HomeMy WebLinkAbout1990 12 18 - Transmittal to Council for ApprovalCity of Sebastian
POST OFFICE BOX 780127 o SEBASTIAN, FLORIDA 32978
TELEPHONE (407) 589-5330 o FAX (407) 589-5570
SUBJECT:
SAND MINING PERMIT FOR FLATT
INDUSTRIAL SUBDIVISION
Approved For Submittal By:
City Manager
Agenda No. //'_dd?
Dept. Origin Community Development
Date Submitted 12/18/90 (BC0—r�
For Agenda Of 1/2/91
Exhibits:
Memo dated 8/16/90 from P & Z
Application and Plans for Sand Mine
EXPENDITURE AMOUNT APPROPRIATION
REQUIRED: BUDGETED: REQUIRED:
SUMMARY STATEMENT
The applicants, Jo Flatt and Tony DeCristafuro, have submitted a proposed
Preliminary Subdivision and a sand mining permit which, the Planning and
Zoning Commission has recommended approval for both applications. Due to
the existing topography, the applicant must cut down the grade by removing
approximately 6100 cubic yards of sand in order to properly engineer and
develop the subdivision. The applicants of this property and the adjacent
property owner, Mrs. Morchesky, are working together to build an
industrial subdivision between both properties. Even though the two
properties will interconnect with the right-of-way, this project has been
filed separately from the adjacent property owner. Until the annexation
of the out parcel for Mrs. Morchesky is cleared up, the Preliminary
Subdivision Plats will not be forwarded to City Council on both
properties.
RECO14MENDED ACTION
Move to direct the City Attorney to draft a resolution for the sand mining
permit and set the public hearing for January 23, 1991.
r
CITY OF SEBASTIAN, FLORIDA
APPLICATION ME SAND MINING a .
RECEIVED JUL 2 7 2.0
THIS APPLICATION FOR A SAND MINING PERMIT IS PURSUANT TO THE LAND
DEVELOPMENT OF THE CITY OF SEBASTIAN, FLORIDA, SECTION 20A-5.19.
PRINTS OF A MINING SITE PLAN PREPARED, SIGNED AND SEALED BY A
PROFESSIONAL ENGINEER LICENSED IN THE STATE OF FLORIDA.
PLEASE COMPLETE THE FOLLOWING:
1. DATE OF APPLICATION: July 20, 1990
2. SECTION, TOWNSHIP AND RANGE TOGETHER WITH A LEGAL DESCRIPTION
OF PROJECT AREA: (LEGAL DESCRIPTION MAY BE ATTACHED TO
APPLICATION.)
Section 7, Township 315, Range 39E. See attachment for
legal description.
3. NAME AND ADDRESS OF OWNER OF RECORD: Tony Howard Decristofaro
709 West Fischer Circle, Sebastian, Florida 32958
TELEPHONEt
(407) 589-7971
4. NAME AND ADDRESS OF APPLICANT: (IF DIFFERENT FROM OWNER
ATTACH LETTER OF AUTHORIZATION) -.Randy L. Mosby, P.E.
1507 20th Street, Vero Beach, Florida 32960
TELEPHONE (INCLUDE AREA CODEC) (407) 569-0035
5. ATTACH NINE (9) PRINTS OF MINING SITE PLAN TO APPLICATION
SHOWING AT LEAST THE FOLLOWING INFORMATION:
(a) North point arrow, scale acceptable to the city
engineer, and date.
(b) Location of the area to be excavated including the
location of any easements or rights-of-way.
(c) Existing and proposed grades based on U.S.G.S. datum.
(d) Location of all existing and proposed structures.
(e) Location of all areas on the property subject to inundation
or flood hazard, and the location with and direction of
flow of all waterways and flood control channels that may be
affected by the excavation.
(f) Bench marks.
(g) Typical cross sections, showing the extent of overburden,
extent of sand and gravel deposits, and the water table.
(h) Processing and storage areas.
(i) Proposed screening including fencing, gates, parking areas
and signs.
(j) Ingrese/egress roads, plus on-site roads and proposed
surface treatment and means to limit dust.
(k) A map showing access routes between the property and the
nearest arterial road.
(1) Areas to be used for ponding.
6. Statement describing method of operation. A statement shall be
submitted with the site pian to include the following:
(a) The approximate date of commencement of the excavation and
the duration of the operation.
(b) Proposed hours and days of operation.
9r von
kEGEIVEU JUL 2 71950
_ (c) Esti^ted date and volume of the excav/\ion.
(d) Met, of extracting and processing, luding the deposit
of overburden or top soils.
(e) Equipment proposed to be used in the operation of the
excavation.
(f) Operating practices proposed to be used to minimize noise,
dust, air contaminants and vibration.
(g) Method to prevent pollution of surface or underground
water.
7. Required reclamation plan:
(a) A reclamation plan shall be submitted with each application
as part of the site plan which shall include the followings
i. A statement of planned reclamation, including the
methods of accomplishment, phasing and timing.
ii. A plan indicating the final grade of the excavation;
any water features including the rehabilitation and methods
planned to prevent stagnation and pollution;
landscaping or vegetative planting; and areas of cut or
fill. This plan, if clearly delineated, may be
included with the site plan. For quarry applications,
the final grade shall mean the approximate planned
final grade.
iii. A phasing plan, if the excavation of the site is to be
accomplished in phases. This plan shall indicate the
area and extent of each phase and the approximate
timing of each phase.
iv. The method of disposing of any equipment or structures
used in the operation of,the excavation upon completion of
the excavation. 1
8. Required fee. The application hal b4 accompanied by a fee as
shall be determined by resolutr o�/o ;the City Council.
9. Signature of applicant: / [�
Randy L. Mosby, P.E.
PLEASE DO NOT WRITE BELOW THIS LINE - FOR CITY USE ONLY
1. DATE APPLICATION RECEIVED:
2. APPLICATION FEE PAID:
3. NINE (9) PRINTS OF SITE PLAN ATTACHED:
4. DATE FIRST ACTION OF PLANNING AND ZONING COMMISSION:
5. DATE SUBMITTED TO CITY COUNCIL FOR SPECIAL USE PERMIT:
6. DATE OF PUBLIC REARING BEFORE CITY COUNCIL -
7. DATE OF FINAL CITY COUNCIL ACTION:
S. PERMIT ISSUED (OR DENIED) ON: