EFFECTIVE. 5. EXISTING DRAINAGE PATTERNS AND CAPACITIES ARE TO BE PROTECTED AND MAINTAINED DURING CONSTRUCTION TO ELIMINATE FLOODING AND PONDING WATER ON PRIVATE PROPERTY. CONTRACTOR TO PROVIDE TEMPORARY DRAINAGE MEASURES AS REQUIRED TO MEET THIS REQUIREMENT. SPECIAL CONDITIONS 1. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION WITH BELLSOUTH, CABLE TV, F.P.L. & I.R.C. UTILITY DEPARTMENT FOR SCHEDULING INSTALLATION AND OR INSPECTIONS WITH REGARD TO THEIR RESPECTIVE SERVICES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL, REPAIR, REINSTALLATION OR RECONSTRUCTION OF PRIVATELY OWNED ITEMS (MAILBOXES, FENCE, ET. AL.) WITHIN PROJECT LIMITS. CONTRACTOR SHALL TAKE DUE CARE AS TO NOT ADVERSELY IMPACT PRIVATE CITIZENS & THEIR ABILITY TO USE SUCH ITEMS. 3. CONTRACTOR SHALL PREPARE & SUBMIT FOR REVIEW A PROJECT MAINTENANCE OF TRAFFIC PLAN. THIS PLAN SHALL BE PREPARED TO INSURE RESIDENTS & BUSINESS OWNERS WITHIN THE PROJECT LIMITS SHALL HAVE REASONABLE & CONTINUOUS ACCESS TO THEIR PROPERTIES DURING THE CONSTRUCTION PHASE. 4. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE SHOP DRAWINGS PRIOR TO START OF CONSTRUCTION. REVISIONS NO. TTBY J. DESCRIPTION MDS RESPONSE TO SJRWMD RAI DATED 05-06-09 DRAWING INFORMATION FILENAME: GEORGE ST. DITCH SCALE: 1 " = 10' SURVEYED BY: HSBS DSGN: FTW DATE: 04-17--09 DRWN: MDS DATE: 06-11-09 CHKD: LGM DATE: 06-15-09 QA/QC: FTW DATE: 06-15-09 MINIMUM STANDARDS 1. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMEN I° BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHAL I,, BE CONSTRUCTED AS A FIRST STEP IN LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 2. SEDIMENT CONTROL MEASURES ARE TO BE ADJUSTED TO MEET FIELD CONDITIONS AT THE TIME OF CONSTRUCTION AND BE CONSTRUCTED PRIOR TO GRADING OR DISTURBANCE OF EXISTING SURFACE MATERIAL ON BALANCE OF SITE. PERIMETER SEDIMENT BARRIERS SHALL BE CONSTRUCTED TO PREVENT SEDIMENT OR TRASH FROM FLOWING OR FLOATING ONTO ADJACENT PROPERTIES. 3• PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN UNDISTURBED FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT UNDISTURBED FOR MORE THAN ONE YEAR. 4• DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF SOIL STOCKPILES ON SITE AS WELL AS SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. 5• A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL BE CONSIDERED ESTABLISHED UNTIL A GROUND (OVER IS ACHIEVED THAT, IN THE OPINION OF THE REVIEWER, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 6• STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 7. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE SEDIMENT BASIN SHALL BE DESIGNED AND CONSTRUCTED TO ACCOMMODATE THE ANTICIPATED SEDIMENT LOADING FROM THE LAND -DISTURBING ACTIVITY. THE OUTFALL DEVICE OR SYSTEM DESIGN SHALL TAKE INTO ACCOUNT THE TOTAL DRAINAGE AREA FLOWING THROUGH THE DISTURBED AREA TO BE SERVED BY THE BASIN. 8• AFTER SIGNIFICANT RAINFALL, SEDIMENT CONTROL STRUCTURES WILL BE INSPECTED FOR INTEGRITY. DAMAGED DEVICES SHALL HE CORRECTED BY THE CONTRACTOR IMMEDIATELY. 9. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME (DR SLOPE DRAIN STRUCTURE. 10. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. 11. SEDIMENT WILL BE PREVENTED FROM ENTERING ANY STORM DRAIN SYSTEM, DITCH OR CHANNEL. ALL STORM WATER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRS -f BEING FILTERED OR OTHER WISE TREATED TO REMOVE SEDIMENT. 12. UNDERGROUND UTILITY POWER LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: (a) NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. (b) EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. (c) EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR, PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY ,AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. (d) RESTABUIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. 13. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMEN-f IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE WITH CURBS AND GUTTERS, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL SUBDIVISION LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. 14. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, IN THE OPINION OF THE PROJECT ENGINEER. DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 15. PROPERTIES AND WATERWAYS DOWNSTREAM FROM CONSTRUCTION SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION AND EROSION. 16. EROSION CONTROL DESIGN AND CONSTRUCTION SHALL FOLLOW THE REQUIREMENTS IN INDEX Nos. 101, 102 AND 103 OF FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS. 17. PERIODIC INSPECTION AND MAINTENANCE OF SEDIMENT CONTROL STRUCTURES MUST BE PROVIDED TO ENSURE INTENDED PURPOSE IS ACCOMPLISHED. THE OWNER AND CONTRACTOR SHALL BE CONTINUALLY RESPONSIBLE FOR SEDIMENT LEAVING THE PROPERTY. SEDIMENT CONTROL MEASURES SHALL BE IN WORKING CONDITION AT THE END OF EACH WORKING DAY. NEEL-SCHAFFER SOLUTIONS YOU CAN BUILD UPON 1201 19th Place, Suite A-100 Vero Beach, Florida 32960 PH: (772) 770-4707 FAX: (772) 770-4640 CA00008556 CONSTRUCTION IN STREETS, ROAD RIGHTS-OF-WAY & PARKING AREAS 1. OPEN ROAD CUTS REQUIRE PRIOR APPROVAL OF THE CITY, COUNTY, STATE OR ANY OTHER AGENCY WHICH MAY HAVE JURISDICTION. 2. CONSTRUCTION, MATERIALS AND WORKMANSHIP ARE TO BE IN ACCORDANCE WITH FLORIDA DEPARTMENT OF TRANSPORTATION SPECIFICATIONS AND STANDARDS. 3. AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION SHALL RECEIVE GRASS, MULCH OR SOLID SOD, AS STATED ON THE PLANS. 4. STREET OR HIGHWAY RESTORATION TO BE DONE AS PER LOCAL OR STATE AGENCY HAVING JURISDICTION. 5. THE CONTRACTOR SHALL COMPLY WITH RULES AND REGULATIONS OF THE STATE, COUNTY AND CITY AUTHORITIES REGARDING CLOSING OR RESTRICTING THE USE OF PUBLIC STREETS OR HIGHWAYS. 6. TRAFFIC CONTROL ON COUNTY AND STATE HIGHWAY RIGHTS-OF-WAY SHALL MEET THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (U.S. DOT/FHA) AND THE REQUIREMENTS OF THE STATE AND ANY LOCAL AGENCY HAVING JURISDICTION. 7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY AND DOCUMENT THE ACTUAL LOCATION AND EXTENT OF EXISTING UTILITIES WHICH MAY AFFECT CONSTRUCTION. EXISTING UTILITIES SHOWN ARE BASED UPON THE BEST AVAILABLE INFORMATION SUPPLIED TO THE OWNER/ENGINEER AND IS SHOWN FOR INFORMATIONAL PURPOSE ONLY. 8. CONTRACTOR IS RESPONSIBLE FOR CHECKING ACTUAL SITE CONDITIONS BEFORE STARTING CONSTRUCTION. 