HomeMy WebLinkAbout2006 - Drainage Completion1% NEEL®SCHAFFER
February 27, 2006
Ken Jones
1225 Main Street
City of Sebastian Public Works
Sebastian, Florida 32958
Re: Collier Club Phase III
Collier Club Drainage As-Builts Rev. 2/16/2006
Dear Mr. Jones:
1705 19th Place, Ste. G-3
Vero Beach, FL 329604414
772.770.4707 fax: 772.770.4640
www.neel-schaffer.com
This is to certify that stormwater system improvements for the above referenced project
phase has been completed in substantial accordance with the City of Sebastian approved
plans. As -built drawings have been provided previously under separate cover.
This system is expected to perform within the parameters of the approved design (as a
submerged system) with the necessary customary maintenance for a design of this nature.
Should you have any questions or require additional information, please contact this
office.
Sincerely,
Neel -Schaffer, Inc.
L
I-Boehning, P.E.
1
Manager / Office Manager
engineers • planners • environmental scientists • landscape architects • surveyors
N
O
O
N
CJl
co