HomeMy WebLinkAbout1993 12 21 - Sebastian Lakes Wastewater System InterconnectHARTMAN & ASSOCIATES, INC. i9" iRNCIPALS engineers, hydrogeologists, surveyors & management consultants l.phar. RE. arles nkS RC. Ch . 'J U Gcnl'd C Hartman. RE. !lark I. Lula,. R.LS. December 21, 1993 HAI -117L— •��_ — N mW2' luny J,.., RE ASSOCIAM. Rulmn J. Ori. N.R. A, R.11iam D. %1 mac, P.E.. A'ou C Quinlan. P. E. Mr. Richard Votopka, P.E. 'j..g A. HncRuli. R.E. Utilities Director City of Sebastian 1225 Main Street Sebastian, Florida 32958 Subject: Sebastian Lakes Wastewater System Interconnect Dear Mr. Votopka: As requested we have prepared a cost estimate to install a force main from the Sebastian Lakes WWTP to the City's existing system. Instead of routing the force main so that it discharges into the lift station at Caprona, south of Englar, we proposed to manifold into the existing 8 - inch force main on Schumann Drive. Although slightly more 8 -inch force main was required, we eliminated one (1) open cut. In summary, approximately 13,000 feet of force main ranging in diameter from 4 to 8 inches, 11 road cuts, three (3) jack and bores and one (1) bridge crossing was required. The total cost to connect this system to the City's system was estimated to be approximately $307,500 and is summarized in Table 1, attached hereto. In addition, the total estimated project cost included a 7.5 percent contingency for the Contractor to meet the Bidding General Requirements (i.e., mobilization, insurance, etc.), a 20 percent contingency for Contractor overhead and profit, and a 10 percent contingency for engineering and survey. I trust the above meets your needs. If, however, additional information is required, please do not hesitate to contact either Gary ReVoir, III, P.E. or me. Very truly yours, Hartman & Associates, Inc. Harold E. Sch - , Jr., E. Vice President cc: Gary J. ReVoir, III, P.E., HAI HES/dt/C-2/Votopka. hes 201 EAST PINE STREET • SUITE 1000 • ORLANDO, FL 32801 TELEPHONE (407) 839-3955 • FAX (407) 839-3790 ORLANDO FORT SI}"EAS JACKSONVILLE TALLAHASSEE TABLE 1 CITY OF SEBASTIAN COST ESTIMATE FOR THE FORCE MAIN FROM SEBASTIAN LAKES AND MISCELLANEOUS IMPROVEMENTS ASSOCIATED WITH THE CONNECTION OF SEBASTIAN LAKES TO THE CITY'S WASTEWATER SYSTEM Force Unit. I o a Main Length Cost Cost Item Description inches feet / I. / I.f. Gonia Street 4 2,2G0_____$7.00 $i5,46 Rose Arbor Drive 4 3,200 $7.00 $22,400 Barber Street 6 1,250 $10.50 $13,125 Englar Drive 8 2,000 $14.00 $28,000 Englar Avenue 8 4,350 $14.00 $60,900 Road Crossings en Cut unless note ea.(Total Laconia @ Granduer Laconia @ Rose Arbor $750.00 $750.00 Bore & Jack @ Laconia $6,000.00 $6,000.00 Rose Arbor Drive @ Clearmont Street $750.00 $750.00 Rose Arbor Drive @ Howe Lane $750.00 $750.00 Rose Arbor Drive @ Fairfield Lane $750.00 $750.00 Barber Street @ Atlantus Terrace $750.00 $750.00 Bore & Jack @ Barber Street $10,000.00 $10,000.00 Englar Drive @ Watercrest Street $750.00 $750.00 Englar Drive @ Landsdowne Drive $750.00 $750.00 Bridge Crossing @ Englar Avenue $5,000.00 $5,000.00 Englar Avenue @ Kirby Court $750.00 $750.00 Bore & Jack Englar Ave. @ South Easy St. $6,000.00 $6,000.00 Englar Avenue @ Hickory Drive $750.00 $750.00 Englar Avenue @ Mohawk Street $750.00 $750.00 Other Requirements ea.(Total isc Pump Station Improvements 0$2u00u.0 Sodding along Force Main Route $4.00 $20,000.00 Connect to Force Main @ Schumann $5,000.00 $5,000.00 Sub—total onstruction $220,075.00 General Requirements 7.5 % $16,505.63 otal Uonstruction $236,580.63 Contingency (@20 %) $47,316.13 Engineering,Survey, (@10%) $23,658.06 otal Estimatdcl-Prolectos s ==