HomeMy WebLinkAbout1995 10 05 - Water Main ProjectMASTELLER & MOLER, INC.
M - CONSULTING ENGINEERS -
October 5, 1995
Mr. Bryan Maxwell
Speegle Construction
395 South Range Road
Cocoa, Florida 32926
RE: City of Sebastian Riverfront Water Main Project
Proposed Final Change Order
Dear Bryan:
Enclosed for your review is a copy of a revised Final Change Order for the referenced project.
We have voided the previous change order signed by you due to the following discrepancies
identified by our value engineering staff.
1. Item #12 -Paved Road Restoration- No additional payment is due. The method of
removal of the concrete base that was used caused the necessity to pave the additional
widths. Therefore, payment for this item will be made on the actual lineal footage as
outlined in the contract specifications, Section 2.3.1. "Paved Road Restoration"- Quantity
and Payment.
2. Item #20 -Survey, Stakeout, As-Builts- In accordance with the contract documents
Sections 1.5.4. "Construction Layout" and 1.8.8. "As -Built Drawings" states that no
separate payment will be made for these items. The cost shall be included in the prices bid
for the various items scheduled in the proposal. Therefore, no payment for this item is due
and it has been deducted from the contract.
1
3. Item #29-Bond/Insurance- In accordance with contract documents Section 2.1.1.
"Mobilization" states that the cost for insurance and bonds are included in the lump sum
price for mobilization. Therefore, no additional payment is due, and it has been deducted
from the contract.
4. New Item #42 Repair of unknown electrical supply to Hurricane Harbor P.S. is not
acceptable. It is the contractors responsibility to investigate and locate all existing utilities
prior to any excavation. Therefore, no payment for this item will be made.
5. New Item #43 - Survey Stakeout/As-Built of additional services after substantial
completion. See above 92.
❑ 1623 N. U.S. Highway 1, Suite 82 ❑ 7380 Murrell Road, Suite 106
Sebastian, FL 32958 Melbourne, Florida 32940
(407) 589-4800 (407) 255-1175
(407) 589-2742 Fax (407) 253-4439 Fax
Mr. Bryan Maxwell
October 5, 1995
Page 2
As you are aware, this project is an assessment project, and in the interest of the property owners
being assessed, we expect you will approve the changes made and will execute the revised
enclosed "Final' Change Order. Please return six(6) signed copies as soon as possible in order to
avoid further delay of finalizing the project.
Shouid you have any questions or comments regarding the change order, please do not hesitate to
contact our office.
Sincerely yours,
MASTELLER & MOLER, INC.
Michael Delaney
Project Manager
MD/vk
cc: Mr. Joel Koford
W. Joel Hanford
Mr. Harry Asher
Mr. William McCain
File #945916
(sp100595.doc)
1.9.3. CHANGE ORDER (co9459#5.W5)
CONTRACT CHANGE ORDER
CHANGE ORDER N0. 5 ORIGINAL CONTRACT
PRICE
8699,657.80
DATE
10/05/95 REVISED
CONTRACT
PRICE
8719,959.60
JOB
NAME INDIAN RIVER COUNTY PROJECT MJW-93-30-DS/SEBASTIAN
RIVERFRONT AREA
OWNER INDIAN RIVER COUNTY
UNIT
PRICE
REV. TOTAL
ITEM
DESCRIPTION QUANTITY
UNIT
UNIT PRICE
TOTAL PRICE
CHANGE
CHANGE
PRICE
**iiffwww#++trYrtrt*t+ftrt*xifrrrxxtfi#+YYrtxxkff+t+*tt+#ffrt*t+t#rrrttftffrrfff*frtY[*rtt#++rtrrt*x+++tf*YxxxMirYr*t++tirrYY#*t
1.
MOBILIZATION
1
LS
30,000.00
30,000.00
0
0.00
30,000.00
2.
12" DIA. DIP/PVC WM
0
LF
22.00
0.00
0
0.00
0.00
3.
6" DIA. DIP/PVC WM
4,760
LF
8.60
40,936.00
-283
-2,433.80
38,502.20
4.
4" DIA. DIP/PVC WATER MAIN
1,200
LF
6.50
7,800.00
-157
-1,020.50
6,779.50
5.
12" DIA. GATE VALVE
0
EA
1,200.00
0.00
0
0.00
0.00
6.
6" DIA. GATE VALVE
17
EA
400.00
6,800.00
-2
-800.00
6,000.00
7.
4" DIA. GATE VALVE
6
EA
350.00
2,100.00
-1
-350.00
1,750.00
8.
FIRE HYDRANT ASSEMBLY
0
EA
2,000.00
0.00
0
0.00
0.00
9.
FITTINGS
8.78
TON
5,000.00
43,900.00
-1.18
-5,900.00
38,000.00
10.
16" DIA. AERIAL CROSSING
0
LS
5,100.00
0.00
0
0.00
0.00
11.
SIDEWALK RESTORATION
20
LF
7.00
140.00
11
77.00
217.00
12.
PVD ROAD RESTORATION
400
LF
20.00
8,000.00
14
280.00
8,280.00
13.
PVD DRIVE RESTORATION
1,935
LF
15.00
29,025.00
-519
-7,785.00
21,240.00
14.
