HomeMy WebLinkAbout1996 01 03 - Water TransmissionCity Of Sebastian
1225 MAIN STREET C3 SEBASTIAN, FLORIDA 32958
TELEPHONE (407) 589-5330 13 FAX (407) 589-5570
January 3, 1996
Mr. Roger F. McCain
Indian River County
1840 25th Street
Vero Beach, FL 32960
Re: Indian River County Project #UW -93 -30 -DS
Route 510/US #1 Water Transmission / Sebastian Riverfront Area
Partial Payment #6 (Final)
Dear Mr. McCain:
Enclosed please find five (5) signed copies of Partial Payment Estimate #6 (Final),
for the above referenced project.
Please feel free to contact me if you should need any additional information.
Sincerely,
Iit
Koford
y Manager
JLK/jmt
Enclosures
MASTELLER & MOLER, INC.
M — CONSULTING ENGINEERS —
December 27, 1995
Mr.Joel Koford JQN X96
�'roi,.f�r1
City of Sebastian Utilities Department
Post Office Box 127
Sebastian, Florida 32958
RE: Indian River County Project #UW -93 -30 -DS
Route 510/US 41 Water Transmission/ Sebastian Riverfront Area
Partial Payment 46 (Final)
Dear Mr. Koford:
Please find enclosed five (5) copies of Partial Payment Estimate 96 (Final), for the above
referenced project. We have reviewed the pay request and found it to be in order. Therefore,
upon your review please sign and forward to Mr. William R McCain for payment in the amount
of One Hundred Eight Thousand Seven Hundred Fifty-eight Dollars & 09/100 ($108,758.09).
Please do not hesitate to contact our office should you have any questions regarding the enclosed
partial payment request.
Respectfully,
MASTELLER & MOLER, INC.
/%;191C1W
Michael Delaney
Project Manager
MD/vk
Enclosures
cc: Bryan Maxwell, Speegle
File #9459LB
(Jk122795.doc)
1623 N. U.S. Highway 1, Suite 82 ❑ 7380 Murrell Road, Suite 106
Sebastian, FL 32958 Melbourne, Florida 32940
(407) 589-4800 (407) 255-1175
(407) 589-2742 Fax (407) 253-4439 Fax
SPEEGLE CONSTRUCTION, INC.
P.O. Box 2089
COCOA, FLORIDA 32923.2089
(407) 632-8164
INDIAN RIVER COUNTY
TO
TERMS:
NET 10 DAYS
Al fl
fZft-c)'dDOOEC 2 6 1995 5640
DATE 12-20-95
CUSTOMER ORDER NO.
762A
SALESPERSON
VIA
QUANTITY I DESCRIPTION I PRICE I AMOUNT
REVISED CONTRACT AMOUNT $745,834.26 1 1 1
TOTAL AMOUNT DUE AND PAYABLE THIS REQUEST
ORIGINAL ��pj pn a I lv�^ 401y. Pre -Consumer Content
pP0011Ci I% C11M..GMm, man UIg1.le01ln NONE TOLL iPFE LBnRSGIBO vW 10%Post-Consumer Content
1.11 .8. Partial Payment Form
PARTIAL PAYMENT ESTIMATE
(NUM ER Ub )
Name of Contractor: Speeqle Construction, Inc.
Name of Owner
(Association):
INDIAN
RIV^R COUNTY
Date of Completion:
Amount of Contract:
Dates
of Estimate:
original_ 10-31-95
original $ 577,120.00
From
11-1-94
Revised 12-31-95
Revised $ 745,834.26
To
12-31-95
Description of Job:
Indian River County Project=UW-93-30-DS, County
Route 510/U.S.Highway 01
water
Transmission
-
Project
Iten
This Period
I Total to Date
1.11.8. Partial Payment Form (Con't)
Amnnnl- Thie pPrinA Tntal }n n.+e
mount Earned
Is 75,227.76
S 745,834.26
P.rnount Reta' ' e?i'"-" " "' '
S (33,530.13)
•
0.0y
revious Payments
XXXXXXXXXXXXXXXXXXXXXX
637,076.17
Amount Due
S 108,758.09
108,758.09
Estimated Percentage of Job Complete ............................ 100 g
Is Contractor's Construction Progress on Schedule?....... XX.Yes- Nd
I hereby certify that I have carefully inspected the work and, as
a result of my inspection and to the best of my knowledge and belief, the
quantities shown in this estimate are correct and have not been shown in
previous estimates and the work has been performed in accordance with the
contract documents.
Speegle Construction, Inc. Masteller & Moler. Inc.
(Name of Contractor) (Engineer Firm)
By
—I.0 Anne Willis, Vice Presidentvj
Earl H. Mas -teller, P.E., President
Date 12-20-95 Date 171V (q";-
Approved
4'i
By:
Approved by Indian River County
Approved by the City of Sebastian
SEBASTIAN AIVERFRONT ARES
CONTRACTOR - SPEEGLE CONSTRUCTION, INC., P.O. BOX 2089, COCOA, FL 32923-2089
DRAW
REQUEST NO. 06
THIS PERIOD
TO
DATE
ITEM
NO. DESCRIPTION OF ITEM QUANITY
UNITUNIT PRICE
AMOUNT
QUANITY
AMOUNT
QUANITY
TOTAL AMOUNT
PERCENT COM
SECTION
I
1.
MOBILIZATION
1
LS
$30,000.00
$30,000.00
0.00
0.00
1.00
30000.00
1.00
2.
12" PVC
0
LS
$22.00
$0.00
0.00
0.00
0.00
0.00
0.00
3.
6" PVC
4,477
LF
$8.60
$38,502.20
0.00
0.00
4477.00
38502.20
1.00
4.
4" PVC
1,043
LF
$6.50
$6,179.50
0.00
0.00
1043.00
6779.50
1.00
5.
