Loading...
HomeMy WebLinkAbout1994 01 18 - Hartman ProposalHAW1, AN & ASSOCIATES, INC. engineers, hydrogeologists, surveyors & management consultants January 18, 1994 HAI #92-023.12 PRINCIPALS Jamo E. Chnumphec P.E. Clado W Dvkc, P.G. Gcnld C. Harmon, BE. Muk 1. Lukq P.L.S. Mark A. R"mng, P.E. Hamid E. Schmidt. Jc. P.E. ASSOCIATES: Rohcrt J. Ori, M.B.A. k9110m D. M. . P.E. scout C. Quinlan, P.E. Mr. Richard B. Votapka, P.E. Timothy A. HuchuB, Y.E. Utilities Director City of Sebastian 1225 Main Street Sebastian, Florida 32958 Subject: Barber Street (fka Stratton Avenue) 10 -inch Water Main Project - Park Place/Palm Lake Club Interconnection with City Water Distribution System Dear Mr. Votapka: This proposal is to design, permit, inspect, certify and prepare record drawings for the installation of a 10 -inch PVC DR 18 water main with fire hydrants from the Park Place Water Treatment Plant (WT?) site to the existing 6 -inch looped water main on Barber Street. The water main will be approximately 2,000 feet long and shall include all valving, hydrants and appurtenances necessary to properly interconnect the Park Place/Palm Lake Club system with the City's water distribution system. Our engineering proposal for these services is as follows: 1. Field surveys - $1,580. 2. Engineering design and specifications and shop drawing review - $3,500. 3. Florida Department of Environmental Protection (FDEP) permit fee - $500. 4. FDEP permit preparation - $250. 5. Project testing inspection and witnessing of pressure tests, and receipt of bacteriological sampling to be forwarded to FDEP for clearance of the project - $500. 6. The assumption is that day-to-day inspections would be conducted by the City of Sebastian as warranted and that Hartman & Associates, Inc. (HAI) would provide services at the project testing and completion standpoint - $ N/A . 7. Project certification and record drawings - $620. Total Engineering Services - $6,950 201 EAST PINE STREET • SUITE 1000 • ORLANDO, FL 32801 TELEPHONE (407) 839-3955 a FAX (407) 839-3790 ORLANDO FORT MYERS JACKSONVILLE TALLAHASSEE r11 Mr. Richard B. Votapka, P.z. January 18, 1994 Page 2 The schedule for this project would involve one (1) month for design, one (1) month for permitting, sixty (60) days for construction, and twenty (20) days for testing, clearance and project completion. The above represents our estimate of a normal work schedule and completing the assignment. If the City wishes to expedite the assignment, this can also be accomplished. In addition, our General Provisions for design, bidding and construction services are provided in Attachment "A" and made a part of this Agreement. I will be the Principal -in -Charge of this project throughout its duration. I will be assisted primarily by Mr. Gary ReVoir, 11, P.E., and Ms. Jill A. Manning for the duration of the project. As with all our projects with the City, we are committed to provide a quality and cost-effective project. If this proposal is satisfactory to you, please sign one (1) copy and return it to our office for our records. If, however, you should have any questions, please do not hesitate to call me. Accepted by: Date: Very truly yours, Hartman & Associates, Inc. Harold E. Sch , Jr., P.E. Vice President HES/ch P14/Votapka.12 Attachment Kathryn M. O'Halloran, CMC AAE City Clerk Approved as o Fo and Content: Charles Ia Nash, City Attorney ATTACHMENT "Alt GENERAL PROVISIONS Attached to and made a part of LETTER AGREEMENT, dated January 17, 1994, between City of Sebastian, Florida (OWNER) and Hartman & Associates, Inc. (ENGINEER) in respect of the Project described therein. SECTION 1 -BASIC SERVICES OF ENGINEER 1.1. General. 1.1.1. ENGINEER shall perform for OWNER professional engineering services in all phases of the Project to which this Agreement applies as hereinafter provided. These services will include serving as OWNER's professional engineering representative for the Project, providing professional engineering consultation and advice and furnishing customary civil, structural, mechanical and electrical engineering services and customary architectural services incidental thereto. 1.2. Preliminary Design Phase. After written authorization to proceed with the Preliminary Design Phase, ENGINEER shall: 1.2.1. In consultation with OWNER and on the basis of the accepted Study and Report documents, determine the general scope, extent and character of the Project. 1.2.2. Prepare Preliminary Design documents consisting of final design criteria, preliminary drawings, outline specifications and written descriptions of the Project. 1.2.3. Advise OWNER if additional data or services of the types described in the first subparagraph of paragraph 3.2 are necessary and assist OWNER in obtaining such data and services. 1.2.4. Based on the information contained in the preliminary design documents, submit an opinion of probable Total Project Costs. 1.2.5. Furnish five copies of the above Preliminary Design documents and present and review them in person with OWNER. 1.3. Final Design Phase. After written authorization to proceed with the Final HES/ch P14/Votapka.Scp 1- sM, Design Phase, ENGINEER shall: 1.3.1. On the basis of the accepted Preliminary Design documents and the revised opinion of probable Total Project Costs, prepare for incorporation in the Contract Documents final drawings to show the general scope, extent and character of the work to be furnished and performed by Contractor(s) (hereinafter called "Drawings") and Specifications (which will be prepared in conformance with the sixteen division format of the Construction Specifications Institute). 1.3.2. Provide technical criteria, written descriptions and design data for OWNER's use in filing applications for permits with or obtaining approvals of such governmental authorities as have jurisdiction to approve the design of the Project, and assist OWNER in consultations with appropriate authorities. 1.3.3. Advise OWNER of any adjustments to the latest opinion of probable Total Project Costa caused by changes in general scope, extent or character or design requirements of the Project or Construction Costs. Furnish to OWNER a revised opinion of probable Total Project Costs based on the Drawings and Specifications. 1.3.4. Prepare for review and approval by OWNER, its legal counsel and other advisors contract agreement forms, general conditions and supplementary conditions, and (where appropriate) bid forms, invitations to bid and instructions to bidders (all of which shall be consistent with the forms and pertinent guide sheets prepared by the Engineers' Joint Contract Documents Committee), and assist in the preparation of other related documents. 1.3.5. Furnish five copies of the above documents and of the Drawings and Specifications and present and review them in person with OWNER. 1.4. Bidding or Negotiating Phase. After written authorization to proceed with the Bidding or Negotiating Phase, ENGINEER shall: 1.4.1. Assist OWNER in advertising for and obtaining bids for each separate prime contract for construction, materials, equipment and services; and, where applicable, maintain a record of prospective bidders to whom Bidding Documents have been issued, attend prebid conferences and receive and process deposits for Bidding Documents. 1.4.2. Issue addenda as appropriate to interpret, clarify or expand the Bidding Documents. 1.4.3. Consult with and advise OWNER as to the acceptability of subcontractors, suppliers and other persons and organizations proposed by the prime contractor(s) (herein called "Contractor(s)") for those portions of the work as to which such acceptability is required by the Bidding Documents. 1.4.4. Consult with OWNER concerning and determine the acceptability of substitute materials and equipment proposed by Contractors) when substitution prior to the award of contracts is allowed by the Bidding Documents. 1.4.5. Attend the bid opening, prepare bid tabulation sheets and assist OWNER in evaluating bids or proposals and in assembling and awarding contracts for construction, materials, equipment and services. 1.5. Construction Phase. During the Construction Phase: I.S.I. General Administration of Construction Contract. The OWNER has the right to approve which of the ENGINEER's employees or agents that will be providing the services hereunder. ENGINEER shall consult with and advise OWNER and act as OWNER's representative as provided in Articles 1 through 17, inclusive, of the Standard General Conditions of the Construction Contract, No. 1910-8 (1983 edition) of the Engineers' Joint Contract Documents Committee. The extent and limitations of the duties, responsibilities and authority of ENGINEER as assigned in said Standard General Conditions shall not be modified, except as ENGINEER may agree in writing. All of OWNER's instructions to Contractor(s) will be issued through ENGINEER who will have authority to act on behalf of OWNER to the extent provided in said Standard General Conditions except as otherwise provided in writing. 