NON -PVD DRIVE RESTORATION
1,660
LF
2.00
3,320.00
215
430.00
3,750.00
15.
SOD
12,665
LF
1.80
22,797.00
555
999.00
23,796.00
16.
2" DIA. LONG SERVICE W/
2
EA
1,000.00
2,000.00
4
4,000.00
6,000.00
17.
METER BOX
2" DIA. SHORT SERVICE W/
3
EA
400.00
1,200.00
1
400.00
1,600.00
18.
METER BOX
1" DIA. LONG SERVICE W/
13
EA
500.00
6,500.00
13
6,500.00
13,000.00
19.
METER BOX
1" DIA. SHORT SERVICE W/
21
EA
400.00
8,400.00
10
4,000.00
12,400.00
20.
METER BOX
SURVEY,STAKEOUT,ASBUILTS
1
LS
10,362.00
10,362.00
-1
-10,362.00
0.00
21.
BOND/INSURANCE
0
LS
5,500.00
0.00
0
0.00
0.00
22.
JACK & BORE US #1
0
EA
20,500.00
0.00
0
0.00
0.00
23.
2" BLOWOFF
16
EA
350.00
5,600.00
-6
-2,100.00
3,500.00
24.
JUMPER ASSEMBLY
0
LS
4,800.00
0.00
0
0.00
0.00
25.
16" DIA. DIP, WATER MAIN
10,720
LF
28.43
304,769.60
437
12,423.91
317,193.51
26.
16" DIA. BFV
22
EA
1,710.00
37,620.00
0
0.00
37,620.00
27.
FIRE HYDRANT ASSEMBLY
26
EA
2,203.48
57,290.48
2
4,406.96
61,697.44
28.
16" DIA. AERIAL CROSSING
1
LS
6,100.00
6,100.00
0
0.00
6,100.00
29.
BOND/INSURANCE
1
LS
10,339.77
10,339.77
-1
-10,339.77
0.00
30.
JACK & BORE
1
LS
21,497.52
21,497.52
0
0.00
21,497.52
31.
1" DIA. LONG SERVICE W/METER
32
EA
541.00
17,312.00
.6
-3,246.00
14,066.00
32.
BOX ON 16"DIA. WM (ONLY)
1" DIA. SHORT SERVICE W/METER
21
EA
427.50
8,977.50
4
1,710.00
10,687.50
33.
BOX ON 16" DIA. WM (ONLY)
JUMPER ASSEMBLY
1
EA
6,870.93
6,870.93
0
0.00
6,870.93
34.
1V1' DIA. LONG SERVICE W/(2)
0
EA
1,125.00
0.00
4
4,500.00
4,500.00
35.
METER BOXES ON 16" DIA.WM (ONLY)
iK" DIA. SHORT SERVICE W/(2)
0
EA
800.00
0.00
4
3,200.00
3,200.00
36.
METER BOXES ON 16" DIA.WM (ONLY)
1Y," DIA. LONG SERVICE W/(2)
0
EA
1,000.00
0.00
2
2,000.00
2,000.00
37.
METER BOXES ON 4" & 6" DIA. WM
1%-' DIA. SHORT SERVICE W/(2)
0
EA
765.00
0.00
4
3,060.00
3,060.00
38.
METER BOXES ON 41& 6" DIA.WM
%" DIA. SERV.(250 LF t) W/(1)
0
EA
1,795.00
0.00
1
1,795.00
1,795.00
39.
METER BOX
2" DIA. SERV.(350 LF t)W/(2)
0
EA
2,800.00
0.00
1
2,800.00
2,800.00
1" DIA. SERV. & (2) METER BOXES
0
LF
1.00
0.00
11,157
11,157.00
11,157.00
40.
41.
POLY WRAP
REMOVAL & DISPOSAL OF CONCRETE
0
EA
150.00
0.00
6
900.00
900.00
820,301.80
TOTAL
$699,657.80
8719,959.60
1 9 3 Chancre Order (Cont Id) Page 2 of 2
CONTRACT CHANGE ORDER
CHANGE ORDER NO. 5 ORIGINAL CONTRACT PRICE: S 699.657.80
DATE: Oct. 5, 1995 REVISED CONTRACT PRICE: $ 719,959.60
JOB NAME: INDIAN RIVER COUNTY PROJECT #UW-93-30-DS/SEBASTIAN
RIVERFRONT AREA
OWNER: INDIAN RIVER COUNTY
•s*r***,t*rs*****a*********,t***rrer********+r****�**,t*,t******,t*******,t+t***
The amount of the Contract will be (DECREASED)(INCREASED)(UNCHANGED) by
the sum of: Twenty Thousand Three Hundred One Dollars and
(written amount)
80/100 Dollars ( $ 20,301.80 ).
The Contract total including this Change Order will be:
tten amount)
60/100 Dollars _
The Contract Time provided for Project Completion will be (DECREASED)
(INCREASED)(UNCHANGED): Days.
This document will become a supplement to the ,Contract and all
provisions will apply hereto.
CONTRACTOR: DATE:
ENGINEER:
OWNER:
OWNER:
Sneegle Construction Inc.
Masteller & Moler, Inc.
DATE:
DATE:
Indian River County Commission Kenneth R. Macht, Chairman
Joel Koford City Manager
DATE: