Loading...
HomeMy WebLinkAbout1993 12 20 - Master Plan ProposalHARx MAN & ASSOCIATES, INC. PRINCIPALS: engineers, hydrogeologlsts, surveyors & management consultants Jamcs E. Christopher. P.F:. Chyles W. Drake. RG GemIJ C. Hartman. P.E. December 20, 1993 HAI #92-023. Mark I. Lake' P. L.5 Mark A. RynnlnR. P.E. mltl E. 5[hmitl[. Jr.. P.E. ASSOCIATES: Mr. Richard Votapka, P.E. HIL.RobD.M M.R.A. William D. 011. M, EE. Utilities Director rnn C. Quinlan, P.E. Timothy A. xornan, P.E. City of Sebastian 1225 Main Street Sebastian, Florida 32958 Subject: City of Sebastian Water and Wastewater Master Plan Proposal Dear Mr. Votapka: Hartman & Associates, Inc. (HAI) is pleased to submit this proposal for preparing a 10 -year Water and Wastewater Master Plan for the area encompassing the existing City of Sebastian corporate limits. As you are aware from our previous work for the City, as well as our qualifications statement, HAI can offer the City a unique blend of engineers, hydrogeologists and financial consultants who have a complete understanding of managing and developing a water and wastewater utility system. As a result, HAI can provide the City with an efficient and responsive project team for developing . Moreover, you will find that members of our project team have distinguished themselves on many occasions with participation in rule making, development of standards, and authoring technical articles in the area of utility management and feasibility. In addition, we have included an analysis on meeting the existing and future requirements of the Amendments to the 1986 Safe Drinking Water Act (SDWA), Florida Department of Environmental Protection (FDEP), and United States Environmental Protection Agency (USEPA) rules and regulations. Furthermore, you will find that the staff assigned to this project are principals of the firm who can make decisions necessary for the effective prosecution of the assignment and can assure you that this project will be a top priority. I will be the principal in charge of the project throughout its duration. I will be assisted primarily by Mr. Gary ReVoir, II, P.E., and Ms. Jill Manning for the duration of the project. As with all of our projects with the City, we are committed to provide the City with a quality and cost-effective project. Our firm is well versed in what is required to develop a utility system from scratch, as well as the financial considerations thereof. In the past two (2) years, our firm has prepared water and wastewater master plans for the following entities: 1. City of North Port 2. City of Sanibel 3. Spring Hill 4. Pinellas County 201 EAST PINE STREET • SUITE 1000 • ORLANDO, FL 32801 TELEPHONE (407) 839-3955 • FAX (407) 839-3790 ORLANDO FORT MYERS JACKSONVILLE TALLAHASSEE N n Mr. Richard Votapka, P._.. December 20, 1993 Page 2 5. Clay County Included in Attachment "A" is our General Provisions as amended and supplemented in Exhibit "A" attached thereto. Exhibit "A" describes the scope of services and schedule for preparing the Water and Wastewater Master Plan for the City. Our estimated not -to -exceed fee is $59,247.74, as summarized in Exhibit "B". We would expect to begin our services promptly after notice to proceed and shall complete this study within five (5) months, as outlined in Exhibit "A". If the above and attachments satisfactorily set forth your understanding of our agreement, we would appreciate your signing one (1) copy of this agreement and returning it to our offices. If you have any questions regarding this agreement or the attachments, please do not hesitate to contact me. Very truly yours, Hartman & Associates, Inc. A ZU WitnessHarold E. Sch t . d, .E. Vice President Witness 1, Witness 9 N fitness HES/ch P13/Votapka.hes Attachment City of Sebastian, Florida , /aby Date Kayor C`� A-r6r^t7Charles Ian Nash a Nut,4- Kathryn M. O'Halloran, City Clerk C`� A-r6r^t7Charles Ian Nash ATTACHMENT A loftN GENERAL