Loading...
HomeMy WebLinkAbout2005 - Phase 3-Aas City of Sebastian NOW aFUNM"o Development Order Application Permit Application No. Applicant If not owner, written authorization notarized from owner Is required) Name: COII if r Cluh enc. clo Qnnik M -i- Ar, Address: i cicp -D Cl zG LPLP Phone Number (19Z,)rJQ- 1 4A 5q r],Irl FAX Number: ( E -Mail: Owner ff different from applicant) Name: Address: Phone Number. ( ) FAX Number: ( ) E -Mail: Title of permit or action requested: PLEASE COMPLETE ONLY THOSE SECTIONS WHICH ARE NECESSARY FOR THE PERMIT OR ACTION THAT YOU ARE REQUESTING. COPIES OF ALL MAPS, SURVEYS, DRAWINGS, ETC. SHALL BE ATTACHED AND 8-1t2" BY 11" COPIES OF ANY ATTACHMENTS SHALL BE INCLUDED. ATTACH THE APPROPRIATE SUPPLEMETAL INFORMATION FORM. A. Project Name (if applicable): CSk er C t u b Phone irr_ A B. Site Information Address: Lot: Block: Unit: Subdivision: Indian River County Parcel#: 30-38- - Zoning Classification: D Future Land Use: Po Existing Use: Proposed Use: �I c 11'1 � 5 I Detailed description of proposed activity and purpose of the requested permit or action (attach extra sheets If necessary): DATE RECEIVED:/ � DS F�E '-Al $ �p�� O� L lild c-4`��aag I r Z GrowthlNgl `�Icoc6z% : Permit Application No D. Project Personnel: Agent: Name: Address I cq n D z Phone Number.(rlr1Z) ..tl FAX umber. (n+72_)rlol 14 -. — E -Mail: Attome : Name: Lr f 'I a oh Address 1901 A I A - 220 Phone Number. (tjrjti 1 1 FAX Number. (nrl2_) 2C s7-9q E -Mail: eom Engineer: Name: Nee- I +"T( r Address lrinr5 q-Fh 1 , - 5u +e 8-3 e ch EL579to Phone Number. ('jam)_ Number. (,l IZ) - .q rjorlFAX — O E -Mail: Surveyor: Name: I M. Address C. th _ Phone Number. (9r)2_) - .FAX Number. (9,72) - _ q1qz E -Mail: c .b 1, , BEING FIRST DULY SWORN, DEPOSE AND SAY THAT: _ I AM THE OWNER _ 1 AM THE L GAL. REPRESENTATIVE OF THE OWNER OF THE PROPERTY DESCRIBED WHICH IS THE SUBJECT MATTER OF THIS APPLI '"''''HAND THAT ALL THE INFORMATION, MAPS, DATA AND/OR SKETCHES PROVIDED IN THIS APPLICATION ARE AC gpu�OUETO TH EAND BELIEF. r�5 SIGNATURE DATE SWORN TO AND SUBSCRIBED BEFORE ME BY L YiU-Y �C.'� Y1C'C.h1111(i1 WHO IS PERSONALLY KNOWN TO ME OR PRODUCED AS IDENTIFICATION, THIS 3 DAY OF M0.rCy-- , 20_Q5 NOTARY'S SIGNATURE PRINTED NAME OF NOTARY COMMISSION NO./EXPIRATION SEAL: Michelle Ana Moo]]lu Commission #DD16395 i = Expires: Nov 11, 2006 ' y amded Thru ru. Atleotie Bondmg Co., Ivr. ,1111 • �� CITY OF SEBASTIAN AGENDA TRANSMITTAL Subject: Final Plat for Phase IIIA of Agenda No. 05, 113 Collier Club PUD Subdivision Department Origin: Growth Mana ement / App ove for Submittal by: City Manager Purchasing/Contracting: Finance Director: City Attorney: City Clerk: ner Date Submitted: June 14, 2005 For Agenda of: June 22, 2005 Exhibits: Resolution R-05-23, Application, and Final Plat EXPENDITURE REQUIRED: AMOUNT BUDGETED: APPROPRIATION None REQUIRED: Collier Club Inc. has filed a final plat application for phase IIIA of Collier Club Subdivision, which is designed as a deed restricted private single-family community. Phase IIIA contains 22.68 acres with typical lots averaging 70'x 125' with 7.5' side setbacks, 25' rear setbacks and 10' front setbacks. The developer has substantially completed all infrastructure and site development requirements, including installation of public water and sanitary sewer as well as a closed drainage system with curb and gutter road sections. Access to Phase IIIA will be accomplished via an extension of the internal roadway network connecting to Phase IIB. As required by the Conceptual Development Plan, a secondary subdivision access will be provided via a direct connection to the Sebastian Municipal Golf Course. Original approval was granted contingent upon said access being completed prior to final plat approval for phase III. Unfortunately, delays in construction have occurred for various reasons, but the City, Golf Course and Collier Club Inc. have agreed upon the appropriate design, and the developer is requesting approval of the final plat prior to construction completion. Accordingly, and in an effort to properly govern construction, staff required Collier Club Inc. to post a bond in the amount of 110% of engineered construction cost estimates for completion of the roadway. Additionally, all engineering, and surveying details have been satisfied in accordance with Florida Statutes. RECOMMENDED ACTION Move to pass Resolution R-05-23 for Collier Club Phase IIIA. 3