12" GATE VALVE
0
EA
$1,200.00
$0.00
0.00
0.00
0.00
0.00
0.00
6.
6' GATE VALVE
15
EA
$400.00
$6,000.00
0.00
0.00
15.00
6000.00
1.00
7.
4" GATE VALVE
5
EA
$350.00
$1,750.00
0.00
0.00
5.00
1750.00
1.00
8.
FIRE HYDRANT
0
EA
$2,000.00
$0.00
O.DO
0.00
0.00
0.00
0.00
9.
FITTINGS
7.60
TON
$5,000.00
$38,000.00
0.00
0.00
7.60
38000.00
1.00
10.
16" DIA AERIAL CROSSING
0
LS
$5,100.00
$0.00
0.DO
0.00
0.00
0.00
0.00
Il,
SIDEWALK RESTORATION
31
LF
$7.00
$217.00
11.00
77.00
31.00
217.00
1.00
12.
PVD ROAD RESTORATION
568
LF
$20.00
$11,360.00
168.00
3360.00
568.00
11360.00
1.00
13.
PVD DRIVE RESTORATION
1,416
LF
$15.00
$21,240.00
325.00
4875.00
1416.00
21240.00
1.00
14.
NON PVD DRIVE RESTORATION
1,875
LF
$2.00
$3,750.00
215.00
430.00
1875.00
3750.00
1.00
15.
SOD
13,220
LF
$1.80
$23,796.00
555.00
999.00
13220.00
23796.00
1.00
16.
2" DIA LONG SERVICE W/METE
6
EA
$1,000.00
$6,000.00
4.00
4000.00
6.00
6000.00
1.00
17.
2" DIA SHORT SERVICE W/MET
4
EA
$400.00
$1,600.00
1.D0
400.00
4.00
1600.00
1.00
18.
1" DIA LONG SERVICE W/METE
26
EA
$500.00
$13,000.00
13.00
6500.00
26.00
13000.00
1.00
19.
1" DIA SHORT SERVICE W/MET
31
EA
$400.00
$12,400.00
10.00
4000.00
31.00
12400.00
1.00
20.
SURVEY, STAKEOUT, AS -BUILT
1
LS
$10,362.00
$10,362.00
0,00
0.00
1,00
10362.00
1.00
21.
BOND/INSURANCE
0
LS
$5,500.00
$0.00
0.00
0.00
0.00
0.00
0.00
22.
JACK 6 BORE US $1
0
EA
$20,500.00
$0.00
0.00
0.00
0.00
O.OD
0.00
23.
2" BLOWOFF
10
EA
$350.00
$3,500.00
0.00
0.00
10.00
3500.00
0.00
24.
JUMPER ASSEMBLY
0
LS
$4,800.00
$0.00
0.00
0.00
0.00
0.00
0.00
25.
16" DIA DIP WATER MAIN
11,157
LS
$28.43
$317,193.51
437.00
12423.91
11157.00
317193.51
1,00
26.
16" DIA BFV
22
EA
$1,710.00
$37,620.00
0.00
0.00
22.00
37620.00
1.00
27.
FIRE HYDRANT ASSEMBLY
28
EA
$2,203.48
$61,697.44
2.00
4406.96
28.00
61697.44
1.00
28.
16" DIA AERIAL CROSSING
1
EA
$6,100.00
$6,100.00
0.00
0.00
1.00
6100.00
1.00
29.
BOND/INSURANCE
l
LS
$10,339.77
$10,339.11
0.00
0.00
1.00
10339.77
1.00
30.
JACK 6 BORE
l
LS
$21,497.52
$21,497.52
0.00
0.00
1.00
21497.52
1.00
31.
1" DIA LONG SERVICE W/METE
26
EA
$541.00
$14,066.00
1.00
541.00
26.00
14066.00
1.00
32.
1' DIA SHORT SERVICE W/MET
25
EA
$427,50
$10,687.50
4.00
1710.00
25.00
10687.50
1.00
33.
JUMPER ASSEMBLY
1
EA
$6,870.93
$6,870.93
0.00
0.00
1.00
6870.93
1.00
34.
1 1/2" DIA LONG SERVICE
4
EA
$1,125.00
$4,500.00
4.00
4500.00
4.00
4500.00
1.00
35.
1 1/2" DIA SHORT SERVICE
4
EA
$800,00
$3,200.00
4.00
3200.00
4.00
3200.00
1.00
36.
1 1/2" DIA LONG SERVICE
2
EA
$1,000.00
$2,000.00
2.00
2000.00
2.00
2000.00
1.00
37.
1 1/2" DIA SHORT SERVICE
4
EA
$765.00
$3,060.00
4.00
3060.00
4.00
3060.00
1.00
38.
1 1/2" DIA SERVICE
1
EA
$1,795.00
$1,795.00
1.00
1795.00
1.00
1795.00
1.00
39.
2" DIA SERVICE
I
EA
$2,800.00
$2,800.00
1.00
2800.00
1.00
2800.00
1.00
40.
POLY WRAP
11,157
LF
$1.00
$11,157.00
11157.00
11157.00
11157.00
11157.00
1.00
41.
REMOVAL AND DISPOSAL
6
EA
$150.00
$900.00
6.00
900.00
6.00
900.00
1.00
42.
REPAIR OF UNKNOWN ELECTRIC
I
LS
$530.39
$530.39
1.00
530.39
1.00
530.39
1.00
43.
SURVEY STAKEOUT
1
LS
$1,562.50
$1,562.50
1.00
1562.50
1.00
1562.50
1.00
TOTAL
$745,834.26
$75,227.76
$745,834.26
1.00
1.11.8. Partial Payment Form
PARTIAL PAYMENT ESTIMATE
(NUMBER 061
Name of Contractor: Speeqle Construction, Inc.
SPEEGLE CONSTRUCTION, INC.