PROVISIONS Attached to and made a part of LETTER AGREEMENT, dated December 20, 1993, between the City of Sebastian (OWNER) and Hartman & Associates, Inc. (ENGINEER) in respect of the Project described therein. SECTION 1 - BASIC SERVICES OF ENGINEER 1.1 After written authorization to proceed, ENGINEER shall perform the following professional services: 1.1.1. Consult with OWNER to clarify and define OWNER's requirements for the Assignment and review available data; 1.1.2. Advise OWNER as to the necessity of OWNER's providing or obtaining from others special services and data required in connection with the Assignment and assist OWNER in obtaining such data and services; 1.1.3. Provide analyses of OWNER's needs with evaluations and comparative studies of prospective solutions; 1.1.4. Prepare a Report of ENGINEER's findings and recommendations and furnish five copies of the Report and review it in person with OWNER. 1.2.1 The duties and responsibilities of ENGINEER described above are supplemented and amended as indicated in paragraph 1 of Exhibit -A "Scope of Services and Schedule" which is attached to and made a part of the Agreement. SECTION 2 - ADDITIONAL SERVICES 2.1. If authorized in writing by OWNER, Additional Services related to the Assignment will be performed by ENGINEER for an additional professional fee. SECTION 3 - OWNER'S RESPONSIBILITIES OWNER shall do the following in a timely manner so as not to delay the services of ENGINEER: HES/ch/P 13/Sebast. AtA -1- lQ 3.1. Provide all criteria and full information as to OWNER's requirements for the Assignment and designate in writing a person with authority to act on OWNER's behalf on all matters concerning the Assignment; 3.2. furnish to ENGINEER all existing studies, reports and other available data pertinent to the Assignment, obtain or authorize ENGINEER to obtain or provide additional reports and data as required, and furnish to ENGINEER services of others required for the performance of ENGINEER's services hereunder, and ENGINEER shall be entitled to use and rely upon all such information and services provided by OWNER or others in performing ENGINEER's services under this Agreement; 3.3. arrange for access to and make all provisions for ENGINEER to enter upon public and private property as required for ENGINEER to perform services hereunder; 3.4 perform such other functions as are indicated in Exhibit -A" Scope of Services and Schedule"; and 3.S. bear all costs incident to compliance with the requirements of this Section 3. SECTION 4 - PERIOD OF SERVICE 4.1. ENGINEER's Basic Services will be performed and the Report submitted within the time period or by the date stipulated in Exhibit -A "Scope of Services." 4.2. ENGINEER's Basic Services under this Agreement will be considered complete at the earlier of (1) the date when the Report is accepted by OWNER or (2) thirty days after the date when the Report is submitted for final acceptance, plus in each case, if applicable, such additional time as may be considered reasonable for obtaining approval of governmental authorities having jurisdiction to approve the Report. 4.3 ENGINEER's Additional Services will be performed and completed within the time period agreed to in writing by the parties at the time such services are authorized. 4 any Mme period within or a which any of ENGINEER's service a completed is exceeded throu au t of ENGINEER, all rates, meas and amounts of compensation and the time f shall be subject to equitable adjustment. SECTION 5 - PAYMENTS TO ENGINEER 5.1. Methods of Payment for Services of ENGINEER. 5.1.1 For Basic Services. OWNER shall pay ENGINEER for all Basic Services rendered under Section 1 (as amended and supplemented by Exhibit - A "Scope of Services") as follows: 5.1.1.1. On the basis set forth in Exhibits B and C "City of Sebastian Water and Wastewater Master Plan Professional Fees and Hourly Rate Schedule", respectively 5.1.2. For Additional Services. OWNER shall pay ENGINEER for all Additional Services rendered under Section 2 on the basis agreed to in writing by the parties at the time such services are authorized. 