1.5.2. Visits to Site and Observation of Construction. In connection with observations of the work of Contractor(s) while it is in progress: HES/ch P14Notapka.Scp -2- 1.5.2.1. ENGINEER shall make two (2) visits to the site. Based on information obtained during such visits and on such observations, ENGINEER shall endeavor to determine in general if such work is proceeding in accordance with the Contract Documents and ENGINEER shall keep OWNER informed of the progress of the work. 1.5.2.2. The purpose of ENGINEER's visits to and representation by the Resident Project Representative (and assistants, if any) at the site will be to enable ENGINEER to better carry out the duties and responsibilities assigned to and undertaken by ENGINEER during the Construction Phase, and, in addition, by exercise of ENGINEER's efforts as an experienced and qualified design professional, to provide for OWNER a greater degree of confidence that the completed work of Contractor(s) will conform generally to the Contract Documents and that the integrity of the design concept as reflected in the Contract Documents has been implemented and preserved by Contractor(s). On the other hand, ENGINEER shall not, during such visits or as a result of such observations of Contractor(s)' work in progress, supervise, direct or have control over Contractor(s)' work nor shall ENGINEER have authority over or responsibility for the means, methods, techniques, sequences or procedures of construction selected by Contractor(s), for safety precautions and programs incident to the work of Contractor(s)or for any failure of Contractor(s) to comply with laws, rules, regulations, ordinances, codes or orders applicable to Contractor(s) furnishing and performing their work. Accordingly, the ENGINEER shall notify the OWNER of any deficiencies regarding any of the above referenced items. 1.5.3. Defective Work During such visits and on the basis of such observations, ENGINEER may disapprove of or reject Contractor(s)' work while it is in progress if ENGINEER believes that such work will not produce a completed Project that conforms generally to the Contract Documents or that it will prejudice the integrity of the design concept of the 60 Project as reflected in the Contract Documents. 1.5.4. Interpretations and Clarifications. ENGINEER shall issue necessary interpretations and clarifications of the Contract Documents and in connection therewith prepare work directive changes and change orders as required. 1.5.5. Shop Drawings. ENGINEER shall review and approve (or take other appropriate action in respect no Shop Drawings (as that term is defined in the aforesaid Standard General Conditions), samples and other data which Contractor(s) are required to submit, but only for conformance with the design concept of the Project and compliance with the information given in the Contract Documents. Such reviews and approvals or other action shall not extend to means, methods, techniques, sequences or procedures of construction or to safety precautions and programs incident thereto. 1.5.6. Substitutes. ENGINEER shall evaluate and determine the acceptability of substitute materials and equipment proposed by Contractor(s), but subject to the provision of the second subparagraph of paragraph 2.1.2. 1.5.7. Inspections and Tests. ENGINEER shall have authority, as OWNER's representative, to require upon approval by the OWNER's representative, special inspection or testing of the work, and shall receive and review all certificates of inspections, testings and approvals required by laws, rules, regulations, ordinances, codes, orders or the Contract Documents (but only to determine generally that their content complies with the requirements of, and the results certified indicate compliance with, the Contract Documents). 1.5.8. Applications for Payment. Based on ENGINEER's on-site observations as an experienced and qualified design professional, on information provided by the Resident Project Representative and on review of applications for payment and the accompanying data and schedules: 1.5.8.1. ENGINEER shall determine the amounts owing to Contractor(s) and recommend in writing payments to Contractor(s) in such amounts. Such recommendations of payment will constitute a representation to OWNER, based on such observations and review, that the work has progressed to the point HES/ch P14Notapka.Scp -3- indicated, and that, to the best of ENGINEER's knowledge, information and belief, the quality of such work is generally in accordance with the Contract Documents (subject to an evaluation of such work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents and to any other qualifications stated in the recommendation). In the case of unit price work, ENGINEER's recommendations of payment will include final determinations of quantities and classifications of such work (subject to any subsequent adjustments allowed by the Contract Documents). 