P.O. Box 2089
COCOA, FLORIDA 32923-2089
(407) 632.8164
INDIAN RIVER COUNTY
TO
TERMS:
NET 10 DAYS
DATE 12-20-95
WSTOMEROROERNO,
762A
SALESRERSON
vw
5640
OUAY ,;;
- DESCRIPTION
PRICE
AMOUNT
DRAW REQUEST #B
REVISED CONTRACT AMOUNT $745.834.26
OUNT- C0MPtET E $745;8342
S-PREWOUS-REQUEST63
TOTAL AMOUNT DUE AND PAYABLE THIS REQUEST$108,758.)9
CONTRACTOR'S SIGNATURE
40%Pm-Consumer Comm
LKS' W%Posl-Consumer Conlenl
k-
1 li 8 Partial Payment Form (Con't)
Amntlnt This 'PprinA Tntal f -n n.+,
Mount Earned
IS 75,227.76
S 745,834.26
ount Reta" td —"
T (33,530.33)
"0:.6-T`
Previous Payments
XXXXXX.WXXXXXXXXXXXXXX
5 637,076.17
Amount Due
108,758.09
108,7758.09
Estimated Percentage of Job Complete ............................ 100
Is Contractor's Construction Progress on Schedule? ........ XX.Yes. Nd
I hereby certify that I have carefully inspected the work and'' as
a result of lay inspection and to the best of by knowledge and belief, the
quantities shown in this estimate are correct and have not been shown in
previous estimates and the work has been performed in accordance with the
contract documents.
Speegle Construction, Inc. Masteller & Moler. Inc.
(Name of Contractor) (Engineer Firm)
By:
_1u Anne Willis, Vice President Earl H. Masteller, P.E., President
ate 12-20-95
By:
Approved by Indian River County
Approved by the City of Sebastian
—ti
MI?71IV
SEBASTIAN RIVERFRONT ARES
CONTRACTOR - SPEEGLE CONSTRUCTION, INC., P.O. BOX 2089, COCOA, FL 32923-2089
DRAW
REQUEST NO. 06
THIS PERIOD
TO DATE
ITEM
NO. DESCRIPTION OF ITEM QUANITY
UNITUNIT
PRICE
AMOUNT
QUANITY
AMOUNT QUANITY TOTAL
AMOUNT PERCENT COM
SECTION I
1.
MOBILIZATION
1
LS
$30,000.00
$30,000.00
0.00
0.00
1.00
30000.00
1.00
2.
12" PVC
0
LS
$22.00
$0.00
0.00
0.00
0.00
0.00
0.00
3.
6" PVC
4,411
LF
$8.60
$38,502.20
0.00
0.00
4477.00
38502.20
1.00
4.
4" PVC
1,043
LF
$6.50
$6,779.50
0.00
0.00
1043.00
6779.50
1.00
5.
12" GATE VALVE
0
EA
$1,200.00
$0.00
0.00
0.00
0.00
0.00
0.00
6.
6" GATE VALVE
15
EA
$400.00
$6,000.00
0.00
0.00
15.00
6000.00
1.00
7.
4" GATE VALVE
5
EA
$350.00
$1,750.00
0.00
0.00
5.00
1750.00
1.00
B.
FIRE HYDRANT
0
EA
$2,000.00
$0.00
0.00
0.00
0.00
0.00
0.00
9.
FITTINGS
7.60
TON
$5,000.00
$38,000.00
0.00
0.00
7.60
38000.00
1.00
10.
16" DIA AERIAL CROSSING
0
LS
$5,100.00
$0.00
0.00
0.00
0.00
0.00
0.00
11.
SIDEWALK RESTORATION
31
LF
$7.00
$217.00
11.00
77.00
31.00
217.00
1.00
12.
PVD ROAD RESTORATION'
568
LF
$20.00
$11,360.00
168.00
3360.00
568.00
11360.00
1.00
13.
PVD DRIVE RESTORATION
1,416
LF
$15.00
$21,240.00
325.00
4875.00
1416.00
21240.00
1.00
14,
NON PVD DRIVE RESTORATION
1,875
LF
$2.00
$3,750.00
215.00
430.00
1875.00
3750.00
1.00
I5.
SOD
13,220
LF
$1.80
$23,796.00
555.00
999.00
13220.00
23796.00
1.00
16.
2" DIA LONG SERVICE W/METE
6
EA
$1,000.00
$6,000.00
4.00
4000.00
6.00
6000.00
1.00
17.
2" DIA SHORT SERVICE W/MET
4
EA
$400.00
$1,600.00
1.00
400.00
4.00
1600.00
1.00
18.
1" DIA LONG SERVICE W/METE
26
EA
$500.00
$13,000.00
13.00
6500.00
26.00
13000.00
1.00
19.
1" DIA SHORT SERVICE W/MET
31
EA
$400.00
$12,400.00
10.00
4000.00
31.00
12400.00
1.00
20.
SURVEY, STAKEOUT, AS -BUILT
l
LS
$10,362.00
$10,362.00
0.00
0.00
1.00
10362.00
1.00
21.
BOND/INSURANCE
0
LS
$5,500.00
$0.00
0.00
0.00
0.00
0.00
0.00
22.
JACK 6 BORE US 11
0
EA
$20,500.00
$0.00
0.00
0.00
0.00
0.00
0.00
23.
2" BLOWOFF
10
EA
$350.00
$3,500.00
0.00
0.00
10.00
3500.00
0.00
24.
JUMPER ASSEMBLY
0
LS
$4,800.00
$0.00
0.00
0.00
0.00
0.00
0.00
25.
16" DIA DIP WATER MAIN
11,157
LS
$28.43
$317,193.51
437.00
12423.91
11157.00
317193.51
1.00
26.
16" DIA BFV
22
EA
$1,710.00
$37,620.00
0.00
0.00
22.00
37620.00
1.00
27.
FIRE HYDRANT ASSEMBLY
28
EA
$2,203.48
$61,697.44
2.00
4406.96
28.00
61697.44
1.00
28.
16" DIA AERIAL CROSSING
1
EA
$6,100.00
$6,100.00
0.00
0.00
1.00
6100.00
1.00
29.
BOND/INSURANCE
1
LS
$10,339.77
$10,339.77
0.00
0.00
1.00
10339.77
1.00
30.
JACK 6 BORE
I
LS
$21,497.52
$21,497.52
0.00
0.00
1.00
21497.52
1.00
31.
1" DIA LONG SERVICE N/METE
26
EA
$541.00
$14,066.00
1.00
541.00
26.00
14066.00
1.00
32.
1" DIA SHORT SERVICE W/MET
25
EA
$427.50
$10,687.50
4.00
1710.00
25.00
10687.50
1.00
33.
JUMPER ASSEMBLY
1
EA
$6,870.93
$6,870.93
0.00
0.00
1.00
6870.93
1.00
34.
1 1/2" DIA LONG SERVICE
4
EA
$1,125.00
$4,500.00
4.00
4500.00
4.00
4500.00
1.00
35.
l 1/2" DIA SHORT SERVICE
4
EA
$800.00
$3,200.00
4.00
3200.00
4.00
3200.00
1.00
36.
1 1/2" DIA LONG SERVICE
2
EA
$1,000.00
$2,000.00
2.00
2000.00
2.00
2000.00
1.00
37.
1 1/2" DIA SHORT SERVICE
4
EA
$765.00
$3,060.00
4.00
3060.00
4.00
3060.00
1.00
38.
1 1/2" DIA SERVICE
l
EA
$1,795.00
$1,795.00
1.00
1795.00
1.00
1795.00
1.00
39.
2" DIA SERVICE
1
EA
$2,800.00
$2,800.00
1.00
2800.00
1.00
2800.00
1.00
40.
POLY WRAP
11,157
LF
$1.00
$11,157.00
11157.00
11157.00
11157.00
11157.00
1.00
41.
REMOVAL AND DISPOSAL
6 EA
$150.00
$900.00
6.00
900.00
6.00
900.00
1.00
42.
REPAIR OF UNKNOWN ELECTRIC
I LS
$530.39
$530.39
1.00
530.39
1.00
530.39
1.00
43.
SURVEY STAKEOUT
1 LS
$1,562.50
$1,562.50
1.00
1562.50
1.00
1562.50
1.00
TOTAL
$745,834.26
$75,227.76
$745,834.26
1.00
SPEEGLE CONSTRUCTION, INC.
P.O. Box 2089
COCOA, FLORIDA 32923.2089
(407) 632.8164
INDIAN RIVER COUNTY
Tn
TERIA5:
NET 10 DAYS
k tlocs� DLG b 1995
5640
DATE 12-20-95
CUSTOMER ORDER NO.
762A
SALESPERSON
VIA
QUANTITY
DESCRIPTION
PRICE
AMOUNT
DRAW RE U ST #6
REVISED CONTRACT AMOUNT $745,834.26
6UNT-COMP tETE $745,8342
I ESS PREV101 IS, QTc xM QZQ_
TOTAL AMOUNT DUE AND PAYABLE THIS REQUEST
$108,758.)9
1.11.8. Partial Payment Form
PARTIAL PAYHEYT ESTIMATE
(NU'MBER 1
Name of Contractor: Speegle Construction, inc.
Name of Owner
Date of Completion: Anount of Contract: Dates of Estimate:
Original 10-31-95 Original $ 577,120.00 From 11 -1 -94 -
Revised 12-31-95 Revised $ 745,834.26 To 12•-31-95
Description of Job:
Indian River County Project 357JW-93-30-DS, County
Route 510/U.S.Highway :1 Water Transmission
Project
Iteni
This Period
Total to Date
k-
1.11.8. Partial Payment Form (Con't)
Ammini- Thie PPYinA Tni-al Y., n�4,-
7%mount. Zarned
Is 75,227.76
745,834.26
count eta" iii'._`.-. "IS
(33,530.3)
Previous Payments
XXXXXXXXXXXXXXXXXXXXXX
S 637,076.17
Amount Due - --..
108,758.09
108,7-58.09
Estimated Peicentage of Job Complete ............................ 100 g
Is Contractor's Construction Progress on Schedule? ........ XX.Yes. No
I hereby certify that I have carefully inspected the work.and;'as
a result of ny inspection and to the best of my knowledge and belief, the
quantities shown in this estimate are correct and have not been shown in
previous estimates and the work has been performed in accordance with the
contract documents.
Speegle Construction, Inc. Masteller & Moler. Inc.
(Nave of Contractor) (Engineer Firm)
By: BY: ^Y ! .. t
—Lug4An=ne l Tis, Vicomr�esi'dent Earl H. Masteller, P.E., President
Date 12-20-95 Date iZI27 (915 -
By:
Approved by Indian River County
Approved by the City•of Sebastian
SEBASTIAN RIVERFRONT ARES
CONTRACTOR - SPEEGLE CONSTRUCTION, INC., P.O. BOX 2089, COCOA, FL 32923-2089
DRAW
REQUEST NO. 06
THIS PERIOD
TO
DATE
ITEM
NO. DESCRIPTION OF ITEM QUANITY
UNITUNIT PRICE
AMOUNT
QUANITY
AMOUNT QUANITY TOTAL AMOUNT PERCENT CON
SECTION
I
1.
MOBILIZATION
1
LS
$30,000.00
$30,000.00
0.00
0.00
1.00
30000.00
1.00
2.
12" PVC
0
LS
$22.00
$0.00
0.00
0.00
0.00
0.00
0.00
3.