9. DISCREPANCIES ON THE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE COMMENCING WORK. 10. CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS BEFORE COMMENCING WORK. 11. THE CONTRACTOR SHALL CONTACT ALL IMPACTED UTILITIES AT LEAST 48 HOURS IN ADVANCE OF CONSTRUCTION OPERATIONS. 12. NO FIELD CHANGES OR DEVIATIONS FROM DESIGN TO BE MADE WITHOUT PRIOR APPROVAL OF THE ENGINEER AND THE APPROPRIATE GOVERNMENTAL ENTITY. 13. ALL MUCK OR OTHER SUCH UNSUITABLE MATERIAL ENCOUNTERED WITHIN ROAD RIGHTS-OF- WAY AND LOT AREAS SHALL BE FULLY EXCAVATED AND REPLACED WITH CLEAN, ON-SITE FILL MATERIAL COMPACTED TO 95% MAXIMUM DENSITY. ACTUAL EXTENT AND QUANTITY OF EXCAVATION SHALL BE DETERMINED AT THE TIME OF CONSTRUCTION BY APPROPRIATE FIELD MEASUREMENT. DISPOSAL OF UNSUITABLE MATERIAL SHALL BE AS DIRECTED BY OWNER OR OWNER'S ENGINEER. GENERAL NOTES GEORGE STREET DITCH SEBASTIAN, INDIAN RIVER COUNTY, FLORIDA FRANK T. WATANABE, P.E. FL. REG. NO. 66735 WORKING NUMBER: N S.07600.00 e1 SHEET NUMBER: C-2 0• k - d w X (OO \ ° CONCRETE PADS _ { RIP -RAP `-, 0' �� RCP \ (APPROXIMATE LOCATION) B.S.B REMOV58 L.F. 43" x 70". �0 AND REPLACE WITH \ STA 1+30.02 6.48' LT) 6, / \ 56 L.F. TWO (2) 43 x 68 E \ CONNECT 18' CMP pC STOCKADE FENCE " "RC C-)� \ INV. 1_5.11 0 °'- ' SAW CUT PAVEMENT AND \ ���� N �yF ��i 6' DRAINAG�TY EASEMENT / 5 TA 1+00 CENTER LINE GEORGE ST. HEDGES � 0� x`_ TRANSITION TO EXISTING 10 0' =STA 1+00 CONTROL LIN " top of bank / ROADa 10 Xti top of bank 2� 0 00 sTocKAOE FE NCE / \ HEDGES.. _ _ ...... /�rz 1t' 0 5 X2.5'Xti 0 x,,,. �� i < f' 6> • v' i\' I. 9 W H OUT / XI - 00. / �a i / \ 1 " MP 5' EEP j 8 c / RIP RAP ,\' / ` MpACTANDGRADEW,ITH x`�''•\.' \ 5; �. O'INVp13.55 X FILL, CO' _ w T/�.@+69. INV. 15.00 5 �- , 1 / / \ / wns D Jui S ALL ,rNJ / \ 9 i� UT HE D L +31.30 SOD O TOP OF DITCH AREA \,, AREA x4•t A X \ W SHED INV. 15.31 1 1+25.47 / N E L - k / E L V N 0 x X 1 HEADWALL / Q �, e -toe - o / = toe � '� � 5 Q = t a r f' N ---- - - - -- x r 52, 77 '.MP >' to N4 F o ^' x70"n C.P. /' 00 / \ 5. \ \ N' 9 6 0+ k1 43"x70" R.C.P. 4�r)i Oj. 0�. 1`), s�::C,. , .\,! INV.-•T4.08\X, `,\' \ ,--'�.' r' '� �`� J+50 NV.=15.31 x C6NTROL LINE 'A" 6 \ / �� _ / _ ` iO i" f . /'� Uu'P,SH€D L N \ O - - - - - - - / i N� _ k i �5• - -- - ---- -� \ `b \ - k - ---toe h• / 1 18' C k 2.5'x2.5' INV.= 4.4\`J: ,, / WASH OUT /' i` s . / /' WAS, 'D OUT xx 18" CMP WA DEEP J tO E,.. ;-� '� / �. ARA 'X4 O �J..;f '�' O:. INV. -15.86 \ . � \,DE oe STA 0+69.77, xMANi `` / / INV 15.31 z o \ i \ o• T � , � � J-` FILL, COMPACT AND GRADE WITH 0 \ �0' `°f SOD ON TtSP OF DITCHAR 1 x ° x / ' f g \ / +25.47 \ ` xN \ \STA 1 / 89/ 5 `.2",00, i / fKv.15:00 /` f L_ L / / �• ` \ 0 J L -�r - NAIL FD. „........ ,xg PK FI�J `IONBO� � �._._.,...... 1. �0' / top of bank t0D Of x REMOVE AND DISCARD 6' DRAINAGE/UTILITY EASEMENT \ EXISTING HEADWALL 0• / A N N oHE - \ xti / STA 1+29.20(8.10' RT - \ 9� / CONNECT 18" CMP l�' d .... Cro DEMO EXISTING x INV 1'4.41 d °H rn 0 ° e 'd. � � CONCRETE POOL ° ASPHALT ELEV.-20.22 MB / X� a ° d ° EQUIPMENT PAD 6" 23.24 SAW CUT PAVEMENT / 4 °d . c�nG�ETea /C & dPUMP PAD d g AND TRANSITION TO I I ° d °° 25 v W � EXISTING ROAD Cl) J PROPOSED CONCRETE JO CIO CAP .4 Z EXISTING GROUND 20 0 Z mO NOTE: HOUSE AND DECK w 0 c+ --E 0 n DETAILS ON THIS LOT4 ° d d COVERED CONCRETE ARE BASED ON A SURVEY ° Q PORCH 3 PERFORMED & PROVIDED d a.. i BY SMITH SURVEYING & e ° ` d d O. MAPPING, INC. - O JOB #03-0856 °. 12" ADS O 4 c� LOT 8 INV.=18.55 Z BLOCK 180° C B. S. SINGE d a (VACANT) \ �B n a FAMILY W d . RESIDENCE 0 1+50 °d a ° °I d °e. .' .. 'Q OL (APPROXIMATE) . O.m. d . ° ° ° FF. 235 ° 16' CONCRETE d ° d DRI VE ° d d ° d'� .. Q o d° Ln n�^^� a VO •h.L4 a °. . 6 l� STA 0+70.01 0 29.59' 18" CMP REMOVE AND REPLACE NV.=18.2 EXISTING rl1 HEADWALL 0 ° a d . d - dye, A a 0• k - d w X (OO \ ° CONCRETE PADS _ { RIP -RAP `-, 0' �� RCP \ (APPROXIMATE LOCATION) B.S.B REMOV58 L.F. 43" x 70". �0 AND REPLACE WITH \ STA 1+30.02 6.48' LT) 6, / \ 56 L.F. TWO (2) 43 x 68 E \ CONNECT 18' CMP pC STOCKADE FENCE " "RC C-)� \ INV. 1_5.11 0 °'- ' SAW CUT PAVEMENT AND \ ���� N �yF ��i 6' DRAINAG�TY EASEMENT / 5 TA 1+00 CENTER LINE GEORGE ST. HEDGES � 0� x`_ TRANSITION TO EXISTING 10 0' =STA 1+00 CONTROL LIN " top of bank / ROADa 10 Xti top of bank 2� 0 00 sTocKAOE FE NCE / \ HEDGES.. _ _ ...... /�rz 1t' 0 5 X2.5'Xti 0 x,,,. �� i < f' 6> • v' i\' I. 9 W H OUT / XI - 00. / �a i / \ 1 " MP 5' EEP j 8 c / RIP RAP ,\' / ` MpACTANDGRADEW,ITH x`�''•\.' \ 5; �. O'INVp13.55 X FILL, CO' _ w T/�.@+69. INV. 15.00 5 �- , 1 / / \ / wns D Jui S ALL ,rNJ / \ 9 i� UT HE D L +31.30 SOD O TOP OF DITCH AREA \,, AREA x4•t A X \ W SHED INV. 15.31 1 1+25.47 / N E L - k / E L V N 0 x X 1 HEADWALL / Q �, e -toe - o / = toe � '� � 5 Q = t a r f' N ---- - - - -- x r 52, 77 '.MP >' to N4 F o ^' x70"n C.P. /' 00 / \ 5. \ \ N' 9 6 0+ k1 43"x70" R.C.P. 4�r)i Oj. 0�. 1`), s�::C,. , .\,! INV.-•T4.08\X, `,\' \ ,--'�.' r' '� �`� J+50 NV.=15.31 x C6NTROL LINE 'A" 6 \ / �� _ / _ ` iO i" f . /'� Uu'P,SH€D L N \ O - - - - - - - / i N� _ k i �5• - -- - ---- -� \ `b \ - k - ---toe h• / 1 18' C k 2.5'x2.5' INV.= 4.4\`J: ,, / WASH OUT /' i` s . / /' WAS, 'D OUT xx 18" CMP WA DEEP J tO E,.. ;-� '� / �. ARA 'X4 O �J..;f '�' O:. INV. -15.86 \ . � \,DE oe STA 0+69.77, xMANi `` / / INV 15.31 z o \ i \ o• T � , � � J-` FILL, COMPACT AND GRADE WITH 0 \ �0' `°f SOD ON TtSP OF DITCHAR 1 x ° x / ' f g \ / +25.47 \ ` xN \ \STA 1 / 89/ 5 `.2",00, i / fKv.15:00 /` f L_ L / / �• ` \ 0 J L -�r - NAIL FD. „........ ,xg PK FI�J `IONBO� � �._._.,...... 1. �0' / top of bank t0D Of x REMOVE AND DISCARD 6' DRAINAGE/UTILITY EASEMENT \ EXISTING HEADWALL 0• / A N N oHE - \ xti / STA 1+29.20(8.10' RT - \ 9� / CONNECT 18" CMP l�' d .... Cro DEMO EXISTING x INV 1'4.41 d °H rn 0 ° e 'd. � � CONCRETE POOL ° ASPHALT ELEV.-20.22 MB / X� a ° d ° EQUIPMENT PAD 6" 23.24 SAW CUT PAVEMENT / 4 °d . c�nG�ETea /C & dPUMP PAD d g AND TRANSITION TO I I ° d °° 25 15 `IX v W � EXISTING ROAD Cl) J PROPOSED CONCRETE JO CIO CAP .4 Z EXISTING GROUND 20 0 Z 15 `IX co (a a a ° NOTICE TO DRAWING HOLDER "ALE THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE DO NOT SITS, THE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DOCUMEN,TIONS PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER CLARIFICQ TO AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO REFERREER FOR USE ON THIS PROJECT ONLY, THIS DRAWING SHOULD NOT BE USED THE OWNfSIONS OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS ON EXTEI`, WITHOUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL DRAWING REUSER'S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD ,S THE ENGINEER FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES, BEAT W3 ATTORNEY'S FEES ARISING OUT OF OR RESULTING THEREFROM. HARMLE INCLUD EXISTING 43"X70" RCP TO BE REMOVED FDOT TYPE JUNCTION BOX 1+00 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800-432-4770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. W m Cl) J CIO JO W .4 Z nj Z 0 Z mO OU w 0 c+ --E 0 co (a a a ° NOTICE TO DRAWING HOLDER "ALE THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE DO NOT SITS, THE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DOCUMEN,TIONS PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER CLARIFICQ TO AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO REFERREER FOR USE ON THIS PROJECT ONLY, THIS DRAWING SHOULD NOT BE USED THE OWNfSIONS OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS ON EXTEI`, WITHOUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL DRAWING REUSER'S SOLE RISK AND THE REUSER SHALL INDEMNIFY AND HOLD ,S THE ENGINEER FROM ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES, BEAT W3 ATTORNEY'S FEES ARISING OUT OF OR RESULTING THEREFROM. HARMLE INCLUD EXISTING 43"X70" RCP TO BE REMOVED FDOT TYPE JUNCTION BOX 1+00 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800-432-4770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. N0. DATE BY 1. 6-11-09 MDS w 0 IRRIGATION SYSTEM INTAKE (APPROXIMATE) 1.0' HEADWALL PIPE DITCH AND • FILL IN AREA / 1 ti \,€ N REMOVE AND REPLACE EXISTING SEAWALL _ STA. 2+51.30 (5.21' LT) O O 0�0 � k 60" CMP V.=13.14 Lid STA: 2+51.30 INV. 13.14 O REMOVE AND DISCARD ' 6 O 35 L.F. 60" CMP 0• U-I2EMOVE AND REPLACE EXISTING SEAWALL STA. 2+51.30 ( 5.21' RT ) t INSTALL 120 L.F. 52"x77" CMP 1' WITNESS IRRIGATION SYSTEM INTAKE (APPROXIMATE) HEADWALL EXISTING CANAL REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 DRAWING INFORMATION FILENAME: GEORGEST. DITCH SCALE: 1"= 10' SURVEYED BY: HSBS DSGN: FTW DATE: 04-17-09 DRWN: MDS DATE: 06-11-09 CHKD: LGM DATE: 06-15-09 QAIQC: FTW DATE: 06-15-09 2+00 -- COMPACTED FILL 1:10 HORIZONTAL 1:5 VERTICAL Report of Survey: (Ditch) *TYPE OF SURVEY: TOPOGRAPHIC * THIS SURVEY PERFORMED BY: HOUSTON, SCHULKE, BITTLE & STODDARD, INC. L.B. #6905 1717 INDIAN RIVER BLVD. SUITE 101 VERO BEACH, FLORIDA 32960 * PROFESSIONAL SURVEYOR & MAPPER IN RESPONSIBLE CHARGE: STUART A. HOUSTON, P.L.S. #4490 E LAND T THE EXPECTED USE H , AS CLASSIFIED ASSIFIED IN THE MINIMUM TECHNICAL STANDARDS (61G17-6, FAC) IS SUBURBAN. THE MINIMUM RELATIVE ACCURACY FOR THIS TYPE OF BOUNDARY SURVEY IS 1 FOOT IN 7,500. THE MEASUREMENT AND CALCULATION OF A CLOSED GEOMETRIC FIGURE WAS FOUND TO BE IN EXCESS OF THIS ACCURACY REQUIREMENT. * THIS SURVEY MEETS OR EXCEEDS ALL APPLICABLE REQUIREMENTS OF THE MINIMUM TECHNICAL STANDARDS, AS ESTABLISHED IN CHAPTER 61,317-6, FLORIDA ADMINISTRATIVE CODE. * ELEVATIONS AND DIMENSIONS SHOWN HEREON ARE MEASURED IN FEET AND DECIMAL PARTS THEREOF. THE LAST DATE OF FIELD WORK WAS: 9/30/08 * THE BEARING BASE FOR THIS SURVEY IS: N00°04'45"W, ASSUMED ALONG THE CLOF GEORGE STREET, PER THE PLAT, AND SHOWN THEREON. (NOTE: GEORGE STREET IS PLATTED AS "LANDSDOWNE DRIVE".) * THIS SURVEY DOES NOT CERTIFY TO THE EXISTENCE OR LOCATION OF ANY UNDERGROUND IMPROVEMENTS: UTILITIES, FOUNDATIONS, OR ENCROACHMENT.;, EXCEPT AS SHOWN. _ * NO INSTRUMENTS OF RECORD REGARDING EASEMENTS, RIGHT-OF-Wn S OR OWNERSHIP WERE SUPPLIED TO THIS SURVEYOR, EXCEPT AS SHOWN. * NO TITLE OPINION OR GUARANTEE IS EXPRESSED OR IMPLIED. * UNLESS A COMPARISON IS SHOWN, PLAT VALUES AND MEASURED VALUES ARE THE SAME. * LEGAL DESCRIPTION IS AS PROVIDED BY THE CLIENT. _ * THE PARCEL OF LAN`, SHOWN HEREON APPEARS TO BE IN FLOOD ZONE 'X' PER FLOOD INSURANCE RATE MAP #12061 C0078 E, DATED MAY 4th., 1989 * THE ELEVATIONS SHOWN HEREON ARE NGVD '29, AND ARE BASED ON A CLOSED BENCH CIRCUIT TO A F,I.R.M. BENCHMARK. (REFERENCE MARK 26, F.I.R.M. PANEL _ 0078, - CHISELED SQUARE ON THE SOUTHWEST CORNER OF ENGLAR AVE. BRIDGE OVER COLLIER WATERWAY, ELEV.= 25.07) ON-SITE BENCHMARK AS SHOWN. Legend & Abbreviations: (symbols not scaleable for size) PLS - PROFESSIONAL LAND SURVEYOR - WOOD UTILITY POLE PSM - PROFESSIONAL SURVEYOR & MAPPER ® - TELEPHONE SERVICE LB - LAND SURVEYING BUSINESS ® - CABLE T.V. . OX & - CENTERLINE -- - E/P - EDGE OF PAVEMENT O - WELL B. M. - BENCHMARK ® - WATER METER O - IRON ROD & CAP LB 6905 FD. ® - SEPTIC TANK FD - FOUND - MITERED END SECTION (MES) P PLAT VALUE - DRAINAGE (M) - MEASURED VALUE MB - MAIL BOX F. F. - FINISH FLOOR OHE - OVERHEAD ELECTRIC 'I CABBAGE PALM - OAK - CITRUS LEGEND 7i SURFACE WATER IMPACT (Area = 0.08 Ac) REMOVE EXISTING CABBAGE PALM PROPOSED SILT FENCE EXISTING PAVEMENT TO BE REMOVED AND REPLACED BY STRUCTURAL CONCRETE CAP (FROM TOP OF PIPE - - -- EXISTING ROAD ELEVATION). NOT EXISTING CANAL -_ 1. NO MITIGATION IS REQUIRED FOR THE IMPACTS TO UPLAND EXCAVATED DITCHES I/ PLAT OF SURVEY FOR: A�� EXISTING 60" CMP A TOPOGRAPHIC SURVEY OF A PORTION THE 30' EXISTING SEAWALL I n DRAINAGE R/W ABUTTING LOTS 42 & 43,, BLOCK 176, TO BE REMOVED SEBASTIAN HIGHLANDS UNIT 8, AS SHOWN ON THE PLAT THEREOF, RECORDED IN PLAT BOOK 6, PAGE 13, OF THE PUBLIC RECORDS OF INDIAN RIVER COUNTY, FLORIDA. HOME OF PELICAN ISLAND REVISIONS ®° PCERTIFICA7EOFAUTHORIZATION � RS 05 D L'hVX 17171NDMAIMTRBLVD. -SUITE 101 D VEROBEACH, FL. 32960 PH.: (772) 794-1213 FAX: (772) 794-1096 E-MAIL : W905Qabellsouthnet N0. DATE DESCRIF TION North GRAPHIC SCALE 0 5 10 (IN FEET) 1 inch= 10 ft. TYPE: Topographic PROJECT# Ditch DATE: 9/30/08 F.B. PG. DRAWN BY., S.A.H. CHECKED BY: SCALE: 1"=10' SHEET: 1 of 1 THIS SURVEY IS NOT VALID WITHOUT THE SIGNATURE AND THE ORIGINAL RAISED SEAL OF THE FLORIDA LICENSED SURVEYOR AND MAPPER NAMED BELOW. BY I STUART A. HOUSTON, F.L.S.