1.5.8.2. By recommending any payment ENGINEER will not thereby be deemed to have represented that exhaustive, continuous or detailed reviews or examinations have been made by ENGINEER . to check the quality or quantity of Contractor(s)' work as it is famished and performed beyond the responsibilities specifically assigned to ENGINEER in this Agreement and the Contract Documents. ENGINEER's review of Contractor(s)' work for the purposes of recommending payments will not impose on ENGINEER responsibility to supervise, direct or control such work or for the means, methods, techniques, sequences, or procedures of construction or safety precautions or programs incident thereto or Contractor(s) compliance with laws, rules, regulations, ordinances, codes or orders applicable to their furnishing and performing the work. It will also not impose responsibility on ENGINEER to make any examination to ascertain how or for what purposes any Contractor has used the moneys paid on account of the Contract Price, or to determine that title to any of the work, materials or equipment has passed to OWNER free and clear of any lien, claims, security interests or encumbrances, or that there may not be other matters at issue between OWNER and Contractor that might affect the amount that should be paid. 1.5.9. Contractor(s)'Completion Documents. .-. .. ENGINEER shall receive and review maintenance -Preparation of applications and supporting and operating instructions, schedules, guarantees, documents for governmental financial bonds and certificates of inspection, tests and support of the Project in addition to those approvals which are to be assembled by required under Basic Services; preparation Contractor(s) in accordance with the Contract or review of environmental studies and Documents (but such review will only be to related services; and assistance in obtaining determine that their content complies with the environmental approvals. requirements of, and in the case of certificates of -Services to make measured drawings of or inspection, tests and approvals the results certified to investigate existing conditions or indicate compliance with, the Contract Documents); facilities. and shall transmit them to OWNER with written -Services resulting from significant changes comments in the general scope, extent or character of the Project or major changes in 1.5.10. Inspections. ENGINEER shall conduct an documentation previously accepted by inspection to determine if the work is substantially OWNER where changes are due to causes complete and a final inspection to determine if the beyond ENGINEER's control. completed work is acceptable so that ENGINEER -Providing renderings or models. may recommend, in writing, final payment to -Preparing documents for alternate bids Contractor(s) and may give written notice to requested by OWNER for work which is OWNER and the Contractor(s) that the work is not executed or for out -of -sequence work. acceptable (subject to any conditions therein -Detailed consideration of operations, expressed), but any such recommendation and notice maintenance and overhead expenses; value will be subject to the limitations expressed in engineering and the preparation of rate paragraph 1.5.9.2. schedules, earnings and expense statements, cash flow and economic evaluations, 1.5.11. Limitation of responsibilities. ENGINEER feasibility studies, appraisals and shall not be responsible for the acts or omissions of valuations. Furnishing the services of any Contractor, or of any subcontractor or supplier, independent professional associates or or any of the Contmctor(s)' or subcontractor's or consultants for other than Basic Services. supplier's agents or employees or any other persons -If ENGINEER's compensation for Basic (except ENGINEER's own employees and agents) at Services is not on the basis of Direct Labor the site or otherwise famishing or performing any of or Salary Costs, services resulting from the the Contractor(s)' work; however, nothing contained award of more than one prime contract for in 1.5.1 through 1.5.1 1, inclusive, shall construction, materials, equipment or paragraphs be construed to release ENGINEER from liability services for the Project, or from the for failure to properly perform duties and construction contract containing cost plus responsibilities assumed by ENGINEER in the or incentive -savings provisions for Contract Documents. Contractor's basic compensation, or from arranging for performance by persons other SECTION 2 -ADDITIONAL SERVICES OF than the principal prime contractors or from ENGINEER administering OWNER's contracts for such services. 