6" PVC
4,411
LF
$8.60
$38,502.20
0.00
0.00
4477.00
38502.20
1.00
4.
4" PVC
1,043
LF
$6.50
$6,779.50
0.00
0.00
1043.00
6779.50
1.00
5.
12" GATE VALVE
0
EA
$1,200.00
$0.00
0.00
0.00
0.00
0.00
0.00
6.
6" GATE VALVE
15
EA
$400.00
$6,000.00
0.00
0.00
15.00
6000.00
1.00
7.
4" GATE VALVE
5
EA
$350.00
$1,750.00
0.00
0.00
5.00
1750.00
1.00
8.
FIRE HYDRANT
0
EA
$2,000.00
$0.00
0.00
0.00
0.00
0.00
0.00
9.
FITTINGS
7.60
TON
$5,000.00
$38,000.00
0.00
0.00
7.60
38000.00
1.00
10.
16" DIA AERIAL CROSSING
0
LS
$5,100.00
$0.00
0.00
0.00
0.00
0.00
0.00
11.
SIDEWALK RESTORATION
31
LF
$7.00
$217.00
11.00
77.00
31.00
217.00
1.00
12.
PVD ROAD RESTORATION
568
LF
$20.00
$11,360.00
168.00
3360.00
568.00
11360.00
1.00
13.
PVD DRIVE RESTORATION
1,416
LF
$15.00
$21,240.00
325.00
4875.00
1416.00
21240.00
1.00
14.
NON PVD DRIVE RESTORATION
1,875
LF
$2.00
$3,750.00
215.00
430.00
1875.00
3750.00
1.00
15.
SOD
13,220
LF
$1.80
$23,796.00
555.00
999.00
13220.00
23796.00
1.00
16.
2" DIA LONG SERVICE W/METE
6
EA
$1,000.00
$6,000.00
4.00
4000.00
6.00
6000.00
1.00
17.
2' DIA SHORT SERVICE W/HET
4
EA
$400.00
$1,600.00
1.00
400.00
4.00
1600.00
1.00
18.
1" DIA LONG SERVICE W/METE
26
EA
$500.00
$13,000.00
13.00
6500.00
26.00
13000.00
1.00
19.
1" DIA SHORT SERVICE W/MET
31
EA
$400.00
$12,400.00
10.00
4000.00
31.00
12400.00
1.00
20.
SURVEY, STAKEOUT, AS -BUILT
1
LS
$10,362.00
$10,362.00
0.00
0.00
1.00
10362.00
1.00
21.
BOND/INSURANCE
0
LS
$5,500.00
$0.00
0.00
0.00
0.00
0.00
0.00
22.
JACK $ BORE US 11
0
EA
$20,500.00
$0.00
0.00
0.00
0.00
0.00
0.00
23,
2" BLONOFF
10
EA
$350.00
$3,500.00
0.00
0.00
10.00
3500.00
0.00
24.
JUMPER ASSEMBLY
0
LS
$4,800.00
$0.00
0.00
0.00
0.00
0.00
0.00
25.
16" DIA DIP WATER MAIN
11,157
LS
$28.43
$317,193.51
437.00
12423.91
11157.00
317193.51
1.00
26.
16" DIA BFV
22
EA
$1,710.00
$37,620.00
0.00
0.00
22.00
37620.00
1.00
27.
FIRE HYDRANT ASSEMBLY
28
EA
$2,203.48
$61,697.44
2.00
4406.96
28.00
61697.44
1.00
28.
16" DIA AERIAL CROSSING
l
EA
$6,100.00
$6,100.00
0.00
0.00
1.00
6100.00
1.00
29.
BOND/INSURANCE
1
LS
$10,339.77
$10,339.77
0.00
0.00
1.00
10339.77
1.00
30.
JACK 8 BORE
1
LS
$21,497.52
$21,497.52
0.00
0.00
1.00
21497.52
1.00
31.
l" DIA LONG SERVICE W/METE
26
EA
$541.00
$14,066.00
1.00
541.00
26.00
14066.00
1.00
32.
1" DIA SHORT SERVICE W/MET
25
EA
$427.50
$10,687.50
4.00
1710.00
25.00
10687.50
1.00
33.
JUMPER ASSEMBLY
I
EA
$6,870.93
$6,870.93
0.00
0.00
1.00
6870.93
1.00
34.
l 1/2" DIA LONG SERVICE
4
EA
$1,125.00
$4,500.00
4.00
4500.00
4.00
4500.00
1.00
35.
l 1/2' DIA SHORT SERVICE
4
EA
$800.00
$3,200.00
4.00
3200.00
4.00
3200.00
1.00
36.
1 1/2" DIA LONG SERVICE
2
EA
$1,000.00
$2,000.00
2.00
2000.00
2.00
2000.00
1.00
37.
l 1/2" DIA SHORT SERVICE
4
EA
$765.00
$3,060.00
4.00
3060.00
4.00
3060.00
1.00
38.
1 I/2' DIA SERVICE
l
EA
$1,795.00
$1,795.00
1.00
1795.00
1.00
1795.00
1.00
39.
2' DIA SERVICE
1
EA
$2,800.00
$2,800.00
1.00
2800.00
1.00
2800.00
1.00
40.
POLY WRAP
11,157
LF
$1.00
$11,157.00
11157.00
11157.00
11157.00
11157.00
1.00
41.
REMOVAL AND DISPOSAL
6
EA
$150.00
$900.00
6.00
900.00
6.00
900.00
1.00
42.
REPAIR OF UNKNOWN ELECTRIC
I
LS
$530.39
$530.39
1.00
530.39
1.00
530.39
1.00
43.
SURVEY STAKEOUT
1
LS
$1,562.50
$1,562.50
1.00
1562.50
1.00
1562.50
1.00
TOTAL
$745,834.26
$15,227.16
$745,834.26
1.00
1.11.8. Partial Payment FOrm
SPEEGLE CONSTRUCTION, INC.