#4490 .,,® NEEL-SCHAFFEREXISTING CONDITIONS AND PROPOSED IMPROVEMENTS SOLUTIONS YOU CAN BU/LD UPON - GEORGE STREET DITCH 1201 19th Place, Suite A-100 Vero Beach, Florida 32960 PH: (772) 770-4707 SEBA-8TIAN, INDIAN RIVER COUNTY, FLORIDA T. FAX: (772) 770-4640 CA00008556 FRANK FL. REG. NOO..66673 BE, P. . 6735 WORKING NUMBER: N .07600.001 SHEET NUMBER: C-3 m Cl) m � .4 Z nj Z NO mO �H c+ --E N0. DATE BY 1. 6-11-09 MDS w 0 IRRIGATION SYSTEM INTAKE (APPROXIMATE) 1.0' HEADWALL PIPE DITCH AND • FILL IN AREA / 1 ti \,€ N REMOVE AND REPLACE EXISTING SEAWALL _ STA. 2+51.30 (5.21' LT) O O 0�0 � k 60" CMP V.=13.14 Lid STA: 2+51.30 INV. 13.14 O REMOVE AND DISCARD ' 6 O 35 L.F. 60" CMP 0• U-I2EMOVE AND REPLACE EXISTING SEAWALL STA. 2+51.30 ( 5.21' RT ) t INSTALL 120 L.F. 52"x77" CMP 1' WITNESS IRRIGATION SYSTEM INTAKE (APPROXIMATE) HEADWALL EXISTING CANAL REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 DRAWING INFORMATION FILENAME: GEORGEST. DITCH SCALE: 1"= 10' SURVEYED BY: HSBS DSGN: FTW DATE: 04-17-09 DRWN: MDS DATE: 06-11-09 CHKD: LGM DATE: 06-15-09 QAIQC: FTW DATE: 06-15-09 2+00 -- COMPACTED FILL 1:10 HORIZONTAL 1:5 VERTICAL Report of Survey: (Ditch) *TYPE OF SURVEY: TOPOGRAPHIC * THIS SURVEY PERFORMED BY: HOUSTON, SCHULKE, BITTLE & STODDARD, INC. L.B. #6905 1717 INDIAN RIVER BLVD. SUITE 101 VERO BEACH, FLORIDA 32960 * PROFESSIONAL SURVEYOR & MAPPER IN RESPONSIBLE CHARGE: STUART A. HOUSTON, P.L.S. #4490 E LAND T THE EXPECTED USE H , AS CLASSIFIED ASSIFIED IN THE MINIMUM TECHNICAL STANDARDS (61G17-6, FAC) IS SUBURBAN. THE MINIMUM RELATIVE ACCURACY FOR THIS TYPE OF BOUNDARY SURVEY IS 1 FOOT IN 7,500. THE MEASUREMENT AND CALCULATION OF A CLOSED GEOMETRIC FIGURE WAS FOUND TO BE IN EXCESS OF THIS ACCURACY REQUIREMENT. * THIS SURVEY MEETS OR EXCEEDS ALL APPLICABLE REQUIREMENTS OF THE MINIMUM TECHNICAL STANDARDS, AS ESTABLISHED IN CHAPTER 61,317-6, FLORIDA ADMINISTRATIVE CODE. * ELEVATIONS AND DIMENSIONS SHOWN HEREON ARE MEASURED IN FEET AND DECIMAL PARTS THEREOF. THE LAST DATE OF FIELD WORK WAS: 9/30/08 * THE BEARING BASE FOR THIS SURVEY IS: N00°04'45"W, ASSUMED ALONG THE CLOF GEORGE STREET, PER THE PLAT, AND SHOWN THEREON. (NOTE: GEORGE STREET IS PLATTED AS "LANDSDOWNE DRIVE".) * THIS SURVEY DOES NOT CERTIFY TO THE EXISTENCE OR LOCATION OF ANY UNDERGROUND IMPROVEMENTS: UTILITIES, FOUNDATIONS, OR ENCROACHMENT.;, EXCEPT AS SHOWN. _ * NO INSTRUMENTS OF RECORD REGARDING EASEMENTS, RIGHT-OF-Wn S OR OWNERSHIP WERE SUPPLIED TO THIS SURVEYOR, EXCEPT AS SHOWN. * NO TITLE OPINION OR GUARANTEE IS EXPRESSED OR IMPLIED. * UNLESS A COMPARISON IS SHOWN, PLAT VALUES AND MEASURED VALUES ARE THE SAME. * LEGAL DESCRIPTION IS AS PROVIDED BY THE CLIENT. _ * THE PARCEL OF LAN`, SHOWN HEREON APPEARS TO BE IN FLOOD ZONE 'X' PER FLOOD INSURANCE RATE MAP #12061 C0078 E, DATED MAY 4th., 1989 * THE ELEVATIONS SHOWN HEREON ARE NGVD '29, AND ARE BASED ON A CLOSED BENCH CIRCUIT TO A F,I.R.M. BENCHMARK. (REFERENCE MARK 26, F.I.R.M. PANEL _ 0078, - CHISELED SQUARE ON THE SOUTHWEST CORNER OF ENGLAR AVE. BRIDGE OVER COLLIER WATERWAY, ELEV.= 25.07) ON-SITE BENCHMARK AS SHOWN. Legend & Abbreviations: (symbols not scaleable for size) PLS - PROFESSIONAL LAND SURVEYOR - WOOD UTILITY POLE PSM - PROFESSIONAL SURVEYOR & MAPPER ® - TELEPHONE SERVICE LB - LAND SURVEYING BUSINESS ® - CABLE T.V. . OX & - CENTERLINE -- - E/P - EDGE OF PAVEMENT O - WELL B. M. - BENCHMARK ® - WATER METER O - IRON ROD & CAP LB 6905 FD. ® - SEPTIC TANK FD - FOUND - MITERED END SECTION (MES) P PLAT VALUE - DRAINAGE (M) - MEASURED VALUE MB - MAIL BOX F. F. - FINISH FLOOR OHE - OVERHEAD ELECTRIC 'I CABBAGE PALM - OAK - CITRUS LEGEND 7i SURFACE WATER IMPACT (Area = 0.08 Ac) REMOVE EXISTING CABBAGE PALM PROPOSED SILT FENCE EXISTING PAVEMENT TO BE REMOVED AND REPLACED BY STRUCTURAL CONCRETE CAP (FROM TOP OF PIPE - - -- EXISTING ROAD ELEVATION). NOT EXISTING CANAL -_ 1. NO MITIGATION IS REQUIRED FOR THE IMPACTS TO UPLAND EXCAVATED DITCHES I/ PLAT OF SURVEY FOR: A�� EXISTING 60" CMP A TOPOGRAPHIC SURVEY OF A PORTION THE 30' EXISTING SEAWALL I n DRAINAGE R/W ABUTTING LOTS 42 & 43,, BLOCK 176, TO BE REMOVED SEBASTIAN HIGHLANDS UNIT 8, AS SHOWN ON THE PLAT THEREOF, RECORDED IN PLAT BOOK 6, PAGE 13, OF THE PUBLIC RECORDS OF INDIAN RIVER COUNTY, FLORIDA. HOME OF PELICAN ISLAND REVISIONS ®° PCERTIFICA7EOFAUTHORIZATION � RS 05 D L'hVX 17171NDMAIMTRBLVD. -SUITE 101 D VEROBEACH, FL. 32960 PH.: (772) 794-1213 FAX: (772) 794-1096 E-MAIL : W905Qabellsouthnet N0. DATE DESCRIF TION North GRAPHIC SCALE 0 5 10 (IN FEET) 1 inch= 10 ft. TYPE: Topographic PROJECT# Ditch DATE: 9/30/08 F.B. PG. DRAWN BY., S.A.H. CHECKED BY: SCALE: 1"=10' SHEET: 1 of 1 THIS SURVEY IS NOT VALID WITHOUT THE SIGNATURE AND THE ORIGINAL RAISED SEAL OF THE FLORIDA LICENSED SURVEYOR AND MAPPER NAMED BELOW. BY I STUART A. HOUSTON, F.L.S.#4490 .,,® NEEL-SCHAFFEREXISTING CONDITIONS AND PROPOSED IMPROVEMENTS SOLUTIONS YOU CAN BU/LD UPON - GEORGE STREET DITCH 1201 19th Place, Suite A-100 Vero Beach, Florida 32960 PH: (772) 770-4707 SEBA-8TIAN, INDIAN RIVER COUNTY, FLORIDA T. FAX: (772) 770-4640 CA00008556 FRANK FL. REG. NOO..66673 BE, P. . 6735 WORKING NUMBER: N .07600.001 SHEET NUMBER: C-3 UNIFORM CROSS SLOPE TO MATCH EXISTING AND UNIFORM GRADE PARALLEL TO ROADWAY TO MATCH ELEVATIONS AT LIMITS OF WORK REMOVE EXISTING PAVEMENT SAWCUT EXISTING PAVEMENT 12" TO FORM A SMOOTH AND STRAIGHT JOINT MATCH NEW PAVEMENT TO EXISTING O1Oo 01), 50 a, REMOVE EXISTING BACKFILL MATERIAL AND GRADE UNIFORMLY TO RECIEVE 12" 12" MIN. THICK COQUINA BASE COMPACTED TO 100% OF MAXIMUM DRY DENSITY AASHTO T-180 EXISTING PAVEMENT I NEW PAVEMENT 01 SAW CUT AND BUTT JOINT SCALE: N.T.S. I Type A Or B Riser — 2 Additional Bars A 1 ® 5" 0. C. 0 Perpendicular Bars A a` (See Section A—A) LU NL c .+ c d - 3-6" ( yp•) I� ro _ At Openin (See Note) 2—#7's Each a I Placed On To 0 Bars A And B At 45' o a° o Parallel Bars B (See Section A— Shear Key o TOP SLAB REINFORCIN( U. V a` o m D ad; W cO wi!I be permitted subject to the " Corners For 6 Rectangular Risers) F c 2 m+L Shear Key 1 Optional Shear Ka.1\ m— o m° % mo ars A f S-6" 'io tt� 0 N Index No. 201. 4r0" � c thickness and reinforcement are for either reinforced cast—In- place to facilitate connections between the structure walls and storm sewer pipes. 12. Structures with depths over 14' are to be checked for floatation by designer of jo` c g• Bars B_� mm 0.2 u:6Wr €IE shall be straight embedment. when these units will not cause or increase the severity a utility mnfllets. Such STRUCTURE BOTTOMS be furnished at no additional cost to the Department. Larger placed 4. Top and floor slab thickness and reinforcement are for precast and cast in y c larger units shall Alternate A units cannot replace Alternate B units without approval of the TG AND Engineer. This note applies to this Index only. r m precast circular units manufactured under ASTM C-76 or ASTM C-478, Horizontal s{eel in rectangular structures shall be lapped a minimum of 24 bar diameters used in lieu of Class — and Class -- concrete in precast items manufactured the 'Standard Operating Procedures' for the oa M In N 1n plants which are under inspection of precast drainage products. details see Index No. 201. 5. All reinforcement shall be A.S.T.M. A615, Grade 60 or 65 KSI welded wire m m� fabric, either smooth or deformed. m r5ale #5 Hoop Bar /#4 Hoop Bar J Reference Axis STEEL DIAGRAM #4®12"uW (Horizontal tsars —Continuous Around'.R Corners Foi m Rectangular Risersf a 2—Extra # 4'; m m Each Side Ana Above Opening o 0 #4' @ 12" 0.;. m 'Each Way $ Bars A Short (See Section 2 Additional Bo ® 5" Max. 0. C Side Of Openinc MATCH EXISTING PAVEMENT THICKNESS OR CONSTRUCT 1-y2" MIN. COMPACTED THICKNESS D.O.T. TYPE SP -12.5 ASPHALTIC CONCRETE SURFACE; PRIME COAT ALL SURFACES AND EDGES PRIOR TO SURFACING 1" MINIMUM TYPE SP-9.5(2ND LIFT) 1 1/2" MINIMUM TYPE SP -12.5 COQUINA BASE 8" MINIMUM THICKNESS COMPACTED TO 98% OF MAXIMUM DENSITY PER AASHTO. 12" STABILIZED SUBGRADE (FBV 50) (98% COMPACTION AASHTO T-180) FILL COMPACTED TO 98% MAX/ DENSITY 2— #5 Hoop Bars ,2 Lap Splices Permitted) B J 2 Additional Bars A ®5"0. C. Bars B Long Way (See Section B—B) TOP SLAB REINFORCING STEEL DIAGRAM o W Top Slab Reinforctngz,. Supplemental Bar A Or B `mom G J 0 ,2 m a` m `o LU NL c .+ c d - 3-6" ( yp•) Horizontal Wall Reinforcing m At Openin (See Note) o #4 ®12" BW (Horizontal Bars t; cN o a° o a a Shear Key 10' Draf Continuous Around m o m 0 Bars A\ wi!I be permitted subject to the " Corners For 6 Rectangular Risers) F c 2 Bai Shear Key 1 Optional Shear Ka.1\ m— are 3" Top Slab Reinforctngz,. Supplemental Bar A Or B `mom -- Vertical Wall Reinforcing 0 ° ALTERNATE A (See Table) m `o LU NL DATE: m W O (tro Reinforcin Horizontal Wall Reinforcing v C At Openin (See Note) (See Table) a Wall Reinforcin g" m Shear Key 10' Draf r c Top Slab Reinforctngz,. Supplemental Bar A Or B m m Bars A� Bars B c W m— Y a ° ALTERNATE A AT TOP SLAB m ALTERNATE B SECTION B -B LU NL DATE: F° SECTION A -A o m v NOTE: Provide extra reinforcing each side of each opening DATE: 3 " * NOTE: When the inside diameter of a round structure is ^, Optional Shear K 14" Wall Reinforcin not more than 1'-6" larger than the opening in the riser or top slab, the top of the structure Shear Key 10' Draf or riser shall be constructed according to the "Special Top Slab" details on this sheet. maximum spacing as removed by the opening. NOTE: Variations in shear koy dimensions wi!I be permitted subject to the 1. Standard structure bottoms 4'-0" diameter and smaller (Alt. A) and 3'-6" 6. battoms Engineers approval. 10' Dra square (Alt. B) are designated Type P. Larger standard structure designated Type J. Risers are permitted for all structures. Shear Key 1 Optional Shear Ka.1\ m— are 3" C C- �Y � AT BOTTOM SLAB o �� I Bottom Slab Relnforcln SLAB TO WALL DETAILS Faq PRECAST ALTERNATE WITH 8" WALLS #4 Ties ® 12" O.C. #5 Peripheral Reinforcement Wall Reinforcing 9— # 4 Ties ® 12" 0. C, Rotate* 4 Bars As Required (See Section) To Maintain Cover #5 Peripheral Reinforcr lent L J m Bars A Bars B DATE: Bars A� Bars B SECTION C—C Y ° ALTERNATE A € m ALTERNATE B SECTION B -B SPECIAL TOP SLAB' DATE: F° SECTION A -A o m v NOTE: Provide extra reinforcing each side of each opening DATE: o * NOTE: When the inside diameter of a round structure is uI" at 3" maximum spacing equal to half the area of vertical not more than 1'-6" larger than the opening in the riser or top slab, the top of the structure reinforcment removed by the opening and provide the some area of reinforcment above each opening at 3" or riser shall be constructed according to the "Special Top Slab" details on this sheet. maximum spacing as removed by the opening. GENERAL NOTES 1. Standard structure bottoms 4'-0" diameter and smaller (Alt. A) and 3'-6" 6. battoms Structure bottoms may be used in conjunction with curb inlet 10. tops Types 1, 2, 3, 4, 5, 6, 9, and 10, and any manhole or junction box unless The corner fillets shown are necessary for rectangular structures used with circular risers and inlet throats and used on skew with rectangular risers, inlet and inlet be in lieu of the bottom slab of the Alt. Ei rlser when square (Alt. B) are designated Type P. Larger standard structure designated Type J. Risers are permitted for all structures. otherwise shown in the plans or other standard drawings. Alt. B structure bottoms be used in conjunction with curb inlet Types 7 & 8, or throats. Fillets will required used with the Alt. A box. Each fillet shall be reinforced with 2—//5 barn. are may any ditch bottom inlet unless otherwise shown in the plans or other standard 2. Walls of circular structures (Alternate A) constructed in place may be non—reinforced concrete or brick or reinforced concrete. Precast and awi drngs. 11. Inlet throats, riser or manhole tops shall be secured to structures aK shown on of rectangular structures (Alternate B) shall be constructed of reinforced Index No. 201. concrete only. 7. Rectangular structures may be rotated as directed by the Engineer in order thickness and reinforcement are for either reinforced cast—In- place to facilitate connections between the structure walls and storm sewer pipes. 12. Structures with depths over 14' are to be checked for floatation by designer of 3. Wall concrete units except that precast circular units may be furnished project drainage. or precast with walls in accordance with either A.S.T.M. 0-478 (up to 96 diameter) 8. Except when ACI hooks are specifically required, reinforcement top and slab 13. Units larger than specified standard may be substituted at the contractors option or A.S.T.M. C-76, Class ---, B Wall, modified where the elliptical steel cage area is in the center one—third of the wall. shall be straight embedment. when these units will not cause or increase the severity a utility mnfllets. Such STRUCTURE BOTTOMS be furnished at no additional cost to the Department. Larger placed 4. Top and floor slab thickness and reinforcement are for precast and cast in y All steel bars shall hav6}" minimum cover unless otherwise shown except for larger units shall Alternate A units cannot replace Alternate B units without approval of the TG AND Engineer. This note applies to this Index only. r place construction. Top and floor slabs shall be of Class -- concrete. Concrete as specified in A.S.T.M. C-478 (4000 psi) may be precast circular units manufactured under ASTM C-76 or ASTM C-478, Horizontal s{eel in rectangular structures shall be lapped a minimum of 24 bar diameters used in lieu of Class — and Class -- concrete in precast items manufactured the 'Standard Operating Procedures' for the at corners. 14. For manhole and junction box tops, for frames and covers, and, for supplementary 1n plants which are under inspection of precast drainage products. details see Index No. 201. 5. All reinforcement shall be A.S.T.M. A615, Grade 60 or 65 KSI welded wire fabric, either smooth or deformed. TYPE 'P' AND 'J' STRUCTURE BOTTOM REFER TO FDOT INDEX NO. 200 NTS 03 TYPE 'P'AN D 'J' STRUCTURE BOTTOM (FDOT INDEX 200 CD -1 SCALE: N.T.S. NOTICE TO DRAWING HOLDER THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE DO NOT 'SCAL'-IE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DOCUMENTS, "'S PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER CLARIFICATIb AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO REFERRED T(' %R USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED THE OWNER F,,S OF THIS PROJECT OR ON ANY OTHER PROJECT. ANY REUSE OF THIS ON EXTENSIC i tiOUT WRITTEN VERIFICATION OR ADAPTION BY THE ENGINEER, SHALL DRAWING, Vuft'INDEMNIFYTHE REUSER SHALL '" "ENGINEER FROM ALSER'S SOLE RISK L CLAIMS, DAMAGES, LOSSES AND EXPENSES, BE AT WE RV "ORNEY'S FEES ARISING OUT OF OR RESULTING THEREFROM. HARMLESS 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-800433,214-7-70- SUNSHINE -800-32-4-774 SUNSHINE STATE ONE CALL OF FLORIDA, INC. NO. I DA -_ ,F 6-1' E BY 1. 0 09 MDS REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 DRAWING INFORMATION FILENAME: GEORGE ST. DITCH SCALE: SURVEYED BY: HSBS DSGN: FTW DATE: 04-17-09 DRWN: MDS DATE: 06-11-09 CHKD: LGM DATE: 06-15-09 QNQC: FTW DATE: 06-15-09 NEEL-SCHAFFER 44M SOLUTIONS YOU CAN BUILD UPON 1201 19th Place, Suite A-100 Vero Beach, Florida 32960 PH: (772) 770-4707 FAX: (772) 770-4640 CA00008556 NEW HOT PATCH ASPHALT TO BE SAME TYPE OF MATERIAL AS EXISTED AT THE TIME OF REMOVAL. EXISTING SURFACE AND BASE TO � BE CUT WITH CONCRETE SAW. EXISTING ASPHALT 1 IN. 8" MIN. MIN. REPLACEMENT BASE MATERIAL SHALL BE 3000 PSI HIGH EARLY STRENGTH CONCRETE. EXISTING BASE 3'-0" /�1'-6" 1'-6'/\/ TRENCH WIDTH TRENCH WALL DIA. _ �� BACKFILL TRENCH WITH SUITABLE MATERIAL AND TAMP ARIES ���� MATERIAL IN LAYERS NOT TO EXCEED 6" IN ACCORDANCE UTILITY PIPE , \ ���j� W/ THE SPECIFICATIONS. (95% MAX. PER. AASHTO T-180). UNDISTURBED EARTH -7.7�,/A� 12" 112" MAX MAX NOTES: THE CONTRACTOR SHALL PROMPTLY FILL OPEN -CUT TO ALLOW TRAFFIC TO PASS FREELY AND SAFELY. IF PERMANENT RESTORATION IS TO BE DEFERRED. THE CONTRACTOR SHALL MAINTAIN THE TEMPORARY CONDITION TO THE ORANGE COUNTY ENGINEERING DEPARTMENT SATISFACTION. 02 ASPHALT ROADWAY OPEN CUT DETAIL CD -1 SCALE: N.T.S. PAVED AREAS p MISCELLANEOUS DETAILS GEORGE STREET DITCH SESASI IAN, INDIAN RIVER COUNTY, FLORIDA FRANK T. WATANABE, P.E. FL. REG. NO. 66735 WORKING NUMBER: NS.07600.001 SHEET NUMBER: CD -1 C C _ J 10" 1- 5' ID or Spad D or Span I FRONT VIEW TOP VIEW 2-#4 Bar_ I I I _ r ° M - yF__ I - ¢ _ C N00 6 4" B Const. Joint Permitted o U_ See End View o B (Enlarged) '(rons�t Location Reference (Horizontal Clearance Measured to this point) Seo" End Of Pipe (See Note 9) Point A I I I Const. Joint Permitted (Keyway & Dowels Required - Dowels #4 Bars, 18" With 9" Embedment 0 12" Ctrs For Bar Grade And E Payment See Note 3.) END VIEW (ENLARGED) ENDWALL DIMENSIONS (EXCLUSIVE OF MULTIPLE PIPE SPACING) FRONT VIEW S � Interior Outside Pipe (Typ.) Pipe (Typ.) Location Reference Line (See Location Control Abov i I TOP VIEW NORMAL PIPE X (X=S. Seca ) cc FRONT VIEW TOP VIEW SKEWED PIPE END VIEW 1. Position is set by the intersection of the front slope and Point A where this intersection falls outside the clearzone. 2. Where the front slope and Point A intersects inside the clear zone, the endwall is positioned so the location reference point is at the clear zone limit. The front slope is transitioned to the endwall as shown in Index No. 280. STANDARD LOCATION CONTROL LEGEND or Pipe Skew S Center To Center Pipe Spacing X Centerline To Centerline Dimension At Face Of Headwall ENDWALL POSITIONS FOR SINGLE AND MULTIPLE PIPE AND SPACING FOR MULTIPLE PIPE 01 STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 CD -2 SCALE: N.T.S. DATA AND ESTIMATED QUANTITIES FOR ONEENDWALL GENERAL NOTES 1. Endwall dimensions, locations and positions are for round and elliptical concrete pipe and for round and pipe -arch corrugated metal pipe. Round concrete pipe shown. 2. Front slope and ditch transitions shall be in accordance with Index No. 280. 3. Endwails may be cast in place or precast concrete. Reinforcing steel shall be Grades 40 or 60. Additional reinforcement necessary for handling precast units shall be determined by the Contractor or the supplier. Cost of reinforcement shall be included in the contract unit price for concrete, (endwalls). 4. All exposed corners and edges of concrete are to be chamfered i" . 5. Concrete meeting the requirements of ASTM C-478 (4000 psi) may be used in lieu of Class I concrete in precast items manufactured in plants which are under the Standard Operating Procedures for the Inspection of precast drainage products. 6. On outfall ditches with side slopes flatter than 141, provide 20' transitions from the endwall to the flatter side slopes, right of way permitting. 7. For sodding around endwalls see Index No. 281. 8. Payment for concrete quantities for endwalls skewed to the pipe shall be made on the following basis: Endwali Skew To Pipe Use Tabulated Value 0' to 5' 0' 6' to 15' 15' 16' to 30' 30' 31' or over 45' 9. Pipe length plan quantities shall be based on the pipe end locations shown in the standard location control end view, or lengths based on special endwall locations called for in the plans. 10. Payment for pipe in pipe culverts shall be based on plan quantities, adjusted for endwall locations subsequently established by the Engineer. 11. Endwalls to be paid for under the contract unit price for Class I Concrete (Endwails), CY. 02 STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 CD -2-) SCALE: N.T.S. NOTICE T E THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE DO NOT SCAL THE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DOCUMENTS, NS PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER CLARIFICATIGI AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO REFERRED TCOR USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED THE OWNER F THIS THOU T WRITTEN VERIFICATION F THIS PROJECT OR OR ADAPTION BY HE ENGINEER,N ANY OTHER PROJECT. ANY REUSE HALL ONE,�IENSI INDEMNIFY AND HOLD IUSER'S D ENGINEER FROM ALL CLAIMS, DAMAGESTHE REUSER , LOSSES AND EXPENSES, nD S\�IIN�i-11 TORNEY'S FEES ARISING OUT OF OR RESULTING THEREFROM. 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-8004324770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. NO. DA E BY 1. 06-1 1-09 MDS REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 Note: Use the guidelines of General Note No. 8 for selecting tabular quantities. DRAWING INFORMATION FILENAME: GEORGEST. DITCH SCALE: SURVEYED BY: HSSS ROUND CONCRETE AND CORRUGATED METAL PIPE DRWN: MDS CORRUGATED METAL PIPE ARCH PIPE CHKD. JGM DATE: 06-15-09 Class - Concrete (CY) DATE. 06-15-09 Opening Area Number And Type Of Pipe And Skew Angle Of Pipe Class - Concrete (CY) Class Dimensions Approx Approx Triple Quadruple Opening Area (SF) X Single Concret . Metal Double Metal Concrete Metal Concrete Metal D D Number Of Pipes A g C E F G S (SF) 0°45° 0° 15 30° 45° 0° 15 30° 45° 0° 15 30° 45° 0° 15 30° 45° 0° 15 30° 45 1 2 3 4 0° 15° 30° 45° 2'-8" 3'-0' 3'-8' 0° 1.23 0° 1.24 1.591.74 1.62 1.63 1.68 1.78 1.94 1.96 2.05 2.23 1.99 2.02 2.11 2.30 2.30 2.34 2.47 2.74 2.37212.84 A1.601 15" 15" 1.23 2.46 3.69 4.92 l'-11 ' 1'-2' 4'-0' 1'-10' 1'-2' 0'-6' 2'-7 ' 2'-7' '3-3' 4'-0' 1.56 1.59 1.992.17 2.04 2.06 2.11 2.23 2.43 2.46 2.56 2.79 2.51 2.54 2.65 2.89 2.86 2.91 3.06 3.40 2.96 3.01 3.17 3.53 21 18" 1.77 3.54 5.31 7,08 2'-2" 1'-3' 4'-6' V-11 l'-3" 1'-0'2'-10 2'-10'2'-11 2.41 4.82 7.23 9.64 2'-5" 1'-4' 5'-0' 2'-0" l'-4' 1'-6 3'-2" 3'-2" 3'-3" 3'-8' 4'-6" 1.97 Double 3.57 3.87 3.52 3.56 3.71 4.03 3.97 4.03 4.24 4.69 4.14 4.20 4.43 4.91 24'; 21" 1'-4 5'-6' 2'-0" 1'-4 2'-0' 3'-5" 3'-5" 3'-6' 3'-11'+'-10' 2.24 2.29 2.82 2.84 2.91 3.06 2.91 2.93 3.01 3.17 3.39 3.43 Of 24" 27" 3.14 6.28 9.42 12.56 2'-8" 3.98 7.96 11.94 15.92 2'-11 1'-5 6'-0° 2'-1" -1'-5' 2'-6' 3'-10' 3'-10'4'-0' 4'-5' 5'-5" 4'-1 "6'-0" _-T-2" 2.73 3.26 3.34 4.13 4.16 4.26 4.49 4.28 4.31 4.43 4.67 4.98 5.04 5.25 5.69 5.20 5.27 5.49 5.97 5.84 5.93 6.24 6.91 6.13 6.23 6.56 7..2 36" 30" 4.91 9.82 14.73 19.64 1'-6' 6'-6" 2'-2" I'-6' 3'-0' 4'-3' -1'-8 4'-3' 4'-5' 5'-10'7'-2" 4.53 4.64 5.73 5.77 5.92 6.23 5.95 6.00 6.15 6.49 6.92 7.00 7.29 7.91 7.25 7.34 7.65 8.33 8.13 8.26 8.69 9.62 8.57 8.71 9.18 10.20 36" 36" 7.07 14.14 21.21 28.28 3'-8" 1'-8' 7'-6' 2'-4" 4'-0' 5'-1" 5'-1' S'-3' 6'-3' 6'-11"8'-6" 6.33 6.49 8.11 8.17 8.39 8.85 8.43 8.50 8.73 9.23 9.90 10.0 10.4 11.3 10.3 10.5 10.9 11.99 11.68 11.8 12.5113.8912.3 12.5213.2 14.73 42" 42" --§--62 19.24 28.86 38.48 4'-2" 1'-1 "8'-6" 2'-6" 2'-0' 5'-0' 6'-0' 6'-0' 17" 21" 15" 10.7 11.3 10.8 10.9 11.2 11.8 12.6 12.8013.3414.5 13.3 13.51 14.1115.39 14.8 15.1 15.9 17.6 15.8 16.0 16.9 18.90 48" 48" 12.57 25.14 37.71 50.28 4'-8" 2'-1" 9'-6' 2'-9" 2'-0' 6'-0' 6'-9' 6'-9' 7'-0'7'-10 9'-7" 8.15 _ 8.38 10.4 10.4 18.7 22.2 2.6 23.9 26.6 54" 54" 15.90 31.80 47.70 63.60 5'-2" 2'-6' 10'-6 3'-2" 2'-3' 7'-0' 7'-8' 7'-8 7'-1 B'-1010'-1 11.71 11.77 15.2 15.3 15.7 16.6 1.11. .-- 02 STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 CD -2-) SCALE: N.T.S. NOTICE T E THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE DO NOT SCAL THE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DOCUMENTS, NS PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER CLARIFICATIGI AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO REFERRED TCOR USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED THE OWNER F THIS THOU T WRITTEN VERIFICATION F THIS PROJECT OR OR ADAPTION BY HE ENGINEER,N ANY OTHER PROJECT. ANY REUSE HALL ONE,�IENSI INDEMNIFY AND HOLD IUSER'S D ENGINEER FROM ALL CLAIMS, DAMAGESTHE REUSER , LOSSES AND EXPENSES, nD S\�IIN�i-11 TORNEY'S FEES ARISING OUT OF OR RESULTING THEREFROM. 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-8004324770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. NO. DA E BY 1. 06-1 1-09 MDS REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 Note: Use the guidelines of General Note No. 8 for selecting tabular quantities. DRAWING INFORMATION FILENAME: GEORGEST. DITCH SCALE: SURVEYED BY: HSSS DSGN: FTW DATE: 04-17-09 DRWN: MDS CORRUGATED METAL PIPE ARCH PIPE CHKD. JGM DATE: 06-15-09 QAIQC. FTW DATE. 06-15-09 Class - Concrete (CY) Class - Concrete (CY) Approx Approx Opening Opening Area DimensionsEquiv. Number Of Pipe And Skew Angle Of Pipe (SF) (SF) Rise Span Round Span Rise Round X Single Double Triple Quadruple X Single Double Tri le Quadruple Number Of Pipe Span Rise Number Of Pi e 0 ° 15° 30° 45° A g C E F Gk3'-5" 0* 0 ° 156 30° 45° 0* 15 30° 45° 0° 15° 30° 45° 3 4 1'-2' 3'-9' 1'-10' 1'-2' 0'-3' 2'-10' 2'-10' 2'-11 3'-3" 4'-0" 1.09 1.45 1.46 1.51 1.60 1.80 1.82 1.91 2.09 2.16 2.20 2.33 2.60 13' 1 1.1 2 2.2 3 3.3 4 4.4 1'-9" 1'-2" 3'-1 "1'-10' 1'-2" 0'-4' 2'-6" 2'-7" 2'-11' 3'-6" 1.16 1.47 1.48 1.52 1.60 1.78 1.80 1.88 2.04 2.09 2.12 2.23 2.48 2.40 2.44 2.57 2.84 17" 21" 13" 15" 15" 18" 17" 21" 15" 1.6 3.2 4.8 6.4 1'-11 ' 1'-2" 4'-3" 1'-10' V-2' 0'-9"'2 -10 2'-11 '3'-3" 4'-0" ' 3'-11' 4'-10 1.33 1.78 1.69 1.70 1.75 2.31 2.33 2.39 1.84 2.04 2.06 2.15 2.33 2.53 2.83 2.87 2.99 3.26 3.36 3.42 3.60 4.01 28" 20" 24" 28" 20" 9.9 11.2 2'-4' 1'-3" 5'-2" 1'-11 1'-3' V-8' S-5" 3'-6' 2'-8' 1'-4'5'-1; 2'-0" 1'-4'2'5 4'-0" 4'-2' 4'-7" 5'-8" 2.34 3.03 3.05 3.14 3.32 3.72 3.77 3.93 4.29 4.40 4.47 4.72 5.25 35" 24" 30" 24" 4.3 8.6 12.9 17.2 2 3'-1" 1'-5"6'-10 2'-1" 1'-5'3'4 4'-9" 4'-9" 4'-11'5'-6" 6'-9" 3.13 4.06 4.09 4.20 4.45 4.99 5.06 5.28 5.76 5.93 6.03 6.36 7.09 42" 29" 36" 42" 42" 29" 5.9 8.4 11.8 16.8 17.7 25.2 23.6 33.6 3'-5" 1'-6" 7'-8' 2'-2' 1'-6' 4'-2' 5'-6" 5'-6" 5'-8' 6'-4" 7'-9" 3.83 5.00 5.04 5.18 5.48 6.16 6.24 6.52 7.12 7.32 7.44 7.86 8.76 49" 57" 33" 38" 48" 49" 33" 5.22 7.16 7.23 7.46 7.96 9.10 9.24 9.70 10.71 11.0 11.2511.9513.46 38" 42.4 3'-10' 1'-7' 8'�' 2'-3' 1'-7' 5'a� 6'-4" 6'-4" 6'-7' 7'-4' 8'-11 ' 4.87 6.31 6.36 6.53 6.91 7.74 7.84 8.18 8.93 9.18 9.33 9.85 10.9 38.73'-10' 1'-8' 8'-9 1'-10'9'-84 2'-6" 54" 57" 38" 10.6 21.2 31.8 52.8 4'-3" 1'-8" 9'-6 2'-4" 1'-8"6'--0 7'-1" 7'-1" T-4" 8'-2" 10'-0' 5.88 7.64 7.70 7.91 8.37 9.40 9.52 9.94 10.8 11.1 11.3311.9 13.3 64" 43" 47" 60" 64" 43" 13.2 16.9 26.4 33.8 39.6 50.7 67.6 4'-7' 1'-10' 10'- "2'-6" 2'-0" 6'-1 7'-10 8'-1" 9'-1" 11'-1' 7.80 10.1510.2 10.51 11.1212.4 12.6 13.2214.4 14.8515.1 15.9 17.7 71" 53" 83" 91" 71" 47" 83" 24.8 49.6 74.4 5'-1" 2'-10 T 64 3'-6" 2'-109'-0 11'-4'11'- "11'-9'13'-1'16'-0' 16.46 22.26 2.4 23.1624.6 28.0 28.4 29.8 2.8533.8534.4 6.5 41.0 58" 58" 02 STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 CD -2-) SCALE: N.T.S. NOTICE T E THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE DO NOT SCAL THE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DOCUMENTS, NS PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER CLARIFICATIGI AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO REFERRED TCOR USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED THE OWNER F THIS THOU T WRITTEN VERIFICATION F THIS PROJECT OR OR ADAPTION BY HE ENGINEER,N ANY OTHER PROJECT. ANY REUSE HALL ONE,�IENSI INDEMNIFY AND HOLD IUSER'S D ENGINEER FROM ALL CLAIMS, DAMAGESTHE REUSER , LOSSES AND EXPENSES, nD S\�IIN�i-11 TORNEY'S FEES ARISING OUT OF OR RESULTING THEREFROM. 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-8004324770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. NO. DA E BY 1. 06-1 1-09 MDS REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 Note: Use the guidelines of General Note No. 8 for selecting tabular quantities. DRAWING INFORMATION FILENAME: GEORGEST. DITCH SCALE: SURVEYED BY: HSSS DSGN: FTW DATE: 04-17-09 DRWN: MDS CONCRETE ELLIPTICAL PIPE CHKD. JGM DATE: 06-15-09 QAIQC. FTW DATE. 06-15-09 Class - Concrete (CY) Approx Opening Area DimensionsEquiv. Number Of Pipe And Skew Angle Of Pipe (SF) Rise Span Round X Single Double Triple Quadruple Pipe Rise Span Number Of Pi e A g C E F G S 0° 15 30° 45° 0 ° 0° 15° 30° 45° 0 15 30° 45° 0° 15 30° 45° 2 3 4 1'-2' 3'-9' 1'-10' 1'-2' 0'-3' 2'-10' 2'-10' 2'-11 3'-3" 4'-0" 1.09 1.45 1.46 1.51 1.60 1.80 1.82 1.91 2.09 2.16 2.20 2.33 2.60 12" 18" 15" 18" 12"2.6 3.9 5.2 1'-8" 1'-3' 4' 2 1'-11' 1'-3' 8 3'-5" 3'-5" 3 -6 3'-11' 4'-10' 1.36 1.82 1.84 1.89 2.01 2.29 2.32 2.43 2.68 2.75 2.80 2.97 3.33 14" 23" 24" 14"3.6 V30" 5.4 7.2 1'-10 2'-0" 1'-4' 1'-7 4'-2" 4'-2' 4'-4" 4-105'-11' 1. 9 2.55 2.57 2.65 2.82 3.22 3.27 3.43 3.77 3.88 3.95 4.19 4.70 19" 30" 14"6.6 9.9 2 2'-3" 1'-4' 5'-1 2'-8" 6'-3' 2'-1" 13K66.4 1'-5' 2'-9' 5'-2" 5'-2" 5'-4" 6'-0" 7'-4" 2.84 3.55 3.58 3.69 3.93 4.48 4.54 4.77 5.24 5.39 5.49 5.82 6.53 24" 38" 30"29" 24"10.2 15.3 l'-5' 7'-0 2'-2" -1'-6' 3'-6" 6'-0" 6'-0' 6'-3" 6'-11' 8'-6" 3.32 4.48 4.52 4.66 4.96 5.64 5.72 6.00 6.60 6.80 6.92 7.34 8.24 29" 45" 36" 42" 14.8 22.23'-1" 1'-6' 1'-7' T-11� 2'-3" -T--'T 4'-5 T-1" T-1" 7'-4" 8'-2" 10'-0' 4.24 5.76 5.81 6.00 6.39 7.29 7.40 7.76 8.55 8.81 8.97 9.52 10.7 34" 53" 48" 34" 53" 10.2 20.4 30.63'-6" 2'-4" 1'-8' 5'-3' 7'-11 ' 7'-11 '8'-2" 9'-2" 11'-2' 5.22 7.16 7.23 7.46 7.96 9.10 9.24 9.70 10.71 11.0 11.2511.9513.46 38" 60" 38" 60" 12.9 25.8 38.73'-10' 1'-8' 8'-9 1'-10'9'-84 2'-6" 1'-1 5-2 8-10'8'-10 9'-2" 10'-2' 12'-6' 6.63 9.01 9.09 9.38 10.0 11.3 11.5 12.1 13.36 13.7 14.0 14.8 16.73 43"68" 54" 43" 68" 16.6 33.2 49.8 4'-3" 2'-1' 10'-8' 2'-9" 2 -0' 7'-2' 9'-9" 9'-9" 10'-1 '11'-3' 13'-9' 8.66 11.7 11.8512.2213.0214.8'15.0 15.77 17.3 17.9 18.2 19.3 21.7 48" 76" 60" 48" 76" 20.5 41.0 61.5 4'-8" 99.2 2'-6" 11'-7'3'-2" 2'-6 8'-1' 10'- "10'-7'10'-1 1'2'-3' 15'-0' 12.50 16.9 16.9 17.6 188-21..4721.7 22.8 25.1 25.97 6.4 28.0 31.5 53" 83" 91" 66" 72" 53" 83" 24.8 49.6 74.4 5'-1" 2'-10 T 64 3'-6" 2'-109'-0 11'-4'11'- "11'-9'13'-1'16'-0' 16.46 22.26 2.4 23.1624.6 28.0 28.4 29.8 2.8533.8534.4 6.5 41.0 58" 58" 91" 29.5 59.0 88.5 118.05'-6" 02 STRAIGHT CONCRETE ENDWALLS SINGLE AND MULTIPLE PIPE FDOT INDEX 250 CD -2-) SCALE: N.T.S. NOTICE T E THESE DRAWINGS. IF ANY DISCREPANCIES OCCUR WITHIN THESE DO NOT SCAL THE CONTRACTOR SHALL CONTACT NEEL-SCHAFFER, INC. FOR DOCUMENTS, NS PRIOR TO CONSTRUCTION. NEEL-SCHAFFER, INC., HEREINAFTER CLARIFICATIGI AS THE ENGINEER HAS PREPARED AND FURNISHED THIS DRAWING TO REFERRED TCOR USE ON THIS PROJECT ONLY. THIS DRAWING SHOULD NOT BE USED THE OWNER F THIS THOU T WRITTEN VERIFICATION F THIS PROJECT OR OR ADAPTION BY HE ENGINEER,N ANY OTHER PROJECT. ANY REUSE HALL ONE,�IENSI INDEMNIFY AND HOLD IUSER'S D ENGINEER FROM ALL CLAIMS, DAMAGESTHE REUSER , LOSSES AND EXPENSES, nD S\�IIN�i-11 TORNEY'S FEES ARISING OUT OF OR RESULTING THEREFROM. 48 HOURS BEFORE DIGGING CALL TOLL FREE 1-8004324770 SUNSHINE STATE ONE CALL OF FLORIDA, INC. NO. DA E BY 1. 06-1 1-09 MDS REVISIONS DESCRIPTION RESPONSE TO SJRWMD RAI DATED 05-06-09 Note: Use the guidelines of General Note No. 8 for selecting tabular quantities. DRAWING INFORMATION FILENAME: GEORGEST. DITCH SCALE: SURVEYED BY: HSSS DSGN: FTW DATE: 04-17-09 DRWN: MDS DATE: 06-11-09 CHKD. JGM DATE: 06-15-09 QAIQC. FTW DATE. 06-15-09 FA= NEEL=SCHAFFER 1401L - SOLUTIONS YOU CAN BUILD UPON 1201 19th Place, Suite A-100 Vero Beach, Florida 32960 PH: (772) 770-4707 FAX: (772) 770-4640 CA00008556 MISCELLANEOUS DETAILS GEORGE STREET DITCH SEBAS 'IAN, INDIAN RIVER COUNTY, FLORIDA FRANK T" WATAt FL. REG. NO. 667 E, P. E. WORKING NUMBER: NS.07600.001 SHEET NUMBER: CD -2