2.1. Normal and customary engineering services -Services in connection with field surveys do not include service in respect of the following for design purposes and engineering categories of work which are usually referred to as surveys and staking out the work of Additional Services. Contractor(s). -Services during out-of-town travel other 2.1.1. If OWNER wishes ENGINEER to than visits to the site. perform any of the following Additional -Preparation of operating and maintenance Services, OWNER shall so instruct manuals. ENGINEER in writing, and ENGINEER -Preparing to serve or serving as a shall perform or obtain from others such consultant or witness in any litigation, services and will be paid therefor as arbitration or other legal or administrative provided in the Letter Agreement: proceeding except where required as part of HES/ch P14/Votapka.Scp -4- .•, Basic Services. 2.1.2. When required by the Contract Documents in circumstances beyond ENGINEER's control, ENGINEER shall perform or obtain from others any of the following Additional Services as circumstances require during construction and without waiting for specific instructions from OWNER, and ENGINEER will be paid therefor as provided in the Letter Agreement: -Services in connection with work directive changes and change orders to reflect the changes requested by OWNER if the resulting change in compensation for Basic Services is not commensurate with the additional services rendered. -Services in making revisions to Drawings and Specifications occasioned by the acceptance of substitutions proposed by Contractor(s); services after the award of each contract in evaluating and determining the acceptability of an unreasonable or excessive number of substitutions proposed by Contractor; and evaluating an unreasonable or extensive number of claims submitted by Contractor(s) or others in connection with the work. services resulting from significant delays, changes or price increases occurring as a direct or indirect result of material, equipment or energy shortages. -Additional or extended services during construction made necessary by (1) work damage by fire or other causes during construction, (2) a significant amount of defective or neglected work of any Contractor, (3) acceleration of the progress schedule involving services beyond normal working hours, (4) default by any Contractor. SECTION 3 -OWNER'S RESPONSIBILITIES 3.1. OWNER shall provide all criteria and full information as to OWNER's requirements for the Project; designate a person to act with authority on OWNER's behalf in respect of all aspects of the Project; examine and respond promptly to ENGINEER's submissions; and give prompt written notice to ENGINEER whenever OWNER observes or otherwise becomes aware of any defect in the work. 3.2. OWNER shall also do the following and pay all costs incident thereto: -Guarantee access to and make all provisions for ENGINEER to enter upon public and private property. -Provide such legal, accounting, independent cost estimating and insurance counseling services as may HES/ch P14/Votapka.Scp 5- be required for the Project, any auditing service required in respect of Contractor(s)' applications for payment, and any inspection services to determine if Contractor(s) are performing the work legally. -Permit fees. -Survey of site and routes. 3.3. OWNER shall pay all costs incident to obtaining bids or proposals from Contractor(s). SECTION 4 -MEANING OF TERMS 4.1. As used herein the term "this Agreement" refers to the Letter Agreement to which these General Provisions are attached. 4.2. The construction cost of the entire Project (herein referred to as "Construction Cost") means the total cost to OWNER of those portions of the entire Project designed and specified by ENGINEER, but it will not include ENGINEER's compensation and expenses, the cost of land, rights- of-way, or compensation for or damages to, properties unless this Agreement so specifies, nor will it include OWNER's legal, accounting, insurance counseling or auditing services, or interest and financing charges incurred in connection with the Project or the cost of other services to be provided by others to OWNER pursuant to paragraph 3.2. [Construction Cost is one of the items comprising Total Project Cost] 4.3. Reimbursable Expenses mean the actual expenses incurred by ENGINEER or ENGINEER's independent professional associates or consultants directly in connection with the Project, such as expenses for: transportation and subsistence incidental thereto; obtaining bids or proposals from Contractor(s); providing and maintaining field office facilities including furnishings and utilities; toll telephone calls and telegrams; reproduction of reports, Drawings, Specifications, Bidding Documents and similar Project -related items in addition to those required under Section 1; and if authorized in advance by OWNER, overtime work requiring higher than regular rates. Any expense greater than $500 will require approval of the OWNER. SECTION 5 - MISCELLANEOUS 5.1. Reuse of Documents. Any reuse, including drawings and specifications, without written verification or adaptation by ENGINEER for the specific purpose intended will be at OWNER's sole risk and without liability or legal exposure to ENGINEER, and OWNER shall indemnify and hold harmless ENGINEER from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle ENGINEER to further compensation at rates to be agreed upon by OWNER and ENGINEER. 5.2. Opinions of Cost. Since ENGINEER has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractor(s)' methods of determining prices, or over competitive bidding or market conditions, ENGINEER's opinions of probable Total Project Costs and Construction Cost provided for herein are to be made on the basis of ENGINEER's experience and qualifications and represent ENGINEER's best judgment as an experienced and qualified professional engineer, familiar with the construction industry; but ENGINEER cannot and does not guarantee that proposals, bids or actual Total Project or Construction Costs will not vary from opinions of probable cost prepared by ENGINEER. If prior to the Bidding or Negotiating Phase OWNER wishes greater assurance as to Total Project or Construction Costs, OWNER shall employ an independent. cost estimator as provided in paragraph 3.2. ENGINEER's services to modify the Contract Documents to bring the Construction Cost within any limitation established by OWNER will be considered Additional Services and paid for as such by OWNER. 5.3. Other Provisions Concerning Payments. 5.3.1. Methods of Payment for Services of ENGINEER. 5.3.1.1 For Basic Services. OWNER shall pay ENGINEER for all Basic Services rendered under Section 1 on the basis set forth in Exhibit A "Hartman & Associates, Inc. Hourly Rate Table' 5.3.1.2. For Additional Services. OWNER shall pay ENGINEER for all Additional Services rendered under Section 2 on the basis agreed to in writing by the parties at the time such services are authorized. HES/ch P14Notapka.Scp 3 5.3.1.3. Reimbursable Expenses. In addition to the payments provided for in paragraphs 5.3.1.1. and 5.3.1.2, OWNER shall pay ENGINEER the actual costs (except where specifically provided otherwise) of all Reimbursable Expenses incurred in connection with all Basic Services and Additional Services. Reimbursable expenses mean the actual expenses incurred by ENGINEER or ENGINEER's independent professional associates or consultants directly or indirectly in connection with the Project, such as expenses for: transportation, and subsistence incidental thereto, reproduction of reports, toll l telephone calls and postage sob je�+ +o 4c 1 iv^i iTAr phi C�A*rxineZ ;. GhatAir IIL,FIo+�a� Sis.�vks• 5.3.2. ENGINEER shall submit monthly statements for Basic and Additional Services rendered and for Reimbursable Expenses incurred. OWNER shall make prompt monthly payments in response to ENGINEER's monthly statements. 5.3.3. ENGINEER's above charges are on the basis of prompt payment of bills rendered and continuous progress of the work on the Assignment until submission of the Report. 5.3.4. If OWNER fails to make any payment due ENGINEER for services and expenses within thirty days after receipt of ENGINEER's statement therefor, ' due vsll�� ENGINEER may, after giving seven day's written notice to OWNER, suspend services under this Agreement until ENGINEER has been paid in full all amounts due for services, expenses and charges. 5.4. Termination. The obligation to provide further services under this Agreement may be terminated by the OWNER upon seven days' written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof through no fault of the terminating party. In the event of any termination, ENGINEER will be paid for all services rendered to the date of termination, all Reimbursable Expenses and termination expenses. The OWNER enters into this AGREEMENT based upon the experience and competency of principals and employees of ENGINEER as of the date of this AGREEMENT. Any change in the composition of the ENGINEER's principals and employees that the OWNER deems to materially affect the performance of this AGREEMENT shall be grounds for termination. 