P.O. Box 2089
COCOA, FLORIDA 32923.2089
(407) 632.8164
INDIAN RIVER COUNTY
TO
TERMS:
NET 10 DAYS
5640
OUANTITV ,..
DESCRIPTION
PRICE
AMOUNT
DRAW REQUEST 6
REVISED CONTRACT AMOUNT $745,834.26
MOUNT-COMPLE 74"34.2
I ESS FVIOUS REQUESTS .637
TOTAL AMOUNT DUE AND PAYABLE THIS REQUEST
$108.758.)9
1.11.8. Partial Payment Form (Con't)
Amount This PPYinA Tni-a1 1-n n.+e
Amount Earned
Is 75,227.76
S 745,834.26
.mount Reta'' iti---'
S (33,530.33
:by'"'
Previous Payments
xxx xxxNnxXxxxxxx
S 637,076.17
Amount Due -
108,758.09
108,758.09 .
Estimated Percentage of Job Complete ............................ 100 !k
Is Contractor's Construction Progress on Schedule? ......... XX.Yes. Nd
T- hereby certify that I have carefully inspected the work.and;'as
a result of my inspection and to the best of ny knowledge and belief, the
vuantities shown in this estimate are correct and have not been shown in
previous estimates and the work has been performed in accordance with the
contract documents.
Speegle Construction, Inc. Masteller & Moler. Inc.
(Name of Contractor) (Engineer Firm)
By: Ey:�p216zaof
—LU AnWillis, ViCe Presiaent Earl H. Masteller, P.E., President
Date 12-20-95 Date 1112-7I�r
Approved by Indian River County
Approved by the City of Sebastian
S
M
llll�J�J ,
SEBASTIAN RIVERFRONT ARES
CONTRACTOR - SPEEGLE CONSTRUCTION, INC., P.O. BOX 2089, COCOA, FL 32923-2089
DRAW
REQUEST NO. 06
THIS PERIOD
TO
DATE
ITEM
NO. DESCRIPTION OF ITEM QUANITY UNITUNIT
PRICE
AMOUNT
QUANITY
AMOUNT QUANITY TOTAL
AMOUNT PERCENT COM
SECTION
I
1.
MOBILIZATION
1
LS
$30,000.00
$30,000.00
0.00
0.00
1.00
30000.00
1.00
2.
12" PVC
0
LS
$22.00
$0.00
0.00
0.00
0.00
0.00
0.00
3.
6" PVC
4,411
LF
$8.60
$38,502.20
0.00
0.00
4477.00
38502.20
1.00
4.
4" PVC
1,043
LF
$6.50
$6,779.50
0.00
0.00
1043.00
6119.50
1.00
5.
12" GATE VALVE
0
EA
$1,200.00
$0.00
0.00
0.00
0.00
0.00
0.00
6.
6" GATE VALVE
15
EA
$400.00
$6,000.00
0.00
0.00
15.00
6000.00
1.00
7.
4" GATE VALVE
5
EA
$350.00
$1,750.00
0.00
0.00
5.00
1750.00
1.00
8.
FIRE HYDRANT
0
EA
$2,000,00
$0.00
0.00
0.00
0.00
0.00
0.00
9.
FITTINGS
7.60
TON
$5,000.00
$38,000.00
0.00
0.00
7.60
38000.00
1.00
10.
16" DIA AERIAL CROSSING
0
LS
$5,100.00
$0.00
0.00
0.00
0.00
0.00
0.00
11.
SIDEWALK RESTORATION
31
LF
$7.00
$217.00
11.00
77.00
31.00
217.00
1.00
12.
PVD ROAD RESTORATIOR
568
LF
$20.00
$11,360.00
168.00
3360.00
568.00
11360.00
1.00
13.
PVD DRIVE RESTORATION
1,416
LF
$15.00
$21,240.00
325.00
4875.00
1416.00
21240.00
1.00
14.
NON PVD DRIVE RESTORATION
1,875
LF
$2.00
$3,750.00
215.00
430.00
1875.00
3750.00
1.00
15.
SOD
13,220
LF
$1.80
$23,796.00
555.00
999.00
13220.00
23796.00
1.00
16.
2" DIA LONG SERVICE W/METE
6
EA
$1,000.00
$6,000.00
4.00
4000.00
6.00
6000.00
1.00
17.
2" DIA SHORT SERVICE W/MET
4
EA
$400.00
$1,600.00
1.00
400.00
4.00
1600.00
1.00
18.
1" DIA LONG SERVICE W/METE
26
EA
$500.00
$13,000.00
13.00
6500.00
26.00
13000.00
1.00
19.
1" DIA SHORT SERVICE W/MET
31
EA
$400.00
$12,400.00
10.00
4000.00
31.00
12400.00
1.00
20.
SURVEY, STAKEOUT, AS -BUILT
I
LS
$10,362.00
$10,362.00
0.00
0.00
1.00
10362.00
1.00
21.
BOND/INSURANCE
0
LS
$5,500.00
$0.00
0.00
0.00
0.00
0.00
0.00
22.
JACK A BORE US 11
0
EA
$20,500.00
$0.00
0.00
0.00
0.00
0.00
0.00
23.
2" BLOWOFF
10
EA
$350.00
$3,500.00
0.00
0.00
10.00
3500.00
0.00
24.
JUMPER ASSEMBLY
0
LS
$4,800.00
$0.00
0.00
0.00
0.00
0.00
0.00
25.
16" DIA DIP WATER MAIN
11,157
LS
$28.43
$317,193.51
437.00
12423.91
11157.00
317193.51
1.00
26.
16" DIA BFV
22
EA
$1,710.00
$37,620.00
0.00
0.00
22.00
37620.00
1.00
27,
FIRE HYDRANT ASSEMBLY
28
EA
$2,203.48
$61,697.44
2.00
4406.96
28.00
61697.44
1.00
28.
16" DIA AERIAL CROSSING
1
EA
$6,100.00
$6,100.00
0.00
0.00
1.00
6100.00
1.00
29.
BOND/INSURANCE
I
LS
$10,339.11
$10,339.77
0.00
0.00
1.00
10339.77
1.00
30.
JACK 6 BORE
I
LS
$21,497.52
$21,497.52
0.00
0.00
1.00
21497.52
1.00
31.
1" DIA LONG SERVICE W/METE
26
EA
$541.00
$14,066.00
1.00
541.00
26.00
14066.00
1.00
32.
1" DIA SHORT SERVICE W/MET
25
EA
$427.50
$10,687.50
4.00
1710.00
25.00
10687.50
1.00
33.
JUMPER ASSEMBLY
1
EA
$6,870.93
$6,870.93
0.00
0.00
1.00
6870.93
1.00
34.
1 1/2" DIA LONG SERVICE
4
EA
$1,125.00
$4,500.00
4.00
4500.00
4.00
4500.00
1.00
35.
1 1/2" DIA SHORT SERVICE
4
EA
$800.00
$3,200.00
4.00
3200.00
4.00
3200.00
1.00
36.
1 1/2" DIA LONG SERVICE
2
EA
$1,000.00
$2,000.00
2.00
2000.00
2.00
1000.00
1.00
37.
1 1/2" DIA SHORT SERVICE
4
EA
$765.00
$3,060.00
4.00
3060.00
4.00
3060.00
1.00
38.
11/2" DIA SERVICE
1
EA
$1,795.00
$1,795.00
1.00
1795.00
1.00
1795.00
1.00
39.
2" DIA SERVICE
1
EA
$2,800.00
$2,800.00
1.00
2800.00
1.00
2800.00
1.00
40.
POLY WRAP
11,157
LF
$1.00
$11,157.00
11157.00
11157.00
11157.00
11157.00
1.00
41.
REMOVAL AND DISPOSAL
6
EA
$150.00
$900.00
6.00
900.00
6.00
900.00
1.00
42.
REPAIR OF UNKNOWN ELECTRIC
1
LS
$530.39
$530.39
1.00
530.39
1.00
530.39
1.00
43.
SURVEY STAKEOUT
i
LS
$1,562.50
$1,562.50
1.00
1562.50
1.00
1562.50
1.00
TOTAL
$745,834.26
$75,227.76
$745,834.26
1.00
SPEEGLE CONSTRUCTION, INC.
P.O. Box 2089
COCOA, FLORIDA 32923.2089
(407) 632-8164
INDIAN RIVER COUNTY
TO
TERMS:
NET 10 DAYS
DATE 12_20-95
CUSTOMER ORDER W.
762A
SALESPERSON
VW
5640
QUANTITY •fr
77,
DESCRIPTION
PRICE
AMOUNT
DRAW REQUEST #6
REVISED CONTRACT AMOUNT $745,834.26
—AMOUNT -COMPLETE 745;83712
ESS-PREV40US-REQU 637-076:1-7
TOTAL AMOUNT DUE AND PAYABLE THIS REQUEST
$108,758.)g
ko(,�)
A0%Na-Consumer Conlanl
10%Pas(-Consumer C.tW
1.11.8. Partial Payment Form
PARTIAL PAYMENT ESTIMATE
(NUi4nER �Z
Name of Contractor: Speegle. Construction, Inc.
Name of Owner
Date of Completion:
Amount of Contract:
Dates
of Estimate:
original_ 10-31-95
original $ 577,120.00
From
11-1-94
Revised 12-31-95
Revised $ 745,834.26
To
12-31-95
Description of Job:
Indian River County Project IIW-93-30-DS, County
Route 510/U.S.Hichway rl
Water
Transmission
Project
Item
This Period
Total to Date
k-
1.11.8. Partial Payment Form (Con't)
Amrnin+ Thic •Parir.A T„}.1 i-,., n'+.—
Amoun
t Earned
Is 75,227.76
S 745,834.26
A-nount Reta" a ,-_......,.. .-
s (33,530.33)
O.OZi ........ .
Previous Payments
XXXXXXXXXXXXXXXXXXXXXX
S 637,076.17
Amount Due
108,758.09
108,758.09
Estimated Percentage of Job Complete ............................ 100 !k
Is Contractor's Construction Progress on Schedule? ........ XX.Yes• Nd
I hereby certify that I have carefully inspected the work.and;-as
a result of my inspection and to the best of my knowledge and belief, the
quantities shown in this estimate are correct and have not been shown in
previous estimates and the work has been performed in accordance with the
contract documents.
Speegle Construction, Inc. Masteller & Moler. Inc.
(Name of Contractor) (Engineer Firm)
uTnA TWillis, ViCee Frresi ent
12-20-95
By:
Approved by Indian River County
Approved by the City of Sebastian
Ey: 6A !c
Earl H. Masteller, P.E., President
Date 12.IZ7[94�
SEBASTIAN"RIVERFRONT
ARES
CONTRACTOR
- SPEEGLE CONSTRUCTION, INC.,
P.O.
BOX 2089,
COCOA, FL 32923-2069
DRAW
REQUEST NO. 06
THIS PERIOD
TO
DATE
ITEM
NO, DESCRIPTION OF ITEM QUANITY
UNITUNIT PRICE
AMOUNT
QUANITY
AMOUNT QUANITY TOTAL
AMOUNT PERCENT CON
SECTION
I
1.
MOBILIZATION
1
LS
$30,000.00
$30,000.00
0.00
0.00
1.00
30000.00
1.00
2.
12" PVC
0
LS
$22.00
$0.00
0.00
0.00
0.00
0.00
0.00
3.
6" PVC
4,477
LF
$8.60
$38,502.20
0.00
0.00
4477.00
38502.20
1.00
4.
4" PVC
1,043
LF
$6.50
$6,779.50
0.00
0.00
1043.00
6779.50
1.00
5.
12" GATE VALVE
0
EA
$1,200.00
$0.00
0.00
0.00
0.00
0.00
0.00
6.
6" GATE VALVE
15
EA
$400.00
$6,000.00
0.00
0.00
15.00
6000.00
1.00
7.
4" GATE VALVE
5
EA
$350.00
$1,750.00
0.00
0.00
5.00
1750.00
1.00
B.
FIRE HYDRANT
0
EA
$2,000.00
$0.00
0.00
0.00
0.00
0.00
0.00
9.
FITTINGS
7.60
TON
$5,000.00
$38,000.00
0.00
0.00
7.60
38000.00
1.00
10,
16" DIA AERIAL CROSSING
0
LS
$5,100.00
$0.00
0.00
0.00
0.00
0.00
0.00
11.
SIDEWALK RESTORATION
31
LF
$7.00
$217.00
11.00
77.00
31.00
217.00
1.00
12.
PVD ROAD RESTORATIOR
568
LF
$20.00
$11,360.00
168.00
3360.00
568.00
11360.00
1.00
13.
PVD DRIVE RESTORATION
1,416
LF
$15.00
$21,240.00
325.00
4875.00
1416.00
21240.00
1.00
14,
NON PVD DRIVE RESTORATION
1,875
LF
$2.00
$3,750.00
215.00
430.00
1875.00
3750.00
1.00
15.
SOD
13,220
LF
$1.80
$23,796.00
555.00
999.00
13220.00
23796.00
1.00
16.
2" DIA LONG SERVICE W/METE
6
EA
$1,000.00
$6,000.00
4.00
4000.00
6.00
6000.00
1.00
17.
2" DIA SHORT SERVICE N/MET
4
EA
$400.00
$1,600.00
1.00
400.00
4.00
1600.00
1.00
18.
l" DIA LONG SERVICE N/METE
26
EA
$500.00
$13,000.00
13.00
6500.00
26.00
13000.00
1.00
19.
1" DIA SHORT SERVICE W/MET
31
EA
$400.00
$12,400.00
10.00
4000.00
31.00
12400.00
1.00
20.
SURVEY, STAKEOUT, AS -BUILT
1
LS
$10,362.00
$10,362.00
0.00
0.00
1.00
10362.00
1.00
21.
BOND/INSURANCE
0
LS
$5,500.00
$0.00
0.00
0.00
0.00
0.00
0.00
22.
JACK 8 BORE US $1
0
EA
$20,500.00
$0.00
0.00
0.00
0.00
0.00
0.00
23.
2" BLOWOFF
10
EA
$350.00
$3,500.00
0.00
0.00
10.00
3500.00
0.00
24.
JUMPER ASSEMBLY
0
LS
$4,800.00
$0.00
0.00
0.00
0.00
0.00
0.00
25.
16" DIA DIP WATER MAIN
11,157
LS
$28.43
$317,193.51
437.00
12423.91
11157.00
317193.51
1.00
26.
16" DIA BFV
22
EA
$1,710.00
$37,620.00
0.00
0.00
22.00
37610.00
1.00
27.
FIRE HYDRANT ASSEMBLY
28
EA
$2,203.48
$61,697.44
2.00
4406.96
28.00
61697.44
1.00
28.
16" DIA AERIAL CROSSING
1
EA
$6,100.00
$6,100.00
0.00
0.00
1.00
6100.00
1.00
29.
BOND/INSURANCE
I
LS
$10,339.77
$10,339.77
0.00
0.00
1.00
10339.77
1.00
30.
JACK $ BORE
l
LS
$21,497.52
$21,497.52
0.00
0.00
1.00
21497.52
1.00
31.
1" DIA LONG SERVICE W/METE
26
EA
$541.00
$14,066.00
1.00
541.00
26.00
14066.00
1.00
32.
l" DIA SHORT SERVICE W/HET
25
EA
$427.50
$10,687.50
4.00
1710.00
25.00
10687.50
1.00
33.
JUMPER ASSEMBLY
l
EA
$6,870.93
$6,870.93
0.00
0.00
1.00
6870.93
1.00
34.
1 1/2" DIA LONG SERVICE
4
EA
$1,125.00
$4,500.00
4.00
4500.00
4.00
4500.00
1.00
35.
1 1/2" DIA SHORT SERVICE
4
EA
$800.00
$3,200.00
4.00
3200.00
4.00
3200.00
1.00
36,
1 1/2" DIA LONG SERVICE
2
EA
$1,000.00
$2,000.00
2.00
2000.00
2.00
2000.00
1.00
37.
1 1/2" DIA SHORT SERVICE
4
EA
$765.00
$3,060.00
4.00
3060.00
4.00
3060.00
1.00
38.
1 1/2" DIA SERVICE
I
EA
$1,795.00
$1,795.00
1.00
1795.00
1.00
1795.00
1.00
39.
2" DIA SERVICE
1
EA
$2,800.00
$2,800.00
1.00
2800.00
1.00
2800.00
1.00
40,
POLY WRAP
11,157
LF
$1.00
$11,157.00
11157.00
11157.00
11157.00
11157.00
1.00
41.
REMOVAL AND DISPOSAL
6
EA
$150.00
$900.00
6.00
900.00
6.00
900.00
1.00
42.
REPAIR OF UNKNOWN ELECTRIC
1
LS
$530.39
$530.39
1.00
530.39
1.00
530.39
1.00
43.
SURVEY STAKEOUT
1
LS
$1,562.50
$1,562.50
1.00
1562.50
1.00
1562.50
1.00
TOTAL
$745,834.26
$75,227.76
$745,834.26
1.00