5.1.3. Reimbursable Expenses. In addition to the payments provided for in paragraphs 5.1.1. and 5.1.2, OWNER shall pay ENGINEER the actual costs (except where specifically provided otherwise) of all Reimbursable Expenses incurred in connection with all Basic Services and Additional Services. Reimbursable expenses mean the actual expenses incurred by ENGINEER or ENGINEER's independent professional associates or consultants directly or indirectly in connection with the Project, such as expenses for: transportation, and subsistence incidental thereto, reproduction of reports, .Solt telephone calls and postag� S" J c %4- Ta 5.2. ENGINEER shall submit monthly statements for Basic and Additional Services rendered and for Reimbursable Expenses incurred. OWNER shall make prompt monthly payments in response to ENGINEER's monthly statements. 5.3. ENGINEER's above charges are on the basis of prompt payment of bills rendered and HES /ch/P 13 /Sebast. AtA 10►, continuous progress of the work on the Assignment until submission of the Report. 5.4. If OWNER fails to make any payment due ENGINEER for services and expenses within thirty days after receipt of ENGINEER's statement therefor, thramexets—due EN .TNFFR 'lt be Wi+#ieth. day , 4wd-in_gtidition, ENGINEER may, after giving seven day's written notice to OWNER, suspend services under this Agreement until ENGINEER has been paid in full all amounts due for services, expenses and charges. SECTION 6 - COST CONTROL 6.1. OWNER's budgetary requirements and considerations in respect of the Assignment are set forth in Exhibit -A "Scope of Services and Schedule". 6.2. Opinions of probable construction cost, financial evaluations, feasibility studies, economic analyses of alternate solutions and utilitarian considerations of operations and maintenance costs prepared by ENGINEER hereunder will be made on the basis of ENGINEER's experience and qualifications and represent ENGINEER's best judgment as an experienced and qualified design professional. It is recognized, however, that ENGINEER does not have control over the cost of labor, material, equipment or services furnished by others or over market conditions or OWNERs' methods of determining their prices, and that any utilitarian evaluation of any facility to be constructed or work to be performed on the basis of the Report must of necessity be speculative until completion f its detailed design. Accordingly, ENGINEER does not guarantee that proposals, bids or actual costs will not vary from opinions, evaluations or studies submitted by ENGINEER to OWNER hereunder. SECTION 7 - GENERAL CONSIDERATIONS 7.1. All documents prepared or furnished by ENGINEER (and ENGINEER's independent professional associates and consultants) pursuant to this Agreement are instruments of service and ENGINEER shall retain an ownership and property interest therein. OWNER may make and retain copies for information and reference; however, such documents are not intended or represented to be suitable for reuse by OWNER or others. Any reuse without written verification or adaptation by ENGINEER for the specific purpose intended will be at OWNER's sole risk and without liability or legal exposure to ENGINEER, or the ENGINEER's independent professional associates or consultants.. Aird—OWAIER -chap de 'fi and u^1 s ENGIN R's independent p ass'onal assmWas and egnstiltarits` cl 'ms, da rng rom. Any such verification or adaptation will entitle ENGINEER to further compensation at rates to be agreed upon by OWNER and ENGINEER. 7.2 The obligation to provide further services under this Agreement may be terminated by either party upon thirty days' written notice in the event of substantial failure by the other party to perform in accordance with the terms thereof through no fault of the terminating party. In the event of any termination, ENGINEER will be paid for all services rendered and Reimbursable Expenses incurred to the date of termination and, in addition, all Reimbursable Expenses directly attributable to termination. 7.3.1. OWNER and ENGINEER each is hereby bound and the partners, successors, executors, administrators and legal representatives of OWNER and ENGINEER (and to the extent permitted by paragraph 7.3.2 the assigns of OWNER and HES/ch/P13/Sebast.AtA -3- ENGINEER) are hereby bound to the other party to this Agreement and to the partners, successors, executors, administrators and legal representatives (and said assigns) of each party, in respect of all covenants, agreements and obligations of the Agreement. 7.3.2. Neither OWNER nor ENGINEER shall assign, sublet or transfer any rights under or interest in (including, but without limitation, moneys that may become due or moneys that are due) this Agreement without the written consent of the other, except to the extent that any assignment, subletting or transfer is mandated by law or the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. Nothing contained in this paragraph shall prevent ENGINEER from employing such independent professional associated and consultants as ENGINEER may deem appropriate to assist in the performance of services hereunder. 7.4 Nothing under the Agreement shall be construed to give any rights or benefits in the Agreement to anyone other than OWNER and ENGINEER, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of OWNER and ENGINEER and not for the benefit of any other party. EXHIBIT "A" SCOPE OF SERVICES AND SCHEDULE Purpose The purpose of this study is to develop a Master Plan for providing water and wastewater utility service within the City of Sebastian corporate limits. The study will include, but not be limited to, economic impacts on the potential customers within the water and wastewater service area, alternative methods of providing water and wastewater service (water supply, treatment, storage and distribution; and wastewater collection, treatment and effluent disposal), population projections, raw water quality, effluent disposal, permitting issues, and other utility related matters. In addition, the study will address the initial and future capital needs of the proposed water and wastewater utility system to accommodate expansion of the system and the flexibility to adapt to future potential - regulatory changes regarding water and wastewater systems. Moreover, the study will be suitable to supplement potential loan and grant applications for the proposed system. Based on the purpose of this Water and Wastewater Master Plan for the City of Sebastian, the study has been divided into nine (9) basic components, as described below. TASK 1 - DATA COLLECTION Data will be collected from, but not be limited to, the offices of the St. Johns River Water Management District (SJRWMD), Florida Department of Environmental Protection (FDEP), City of Sebastian and Indian River County Planning Departments, City of Sebastian Utility Department, the Soil Conservation Service, the United States Geological Service, Department of Community Affairs, and others. The data that will be collected will include, but not be limited to, FDEP Monthly Operating Reports (MOR's) for the water treatment plant (WTP) and wastewater treatment plant (WWTP) in the proposed service area, raw water quality data, WTP and WWTP design criteria, drawings and engineering reports (if available), soil data, land use maps, building permit data, and other relevant information. TASK 2 - CUSTOMER AND FLOW PROJECTIONS Based on a review of the historical population and growth projections as developed in the City's and County's Comprehensive Land Use Plans, building permits and other relevant information, an accurate forecast of customer and equivalent residential connections (ERC's) through a five-year forecast horizon will be developed. In addition, average day, maximum day and peak hour water demands and wastewater flow projections will be calculated utilizing HES/ch P13/Sebast.Scp -I- A"90 the population growth projections, ERC usage, water conservation programs, and other relevant data over the 10 -year forecast horizon. TASK 3 - EXISTING WATER DISTRIBUTION AND TREATMENT A. Distribution The existing distribution system will be evaluated with the use of computer simulation. An engineering opinion overview will be provided based upon existing demands and system capability of meeting service requirements. The overview will also focus on identifying system deficiencies with recommendations for improvements. B. SuWly and Treatment Capacity The potable water facilities will be evaluated with respect to raw water supply, treatment capacity, storage and high -service pumping. The wells and treatment analysis will focus on water quality and ability of existing process to meet existing and anticipated future regulations. Previous hydrogeological reports will be reviewed and evaluated with respect to projected demands and water quality criteria. TASK 4 - EXISTING WASTEWATER COLLECTION. TREATMENT AND EFFLUENT DISPOSAL A. Wastewater Collection An engineering opinion overview will be performed on the wastewater collection system which will include a computer simulation of the overall wastewater collection system. It will be necessary to obtain from the City of Sebastian information on all pump stations. This information will include: Pump make and model or head curves • Wet well diameter Wet well depth Invert depth • Overall wastewater collection system map The overview will be directed at determining system deficiencies and recommending improvements to the wastewater collection system. HES/ch P13/Sebast.Scp -2- B. Treatment and Disposal Capacity The WWTP will be evaluated against demands and level of treatment for commitments for effluent. For effluent disposal, we will utilize previous effluent disposal reports, as well as soil conservation services data. TASK 5 - HYDRAULIC ANALYSIS OF WATER AND WASTEWATER TRANSMISSION SYSTEM A. Water Distribution System Analysis Based on the information obtained from the City relative to the water system, HAI will prepare a pipe and node map of the water transmission and distribution system, as well as a data file based upon the node map for input into the computer run. HAI will utilize the Kentucky Pipe hydraulic analysis program as developed by Dr. Donald J. Wood of the University of Kentucky for modeling the water distribution system. HAI will disaggregate the existing demand data by node based upon the location of existing units and customer sales data. Based on the above, HAI will develop typical per-unit demand data by billing zone for projection of future water supply demands. An estimate of the future demand per node, based upon the total build -out development units and unit demand data, will be developed. Utilizing the water supply operating data obtained from the City, HAI will determine the maximum day demand factor, peak hourly demand factor, and diurnal flow curves. HAI will develop four (4) basic node configurations to include: (1) Existing system. (2) Existing system following the proposed additional well installations. (3) Future system improvements (5 years). (4) Future system improvements (10 years). The hydraulic model of the existing system will be test run with field flow and pressure data provided by the City to verify the hydraulic nodes. A steady state simulation of each configuration above at maximum day, peak hour, and maximum day plus fire flow at up to seven (7) locations determined by the City. The model run results, system deficiencies and recommended improvements will be summarized in the water master plan. In addition, HAI will prepare up to eight (8) pressure contour maps of the model run results, as selected by the City, for incorporation into the master plan. Diskettes of the computer model and node map will be provided to the City. HES/ch P13/Sebast.Scp -3- B. Wastewater Transmission System Analysis Based on the information obtained from the City of Sebastian relative to the wastewater collection and transmission facilities, HAI will prepare a pipe and node map of the wastewater force main system, as well as a data file based upon the node map for input into the computer run. The Kentucky Pipe program will be utilized to model the wastewater force main system. HAI will disaggregate lift station service areas by node. Based upon the data from the FDEP monthly operating reports, HAI will develop a per ERC wastewater generation for projection of future wastewater needs. An estimate of the future wastewater generation per lift station service area, based upon total build -out development units and per ERC, will be developed. Utilizing the data provided by the City, HAI will determine the maximum day and peak hour factor. HAI will develop three (3) basic node configurations to include: (1) Existing system. (2) Future system improvements (5 years). (3) Future system improvements (10 years). A steady-state simulation of each configuration above at average day, maximum day and peak hour will be developed. Diskettes of the hydraulic model and node maps will be provided to the City. TASK 6 - WATER SYSTEM PLANNING Based upon the engineering overview of the existing water system and customer projections, a water system master plan will be developed. This plan will include utilizing the designated well locations and safe yields. The plan will address meeting the SDWA. A phased capital improvement plan will be developed for both distribution and treatment supply. TASK 7 - WASTEWATER SYSTEM PLANNING Based on the engineering overview and customer projections, a phased capital improvement plan will be developed for the collection, treatment and disposal systems. For effluent disposal, we will try to optimize existing effluent disposal sites through re -rating, if possible. Future golf course, green spaces and other effluent reuse sites will also be identified for effluent disposal. The data included in the wastewater system planning will provide sufficient information for preparation of the FDEP Reuse Feasibility Study. HES/ch P 13/Sebast. Sep 4- TASK 8 - ECONOMIC ANALYSIS Based on the recommended existing and future capital improvements for the City's water and wastewater system, an economic analysis will be conducted. In addition, various funding alternatives, including, but not limited to, the Farmers Home Administration Grant/Loan Program, Community Development Block Grants, State Revolving Loan Fund Program, and low interest loans, will be evaluated and included in the economic analysis. Utilizing the customer projections, capital costs, staffing and operational requirements, and other relevant data determined in the seven (7) previous tasks, a range will be developed that will identify the average costs per customer. Moreover, if necessary modifications to other charges (e.g., capital charges, meter installation charges, deposits, reconnection fees, etc.) will be described, and recommended ranges will be identified. TASK 9 - DRAFT AND FINAL REPORT Five (5) copies of the draft report will be provided to the City for their review. A review meeting will be conducted to review the draft report and discuss any comments the City may have. As a result of the review meeting, the City's comments will be incorporated into the final report and ten (10) copies of the final report will be submitted for approval. In addition, HAI will present the final report to the City Council. ESTIMATED PROJECT SCHEDULE The estimated project schedule for this project from data collection to report preparation is five (5) months from the date of approval of the proposal. A draft report will be provided to the City for review in four (4) months from authorization, and a final report submitted four (4) weeks thereafter. Summarized below is the recommended project schedule: 1. 2. 3. 4. GJ Data Collection Customer and Flow Projections Completion Date(1) January 12 - February 16, 1994 January 12 - February 16, 1994 Existing Water Distribution and Treatment January 12 - February 16, 1994 Existing Wastewater Collection and Treatment Review Meeting HES/ch P13/Sebast.Scp -5- January 12 - February 16, 1994 February 24, 1994 6. Hydraulic Analysis for Water and Wastewater System 7. Water System Planning 8. Wastewater System Planning 9. Economic Analysis 10. Draft Report 11. Review Meeting 12. Final Report 13. Presentation to City Council Completion Date(l) February 24 - March 16, 1994 March 16 - April 6, 1994 March 16 - April 6, 1994 April 6 - April 20, 1994 April 20, 1994 April 27, 1994 May 18, 1994 May 25, 1994 (1) Assumes authorization for notice to proceed on January 12, 1994. HES/ch P 13/Sebast. Scp -6- EXHIBIT B CITY OF SEBASTIAN WATER WASTEWATER MASTER PLAN PROFESSIONAL FEES Lk Descri tion Mrs. Principal Coat Project Manages Engine. V Mrs. Coat Project Engine.. Engineer IV Wt.. Coat Engineering Tac m csan Mrs. Coat Mrs. Wo.d Proe.ssing Coat Hcs. TOLal Coal k. Collect and Review All Available Information 2 $212.00 8 $429.28 32 $1,479.68 2 $74.74 2 $61.48 46 $2,257.18 B. Summarize Objective and Existing Situation 2 $212.00 8 $429.28 16 $739.84 8 $298.96 4 $122.96 38 $1,803.04 _. Review Existing Service Area Information and Historical Population 2 $212.00 4 $214.64 8 $369.92 16 $59].92 4 $122.96 34 $1,537.44 0. Describe Existing Potable Water Facilities, Review Historical Water Demand Data and Describe Service Area Agreements 8 $848.00 16 $858.56 32 $1,479.68 16 $597.92 8 $245.92 80 $4 6 E. Describe Existing Wastewater Facilities, Review Historical Sewage Flow and Flow Characteristics Data and Describe Service Area Agreements 8 $848.00 16 $858.56 32 $1,479.68 36 $597.92 8 $245.92 60 $4,030.08 F. Review and Summarize Current Regulatory Requirements 4 $424.00 8 $429.28 24 $1,109.76 4 $149.48 R $245.92 46 $2,358.44 G. Develop Population Projections, Water Demand Projections, Wastewater Flaws Projections and Future Service Areas 8 $818.00 i6 $858.56 32 $1,479.68 16 $59'!.92 B $245.92 RO $4,0]0.08 R. Develop and Summarize Water System Hydraulic Analysis 4 $424.00 16 $858.56 40 $1,849.60 40 $3,494.80 2 $61.48 102 $4,688.44 I. Develop and Summarize Wastewater System Hydraulic Analysis 4 $424.00 16 $858.56 40 $1,849.60 40 $1,494.80 2 $61.48 102 $4,688.44 J. Develop and Summarize Water System Capital Improvements Program 8 $848.00 16 $858.56 32 $1,479.68 16 $597.92 R $245.92 80 $4,030.08 K. Develop and Summarize Wastewater System Capital Improvement Program. 8 $848.00 16 $858.56 32 $1,479.68 16 $597.92 0 $245.92 80 $4,030.08 L. Dvelop and Summarize Financial Management Program to Implement CIP. 36 $1,696.00 24 $1,287.84 40 $1,849.60 16 $597.92 8 $245.92 104 $5,677.28 M. Prepare Draft Master Plan 4 Sumbit Five (5) Copies to City. 16 $1,696.00 32 $1,717.12 60 $2,774.40 24 $896.88 80 $2,459.20 212 $9,543.60 v. Meet with City Staff to Discuss City's Review Comments of Draft M.P. 8 $848.00 6 $429.28 0 $0.00 0 $0.00 1 $30.74 17 $1,308.02 J. Incorporate City's Comments and Submit Ten (10) Final Copies of M.P. 4 $424.00 4 $214.64 8 $369.92 36 $597.92 40 $1,229.60 72 $2,836.08 P. Presentation of Master Plan to City Council. / $424.00 4 $214.64 0 $0.00 0 $0.00 1 $30.74 9 $669.30 Totals 106 $11,236.00 212 $11,375.92 428 $19,790.72 246 $9,193.02 192 $5,902.08 DIr44t Cala: Copia: Travd: TOTAIS: 1184 $57,49].1]4 1 $500.00 $1,000.00 $250.00 $59,24].]4 92-023.07/pt/EXCEL I /COS-Exhb.XLS at-excel/Hrlyrate/2-7Spc. Sch "EXHIBIT C" HARTMAN AND ASSOCIATES, INC. HOURLY RATE SCHEDULE ($/HR) EFFECTIVE 7/1/93 CLASSIFICATION HOURLY Principal, P. E. $108.00 EMPLOYEE $108.00 Principal, Project Manager, P.E. $108.00 G. C. Hartman H. E. Schmidt J. ...:.......:..........::::..:: E. Christopher C. W. Drake M. A. Rynning M. I. Luke at-excel/Hrlyrate/2-7Spc. Sch "EXHIBIT C" HARTMAN AND ASSOCIATES, INC. HOURLY RATE SCHEDULE ($/HR) EFFECTIVE 7/1/93 CLASSIFICATION HOURLY Principal, P. E. $108.00 Principal, Project Manager, P.E. .................................................................................................................................... $108.00 Principal, Project Manager, P.E. $108.00 Principal, Project Manager, P.G. $92.83 Principal Project Manager P.E. $92.83 Principal, Project Manager, P.L.S. $92.83 ...: ...:•:: Financial Manager, CPA. MBA $85.67 P. E. $67.50 P. E. .. $63.61 P. E. $61.67 st VI, P.G. $61.02 Engineer V, P.E. $54.68 Construction Inspector $54.00 H:::`I:::::;:::;:<..................:................................. . vdroggeolo gist V P.G.$53.22 Engineer V $52.57 ::..:.::..::..::.:.::.......:.:.:.:..:.:.:.:.::.::........::.......................<a:...........:....:...:.»........:......:.:: Engineer V, P.E. $51.30 Hydrogeologist IV $51.27 . ...: .. d: .:<: Engineer IV ..:.:::...............;.:.::: $50.63 .::................................................ Senior Rate Analyst y .......:<:::>::::4 .98 $ 9 Administrative Assistaan::>::....:.:..............:...... Assistant ................. 549.95 Senior Rate Analyst, MBA $48.68 Engineer IV $47.12 "EXHIBIT C" HARTMAN AND ASSOCIATES, INC. HOURLY RATE SCHEDULE ($/HR) EFFECTIVE 7/1/93 HOURLY EMPLOYEE CLASSIFICATION RATE A. T. Gawad Engineer IV $46.98 Tr C>pyvyv ,lvq%W' �ffi:.C.'..^v'.:i'?.:aL'.%}.:Y::Y.:.ry::..:I::py<y.�r:»A>:P>:n.:y:Y'pn>:. �4:}F<:::N• yC'x}.Y/�o. �R: K. Wulff Engineering Design II $45.23 W G.R. Crawford Engineer III $42.53 Mw:.eux� F.A. Brinson Engineer III $38.07 �a9 T3 ad's'6.c.3�u°roisf`'d`±' MM S. G. Neumeyer Engineering Technician III S. $33.07 E ts.�iK>:. ! E R. H. Nelson Engineering Technician III $35,91 M. J. Hudkins Engineer 1 $35.69 W. Wasson Hydrogeologist II $35.69 -g m, _.. _.._............. ...:.iii C. M. Gaylord Senior Word Processor $35.64 $e�ro4e+�w/a,i,Ybv;e,:yQ#?24vy.%'yCYfio, rr: MOM h rt �`co gyp. Vii: Q.'Wvy::WnL�`v T. A. Calzaretta Engineering Technician III $35.10 Yvg ,aa , SC.��.Ae2 .$.dtr5`R�96.bfo�oJJJ.pY'w v. AC. tiYajM`f .;°>nxR,F°R' '.;TAY:: ; C: AL£ E.W. Mitchell Engineer 1 $35.10NN �2 , M' : 3'ixw<; °"`°F,o'`'y�. .ta:T...Pc..:. o%§C... F'k`S,h. '6:#:,ine `e?u?:.?>'N.`Mwtt.: '..�'n . G..F. D. Jiskoot Engineering Technician III $34.70 _ K. R. Liebknecht Survey Crew Chief/Survey Technician II $33.48 S.M. Fensterer Survey Crcw Chief/Survey Technician 11 $3281 J.A. Manning Engineer I $32.40 J. Warner Engineering Technician 11 532.40 ROME E. Jenkins Survey technician II $32.40 at-excel/Hrlyrate/2-7Spc. Sch H. A. Cox Engineer 1 $27.00 wag mg "EXHIBIT C" J. Van Anda Engineering Technician 11 HARTMAN AND ASSOCIATES, INC. ............ .... .... . �X HOURLY RATE SCHEDULE ($/HR) $23.63 n. L EFFECTIVE 711/93 T.N. Benedico Word Processor/Receptionist HOURLY EMPLOYEE CLASSIFICATION RATE N. DeCorte Engineer $28.35 $19.44 .......... F. Gidus Hydro Technician 1 $23.35 $17.69 WN ��EMR C. C. Tomlinson Assistant Rate Analyst $27.81 C.A. Lauretta Word Processor $27.14 M�l T. L. Roe Engineering Technician 11 $27.00 H. A. Cox Engineer 1 $27.00 wag mg J. Van Anda Engineering Technician 11 $23.63 ............ .... .... . �X S.D. Clatchey Survey Technician 1 $23.63 n. L $20.25 T.N. Benedico Word Processor/Receptionist $22.95 S. Simon Reproduction/Courier Support $20.25 D. Trussell Word Processor $21.60 L.E. Bennett Survey Technician 1 $20.93 wag mg M. Taylor Reproduction/Courier Support $20.52 ........ . .......... . J.J. Wallace Engineer 1 $20.25 S. Simon Reproduction/Courier Support $20.25 . . .... ......... ... S. C. Cobert Engineer 1 $19.44 .......... C. Cuevas Secretarial Support $17.69 WN at-excel/Hrlyrate/2-7Spc.Sch