5.5. Controlling Law. This Agreement is to be governed by the law of the gl�aeesf�aisessvf�T� * ) 5.6. Successors and Assigns. 5.6.1. OWNER and ENGINEER each is hereby bound and the palmers, successors, executors, administrators and legal representatives of OWNER and ENGINEER (and to the extent permitted by paragraph 5.6.2 the assigns of OWNER and ENGINEER) are hereby bound to the other party to this Agreement and to the partners, successors, executors, administrators and legal representatives (and said assigns) of such other party, in respect of all covenants, agreements and obligations of this Agreement. 5.6.2. Neither OWNER nor ENGINEER shall assign, sublet or transfer any rights under or interest in (including, but without limitation, moneys that may become due or moneys that are due) this Agreement without the written consent of the other, * State of Florida, and venue for any action to interpret or enforce any provision of this Agreement shall be in Indian River County, Florida. HES/ch P14Notapka.Scp -7- except to the extent that any assignment, subletting or transfer is mandated by law or the effect of this limitation may be restricted by law. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement. Nothing contained in this paragraph shall prevent ENGINEER from employing such independent professional associates and consultants as ENGINEER may deem appropriate to assist in the performance of services hereunder, subject to approval by the OWNER. 5.6.3. Nothing under this Agreement shall be construed to give any rights or benefits in this Agreement to anyone other than OWNER and ENGINEER, and all duties and responsibilities undertaken pursuant to this Agreement will be for the sole and exclusive benefit of OWNER and ENGINEER and not for the benefit of any other party. [The remainder of this page was left blank intentionally.] "EXHIBIT A" HARTMANAND ASSOCIATES, INC. HOURLY RATE SCHEDULE WHIR) EFFECTIVE 7/1/93 EMPLOYEE CLASSIFICATION GCHartman Principal, P[ H. E. Schmidt Principal, Project Manager, P.E. Von J. E. Christooher Principal, Project Manager, P.E. J.W. Vogt R. C. Copeland J.D.Fox at'oxuo|/Mdyratu/2'7Spu^Sch P.G. VU PE VPE V,P.E ilogist VPE .k00iot|V Senior Rate Analyst Administrative Assistant Senior Rate Analyst, MBA Engineer IV xuunLY RATE $108.00 $108.00 $108.00 $82.83 $92.83 NEW $70.09 $70.09 EM $61.67 W.O2 $58.40 $54.88 $53.33 $53.22 $51.30 $51.27 $493D $49.85 i4O.G8 $47.12 /►, "EXHIBIT A" HARTMAN AND ASSOCIATES, INC. HOURLY RATE SCHEDULE ($/HR) EFFECTIVE 7/1/93 HOURLY EMPLOYEE CLASSIFICATION RATE A. T. Gawad Engineer IV 546.98 C.E. Canada S Ogg RI 540.50 T.E. Layton Engineer IV $46.74 Engineer III$38.07 K. Wulff Engineering Design III ^ b 23 A.K. G.R. rIV rIV, P.L.S. $44.90 $42.53 at-excel/Hrlyrate/2-7Spc. Sch Updated 1/4/94 C.E. Canada Engineering Technician III 540.50 Brinson Engineer III$38.07 2FA. -`�c�f>: S. G. Neumeyer Engineering Technician III $38.07 R. H. Nelson Engineering Technician III $35.91 M. J. Hudkms Engineer III $35.69 W. Wasson Hydrogeologist II 535.69 C. M. Gaylord Senior Word Processor $35.64 T A. Calzaretta Engineering Technician III $35.10 L. W. Mitchell Engineer II 535.10 D. Jiskoot Engineering Technician III $3=1.70 K. R. Liebknecht Survey Crew Chiei/Survey Technician II S.M. Fenstercr Survey Crew Chief/Survey Technician II J.A. Manning Engineer II $32.40 J. Warner Engineering Technician II 532.40 J.A. Epaves Engineering Technician II 532.40 �:a IN E. Jenkins Survey Technician II $3.'_.40 at-excel/Hrlyrate/2-7Spc. Sch Updated 1/4/94 AM, /^ "EXHIBIT A" HARTMAN AND ASSOCIATES, INC. HOURLY RATE SCHEDULE ($/HR) EFFECTIVE 7/1/93 HOURLY EMPLOYEE CLASSIFICATION RATE ij.6.t`[x,-10�<?: :M� A. R. Terrer�o� Word Processor $29.97 iV M. Looney Word Processor $29.16 XSM �L/ F. Gidus Hydro Technician II $28.35 mmw C. C. Tomlinson Assistant Rate Analyst $27.81 P.N. Williamson Survey Technician II $27.68x C.A. Lauretta Word Processor $27.14 : H. A. Co; Engineer II 527.00 P.D. Tecteis Word Processor $27.00 C.W. Hardin Engineering Techniaan II $27.00 C.W. Sacher Word Processor $24.30 ................................. S.D. Clatchey Survey Technician 1 $23.63 Y.4..t.k:7kF 3t S . . .........: D. Trussell Word Processor $21.60 ;.., L.E. Bennett Survey Technician 1 $20.93 M. Tavlor Reproduction/Courier Support $20.52 T.A. Eggerton Secretarial C. Cuevas E. Cuevas at-excel/Hrlyrate/2-7Spc. Sch Updated 1/4/94 $20.25 $19.44 $17.69 $17.55