Loading...
HomeMy WebLinkAbout2006 - Drainage Completion1% NEEL®SCHAFFER February 27, 2006 Ken Jones 1225 Main Street City of Sebastian Public Works Sebastian, Florida 32958 Re: Collier Club Phase III Collier Club Drainage As-Builts Rev. 2/16/2006 Dear Mr. Jones: 1705 19th Place, Ste. G-3 Vero Beach, FL 329604414 772.770.4707 fax: 772.770.4640 www.neel-schaffer.com This is to certify that stormwater system improvements for the above referenced project phase has been completed in substantial accordance with the City of Sebastian approved plans. As -built drawings have been provided previously under separate cover. This system is expected to perform within the parameters of the approved design (as a submerged system) with the necessary customary maintenance for a design of this nature. Should you have any questions or require additional information, please contact this office. Sincerely, Neel -Schaffer, Inc. L I-Boehning, P.E. 1 Manager / Office Manager engineers • planners • environmental scientists • landscape architects • surveyors N O O N CJl co